Loading...
HomeMy WebLinkAboutFISCHER PROPERTIES - PDP220007 - SUBMITTAL DOCUMENTS - ROUND 3 - ELEVATIONSPATIO TRELLIS STUCCO CONTROL JOINT STUCCO MANUFACTURED STONE VENEER WATER TABLE MANUFACTURED STONE VENEER STANDING SEAM METAL ROOF ALUMINUM STOREFRONTVINYL WINDOW STUCCO ASPHALT SHINGLE ROOF BOARD AND BATTEN COLUMN MANUFACTURED STONE VENEER STUCCO CONTROL JOINT PREFINISHED LOUVER COLUMN BOARD AND BATTEN STEEL TRELLIS BOARD AND BATTEN TRIM VINYL WINDOW STANDING STEAM METAL ROOF MANUFACTURED STONE VENEER WATER TABLE MANUFACTURED STONE VENEER TRIM PREFINISHED STEEL RAILING, PAINTEDDOOR ASPHALT SHINGLE ROOF PREFINISHED LOUVER VINYL WINDOW PREFINISHED METAL FASCIA STANDING SEAM METAL ROOF STANDING SEAM METAL ROOF LAP SIDING COLOR 1 LAP SIDING COLOR 2 BOARD AND BATTEN 145' - 4" 36' - 2"132' - 11" 24' - 7"KNOX BOX COLUMN PREFINISHED STEEL RAILING, PAINTED PREFINISHED METAL DOWNSPOUT MANUFACTURED STONE SILL MANUFACTURED STONE WATER TABLE LAP SIDING COLOR 2 LAP SIDING COLOR 1 134' - 5" 4 " / 1 2 " 4 " / 1 2 "4" / 12"100' - 0" TRIM MANUFACTURED STONE SILL STANDING SEAM METAL ROOF FASCIA BOARD FASCIA BOARD 4" / 12" PREFINISHED METAL FASCIA VINYL WINDOW 4" / 12"4" / 12" 145' - 4" 4" / 12" 4" / 12" 122' - 0"4" / 12"1. REFER TO SYSTEM NOTES FOR DETAILS 2. REFER TO EXTERIOR COLOR SCHEDULE IN SYSTEM NOTES FOR ALL EXTERIOR COLORS. 3. ALL EXTERIOR WALL MOUNTED LIGHTS TO BE FULL CUT-OFF, TYP EXTERIOR ELEVATION GENERAL NOTES EXTERIOR FINISH SCHEDULE STONE STUCCO LAPSIDING 1 LAPSIDING 2 BOARD AND BATTEN ASPHALT ROOF STEEL ROOF STEEL RAILING STOREFRONT FRAME / VINYL WINDOW TRIM BOARD AND BATTEN LAP SIDING COLOR 2 ASPHALT SHINGLE ROOF STANDING SEAM METAL ROOF PREFINISHED LOUVER STANDING SEAM METAL ROOF ASPHALT SHINGLE ROOF STUCCO PREFINISHED LOUVER STUCCO CONTROL JOINT PREFINISHED STEEL RAILING, PAINTED DOOR BOARD AND BATTEN MANUFACTURED STONE VENEER WATER TABLE MANUFACTURED STONE VENEER VINYL WINDOW LAP SIDING COLOR 1 PATIO TRELLIS145' - 4" 145' - 4" 132' - 11"29' - 0" 24' - 7" 30' - 0"110' - 0" STANDING SEAM METAL ROOF 134' - 5" 100' - 0" PREFINISHED METAL FASCIA MANUFACTURED STONE SILL STANDING SEAM METAL ROOF TRIM PREFINISHED METAL DOWNSPOUT PREFINISHED METAL CAP PAINTED STEEL FRAME AND MESH INFILL4" / 12"4" / 12" 3 1/2" / 12"4" / 12"TRIM PLANTERS 136' - 3" PREFINISHED METAL FASCIA FASCIA BOARD145' - 4"4" / 12" 40' - 5"419 Canyon Ave Suite 200, Fort Collins, CO 80521 | 970.224.1191 108 East Lincolnway, Cheyenne, WY 82001 | 307.635.5710 www.VFLA.com DRAWING NUMBER: PROJECT NUMBER: SEAL: IN ASSOCIATION WITH: Strength in design. Strength in partnership. Strength in community. VAUGHT FRYE LARSON ARONSON ARCHITECTURE + INTERIORS, INC. THIS DRAWING MAY NOT BE PHOTOGRAPHED, SCANNED, TRACED OR COPIED IN ANY MANNER WITHOUT THE WRITTEN PERMISSION OF VFLA. COPYRIGHT: SHEET ISSUANCES DESCRIPTION DATE N O T F O R C O N S T R U C T I O N F O R R E F E R E N C E O N L Y A R C H I T E C T U R E + I N T E R I O R S CIVIL ENGINEER: NORTHERN ENGINEERING LANDSCAPE ARCHITECT: RIPLEY DEISGN, INC. STRUCTURAL ENGINEER: RAKER PHODES ENGINEERING MECHANICAL & PLUMBING ENGINEER: INTERGRATED MECHANICAL ELECTRICAL ENGINEER: APS, INC.10/19/2022 11:12:19 AM10/19/2022 11:12:19 AMC:\Users\laura\Documents\Fischer Property_R22_central_Laura_vfla.rvtA1 EXTERIOR ELEVATIONS FISCHER PROPERTIES 1215 S. Shields Street Fort Collins, CO PLANNING DEVELOPMENT PHASE 2016-122.1 SCALE:3/32" = 1'-0"1 