HomeMy WebLinkAboutFISCHER PROPERTIES - PDP220007 - SUBMITTAL DOCUMENTS - ROUND 3 - ELEVATIONSPATIO TRELLIS
STUCCO CONTROL JOINT
STUCCO
MANUFACTURED STONE VENEER WATER TABLE
MANUFACTURED STONE VENEER
STANDING SEAM
METAL ROOF
ALUMINUM STOREFRONTVINYL WINDOW
STUCCO
ASPHALT SHINGLE ROOF
BOARD AND BATTEN
COLUMN
MANUFACTURED STONE VENEER
STUCCO CONTROL JOINT
PREFINISHED
LOUVER
COLUMN
BOARD AND
BATTEN
STEEL TRELLIS
BOARD AND BATTEN
TRIM
VINYL WINDOW
STANDING STEAM
METAL ROOF
MANUFACTURED STONE
VENEER WATER TABLE
MANUFACTURED STONE VENEER
TRIM
PREFINISHED STEEL RAILING, PAINTEDDOOR
ASPHALT SHINGLE ROOF
PREFINISHED LOUVER
VINYL WINDOW
PREFINISHED METAL FASCIA
STANDING SEAM METAL ROOF
STANDING SEAM
METAL ROOF
LAP SIDING
COLOR 1
LAP SIDING COLOR 2
BOARD AND BATTEN
145' - 4" 36' - 2"132' - 11" 24' - 7"KNOX BOX
COLUMN
PREFINISHED STEEL
RAILING, PAINTED
PREFINISHED METAL DOWNSPOUT
MANUFACTURED STONE SILL
MANUFACTURED STONE WATER TABLE
LAP SIDING COLOR 2
LAP SIDING COLOR 1
134' - 5"
4 " / 1 2 "
4 " / 1 2 "4" / 12"100' - 0"
TRIM
MANUFACTURED STONE SILL
STANDING SEAM METAL ROOF
FASCIA BOARD
FASCIA BOARD
4" / 12"
PREFINISHED METAL FASCIA
VINYL WINDOW 4" / 12"4" / 12"
145' - 4"
4" / 12"
4" / 12"
122' - 0"4" / 12"1. REFER TO SYSTEM NOTES FOR DETAILS
2. REFER TO EXTERIOR COLOR SCHEDULE IN
SYSTEM NOTES FOR ALL EXTERIOR COLORS.
3. ALL EXTERIOR WALL MOUNTED LIGHTS TO BE
FULL CUT-OFF, TYP
EXTERIOR ELEVATION GENERAL NOTES
EXTERIOR FINISH SCHEDULE
STONE
STUCCO
LAPSIDING 1
LAPSIDING 2
BOARD AND BATTEN
ASPHALT ROOF
STEEL ROOF
STEEL RAILING
STOREFRONT FRAME / VINYL WINDOW
TRIM
BOARD AND
BATTEN
LAP SIDING
COLOR 2
ASPHALT
SHINGLE ROOF
STANDING SEAM
METAL ROOF
PREFINISHED LOUVER
STANDING SEAM
METAL ROOF
ASPHALT SHINGLE
ROOF
STUCCO
PREFINISHED LOUVER
STUCCO CONTROL JOINT
PREFINISHED STEEL RAILING, PAINTED
DOOR
BOARD AND BATTEN
MANUFACTURED STONE VENEER WATER TABLE
MANUFACTURED STONE VENEER
VINYL WINDOW
LAP SIDING COLOR 1
PATIO TRELLIS145' - 4"
145' - 4"
132' - 11"29' - 0" 24' - 7" 30' - 0"110' - 0"
STANDING SEAM
METAL ROOF
134' - 5"
100' - 0"
PREFINISHED
METAL FASCIA
MANUFACTURED STONE SILL
STANDING SEAM METAL ROOF
TRIM
PREFINISHED METAL DOWNSPOUT
PREFINISHED METAL CAP
PAINTED STEEL FRAME AND MESH INFILL4" / 12"4" / 12"
3 1/2" / 12"4" / 12"TRIM
PLANTERS
136' - 3"
PREFINISHED
METAL FASCIA
FASCIA BOARD145' - 4"4" / 12" 40' - 5"419 Canyon Ave Suite 200, Fort Collins, CO 80521 | 970.224.1191
108 East Lincolnway, Cheyenne, WY 82001 | 307.635.5710
www.VFLA.com
DRAWING NUMBER:
PROJECT NUMBER:
SEAL:
IN ASSOCIATION WITH:
Strength in design. Strength in partnership.
Strength in community.
VAUGHT FRYE LARSON ARONSON ARCHITECTURE + INTERIORS, INC.
THIS DRAWING MAY NOT BE PHOTOGRAPHED, SCANNED, TRACED OR
COPIED IN ANY MANNER WITHOUT THE WRITTEN PERMISSION OF VFLA.
COPYRIGHT:
SHEET ISSUANCES
DESCRIPTION DATE
N O T F O R C O N S T R U C T I O N
F O R R E F E R E N C E O N L Y
A R C H I T E C T U R E + I N T E R I O R S
CIVIL ENGINEER:
NORTHERN ENGINEERING
LANDSCAPE ARCHITECT:
RIPLEY DEISGN, INC.
