HomeMy WebLinkAboutI-25 & MULBERRY - OVERALL DEVELOPMENT PLAN - ODP220002 - SUBMITTAL DOCUMENTS - ROUND 1 - DRAINAGE REPORTODP DRAINAGE REPORT
FOR
I-25 & Mulberry Commercial Development
Fort Collins
Prepared For:
Miller Mokler, LLC
6900 E. Belleview Ave, Suite 300
Greenwood Village, CO 80111
Steve Shoflick
(303) 929-7002
September 2022
Project No. 39789.00
Prepared By:
JR Engineering, LLC
2900 South College Avenue, Suite 3D
Fort Collins, CO 80525
I-25 & Mulberry Commercial Development Fort Collins
ODP Drainage Report
ii
TABLE OF CONTENTS
TABLE OF CONTENTS ......................................................................................................................... ii
APPENDIX ...................................................................................................................................... ii
Engineer’s Certification Block ........................................................................................................... iii
GENERAL LOCATION & EXISTING SITE DESCRIPTION .......................................................................... 1
LOCATION ..................................................................................................................................... 1
DESCRIPTION OF PROPERTY .......................................................................................................... 1
MASTER DRAINAGE BASIN DESCRIPTION ........................................................................................... 2
COOPER SLOUGH/BOXELDER DRAINAGE BASIN ............................................................................. 2
FLOODPLAIN INFORMATION ............................................................................................................. 2
FLOODPLAIN SUBMITTAL REQUIREMENTS ..................................................................................... 2
PROJECT DESCRIPTION ...................................................................................................................... 3
PROJECT SUMMARY ...................................................................................................................... 3
PROPOSED DRAINAGE FACILITIES .................................................................................................. 3
DRAINAGE BASINS AND SUB-BASINS ................................................................................................. 4
MAJOR BASINS AND SUB-BASINS ................................................................................................... 4
EXISTING SUB-BASIN DESCRIPTION ................................................................................................ 5
EXISTING OFFSITE DRAINAGE BASINS ............................................................................................ 5
DRAINAGE DESIGN CRITERIA ............................................................................................................. 6
REGULATIONS ............................................................................................................................... 6
MINIMIZATION OF THE DCIA ......................................................................................................... 6
DEVELOPMENT CRITERIA REFERENCE AND CONSTRAINTS ............................................................. 6
HYDROLOGIC CRITERIA .................................................................................................................. 6
HYDRAULIC CRITERIA ..................................................................................................................... 7
FLOODPLAIN REGULATIONS COMPLIANCE ..................................................................................... 7
CONCLUSIONS ................................................................................................................................... 7
COMPLIANCE WITH STANDARDS ................................................................................................... 7
REFERENCES ...................................................................................................................................... 8
APPENDIX
Appendix A – Figures
Appendix B – SWMM Results
Appendix C – Hydraulic Calculations
Appendix D – Maps
I-25 & Mulberry Commercial Development Fort Collins
ODP Drainage Report
iii
Engineer’s Certification Block
I hereby attest that this report for the ODP drainage design for the I-25 & Mulberry Commercial
Development Fort Collins was prepared by me or under my direct supervision, in accordance with the
provisions of the Fort Collins Stormwater Criteria Manual. I understand that the City of Fort Collins does
not and will not assume liability for drainage facilities designed by others.
Timothy J. Halopoff, PE, CFM
Registered Professional Engineer
State of Colorado No. 37953
I-25 & Mulberry Commercial Development Fort Collins
ODP Drainage Report
1
GENERAL LOCATION & EXISTING SITE DESCRIPTION
LOCATION
The site is located in the North East Quarter of the South West Quarter of Section 10, Township 7 North,
Range 68 West of the 6th Principal Meridian in the City of Fort Collins, Larimer County, Colorado. The site
is located adjacent to Interstate 25 and East Mulberry Street. More specifically, the site is a 46.92 acre
property that is currently undeveloped, and was previously used as farmland. Sunstate Equipment, LLC
lies directly southeast of the site. Directly to the east of this site across Cloverleaf Way is the Cloverleaf
Community. Across Mulberry Street to the south lies Air Care Colorado as well as a number of other
commercial developments. The subject property is located within the Boxelder Cooper Slough Master
Drainage Basin.