PLANNING ELEVATION -NORTH SCALE:3/32" = 1'-0"3 PLANNING ELEVATION -WEST PDP SUBMITTAL - ROUND 1 04-27-2022 PDP SUBMITTAL - ROUND 2 08-24-2022 PDP SUBMITTAL - ROUND 3 10-19-2022 NTSSCALE:2 PERSPECTIVE VIEW -NORTHWEST CORNER PATIO TRELLIS MANUFACTURED STONE VENEER WATER TABLE MANUFACTURED STONE VENEER LAP SIDING COLOR 2 STUCCO PREFINISHED STEEL METAL RAILING, PAINTED COLUMN ASPHALT SHINGLE ROOF ASPHALT SHINGLE ROOF MANUFACTURED STONE CAP MANUFACTURED STONE VENEER STUCCO CONTROL JOINT STUCCO PAINTED STEEL GATE WITH WIRE MESH AND FRAME PATIO TRELLIS VINYL WINDOW BOARD AND BATTEN TRIM STUCCO CONTROL JOINT STANDING SEAM METAL ROOF LAP SIDING COLOR 1 TRIM PAINTED STEEL GATE WITH WIRE MESH AND FRAME LAP SIDING COLOR 2 TRIM COLUMN STANDING SEAM METAL ROOF MANUFACTURED STONE VENEER PAINTED STEEL FRAME WITH WIRE MESH INFILL 145' - 4" 145' - 4" 132' - 11" STANDING SEAM METAL ROOF PREFINISHED METAL CAP 134' - 5" PREFINISHED METAL FASCIA PREFINISHED METAL FASCIA STANDING SEAM METAL ROOF PLANTERS MECHANICAL WELL PLANTERS MECHANCIAL WELL PREFINISHED LOUVER VINYL WINDOW FASCIA BOARD 100' - 0" DOOR PREFINISHED METAL LOUVER 33' - 8"EXTERIOR FINISH SCHEDULE 1. REFER TO SYSTEM NOTES FOR DETAILS 2. REFER TO EXTERIOR COLOR SCHEDULE IN SYSTEM NOTES FOR ALL EXTERIOR COLORS. 3. ALL EXTERIOR WALL MOUNTED LIGHTS TO BE FULL CUT-OFF, TYP EXTERIOR ELEVATION GENERAL NOTES EXTERIOR FINISH SCHEDULE STONE STUCCO LAPSIDING 1 LAPSIDING 2 BOARD AND BATTEN ASPHALT ROOF STEEL ROOF STEEL RAILING STOREFRONT FRAME / VINYL WINDOW TRIM LAP SIDING COLOR 2 PREFINISHED STEEL RAILING, PAINTED MANUFACTURED STONE VENEER WATER TABLE MANUFACTURED STONE SILL VINYL WINDOWCOLUMN BOARD AND BATTEN TRIM STANDING SEAM METAL ROOF ASPHALT SHINGLE ROOFPREFINISHED LOUVER STANDING SEAM METAL ROOF LAP SIDING COLOR 1 COLUMN STANDING SEAM METAL ROOF PREFINISHED STEEL RAILING, PAINTED COLUMN BOARD AND BATTEN TRIM MANUFACTURED STONE VENEER MANUFACTURED STONE VENEER WATER TABLE DOOR TRIM VINYL WINDOW LAP SIDING COLOR 1 36' - 3"145' - 4" LAP SIDING COLOR 2 BOARD AND BATTEN TRIM 3 1 /2 " / 1 2 " PREFINISHED METAL DOWNSPOUT4" / 12"PREFINISHED METAL FASCIA MANUFACTURED STONE VENEER PREFINISHED METAL DOWNSPOUT DOOR STOREFRONT SYSTEM MECHANICAL WELL 100' - 0" 145' - 4" 4 " / 1 2 "40' - 0"PREFINISHED METAL LOUVER 419 Canyon Ave Suite 200, Fort Collins, CO 80521 | 970.224.1191 108 East Lincolnway, Cheyenne, WY 82001 | 307.635.5710 www.VFLA.com DRAWING NUMBER: PROJECT NUMBER: SEAL: IN ASSOCIATION WITH: Strength in design. Strength in partnership. Strength in community. VAUGHT FRYE LARSON ARONSON ARCHITECTURE + INTERIORS, INC. THIS DRAWING MAY NOT BE PHOTOGRAPHED, SCANNED, TRACED OR COPIED IN ANY MANNER WITHOUT THE WRITTEN PERMISSION OF VFLA. COPYRIGHT: SHEET ISSUANCES DESCRIPTION DATE N O T F O R C O N S T R U C T I O N F O R R E F E R E N C E O N L Y A R C H I T E C T U R E + I N T E R I O R S CIVIL ENGINEER: NORTHERN ENGINEERING LANDSCAPE ARCHITECT: RIPLEY DEISGN, INC. STRUCTURAL ENGINEER: RAKER PHODES ENGINEERING MECHANICAL & PLUMBING ENGINEER: INTERGRATED MECHANICAL ELECTRICAL ENGINEER: APS, INC.10/19/2022 11:13:17 AM10/19/2022 11:13:17 AMC:\Users\laura\Documents\Fischer Property_R22_central_Laura_vfla.rvtA2 EXTERIOR ELEVATIONS FISCHER PROPERTIES 1215 S. Shields Street Fort Collins, CO PLANNING DEVELOPMENT PHASE 2016-122.1 SCALE:3/32" = 1'-0"1 PLANNING ELEVATION -SOUTH SCALE:3/32" = 1'-0"2 PLANNING ELEVATION -EAST PDP SUBMITTAL - ROUND 1 04-27-2022 PDP SUBMITTAL - ROUND 2 08-24-2022 PDP SUBMITTAL - ROUND 3 10-19-2022 NTSSCALE:3 PERSPECTIVE VIEW -NORTHEAST CORNER BUILDING IN SECTION STANDING SEAM METAL ROOF PREFINISHED LOUVER LAP SIDING COLOR 1 MECHANICAL WELL PATIO TRELLIS MANUFACTURED STONE SILL MANUFACTURED STONE VENEER PREFINISHED STEEL RAILING BOARD AND BATTEN LAP SIDING COLOR 1 TRIM VINYL WINDOW LAP SIDING COLOR 2 MANUFACTURED STONE VENEER WATER TABLE PREFINISHED METAL DOWNSPOUT VINYL WINDOW PAINTED STEEL GATE WITH MESH INFILL STANDING SEAM METAL ROOF ASPHALT SHINGLE ROOF LAP SIDING COLOR 2 132' - 11" 134' - 5" PREFINISHED METAL FASCIA FASCIA BOARD TRIM PREFINISHED METAL DOWNSPOUT 129' - 0" STANDING SEAM METAL ROOF 4 " / 1 2 "4" / 12"2" / 12"4" / 12"30' - 0"28' - 11 1/4"MANUFACTURED STONE VENEER MANUFACTURED STONE VENEER WATER TABLE ALUMINUM STOREFRONT VINYL WINDOW STANDING SEAM METAL ROOF PREFINISHED METAL FASCIA TRIM BUILDING IN SECTION PREFINISHED LOUVER LAP SIDING COLOR 1 STANDING SEAM METAL ROOF STUCCO STUCCO CONTROL JOINT PREFINISHED LOUVER PATIO TRELLIS ASPHALT SHINGLE ROOF LAP SIDING COLOR 2 BOARD AND BATTEN TRIM MANUFACTURED STONE VENEER MANUFACTURED STONE VENEER WATER TABLE BOARD AND BATTEN PATIO DOOR PREFINISHED STEEL RAILING LAP SIDING COLOR 2 TRIM MANUFACTURED STONE SILL LAP SIDING COLOR 1 LAP SIDING COLOR 2 STANDING SEAM METAL ROOF ASPHALT SHINGLE ROOF PREFINISHED METAL DOWNSPOUT PLANTERSPREFINISHED METAL FASCIA 145' - 4"36' - 3"FASCIA BOARD 3 1/2" / 12"3 1 /2 " / 1 2 " 4 " / 1 2 "4" / 12"4 " / 1 2 "4" / 12"3 1/2" / 12"1. REFER TO SYSTEM NOTES FOR DETAILS 2. REFER TO EXTERIOR COLOR SCHEDULE IN SYSTEM NOTES FOR ALL EXTERIOR COLORS. 3. ALL EXTERIOR WALL MOUNTED LIGHTS TO BE FULL CUT-OFF, TYP EXTERIOR ELEVATION GENERAL NOTES EXTERIOR FINISH SCHEDULE STONE STUCCO LAPSIDING 1 LAPSIDING 2 BOARD AND BATTEN ASPHALT ROOF STEEL ROOF STEEL RAILING STOREFRONT FRAME / VINYL WINDOW TRIM 419 Canyon Ave Suite 200, Fort Collins, CO 80521 | 970.224.1191 108 East Lincolnway, Cheyenne, WY 82001 | 307.635.5710 www.VFLA.com DRAWING NUMBER: PROJECT NUMBER: SEAL: IN ASSOCIATION WITH: Strength in design. Strength in partnership. Strength in community. VAUGHT FRYE LARSON ARONSON ARCHITECTURE + INTERIORS, INC. THIS DRAWING MAY NOT BE PHOTOGRAPHED, SCANNED, TRACED OR COPIED IN ANY MANNER WITHOUT THE WRITTEN PERMISSION OF VFLA. COPYRIGHT: SHEET ISSUANCES DESCRIPTION DATE N O T F O R C O N S T R U C T I O N F O R R E F E R E N C E O N L Y A R C H I T E C T U R E + I N T E R I O R S CIVIL ENGINEER: NORTHERN ENGINEERING LANDSCAPE ARCHITECT: RIPLEY DEISGN, INC. STRUCTURAL ENGINEER: RAKER PHODES ENGINEERING MECHANICAL & PLUMBING ENGINEER: INTERGRATED MECHANICAL ELECTRICAL ENGINEER: APS, INC.10/19/2022 11:13:46 AM10/19/2022 11:13:46 AMC:\Users\laura\Documents\Fischer Property_R22_central_Laura_vfla.rvtA3 COURTYARD ELEVATIONS FISCHER PROPERTIES 1215 S. Shields Street Fort Collins, CO PLANNING DEVELOPMENT PHASE 2016-122.1 SCALE:3/32" = 1'-0"3 WEST COURTYARD ELEVATION -EAST SCALE:3/32" = 1'-0"2 WEST COURTYARD ELEVATION -SOUTH SCALE:3/32" = 1'-0"1 WEST COURTYARD ELEVATION -WEST SCALE:4 PERSPECTIVE VIEW -WEST COURTYARD LOOKING NORTH PDP SUBMITTAL - ROUND 1 04-27-2022 PDP SUBMITTAL - ROUND 2 08-24-2022 PDP SUBMITTAL - ROUND 3 10-19-2022 BUILDING IN SECTION MECHANICAL WELL STUCCO PREFINISHED LOUVER STUCCO CONTROL JOINT STANDING SEAM METAL ROOF PREFINISHED LOUVER