STRUCTURAL ENGINEER:
RAKER PHODES ENGINEERING
MECHANICAL & PLUMBING ENGINEER:
INTERGRATED MECHANICAL
ELECTRICAL ENGINEER:
APS, INC.10/19/2022 11:12:19 AM10/19/2022 11:12:19 AMC:\Users\laura\Documents\Fischer Property_R22_central_Laura_vfla.rvtA1
EXTERIOR
ELEVATIONS
FISCHER
PROPERTIES
1215 S. Shields Street
Fort Collins, CO
PLANNING DEVELOPMENT PHASE
2016-122.1
SCALE:3/32" = 1'-0"1 PLANNING ELEVATION -NORTH
SCALE:3/32" = 1'-0"3 PLANNING ELEVATION -WEST
PDP SUBMITTAL - ROUND 1 04-27-2022
PDP SUBMITTAL - ROUND 2 08-24-2022
PDP SUBMITTAL - ROUND 3 10-19-2022
NTSSCALE:2 PERSPECTIVE VIEW -NORTHWEST CORNER
PATIO TRELLIS
MANUFACTURED STONE
VENEER WATER TABLE MANUFACTURED STONE VENEER
LAP SIDING COLOR 2
STUCCO
PREFINISHED STEEL
METAL RAILING, PAINTED
COLUMN
ASPHALT SHINGLE ROOF
ASPHALT SHINGLE ROOF
MANUFACTURED STONE CAP
MANUFACTURED STONE VENEER
STUCCO CONTROL JOINT
STUCCO
PAINTED STEEL GATE WITH WIRE MESH AND
FRAME
PATIO TRELLIS
VINYL WINDOW
BOARD AND BATTEN
TRIM
STUCCO CONTROL JOINT
STANDING SEAM
METAL ROOF
LAP SIDING COLOR 1
TRIM
PAINTED STEEL GATE
WITH WIRE MESH AND FRAME
LAP SIDING COLOR 2
TRIM
COLUMN
STANDING SEAM METAL ROOF
MANUFACTURED STONE VENEER
PAINTED STEEL FRAME
WITH WIRE MESH INFILL
145' - 4"
145' - 4"
132' - 11"
STANDING SEAM METAL ROOF
PREFINISHED METAL CAP
134' - 5"
PREFINISHED METAL FASCIA
PREFINISHED METAL FASCIA
STANDING SEAM METAL ROOF
PLANTERS
MECHANICAL WELL
PLANTERS
MECHANCIAL WELL
PREFINISHED
LOUVER
VINYL
WINDOW
FASCIA BOARD
100' - 0"
DOOR
PREFINISHED METAL LOUVER
33' - 8"EXTERIOR FINISH SCHEDULE
1. REFER TO SYSTEM NOTES FOR DETAILS
2. REFER TO EXTERIOR COLOR SCHEDULE IN
SYSTEM NOTES FOR ALL EXTERIOR COLORS.
3. ALL EXTERIOR WALL MOUNTED LIGHTS TO BE
FULL CUT-OFF, TYP
EXTERIOR ELEVATION GENERAL NOTES
EXTERIOR FINISH SCHEDULE
STONE
STUCCO
LAPSIDING 1
LAPSIDING 2
BOARD AND BATTEN
ASPHALT ROOF
STEEL ROOF
STEEL RAILING
STOREFRONT FRAME / VINYL WINDOW
TRIM
LAP SIDING COLOR 2
PREFINISHED STEEL RAILING, PAINTED MANUFACTURED STONE VENEER WATER TABLE
MANUFACTURED STONE SILL
VINYL WINDOWCOLUMN
BOARD AND BATTEN
TRIM
STANDING SEAM METAL ROOF
ASPHALT SHINGLE ROOFPREFINISHED LOUVER
STANDING SEAM METAL ROOF
LAP SIDING COLOR 1
COLUMN
STANDING SEAM METAL ROOF
PREFINISHED STEEL RAILING, PAINTED
COLUMN
BOARD AND BATTEN
TRIM
MANUFACTURED STONE VENEER
MANUFACTURED STONE
VENEER WATER TABLE
DOOR
TRIM
VINYL WINDOW
LAP SIDING COLOR 1
36' - 3"145' - 4"
LAP SIDING COLOR 2
BOARD AND BATTEN
TRIM
3 1 /2 " / 1 2 "
PREFINISHED METAL DOWNSPOUT4" / 12"PREFINISHED METAL FASCIA
MANUFACTURED STONE VENEER
PREFINISHED METAL DOWNSPOUT
DOOR
STOREFRONT SYSTEM
MECHANICAL WELL
100' - 0"
145' - 4"
4 " / 1 2 "40' - 0"PREFINISHED METAL LOUVER
419 Canyon Ave Suite 200, Fort Collins, CO 80521 | 970.224.1191
108 East Lincolnway, Cheyenne, WY 82001 | 307.635.5710
www.VFLA.com
DRAWING NUMBER:
PROJECT NUMBER:
SEAL:
IN ASSOCIATION WITH:
Strength in design. Strength in partnership.
Strength in community.
VAUGHT FRYE LARSON ARONSON ARCHITECTURE + INTERIORS, INC.
THIS DRAWING MAY NOT BE PHOTOGRAPHED, SCANNED, TRACED OR
COPIED IN ANY MANNER WITHOUT THE WRITTEN PERMISSION OF VFLA.
COPYRIGHT:
SHEET ISSUANCES
DESCRIPTION DATE
N O T F O R C O N S T R U C T I O N
F O R R E F E R E N C E O N L Y
A R C H I T E C T U R E + I N T E R I O R S
CIVIL ENGINEER:
NORTHERN ENGINEERING
LANDSCAPE ARCHITECT:
RIPLEY DEISGN, INC.