DESCRIPTION OF PROPERTY
The I-25 & Mulberry Commercial Development site is 46.92 acres at the northeast corner of I-25 &
Mulberry. The existing site is currently undeveloped, low lying flat land. The existing site generally slopes
from north to southwest with slopes ranging between 0.60% and 1%. Due to the minimal slopes that exist
on and around the site, minimal slopes are required in swales and storm pipe in the proposed condition.
The property is generally covered with sparse native grasses. There is a ditch along the east property
boundary that drains from the northeast corner to the southeast corner to an existing 24” CMP south of
the site, that outfalls to a large swale along the south side of Mulberry Street to Boxelder Creek, which is
located approximately 700 feet east of the site. The ditch receives the majority of the runoff from the
Cloverleaf Development east of the property. The site is tributary to the Boxelder Creek Master Drainage
Basin. There is a drainage swale starting from the northwest corner of the site traversing down to the
most southern site corner adjacent to the Sunstate property. The swale receives runoff generated from
roadways and properties to the north of the site that are detained inadvertently at the railroad crossing
the frontage road, north of the site. Offsite flows currently collect in a depressed area on the land
southwest of the site that has an on-site area inlet. The inlet captures some of the runoff and slowly
conveys it south across Mulberry, through the Aircare Center out to Boxelder Creek.
There is direct runoff received via sheet flow from the Industrial site directly north of the property. See
Exhibit A in Appendix A.
I-25 & Mulberry Commercial Development Fort Collins
ODP Drainage Report
2
MASTER DRAINAGE BASIN DESCRIPTION
COOPER SLOUGH/BOXELDER DRAINAGE BASIN
The subject property is located within the Boxelder Cooper Slough Master Drainage Basin. The Boxelder
Creek and Cooper Slough Basins encompass approximately 265 square miles; beginning north of the
Colorado/Wyoming border and extending southward into east Fort Collins, where they end at the Cache
la Poudre River. The basins are primarily characterized by farmland with isolated areas of mixed-use estate
residential development and limited commercial development. It is anticipated the lower part of the basin
will undergo urbanization in the future. The I-25 & Mulberry Commercial Development site is generally
located east and central in the master drainage basin.
Previously, the City of Fort Collins and Larimer County performed stream restoration and habitat
improvements within Boxelder Creek that were completed by the Boxelder Stormwater Authority north
of the I-25 & Mulberry Commercial Development’s primary outfall but not directly adjacent to the site.
There are no further storm detention improvements necessary adjacent to the site.
FLOODPLAIN INFORMATION
FLOODPLAIN SUBMITTAL REQUIREMENTS
The site is on FEMA FIRM panel 08069C1003G & 08069C0984H. The site currently lies within FEMA Zone
X; areas which are determined to be outside the 0.2% annual chance floodplain. The site was previously
located in site AE. The site is not located within a FEMA regulated floodplain.
The Boxelder Stormwater Authority has completed improvements upstream of this site and the resulting
floodplain mapping was approved by FEMA as of Feb 21st 2019. The I-25 & Mulberry site has been
removed from the Boxelder Creek floodplain. The revised floodplain boundary map from FCMaps can be
found in Appendix A.
I-25 & Mulberry Commercial Development Fort Collins
ODP Drainage Report
3
PROJECT DESCRIPTION
PROJECT SUMMARY
The I-25 & Mulberry Commercial Development is composed of approximately 46.92 acres of land currently
zoned IL-light industrial. The property has been submitted to the City of Fort Collins for request for
Annexation and Zoning. The request has been made in order to change the current IL zoning to both CS-
Service Commercial and CG-General Commercial zoning. The entirety of the site will be used for various
commercial and industrial uses. Southeast of the site is the Sunstate Equipment property. To the north is
both the RMT Overland and Cactus Wellhead businesses. West of the site is I-25 and east of the site is the
Cloverleaf Community.