LAP SIDING COLOR 1 ASPHALT SHINGLE ROOF MECHANICAL WELL MANUFACTURED STONE SILL PREFINISHED METAL DOWNSPOUT VINYL WINDOW MANUFACTURED STONE VENEER WATER TABLE MANUFACTURED STONE VENEER LAP SIDING COLOR 2 BOARD AND BATTEN TRIM BOARD AND BATTEN PREFINISHED STEEL RAILING 145' - 4"145' - 4" 33' - 8"FASCIA BOARD 4 " / 1 2 "4" / 12" 4 " / 1 2 "4" / 12"4" / 12"MECHANICAL WELL STANDING SEAM METAL ROOF PREFINISHED LOUVER STUCCO STUCCO CONTROL JOINT PATIO DOOR PREFINISHED STEEL RAILING MANUFACTRED STONE VENEER WATER TABLE VINYL WINDOW MANUFACTURED STONE SILL BOARD AND BATTEN LAP SIDING COLOR 2 ASPHALT SHINGL ROOF FASCIA BOARD BUILDING IN SECTION LAP SIDING COLOR 1 STOREFRONT ENTRY MANUFACTURED STONE VENEER WATER TABLE MANUFACTURED STONE SILL MANUFACTURED STONE VENEER LAP SIDING COLOR 1 TRIM PREFINISHED METAL DOWNSPOUT LAP SIDING COLOR 2 VINYL WINDOW STUCCO CONTROL JOINT STUCCO PREFINISHED LOUVER PATIO TRELLIS ASPHALT SHINGLE ROOF MECHANICAL WELL PLANTERS PREFINISHED METAL CAP 145' - 4" METAL STANDING SEAM ROOF 3 1/2" / 12"3 1 /2 " / 1 2 " 4 " / 1 2 "4" / 12"3 1/2" / 12"1. REFER TO SYSTEM NOTES FOR DETAILS 2. REFER TO EXTERIOR COLOR SCHEDULE IN SYSTEM NOTES FOR ALL EXTERIOR COLORS. 3. ALL EXTERIOR WALL MOUNTED LIGHTS TO BE FULL CUT-OFF, TYP EXTERIOR ELEVATION GENERAL NOTES EXTERIOR FINISH SCHEDULE STONE STUCCO LAPSIDING 1 LAPSIDING 2 BOARD AND BATTEN ASPHALT ROOF STEEL ROOF STEEL RAILING STOREFRONT FRAME / VINYL WINDOW TRIM 419 Canyon Ave Suite 200, Fort Collins, CO 80521 | 970.224.1191 108 East Lincolnway, Cheyenne, WY 82001 | 307.635.5710 www.VFLA.com DRAWING NUMBER: PROJECT NUMBER: SEAL: IN ASSOCIATION WITH: Strength in design. Strength in partnership. Strength in community. VAUGHT FRYE LARSON ARONSON ARCHITECTURE + INTERIORS, INC. THIS DRAWING MAY NOT BE PHOTOGRAPHED, SCANNED, TRACED OR COPIED IN ANY MANNER WITHOUT THE WRITTEN PERMISSION OF VFLA. COPYRIGHT: SHEET ISSUANCES DESCRIPTION DATE N O T F O R C O N S T R U C T I O N F O R R E F E R E N C E O N L Y A R C H I T E C T U R E + I N T E R I O R S CIVIL ENGINEER: NORTHERN ENGINEERING LANDSCAPE ARCHITECT: RIPLEY DEISGN, INC. STRUCTURAL ENGINEER: RAKER PHODES ENGINEERING MECHANICAL & PLUMBING ENGINEER: INTERGRATED MECHANICAL ELECTRICAL ENGINEER: APS, INC.10/19/2022 11:14:20 AM10/19/2022 11:14:20 AMC:\Users\laura\Documents\Fischer Property_R22_central_Laura_vfla.rvtA4 COURTYARD ELEVATIONS FISCHER PROPERTIES 1215 S. Shields Street Fort Collins, CO PLANNING DEVELOPMENT PHASE 2016-122.1 SCALE:3/32" = 1'-0"3 EAST COURTYARD ELEVATION -EAST SCALE:3/32" = 1'-0"2 EAST COURTYARD ELEVATION -SOUTH SCALE:3/32" = 1'-0"1 EAST COURTYARD ELEVATION -WEST SCALE:4 PERSPECTIVE VIEW -EAST COURTYARD LOOKING NORTH PDP SUBMITTAL - ROUND 1 04-27-2022 PDP SUBMITTAL - ROUND 2 08-24-2022 PDP SUBMITTAL - ROUND 3 10-19-2022 419 Canyon Ave Suite 200, Fort Collins, CO 80521 | 970.224.1191 108 East Lincolnway, Cheyenne, WY 82001 | 307.635.5710 www.VFLA.com DRAWING NUMBER: PROJECT NUMBER: SEAL: IN ASSOCIATION WITH: Strength in design. Strength in partnership. Strength in community. VAUGHT FRYE LARSON ARONSON ARCHITECTURE + INTERIORS, INC. THIS DRAWING MAY NOT BE PHOTOGRAPHED, SCANNED, TRACED OR COPIED IN ANY MANNER WITHOUT THE WRITTEN PERMISSION OF VFLA. COPYRIGHT: SHEET ISSUANCES DESCRIPTION DATE N O T F O R C O N S T R U C T I O N F O R R E F E R E N C E O N L Y A R C H I T E C T U R E + I N T E R I O R S CIVIL ENGINEER: NORTHERN ENGINEERING LANDSCAPE ARCHITECT: RIPLEY DEISGN, INC. STRUCTURAL ENGINEER: RAKER PHODES ENGINEERING MECHANICAL & PLUMBING ENGINEER: INTERGRATED MECHANICAL ELECTRICAL ENGINEER: APS, INC.10/19/2022 11:15:54 AM10/19/2022 11:15:54 AMC:\Users\laura\Documents\Fischer Property_R22_central_Laura_vfla.rvtA5 PERSPECTIVE VIEWS FISCHER PROPERTIES 1215 S. Shields Street Fort Collins, CO PLANNING DEVELOPMENT PHASE 2016-122.1 SCALE:2 PERSPECTIVE VIEW -SOUTHWEST CORNER PDP SUBMITTAL - ROUND 1 04-27-2022 PDP SUBMITTAL - ROUND 2 08-24-2022 PDP SUBMITTAL - ROUND 3 10-19-2022 NTS NTS NTS NTSSCALE:3 PERSPECTIVE VIEW -SOUTHEAST CORNER SCALE:1 PERSPECTIVE VIEW -NORTHEAST CORNER SCALE:4 PERSPECTIVE VIEW -SOUTHEAST CORNER PAINTED STEEL GATE, SOLID INFILL 6' - 0"PREFINISHED METAL CAP MANUFACTURED STONE VENEER BOLLARD 26' - 4" PREFINISHED METAL CAP MANUFACTURED STONE VENEER 6' - 0"BOLLARD PAINTED STEEL GATE, SOLID INFILL 12' - 0" 6' - 0"PREFINISHED METAL CAP MANUFACTURED STONE VENEER 26' - 4" PREFINISHED METAL CAP 6' - 0"MANUFACTURED STONE VENEER BOLLARD 12' - 0" TRELLIS STANDING SEAM METAL ROOF COLUMN WATER FEATURE PREFINISHED STEEL FENCING PREFINISHED METAL FASCIA WATER FEATURE PREFINISHED STEEL FENCE COLUMN TRELLIS STANDING SEAM ROOF MANUFACTURED STONE VENEER PREFINISHED METAL FASCIA PREFINISHED METAL CAP 6' - 6"PAINTED STEEL GATE WITH WIRE MESH AND FRAME STANDING SEAM METAL ROOF PREFINISHED STEEL FENCING MANUFACTURED STONE VENEER PREFINISHED METAL CAP 6' - 6"COLUMN WATER FEATURE PREFINISHED STEEL FENCING TRELLIS MANUFACTURED STONE VENEER STANDING SEAM ROOF PREFINISHED METAL FASCIA PREFINISHED METAL CAP 26' - 4"12' - 0"CONCRETE PAD PAINTED STEEL GATE, SOLID INFILL PAINTED STEEL GATE, SOLID INFILL BOLLARD 13' - 8"26' - 8"PAINTED STEEL GATE WITH WIRE MESH AND FRAME BIKE STORAGE 419 Canyon Ave Suite 200, Fort Collins, CO 80521 | 970.224.1191 108 East Lincolnway, Cheyenne, WY 82001 | 307.635.5710 www.VFLA.com DRAWING NUMBER: PROJECT NUMBER: SEAL: IN ASSOCIATION WITH: Strength in design. Strength in partnership. Strength in community. VAUGHT FRYE LARSON ARONSON ARCHITECTURE + INTERIORS, INC. THIS DRAWING MAY NOT BE PHOTOGRAPHED, SCANNED, TRACED OR COPIED IN ANY MANNER WITHOUT THE WRITTEN PERMISSION OF VFLA. COPYRIGHT: SHEET ISSUANCES DESCRIPTION DATE N O T F O R C O N S T R U C T I O N F O R R E F E R E N C E O N L Y A R C H I T E C T U R E + I N T E R I O R S CIVIL ENGINEER: NORTHERN ENGINEERING LANDSCAPE ARCHITECT: RIPLEY DEISGN, INC. STRUCTURAL ENGINEER: RAKER PHODES ENGINEERING MECHANICAL & PLUMBING ENGINEER: INTERGRATED MECHANICAL ELECTRICAL ENGINEER: APS, INC.10/19/2022 11:15:57 AM10/19/2022 11:15:57 AMC:\Users\laura\Documents\Fischer Property_R22_central_Laura_vfla.rvtA6 SITE DETAILS AND ELEVATIONS FISCHER PROPERTIES 1215 S. Shields Street Fort Collins, CO PLANNING DEVELOPMENT PHASE 2016-122.1 SCALE:1/8" = 1'-0"5 TRASH -NORTH ELEV. SCALE:1/8" = 1'-0"6 TRASH -EAST ELEV. SCALE:1/8" = 1'-0"7 TRASH -SOUTH ELEV. SCALE:1/8" = 1'-0"8 TRASH -WEST ELEV. SCALE:1/8" = 1'-0"1 BIKE SHED 1 -NORTH ELEV. SCALE:1/8" = 1'-0"4 BIKE SHED 1 -WEST ELEV. SCALE:1/8" = 1'-0"3 BIKE SHED 1 -SOUTH ELEV. SCALE:1/8" = 1'-0"2 BIKE SHED 1 -EAST ELEV. SCALE:1/8" = 1'-0"9 TRASH ENCLOSURE SCALE:1/8" = 1'-0"10 BIKE SHED 1 PDP SUBMITTAL - ROUND 1 04-27-2022 PDP SUBMITTAL - ROUND 2 08-24-2022 PDP SUBMITTAL - ROUND 3 10-19-2022 MANUFACTURED STONE VENEER MANUFACTURED STONE VENEER WATER