STRUCTURAL ENGINEER:
RAKER PHODES ENGINEERING
MECHANICAL & PLUMBING ENGINEER:
INTERGRATED MECHANICAL
ELECTRICAL ENGINEER:
APS, INC.10/19/2022 11:13:17 AM10/19/2022 11:13:17 AMC:\Users\laura\Documents\Fischer Property_R22_central_Laura_vfla.rvtA2
EXTERIOR
ELEVATIONS
FISCHER
PROPERTIES
1215 S. Shields Street
Fort Collins, CO
PLANNING DEVELOPMENT PHASE
2016-122.1
SCALE:3/32" = 1'-0"1 PLANNING ELEVATION -SOUTH
SCALE:3/32" = 1'-0"2 PLANNING ELEVATION -EAST
PDP SUBMITTAL - ROUND 1 04-27-2022
PDP SUBMITTAL - ROUND 2 08-24-2022
PDP SUBMITTAL - ROUND 3 10-19-2022
NTSSCALE:3 PERSPECTIVE VIEW -NORTHEAST CORNER
BUILDING
IN SECTION
STANDING SEAM METAL
ROOF
PREFINISHED LOUVER
LAP SIDING COLOR 1
MECHANICAL WELL
PATIO TRELLIS
MANUFACTURED STONE SILL
MANUFACTURED STONE VENEER
PREFINISHED STEEL RAILING
BOARD AND BATTEN
LAP SIDING
COLOR 1
TRIM
VINYL WINDOW
LAP SIDING COLOR 2
MANUFACTURED STONE
VENEER WATER TABLE
PREFINISHED
METAL DOWNSPOUT
VINYL WINDOW
PAINTED STEEL
GATE WITH MESH INFILL
STANDING SEAM METAL ROOF
ASPHALT
SHINGLE ROOF
LAP SIDING COLOR 2
132' - 11"
134' - 5"
PREFINISHED METAL FASCIA
FASCIA BOARD
TRIM
PREFINISHED METAL
DOWNSPOUT
129' - 0"
STANDING SEAM
METAL ROOF
4 " / 1 2 "4" / 12"2" / 12"4" / 12"30' - 0"28' - 11 1/4"MANUFACTURED STONE VENEER
MANUFACTURED STONE
VENEER WATER TABLE
ALUMINUM STOREFRONT
VINYL WINDOW
STANDING SEAM METAL ROOF
PREFINISHED METAL FASCIA
TRIM
BUILDING IN
SECTION
PREFINISHED LOUVER
LAP SIDING COLOR 1
STANDING SEAM METAL ROOF
STUCCO
STUCCO CONTROL JOINT
PREFINISHED LOUVER
PATIO TRELLIS
ASPHALT SHINGLE ROOF
LAP SIDING
COLOR 2
BOARD AND
BATTEN
TRIM
MANUFACTURED STONE VENEER
MANUFACTURED STONE VENEER WATER TABLE
BOARD AND BATTEN
PATIO DOOR
PREFINISHED STEEL RAILING
LAP SIDING COLOR 2
TRIM
MANUFACTURED STONE SILL
LAP SIDING COLOR 1
LAP SIDING COLOR 2
STANDING
SEAM METAL ROOF
ASPHALT
SHINGLE ROOF
PREFINISHED METAL DOWNSPOUT
PLANTERSPREFINISHED METAL FASCIA
145' - 4"36' - 3"FASCIA BOARD
3 1/2" / 12"3 1 /2 " / 1 2 "
4 " / 1 2 "4" / 12"4 " / 1 2 "4" / 12"3 1/2" / 12"1. REFER TO SYSTEM NOTES FOR DETAILS
2. REFER TO EXTERIOR COLOR SCHEDULE IN
SYSTEM NOTES FOR ALL EXTERIOR COLORS.
3. ALL EXTERIOR WALL MOUNTED LIGHTS TO BE
FULL CUT-OFF, TYP
EXTERIOR ELEVATION GENERAL NOTES
EXTERIOR FINISH SCHEDULE
STONE
STUCCO
LAPSIDING 1
LAPSIDING 2
BOARD AND BATTEN
ASPHALT ROOF
STEEL ROOF
STEEL RAILING
STOREFRONT FRAME / VINYL WINDOW
TRIM
419 Canyon Ave Suite 200, Fort Collins, CO 80521 | 970.224.1191
108 East Lincolnway, Cheyenne, WY 82001 | 307.635.5710
www.VFLA.com
DRAWING NUMBER:
PROJECT NUMBER:
SEAL:
IN ASSOCIATION WITH:
Strength in design. Strength in partnership.
Strength in community.
VAUGHT FRYE LARSON ARONSON ARCHITECTURE + INTERIORS, INC.
THIS DRAWING MAY NOT BE PHOTOGRAPHED, SCANNED, TRACED OR
COPIED IN ANY MANNER WITHOUT THE WRITTEN PERMISSION OF VFLA.
COPYRIGHT:
SHEET ISSUANCES
DESCRIPTION DATE
N O T F O R C O N S T R U C T I O N
F O R R E F E R E N C E O N L Y
A R C H I T E C T U R E + I N T E R I O R S
CIVIL ENGINEER:
NORTHERN ENGINEERING
LANDSCAPE ARCHITECT:
RIPLEY DEISGN, INC.