PROPOSED DRAINAGE FACILITIES
The I-25 & Mulberry Commercial Development will need to construct drainage facilities to manage on site
drainage, as well as manage the storm drainage from various areas of offsite flows. The Site will be divided
into 3 main drainage basins. (See proposed drainage Map in Appendix D) Basin A is composed of
approximately 7.84 acres located in the northwestern portion of the site. This area will be composed of
roadway, parking lot area and commercial/industrial buildings. Runoff generated within this area will be
conveyed via curb & gutter, sheet flow and storm pipes to a proposed detention facility called Pond A
designed in order to reduce a portion of the runoff before ultimately discharging the flow into Pond B.
Pond A is currently sized using SWMM to hold 1.7 acre-ft and not overflow during a 100-year rainfall
event..
Basin B is composed of approximately 31.65 Acres located in the southeastern portion of the site. This
area will be composed of roadway, parking lot area and commercial/industrial buildings. Runoff generated
within this area will be conveyed via curb & gutter, sheet flow and storm pipes to a proposed detention
facility called Pond B. Pond B will be a water quality/detention facility designed to treat site runoff. This
pond has also been designed large enough to receive the offsite runoff generated from the property to
the north of the site as well as the Cloverleaf Community to the East. A trapezoidal channel with a 2’
concrete pan at its base was designed to convey the offsite flows through the pond. The channel runs at
0.5% from the pond outfall structure north along the eastern edge of the property to the northern
property line than east to the existing concrete pan discharging into the site from the north. A 48” RCP
pipe has been designed as the pond outfall to Boxelder Creek to the east. The pipe has been designed to
I-25 & Mulberry Commercial Development Fort Collins
ODP Drainage Report
4
discharge 88 cfs with 5.5’ of head within the detention pond. The Boxelder Ditch Company has been
contacted, and determined that Boxelder Creek Could receive up to the existing condition runoff
untreated into the ditch which is approximately 92cfs. Pond B is currently sized to hold 12.0 acre-ft.
Basin C is composes approximately 7.75 acres and is located in the western portion of the site. This area
will be composed of parking lot area and commercial/retail buildings. Runoff generated within this area
will be conveyed via sheet flow and trapezoidal channel to a proposed detention facility called Pond C.
Pond C has been designed as a water quality/detention facility. Pond C will discharge into a proposed pipe
along the decommissioned frontage road to an existing 24” storm pipe that crosses Mulberry, conveying
flows to a large drainage ditch along the south side of Mulberry. The existing ditch along Mulberry runs
east to Boxelder Creek. The existing 24” pipe will have 2-3 additional 24” RCPs or equivalent added across
Mulberry in order to reduce flooding that occurs in the existing condition at Mulberry/Frontage
intersection as well as act as an appropriate outfall for pond C. Pond C is currently sized to hold 1.2 acre-
ft.
LID systems such as sand filters, vegetative buffers, bioretention/bioswales, and raingardens will be
incorporated into the overall commercial/industrial areas during project development plans in order to
hit the 50% required LID treatment of impervious areas.
DRAINAGE BASINS AND SUB-BASINS
MAJOR BASINS AND SUB-BASINS
The proposed I-25 & Mulberry Commercial Development site is located in the Boxelder Creek/ Cooper
Slough basin. The Boxelder Creek/ Cooper Slough drainage basin extends along the east end of Fort
Collins; from the basin beginning north of the Colorado/ Wyoming border extending southward into east
Fort Collins, ending at the Cache la Poudre. It encompasses 265 square miles in the City of Fort Collins and
Larimer County. Historically, the basin consisted of agricultural land with isolated areas of mixed-use
residential development and limited commercial development. It is anticipated the lower part of the basin
will experience significant urbanization. Most of the projects are located at the northwest and southwest
I-25 & Mulberry Commercial Development Fort Collins
ODP Drainage Report
5
corners of State Highway 14 and I-25, where the majority of the existing damage to structures is
anticipated, which includes this I-25 & Mulberry Commercial Development.
EXISTING SUB-BASIN DESCRIPTION
There are offsite areas that flow across the proposed development site. The existing drainage basins
within the site flow to the southwest of the site. The existing sub-basins can be found on the Offsite
SWMM Map located in Appendix D.