TABLE VINYL WINDOW STUCCO STUCCO CONTROL JOINT TRIM LAP SIDING COLOR 1 VINYL WINDOW STUCCO STUCCO REVEAL LAP SIDING, COLOR 2 TRIM VINYL WINDOW VINYL WINDOW MANUFACTURED STONE VENEER MANUFACTURED STONE SILL BOARD AND BATTEN TRIM PATIO DOOR COMPOSIT DECKING DECK JOISTS PAINTED STEEL FRAME WITH WIRE MESH INFILL MANUFACTURED STONE VENEER PREFINISHED METAL CAP DIGITAL MATERIAL BOARD LEGEND MANUFACTURED STONE VENEER CEMENTITIOUS LAPSIDING COLOR 1 STOREFRONT FRAME COLOR VINYL WINDOW FRAME COLOR STUCCO COLOR BOARD & BATTENCEMENTITIOUS LAPSIDING COLOR 2 MESH INFILL TRIM CEDAR SOFFIT 419 Canyon Ave Suite 200, Fort Collins, CO 80521 | 970.224.1191 108 East Lincolnway, Cheyenne, WY 82001 | 307.635.5710 www.VFLA.com DRAWING NUMBER: PROJECT NUMBER: SEAL: IN ASSOCIATION WITH: Strength in design. Strength in partnership. Strength in community. VAUGHT FRYE LARSON ARONSON ARCHITECTURE + INTERIORS, INC. THIS DRAWING MAY NOT BE PHOTOGRAPHED, SCANNED, TRACED OR COPIED IN ANY MANNER WITHOUT THE WRITTEN PERMISSION OF VFLA. COPYRIGHT: SHEET ISSUANCES DESCRIPTION DATE N O T F O R C O N S T R U C T I O N F O R R E F E R E N C E O N L Y A R C H I T E C T U R E + I N T E R I O R S CIVIL ENGINEER: NORTHERN ENGINEERING LANDSCAPE ARCHITECT: RIPLEY DEISGN, INC. STRUCTURAL ENGINEER: RAKER PHODES ENGINEERING MECHANICAL & PLUMBING ENGINEER: INTERGRATED MECHANICAL ELECTRICAL ENGINEER: APS, INC.10/19/2022 11:16:28 AM10/19/2022 11:16:28 AMC:\Users\laura\Documents\Fischer Property_R22_central_Laura_vfla.rvtA7 DIGITAL MATERIAL BOARD AND ELEVATION DETAILS FISCHER PROPERTIES 1215 S. Shields Street Fort Collins, CO PLANNING DEVELOPMENT PHASE 2016-122.1 SCALE:8 WINDOW DETAIL AT STUCCO SCALE:6 WINDOW DETAIL AT LAPSIDING SCALE:5 WINDOW DETAIL AT LAPSIDING SCALE:7 WINDOW DETAIL AT STONE SCALE:4 DOOR DETAIL AT BOARD & BATTEN SCALE:3 WIRE MESH WINDOW DETAIL PDP SUBMITTAL - ROUND 1 04-27-2022 PDP SUBMITTAL - ROUND 2 08-24-2022 PDP SUBMITTAL - ROUND 3 10-19-2022 SCALE:2 PERSPECTIVE VIEW -NORTHWEST CORNER CEDAR SOFFIT PREFINISHED METAL FASCIA BOARD AND BATTEN ASPHALT SHINGLE ROOF FASCIA BOARD BOARD AND BATTEN LAPSIDING COLOR 2 TRIM STUCCO LAP SIDING COLOR 2 STANDING SEAM METAL ROOF LAP SIDING COLOR 1 FASCIA BOARD MANUFACTURED STONE VERNEER PREFINISHED STEEL RAILING, PAINTED ALUMINUM STOREFRONT PREFINISHED METAL FASCIA TRIM VINYL WINDOW CEDAR SOFFIT MANUFACTURED STONE VENEER LAP SIDING COLOR 1 MANUFACTURED STONE SILL MANUFACTURED STONE VENEER WATER TABLE PREFINISHED METAL DOWNSPOUT LAP SIDING COLOR 1 WESTWARD DR S. SHIELDS STREETPARKING LOT WESTWARD DR S. SHIELDS STREETPARKING LOT WESTWARD DR S. SHIELDS STREETPARKING LOT WESTWARD DR S. SHIELDS STREETPARKING LOT WESTWARD DR S. SHIELDS STREETPARKING LOT WESTWARD DR S. SHIELDS STREETPARKING LOT Shadow cast by 25' tall wall along property line Proposed building shadows beyond 25' wall 419 Canyon Ave Suite 200, Fort Collins, CO 80521 | 970.224.1191 108 East Lincolnway, Cheyenne, WY 82001 | 307.635.5710 www.VFLA.com DRAWING NUMBER: PROJECT NUMBER: SEAL: IN ASSOCIATION WITH: Strength in design. Strength in partnership. Strength in community. VAUGHT FRYE LARSON ARONSON ARCHITECTURE + INTERIORS, INC. THIS DRAWING MAY NOT BE PHOTOGRAPHED, SCANNED, TRACED OR COPIED IN ANY MANNER WITHOUT THE WRITTEN PERMISSION OF VFLA. COPYRIGHT: SHEET ISSUANCES DESCRIPTION DATE N O T F O R C O N S T R U C T I O N F O R R E F E R E N C E O N L Y A R C H I T E C T U