STRUCTURAL ENGINEER:
RAKER PHODES ENGINEERING
MECHANICAL & PLUMBING ENGINEER:
INTERGRATED MECHANICAL
ELECTRICAL ENGINEER:
APS, INC.10/19/2022 11:13:46 AM10/19/2022 11:13:46 AMC:\Users\laura\Documents\Fischer Property_R22_central_Laura_vfla.rvtA3
COURTYARD
ELEVATIONS
FISCHER
PROPERTIES
1215 S. Shields Street
Fort Collins, CO
PLANNING DEVELOPMENT PHASE
2016-122.1
SCALE:3/32" = 1'-0"3 WEST COURTYARD ELEVATION -EAST
SCALE:3/32" = 1'-0"2 WEST COURTYARD ELEVATION -SOUTH
SCALE:3/32" = 1'-0"1 WEST COURTYARD ELEVATION -WEST
SCALE:4
PERSPECTIVE VIEW -WEST COURTYARD
LOOKING NORTH
PDP SUBMITTAL - ROUND 1 04-27-2022
PDP SUBMITTAL - ROUND 2 08-24-2022
PDP SUBMITTAL - ROUND 3 10-19-2022
BUILDING
IN SECTION
MECHANICAL WELL
STUCCO
PREFINISHED LOUVER
STUCCO CONTROL JOINT STANDING SEAM METAL ROOF
PREFINISHED LOUVER
LAP SIDING COLOR 1
ASPHALT
SHINGLE ROOF
MECHANICAL WELL
MANUFACTURED STONE SILL
PREFINISHED METAL DOWNSPOUT VINYL WINDOW
MANUFACTURED STONE VENEER WATER TABLE
MANUFACTURED STONE VENEER
LAP SIDING COLOR 2
BOARD AND BATTEN
TRIM
BOARD AND
BATTEN
PREFINISHED STEEL RAILING
145' - 4"145' - 4" 33' - 8"FASCIA BOARD
4 " / 1 2 "4" / 12"
4 " / 1 2 "4" / 12"4" / 12"MECHANICAL
WELL
STANDING
SEAM METAL ROOF
PREFINISHED LOUVER
STUCCO
STUCCO
CONTROL JOINT
PATIO DOOR
PREFINISHED STEEL
RAILING
MANUFACTRED
STONE VENEER
WATER TABLE
VINYL WINDOW
MANUFACTURED
STONE SILL
BOARD AND BATTEN
LAP SIDING
COLOR 2
ASPHALT
SHINGL ROOF
FASCIA BOARD
BUILDING IN
SECTION
LAP SIDING COLOR 1
STOREFRONT ENTRY
MANUFACTURED STONE VENEER
WATER TABLE
MANUFACTURED STONE SILL
MANUFACTURED STONE VENEER
LAP SIDING COLOR 1
TRIM
PREFINISHED METAL DOWNSPOUT LAP SIDING COLOR 2
VINYL WINDOW
STUCCO CONTROL JOINT
STUCCO
PREFINISHED LOUVER
PATIO TRELLIS
ASPHALT SHINGLE ROOF
MECHANICAL WELL
PLANTERS
PREFINISHED
METAL CAP
145' - 4"
METAL STANDING
SEAM ROOF
3 1/2" / 12"3 1 /2 " / 1 2 "
4 " / 1 2 "4" / 12"3 1/2" / 12"1. REFER TO SYSTEM NOTES FOR DETAILS
2. REFER TO EXTERIOR COLOR SCHEDULE IN
SYSTEM NOTES FOR ALL EXTERIOR COLORS.
3. ALL EXTERIOR WALL MOUNTED LIGHTS TO BE
FULL CUT-OFF, TYP
EXTERIOR ELEVATION GENERAL NOTES
EXTERIOR FINISH SCHEDULE
STONE
STUCCO
LAPSIDING 1
LAPSIDING 2
BOARD AND BATTEN
ASPHALT ROOF
STEEL ROOF
STEEL RAILING
STOREFRONT FRAME / VINYL WINDOW
TRIM
419 Canyon Ave Suite 200, Fort Collins, CO 80521 | 970.224.1191
108 East Lincolnway, Cheyenne, WY 82001 | 307.635.5710
www.VFLA.com
DRAWING NUMBER:
PROJECT NUMBER:
SEAL:
IN ASSOCIATION WITH:
Strength in design. Strength in partnership.
Strength in community.
VAUGHT FRYE LARSON ARONSON ARCHITECTURE + INTERIORS, INC.
THIS DRAWING MAY NOT BE PHOTOGRAPHED, SCANNED, TRACED OR
COPIED IN ANY MANNER WITHOUT THE WRITTEN PERMISSION OF VFLA.
COPYRIGHT:
SHEET ISSUANCES
DESCRIPTION DATE
N O T F O R C O N S T R U C T I O N
F O R R E F E R E N C E O N L Y
A R C H I T E C T U R E + I N T E R I O R S
CIVIL ENGINEER:
NORTHERN ENGINEERING
LANDSCAPE ARCHITECT:
RIPLEY DEISGN, INC.