EXISTING OFFSITE DRAINAGE BASINS
Currently the site collects offsite runoff from 3 locations: the northwest corner via a side road
ditch (Q100 = 12.7 cfs), sheet flow from the north parking (Q100 = 54.8 cfs) and the east side
of the property from various pans coming from the Cloverleaf Area (Q100 = 251.0cfs). Existing
runoff from the northwest will be captured in a culvert and piped under the proposed
configuration of the Frontage Road back to the existing channel located just off of the western
property boundary. This flow is conveyed to the existing channel, south of Pond C where it will
be captured in a Type C inlet and routed to the proposed quad 24” RCP or equivalent under
Mulberry. The Runoff from the property north of the site will be contained within a 2’-4’ deep
trapezoidal channel that runs from the middle of the north end of the site to the eastern property
line, then south into proposed detention Pond B. Offsite flows coming into the site via existing
concrete pans and sheet flow from the Cloverleaf Development to the east will be captured in
the same trapezoidal channel along the eastern property line into Pond B. All offsite runoff is
ultimately conveyed to Boxelder Creek. Offsite flows were evaluated utilizing EPA SWMM
Version 5.1. A map summarizing the SWMM model and flows can be found in Appendix D. The
results from the SWMM modeling as well as all flows entering the site for the 100-year storm
event can be found within Appendix B.
Other offsite flows and upstream basins were evaluated utilizing SWMM in order to accurately
represent the off-site flows that enter the site. The SWMM results as well as an offsite basin map
can be found in Appendix D.
I-25 & Mulberry Commercial Development Fort Collins
ODP Drainage Report
6
DRAINAGE DESIGN CRITERIA
REGULATIONS
This report was prepared to meet or exceed the City of Fort Collins stormwater criteria. The City of
Fort Collins Stormwater Criteria Manual (dated 2018)(FCSCM) and the Urban Drainage Flood Control
District’s (UDFCD) Drainage Criteria Manual (USDCM) Volumes 1, 2 and 3 were referenced as guidelines
for this design.
MINIMIZATION OF THE DCIA
UDFCD recommends the Four Step Process to protect receiving waters. The four step process
incorporates reducing runoff volume, treating water quality capture volume, stabilizing streams, and
implementing long-term source controls. Volume reduction is an important part of the Four Step Process
and is fundamental to effective stormwater management. Per City criteria, a minimum of 75 percent of
new impervious surface area must be treated by a Low-Impact Development (LID) best management
practice (BMP). The proposed LID BMPs will have the effect of slowing runoff through the site lot and
increasing infiltration and rainfall interception by encouraging infiltration and careful selection of vegetative
cover. The improvements will decrease the runoff coefficient from the site and are expected to have no
adverse impact on the timing, quantity, or quality of stormwater runoff.
DEVELOPMENT CRITERIA REFERENCE AND CONSTRAINTS
The master drainage report for the Boxelder Creek Drainage Basin was prepared by ICON Engineering,
Inc. April 9th, 2002. I-25 & Mulberry Commercial Development falls within element 30 in the SWMM file
associated with the master drainage report. The development of the I-25 & Mulberry site must not have
a negative impact on downstream discharges, volumes and water surface elevations. The elements directly
downstream from the I-25 & Mulberry Commercial Development site are elements 47 and 29 from the
master SWMM file.
HYDROLOGIC CRITERIA
SWMM was utilized in conjunction with The City of Fort Collins Stormwater Criteria Manual to determine
basin runoff characteristics and rainfall intensities.
I-25 & Mulberry Commercial Development Fort Collins
ODP Drainage Report
7
HYDRAULIC CRITERIA
The ultimate I-25 & Mulberry Commercial Development storm drainage system will be designed to convey
the minor and major storm events through the property with the proposed inlets, storm sewer pipes, and
swales for the flows being calculated by this report. Per the requirements provided by the City of Fort
Collins Storm Drainage Design Criteria and Construction Manual, all inlets and storm pipes will be
designed to convey the 100-year storm flows. During the major storm event, (developed condition 100-
year storm) the accumulated water depth in the water quality/detention ponds will be held to a maximum
level of six inches below all building finished floor elevations.
FLOODPLAIN REGULATIONS COMPLIANCE
As previously stated, the I-25 & Mulberry Commercial Development site is outside of the City of Fort
Collins Boxelder Creek flood plain. The City of Fort Collins reanalyzed the Boxelder Creek floodplain
and the BFEs (Base Flood Elevations) for Boxelder Creek near the site. Those BFE’s were used for the
purposes of this report.