R E + I N T E R I O R S CIVIL ENGINEER: NORTHERN ENGINEERING LANDSCAPE ARCHITECT: RIPLEY DEISGN, INC. STRUCTURAL ENGINEER: RAKER PHODES ENGINEERING MECHANICAL & PLUMBING ENGINEER: INTERGRATED MECHANICAL ELECTRICAL ENGINEER: APS, INC.10/19/2022 11:16:53 AM10/19/2022 11:16:53 AMC:\Users\laura\Documents\Fischer Property_R22_central_Laura_vfla.rvtA8 SHADOW STUDY FISCHER PROPERTIES 1215 S. Shields Street Fort Collins, CO PLANNING DEVELOPMENT PHASE 2016-122.1 SCALE:1 SHADOW STUDY -SUMMER 3PM SCALE:2 SHADOW STUDY -SUMMER 12PM SCALE:3 SHADOW STUDY -SUMMER 9AM SCALE:4 SHADOW STUDY -WINTER 9AM SCALE:5 SHADOW STUDY -WINTER 12PM SCALE:6 SHADOW STUDY -WINTER 3PM SUMMER SOLSTICE JUNE 21 WINTER SOLSTICE DECEMBER 21 SHADOW STUDY SUMMARY L.U.C.3.2.3. -Solar Access, Orientation, Shading Project Summary The proposed project consists of a 85 unit residential apartment building, including a 2-story wing on the west, 3- story wings to the east, and courtyards with exterior pool and associated site amenities with bike storage shelters. Located at the northeast corner of Westward Dr and S. Shields St within the NCB and RL along the west property boundary and partially within the Transit-Oriented Development Overlay Zone. Study Overview A shadow study was preformed on the proposed residential apartment building. Per code section 3.2.3(A), a study must be done on December 21st to demonstrate the longest shadow of the year (winter solstice) greater than the shadow which would be cast by a twenty-five-foot hypothetical wall located along the property lines. We included June 21st in our study as well to show the shortest shadow day of the year (summer solstice). We have provided shadow studies for three times for each day; 9am, noon, 3pm. This allows the study to look at the shadow movement through the day and potential impacts of shading on surrounding structures right to solar access. The shadow study shows the shadows created by the residential apartment building (teal) and the shadows cast by a twenty-five-foot hypothetical along the property line (orange). Conclusion The shadow study shows the shadows created by the residential apartment building (teal) do not cast shadows onto any adjacent buildings that restrict the surrounding buildings the right to solar access. Therefore, the project meets the shading requirements of the L.U.C.3.2.3. PROJECT NORTH PDP SUBMITTAL - ROUND 1 04-27-2022 PDP SUBMITTAL - ROUND 2 08-24-2022 PDP SUBMITTAL - ROUND 3 10-19-2022 WESTWARD DR S. SHIELDS STREETPARKING LOT WESTWARD DR S. SHIELDS STREETPARKING LOT WESTWARD DR S. SHIELDS STREETPARKING LOT WESTWARD DR S. SHIELDS STREETPARKING LOT WESTWARD DR S. SHIELDS STREETPARKING LOT WESTWARD DR S. SHIELDS STREETPARKING LOT WESTWARD DR S. SHIELDS STREETPARKING LOT WESTWARD DR S. SHIELDS STREETPARKING LOT WESTWARD DR S. SHIELDS STREETPARKING LOT Proposed building shadows 419 Canyon Ave Suite 200, Fort Collins, CO 80521 | 970.224.1191 108 East Lincolnway, Cheyenne, WY 82001 | 307.635.5710 www.VFLA.com DRAWING NUMBER: PROJECT NUMBER: SEAL: IN ASSOCIATION WITH: Strength in design. Strength in partnership. Strength in community. VAUGHT FRYE LARSON ARONSON ARCHITECTURE + INTERIORS, INC. THIS DRAWING MAY NOT BE PHOTOGRAPHED, SCANNED, TRACED OR COPIED IN ANY MANNER WITHOUT THE WRITTEN PERMISSION OF VFLA. COPYRIGHT: SHEET ISSUANCES DESCRIPTION DATE N O T F O R C O N S T R U C T I O N F O R R E F