STRUCTURAL ENGINEER:
RAKER PHODES ENGINEERING
MECHANICAL & PLUMBING ENGINEER:
INTERGRATED MECHANICAL
ELECTRICAL ENGINEER:
APS, INC.10/19/2022 11:14:20 AM10/19/2022 11:14:20 AMC:\Users\laura\Documents\Fischer Property_R22_central_Laura_vfla.rvtA4
COURTYARD
ELEVATIONS
FISCHER
PROPERTIES
1215 S. Shields Street
Fort Collins, CO
PLANNING DEVELOPMENT PHASE
2016-122.1
SCALE:3/32" = 1'-0"3 EAST COURTYARD ELEVATION -EAST
SCALE:3/32" = 1'-0"2 EAST COURTYARD ELEVATION -SOUTH
SCALE:3/32" = 1'-0"1 EAST COURTYARD ELEVATION -WEST
SCALE:4
PERSPECTIVE VIEW -EAST COURTYARD
LOOKING NORTH
PDP SUBMITTAL - ROUND 1 04-27-2022
PDP SUBMITTAL - ROUND 2 08-24-2022
PDP SUBMITTAL - ROUND 3 10-19-2022
419 Canyon Ave Suite 200, Fort Collins, CO 80521 | 970.224.1191
108 East Lincolnway, Cheyenne, WY 82001 | 307.635.5710
www.VFLA.com
DRAWING NUMBER:
PROJECT NUMBER:
SEAL:
IN ASSOCIATION WITH:
Strength in design. Strength in partnership.
Strength in community.
VAUGHT FRYE LARSON ARONSON ARCHITECTURE + INTERIORS, INC.
THIS DRAWING MAY NOT BE PHOTOGRAPHED, SCANNED, TRACED OR
COPIED IN ANY MANNER WITHOUT THE WRITTEN PERMISSION OF VFLA.
COPYRIGHT:
SHEET ISSUANCES
DESCRIPTION DATE
N O T F O R C O N S T R U C T I O N
F O R R E F E R E N C E O N L Y
A R C H I T E C T U R E + I N T E R I O R S
CIVIL ENGINEER:
NORTHERN ENGINEERING
LANDSCAPE ARCHITECT:
RIPLEY DEISGN, INC.
STRUCTURAL ENGINEER:
RAKER PHODES ENGINEERING
MECHANICAL & PLUMBING ENGINEER:
INTERGRATED MECHANICAL
ELECTRICAL ENGINEER:
APS, INC.10/19/2022 11:15:54 AM10/19/2022 11:15:54 AMC:\Users\laura\Documents\Fischer Property_R22_central_Laura_vfla.rvtA5
PERSPECTIVE VIEWS
FISCHER
PROPERTIES
1215 S. Shields Street
Fort Collins, CO
PLANNING DEVELOPMENT PHASE
2016-122.1
SCALE:2 PERSPECTIVE VIEW -SOUTHWEST CORNER
PDP SUBMITTAL - ROUND 1 04-27-2022
PDP SUBMITTAL - ROUND 2 08-24-2022
PDP SUBMITTAL - ROUND 3 10-19-2022
NTS
NTS
NTS
NTSSCALE:3 PERSPECTIVE VIEW -SOUTHEAST CORNER
SCALE:1 PERSPECTIVE VIEW -NORTHEAST CORNER
SCALE:4 PERSPECTIVE VIEW -SOUTHEAST CORNER
PAINTED STEEL GATE, SOLID INFILL
6' - 0"PREFINISHED
METAL CAP
MANUFACTURED STONE VENEER
BOLLARD
26' - 4"
PREFINISHED
METAL CAP
MANUFACTURED STONE VENEER
6' - 0"BOLLARD
PAINTED STEEL GATE, SOLID INFILL
12' - 0" 6' - 0"PREFINISHED
METAL CAP
MANUFACTURED STONE
VENEER
26' - 4"
PREFINISHED
METAL CAP
6' - 0"MANUFACTURED STONE
VENEER
BOLLARD
12' - 0"
TRELLIS
STANDING SEAM
METAL ROOF
COLUMN
WATER FEATURE
PREFINISHED
STEEL FENCING
PREFINISHED
METAL FASCIA
WATER
FEATURE
PREFINISHED
STEEL FENCE
COLUMN
TRELLIS
STANDING
SEAM ROOF
MANUFACTURED
STONE VENEER
PREFINISHED METAL
FASCIA
PREFINISHED METAL CAP
6' - 6"PAINTED STEEL GATE
WITH WIRE MESH AND
FRAME
STANDING SEAM
METAL ROOF
PREFINISHED
STEEL FENCING
MANUFACTURED STONE
VENEER
PREFINISHED METAL CAP
6' - 6"COLUMN
WATER FEATURE
PREFINISHED
STEEL FENCING
TRELLIS
MANUFACTURED STONE
VENEER
STANDING
SEAM ROOF
PREFINISHED
METAL FASCIA
PREFINISHED
METAL CAP
26' - 4"12' - 0"CONCRETE PAD
PAINTED STEEL GATE, SOLID INFILL
PAINTED STEEL GATE, SOLID INFILL
BOLLARD
13' - 8"26' - 8"PAINTED STEEL
GATE WITH WIRE
MESH AND FRAME
BIKE STORAGE
419 Canyon Ave Suite 200, Fort Collins, CO 80521 | 970.224.1191
108 East Lincolnway, Cheyenne, WY 82001 | 307.635.5710
www.VFLA.com
DRAWING NUMBER:
PROJECT NUMBER:
SEAL:
IN ASSOCIATION WITH:
Strength in design. Strength in partnership.
Strength in community.