CONCLUSIONS
COMPLIANCE WITH STANDARDS
The hydrologic and water quality calculations were performed using the required methods as outlined in
the City of Fort Collins Stormwater Criteria Manual. The proposed drainage improvements meet or
exceed the City’s requirements. It should be noted that due to extremely gradual slopes in the existing
site conditions (<1%), it is likely that proposed swales, curb & gutter, and surface grades will meet
minimum slopes and likely need to incorporate concrete pans in many areas on-site.
I-25 & Mulberry Commercial Development Fort Collins
ODP Drainage Report
8
REFERENCES
Fort Collins Stormwater Criteria Manual; City of Fort Collins, Colorado, December 2018.
Urban Storm Drainage Criteria Manual (Volumes 1, 2, and 3); Urban Drainage and Flood Control District,
June 2001.
I-25 & Mulberry Commercial Development Fort Collins
ODP Drainage Report
APPENDIX A – FIGURES
A Westrian Company
VICINITY MAP
SITE
COOPER SLOUGH BASIN
PROPOSED STREAM RESTORATION
AND HABITAT IMPROVEMENTS
Drake Rd
Prospect St
Mulberry St 14
I 25
Timberline RdLemay AveLemay AveTimberline RdI 25
14
Vine Dr
0 2,500 5,0001,250
Feet
Proposed Stream Restoration and
Habitat Improvements
Legend
Cooper Slough Subbasins
Proposed Stream Restoration
and Habitat Improvements
Proposed Stream Restoration and
Habitat Improvements
A Westrian Company
I-25 AND MULBERRY
EXHIBIT A
AREA 9: SITE SOUTHERN ULTIMATE OUTFALL
VIEW: NORTH
AREA 1: 18" CMP
VIEW: NORTH
AREA 3: 18" RCP
VIEW: NORTH
AREA 2: VINE INLET
VIEW: NORTHWEST
AREA 4: RAILROAD CULVERT
VIEW: SOUTH
AREA 6: DRAINAGE PAN FROM CLOVERLEAF
VIEW: SOUTHWEST
AREA 8: 24" CULVERT UNDER
HWY 14
VIEW: SOUTH
AREA 7: ON-SITE AREA INLET
VIEW: NORTH
AREA 10: SITE EASTERN
ULTIMATE OUTFALL
AREA 5: CULVERT INTO SITE
E
HWY 14
E VINE DR
MAPLE
COTTONWOOD
LOCUST
BIRCH
SPRUCE
RAILROAD TRACKS
1
2
3
4
6
7
8
9
10
5
X:\3970000.all\3978900\Drawings\Presentations\Off-site Drainage Exhiit.dwg, 36x48 Title Portrait, 7/24/2020 12:16:37 PM, FC
+\GURORJLF6RLO*URXS²/DULPHU&RXQW\$UHD&RORUDGR
1DWXUDO5HVRXUFHV
&RQVHUYDWLRQ6HUYLFH
:HE6RLO6XUYH\
1DWLRQDO&RRSHUDWLYH6RLO6XUYH\
3DJHRI
1
:
1
:
1
:
1
:1
0DSSURMHFWLRQ:HE0HUFDWRU&RUQHUFRRUGLQDWHV:*6(GJHWLFV870=RQH1:*6