E R E N C E O N L Y A R C H I T E C T U R E + I N T E R I O R S CIVIL ENGINEER: NORTHERN ENGINEERING LANDSCAPE ARCHITECT: RIPLEY DEISGN, INC. STRUCTURAL ENGINEER: RAKER PHODES ENGINEERING MECHANICAL & PLUMBING ENGINEER: INTERGRATED MECHANICAL ELECTRICAL ENGINEER: APS, INC.10/19/2022 11:17:29 AM10/19/2022 11:17:29 AMC:\Users\laura\Documents\Fischer Property_R22_central_Laura_vfla.rvtA9 SHADOW STUDY FISCHER PROPERTIES 1215 S. Shields Street Fort Collins, CO PLANNING DEVELOPMENT PHASE 2016-122.1 LIGHT AND SHADOW FEBRUARY 7 LIGHT AND SHADOW JANUARY 7 LIGHT AND SHADOW DECEMBER 7 SCALE:9 SHADOW STUDY - FEBUARY 9AM SCALE:8 SHADOW STUDY - FEBUARY 12PM SCALE:7 SHADOW STUDY - FEBUARY 3PM SCALE:6 SHADOW STUDY - JANUARY 9AM SCALE:5 SHADOW STUDY - JANUARY 12PM SCALE:4 SHADOW STUDY - JANUARY 3PM SCALE:3 SHADOW STUDY - DECEMBER 9AM SCALE:2 SHADOW STUDY - DECEMBER 12PM SCALE:1 SHADOW STUDY - DECEMBER 3PM SHADOW STUDY SUMMARY L.U.C.3.5.1(G) -Building Height Review Project Summary The proposed project consists of a 85 unit residential apartment building, including a 2-story wing on the west, 3-story wings to the east, and courtyards with exterior pool and associated site amenities with bike storage shelters. Located at the northeast corner of Westward Dr and S. Shields St within the NCB and RL along the west property boundary and partially within the Transit- Oriented Development Overlay Zone. Study Overview A shadow study was preformed on the proposed residential apartment building. Per code section 3.5.1(G), a study must be conducted if a structure exceeds 40' during (3) winter months. We have provided shadow studies for three times for each day; 9am, noon, 3pm on December 7th, January 7th, and February 7th. This allowed the study to look at the shadow movement through the day and potential impacts of shading on surrounding structures right to protect access to sunlight, functional use of solar energy technology,adverse impact on the natural, or artificial light and glare on adjacent properties. The shadow study shows the shadows created by the residential apartment building (teal) that could potentially impact adjacent public or private properties. Conclusion The study shows the shadows created by the residential apartment building (teal) do not cast shadows onto any adjacent buildings that restrict the surrounding buildings the right to solar access. Non-glare building materials and downward directed cutoff site and building lighting will be used and not create glare during the day or night. Nor do the shadows contribute to accumulation of snow and ice on adjacent properties as they do not shade any portion of the adjacent sites for more than 1 hour of the day. The proposed building provides privacy to residence and adjacent properties to the south and west through landscaping and fence on the property line with drive lane and parking buffer zones beyond. The building massing is oriented north to south to allows for a buffer of the single family homes with pedestrian walkways and landscaping. The building steps from 3-story to 2-story east to west and orientation through residential deign features, materials, and scale to adjacent single family residences. Therefore, the project meets the shading requirements of the L.U.C.3.5.1(G). PROJECT NORTH PDP SUBMITTAL - ROUND 1 04-27-2022 PDP SUBMITTAL - ROUND 2 08-24-2022 PDP SUBMITTAL - ROUND 3 10-19-2022