VAUGHT FRYE LARSON ARONSON ARCHITECTURE + INTERIORS, INC.
THIS DRAWING MAY NOT BE PHOTOGRAPHED, SCANNED, TRACED OR
COPIED IN ANY MANNER WITHOUT THE WRITTEN PERMISSION OF VFLA.
COPYRIGHT:
SHEET ISSUANCES
DESCRIPTION DATE
N O T F O R C O N S T R U C T I O N
F O R R E F E R E N C E O N L Y
A R C H I T E C T U R E + I N T E R I O R S
CIVIL ENGINEER:
NORTHERN ENGINEERING
LANDSCAPE ARCHITECT:
RIPLEY DEISGN, INC.
STRUCTURAL ENGINEER:
RAKER PHODES ENGINEERING
MECHANICAL & PLUMBING ENGINEER:
INTERGRATED MECHANICAL
ELECTRICAL ENGINEER:
APS, INC.10/19/2022 11:15:57 AM10/19/2022 11:15:57 AMC:\Users\laura\Documents\Fischer Property_R22_central_Laura_vfla.rvtA6
SITE DETAILS AND
ELEVATIONS
FISCHER
PROPERTIES
1215 S. Shields Street
Fort Collins, CO
PLANNING DEVELOPMENT PHASE
2016-122.1
SCALE:1/8" = 1'-0"5 TRASH -NORTH ELEV.
SCALE:1/8" = 1'-0"6 TRASH -EAST ELEV.
SCALE:1/8" = 1'-0"7 TRASH -SOUTH ELEV.
SCALE:1/8" = 1'-0"8 TRASH -WEST ELEV.
SCALE:1/8" = 1'-0"1 BIKE SHED 1 -NORTH ELEV.
SCALE:1/8" = 1'-0"4 BIKE SHED 1 -WEST ELEV.
SCALE:1/8" = 1'-0"3 BIKE SHED 1 -SOUTH ELEV.
SCALE:1/8" = 1'-0"2 BIKE SHED 1 -EAST ELEV.
SCALE:1/8" = 1'-0"9 TRASH ENCLOSURE
SCALE:1/8" = 1'-0"10 BIKE SHED 1
PDP SUBMITTAL - ROUND 1 04-27-2022
PDP SUBMITTAL - ROUND 2 08-24-2022
PDP SUBMITTAL - ROUND 3 10-19-2022
MANUFACTURED STONE
VENEER
MANUFACTURED
STONE VENEER WATER
TABLE
VINYL WINDOW
STUCCO
STUCCO CONTROL JOINT
TRIM
LAP SIDING COLOR 1
VINYL WINDOW
STUCCO
STUCCO REVEAL
LAP SIDING, COLOR 2
TRIM
VINYL WINDOW
VINYL WINDOW
MANUFACTURED STONE
VENEER
MANUFACTURED
STONE SILL
BOARD AND BATTEN
TRIM
PATIO DOOR
COMPOSIT DECKING
DECK JOISTS
PAINTED STEEL
FRAME WITH WIRE
MESH INFILL
MANUFACTURED STONE
VENEER
PREFINISHED
METAL CAP
DIGITAL MATERIAL BOARD LEGEND
MANUFACTURED
STONE VENEER
CEMENTITIOUS LAPSIDING
COLOR 1
STOREFRONT FRAME
COLOR
VINYL WINDOW
FRAME COLOR
STUCCO COLOR BOARD & BATTENCEMENTITIOUS LAPSIDING
COLOR 2
MESH INFILL TRIM CEDAR SOFFIT
419 Canyon Ave Suite 200, Fort Collins, CO 80521 | 970.224.1191
108 East Lincolnway, Cheyenne, WY 82001 | 307.635.5710
www.VFLA.com
DRAWING NUMBER:
PROJECT NUMBER:
SEAL:
IN ASSOCIATION WITH:
Strength in design. Strength in partnership.
Strength in community.
VAUGHT FRYE LARSON ARONSON ARCHITECTURE + INTERIORS, INC.
THIS DRAWING MAY NOT BE PHOTOGRAPHED, SCANNED, TRACED OR
COPIED IN ANY MANNER WITHOUT THE WRITTEN PERMISSION OF VFLA.
COPYRIGHT:
SHEET ISSUANCES
DESCRIPTION DATE
N O T F O R C O N S T R U C T I O N
F O R R E F E R E N C E O N L Y
A R C H I T E C T U R E + I N T E R I O R S
CIVIL ENGINEER:
NORTHERN ENGINEERING
LANDSCAPE ARCHITECT:
RIPLEY DEISGN, INC.
STRUCTURAL ENGINEER:
RAKER PHODES ENGINEERING
MECHANICAL & PLUMBING ENGINEER:
INTERGRATED MECHANICAL
ELECTRICAL ENGINEER:
APS, INC.10/19/2022 11:16:28 AM10/19/2022 11:16:28 AMC:\Users\laura\Documents\Fischer Property_R22_central_Laura_vfla.rvtA7
DIGITAL MATERIAL
BOARD AND
ELEVATION DETAILS
FISCHER
PROPERTIES
1215 S. Shields Street
Fort Collins, CO
PLANNING DEVELOPMENT PHASE
2016-122.1
SCALE:8 WINDOW DETAIL AT STUCCO
SCALE:6 WINDOW DETAIL AT LAPSIDING
SCALE:5 WINDOW DETAIL AT LAPSIDING
SCALE:7 WINDOW DETAIL AT STONE
SCALE:4 DOOR DETAIL AT BOARD & BATTEN
SCALE:3 WIRE MESH WINDOW DETAIL
PDP SUBMITTAL - ROUND 1 04-27-2022
PDP SUBMITTAL - ROUND 2 08-24-2022
PDP SUBMITTAL - ROUND 3 10-19-2022
SCALE:2 PERSPECTIVE VIEW -NORTHWEST CORNER
CEDAR SOFFIT
PREFINISHED METAL FASCIA
BOARD AND BATTEN
ASPHALT SHINGLE ROOF
FASCIA BOARD
BOARD AND BATTEN
LAPSIDING COLOR 2
TRIM
STUCCO
LAP SIDING COLOR 2 STANDING SEAM
METAL ROOF
LAP SIDING
COLOR 1
FASCIA BOARD
MANUFACTURED STONE VERNEER
PREFINISHED STEEL RAILING, PAINTED
ALUMINUM STOREFRONT
PREFINISHED
METAL FASCIA
TRIM
VINYL WINDOW
CEDAR SOFFIT
MANUFACTURED STONE VENEER
LAP SIDING COLOR 1
MANUFACTURED STONE SILL
MANUFACTURED STONE VENEER WATER TABLE
PREFINISHED METAL DOWNSPOUT
LAP SIDING COLOR 1
WESTWARD DR
S. SHIELDS STREETPARKING LOT
WESTWARD DR
S. SHIELDS STREETPARKING LOT
WESTWARD DR
S. SHIELDS STREETPARKING LOT
WESTWARD DR
S. SHIELDS STREETPARKING LOT
WESTWARD DR
S. SHIELDS STREETPARKING LOT
WESTWARD DR
S. SHIELDS STREETPARKING LOT
Shadow cast by 25' tall wall along property line
Proposed building shadows beyond 25' wall
419 Canyon Ave Suite 200, Fort Collins, CO 80521 | 970.224.1191
108 East Lincolnway, Cheyenne, WY 82001 | 307.635.5710
www.VFLA.com
DRAWING NUMBER:
PROJECT NUMBER:
SEAL:
IN ASSOCIATION WITH:
Strength in design. Strength in partnership.
Strength in community.
VAUGHT FRYE LARSON ARONSON ARCHITECTURE + INTERIORS, INC.
THIS DRAWING MAY NOT BE PHOTOGRAPHED, SCANNED, TRACED OR
COPIED IN ANY MANNER WITHOUT THE WRITTEN PERMISSION OF VFLA.
COPYRIGHT:
SHEET ISSUANCES
DESCRIPTION DATE
N O T F O R C O N S T R U C T I O N
F O R R E F E R E N C E O N L Y
A R C H I T E C T U R E + I N T E R I O R S
CIVIL ENGINEER:
NORTHERN ENGINEERING
LANDSCAPE ARCHITECT:
RIPLEY DEISGN, INC.
STRUCTURAL ENGINEER:
RAKER PHODES ENGINEERING
MECHANICAL & PLUMBING ENGINEER:
INTERGRATED MECHANICAL
ELECTRICAL ENGINEER:
APS, INC.10/19/2022 11:16:53 AM10/19/2022 11:16:53 AMC:\Users\laura\Documents\Fischer Property_R22_central_Laura_vfla.rvtA8
SHADOW STUDY
FISCHER
PROPERTIES
1215 S. Shields Street
Fort Collins, CO
PLANNING DEVELOPMENT PHASE
2016-122.1
SCALE:1 SHADOW STUDY -SUMMER 3PM
SCALE:2 SHADOW STUDY -SUMMER 12PM
SCALE:3 SHADOW STUDY -SUMMER 9AM
SCALE:4 SHADOW STUDY -WINTER 9AM
SCALE:5 SHADOW STUDY -WINTER 12PM
SCALE:6 SHADOW STUDY -WINTER 3PM
SUMMER SOLSTICE
JUNE 21
WINTER SOLSTICE
DECEMBER 21
SHADOW STUDY SUMMARY
L.U.C.3.2.3. -Solar Access, Orientation, Shading
Project Summary
The proposed project consists of a 85 unit residential apartment building, including a 2-story wing on the west, 3-
story wings to the east, and courtyards with exterior pool and associated site amenities with bike storage
shelters. Located at the northeast corner of Westward Dr and S. Shields St within the NCB and RL along the
west property boundary and partially within the Transit-Oriented Development Overlay Zone.
Study Overview
A shadow study was preformed on the proposed residential apartment building. Per code section 3.2.3(A), a
study must be done on December 21st to demonstrate the longest shadow of the year (winter solstice) greater
than the shadow which would be cast by a twenty-five-foot hypothetical wall located along the property lines. We
included June 21st in our study as well to show the shortest shadow day of the year (summer solstice). We have
provided shadow studies for three times for each day; 9am, noon, 3pm. This allows the study to look at the
shadow movement through the day and potential impacts of shading on surrounding structures right to solar
access.
The shadow study shows the shadows created by the residential apartment building (teal) and the shadows cast
by a twenty-five-foot hypothetical along the property line (orange).
Conclusion
The shadow study shows the shadows created by the residential apartment building (teal) do not cast shadows
onto any adjacent buildings that restrict the surrounding buildings the right to solar access. Therefore, the project
meets the shading requirements of the L.U.C.3.2.3.
PROJECT NORTH
PDP SUBMITTAL - ROUND 1 04-27-2022
PDP SUBMITTAL - ROUND 2 08-24-2022
PDP SUBMITTAL - ROUND 3 10-19-2022
WESTWARD DR
S. SHIELDS STREETPARKING LOT
WESTWARD DR
S. SHIELDS STREETPARKING LOT
WESTWARD DR
S. SHIELDS STREETPARKING LOT
WESTWARD DR
S. SHIELDS STREETPARKING LOT
WESTWARD DR
S. SHIELDS STREETPARKING LOT
WESTWARD DR
S. SHIELDS STREETPARKING LOT
WESTWARD DR
S. SHIELDS STREETPARKING LOT
WESTWARD DR
S. SHIELDS STREETPARKING LOT
WESTWARD DR
S. SHIELDS STREETPARKING LOT
Proposed building shadows
419 Canyon Ave Suite 200, Fort Collins, CO 80521 | 970.224.1191
108 East Lincolnway, Cheyenne, WY 82001 | 307.635.5710
www.VFLA.com
DRAWING NUMBER:
PROJECT NUMBER:
SEAL:
IN ASSOCIATION WITH:
Strength in design. Strength in partnership.
Strength in community.
VAUGHT FRYE LARSON ARONSON ARCHITECTURE + INTERIORS, INC.
THIS DRAWING MAY NOT BE PHOTOGRAPHED, SCANNED, TRACED OR
COPIED IN ANY MANNER WITHOUT THE WRITTEN PERMISSION OF VFLA.
COPYRIGHT:
SHEET ISSUANCES
DESCRIPTION DATE
N O T F O R C O N S T R U C T I O N
F O R R E F E R E N C E O N L Y
A R C H I T E C T U R E + I N T E R I O R S
CIVIL ENGINEER:
NORTHERN ENGINEERING
LANDSCAPE ARCHITECT:
RIPLEY DEISGN, INC.
STRUCTURAL ENGINEER:
RAKER PHODES ENGINEERING
MECHANICAL & PLUMBING ENGINEER:
INTERGRATED MECHANICAL
ELECTRICAL ENGINEER:
APS, INC.10/19/2022 11:17:29 AM10/19/2022 11:17:29 AMC:\Users\laura\Documents\Fischer Property_R22_central_Laura_vfla.rvtA9
SHADOW STUDY
FISCHER
PROPERTIES
1215 S. Shields Street
Fort Collins, CO
PLANNING DEVELOPMENT PHASE
2016-122.1
LIGHT AND SHADOW
FEBRUARY 7
LIGHT AND SHADOW
JANUARY 7
LIGHT AND SHADOW
DECEMBER 7
SCALE:9 SHADOW STUDY - FEBUARY 9AM
SCALE:8 SHADOW STUDY - FEBUARY 12PM
SCALE:7 SHADOW STUDY - FEBUARY 3PM
SCALE:6 SHADOW STUDY - JANUARY 9AM
SCALE:5 SHADOW STUDY - JANUARY 12PM
SCALE:4 SHADOW STUDY - JANUARY 3PM
SCALE:3 SHADOW STUDY - DECEMBER 9AM
SCALE:2 SHADOW STUDY - DECEMBER 12PM
SCALE:1 SHADOW STUDY - DECEMBER 3PM
SHADOW STUDY SUMMARY
L.U.C.3.5.1(G) -Building Height Review
Project Summary
The proposed project consists of a 85 unit residential apartment building,
including a 2-story wing on the west, 3-story wings to the east, and courtyards
with exterior pool and associated site amenities with bike storage shelters.
Located at the northeast corner of Westward Dr and S. Shields St within the
NCB and RL along the west property boundary and partially within the Transit-
Oriented Development Overlay Zone.
Study Overview
A shadow study was preformed on the proposed residential apartment building.
Per code section 3.5.1(G), a study must be conducted if a structure exceeds 40'
during (3) winter months. We have provided shadow studies for three times for
each day; 9am, noon, 3pm on December 7th, January 7th, and February 7th.
This allowed the study to look at the shadow movement through the day and
potential impacts of shading on surrounding structures right to protect access to
sunlight, functional use of solar energy technology,adverse impact on the natural,
or artificial light and glare on adjacent properties.
The shadow study shows the shadows created by the residential apartment
building (teal) that could potentially impact adjacent public or private properties.
Conclusion
The study shows the shadows created by the residential apartment building (teal)
do not cast shadows onto any adjacent buildings that restrict the surrounding
buildings the right to solar access. Non-glare building materials and downward
directed cutoff site and building lighting will be used and not create glare during
the day or night. Nor do the shadows contribute to accumulation of snow and ice
on adjacent properties as they do not shade any portion of the adjacent sites for
more than 1 hour of the day.
The proposed building provides privacy to residence and adjacent properties to
the south and west through landscaping and fence on the property line with drive
lane and parking buffer zones beyond. The building massing is oriented north to
south to allows for a buffer of the single family homes with pedestrian walkways
and landscaping.
The building steps from 3-story to 2-story east to west and orientation through
residential deign features, materials, and scale to adjacent single family
residences. Therefore, the project meets the shading requirements of the
L.U.C.3.5.1(G).
PROJECT NORTH
PDP SUBMITTAL - ROUND 1 04-27-2022
PDP SUBMITTAL - ROUND 2 08-24-2022
PDP SUBMITTAL - ROUND 3 10-19-2022