)HHW
0HWHUV
0DS6FDOHLISULQWHGRQ$SRUWUDLW[VKHHW
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²$XJ7KHRUWKRSKRWRRURWKHUEDVHPDSRQZKLFKWKHVRLOOLQHVZHUHFRPSLOHGDQGGLJLWL]HGSUREDEO\GLIIHUVIURPWKHEDFNJURXQGLPDJHU\GLVSOD\HGRQWKHVHPDSV$VDUHVXOWVRPHPLQRUVKLIWLQJRIPDSXQLWERXQGDULHVPD\EHHYLGHQW+\GURORJLF6RLO*URXS²/DULPHU&RXQW\$UHD&RORUDGR1DWXUDO5HVRXUFHV&RQVHUYDWLRQ6HUYLFH:HE6RLO6XUYH\1DWLRQDO&RRSHUDWLYH6RLO6XUYH\3DJHRI
+\GURORJLF6RLO*URXS
0DSXQLWV\PERO 0DSXQLWQDPH 5DWLQJ $FUHVLQ$2, 3HUFHQWRI$2,
$VFDORQVDQG\ORDP
WRSHUFHQWVORSHV
%
&DUXVRFOD\ORDPWR
SHUFHQWVORSH
'
)OXYDTXHQWVQHDUO\
OHYHO
%
)RUW&ROOLQVORDPWR
SHUFHQWVORSHV
&
*DUUHWWORDPWR
SHUFHQWVORSHV
%
.LPORDPWRSHUFHQW
VORSHV
%
.LPORDPWRSHUFHQW
VORSHV
%
.LPORDPWRSHUFHQW
VORSHV
%
.LP7KHGDOXQGORDPV
WRSHUFHQWVORSHV
%
/DULPJUDYHOO\VDQG\
ORDPWRSHUFHQW
VORSHV
%
/DULPHU6WRQHKDP
FRPSOH[WR
SHUFHQWVORSHV
%
/RQJPRQWFOD\WR
SHUFHQWVORSHV
'
/RYHODQGFOD\ORDPWR
SHUFHQWVORSHV
&
1XQQFOD\ORDPWR
SHUFHQWVORSHV
&
1XQQFOD\ORDPWR
SHUFHQWVORSHV
&
1XQQFOD\ORDPZHW
WRSHUFHQWVORSHV
&
2WHURVDQG\ORDPWR
SHUFHQWVORSHV
$
2WHURVDQG\ORDPWR
SHUFHQWVORSHV
$
2WHURVDQG\ORDPWR
SHUFHQWVORSHV
$
3DROLILQHVDQG\ORDP
WRSHUFHQWVORSHV
$
+\GURORJLF6RLO*URXS²/DULPHU&RXQW\$UHD&RORUDGR
1DWXUDO5HVRXUFHV
&RQVHUYDWLRQ6HUYLFH
:HE6RLO6XUYH\
1DWLRQDO&RRSHUDWLYH6RLO6XUYH\
3DJHRI
0DSXQLWV\PERO 0DSXQLWQDPH 5DWLQJ $FUHVLQ$2, 3HUFHQWRI$2,
6DWDQWDORDPWR
SHUFHQWVORSHV
&
6DWDQWDORDPWR
SHUFHQWVORSHV
&
6DWDQWD9DULDQWFOD\
ORDPWRSHUFHQW
VORSHV
'
6WRQHKDPORDPWR
SHUFHQWVORSHV
%
6WRQHKDPORDPWR
SHUFHQWVORSHV
&
7DEOH0RXQWDLQORDP
WRSHUFHQWVORSHV
%
7RWDOVIRU$UHDRI,QWHUHVW
'HVFULSWLRQ
+\GURORJLFVRLOJURXSVDUHEDVHGRQHVWLPDWHVRIUXQRIISRWHQWLDO6RLOVDUH
DVVLJQHGWRRQHRIIRXUJURXSVDFFRUGLQJWRWKHUDWHRIZDWHULQILOWUDWLRQZKHQWKH
VRLOVDUHQRWSURWHFWHGE\YHJHWDWLRQDUHWKRURXJKO\ZHWDQGUHFHLYH
SUHFLSLWDWLRQIURPORQJGXUDWLRQVWRUPV
7KHVRLOVLQWKH8QLWHG6WDWHVDUHDVVLJQHGWRIRXUJURXSV$%&DQG'DQG
WKUHHGXDOFODVVHV$'%'DQG&'7KHJURXSVDUHGHILQHGDVIROORZV
*URXS$6RLOVKDYLQJDKLJKLQILOWUDWLRQUDWHORZUXQRIISRWHQWLDOZKHQ
WKRURXJKO\ZHW7KHVHFRQVLVWPDLQO\RIGHHSZHOOGUDLQHGWRH[FHVVLYHO\
GUDLQHGVDQGVRUJUDYHOO\VDQGV7KHVHVRLOVKDYHDKLJKUDWHRIZDWHU
WUDQVPLVVLRQ
*URXS%6RLOVKDYLQJDPRGHUDWHLQILOWUDWLRQUDWHZKHQWKRURXJKO\ZHW7KHVH
FRQVLVWFKLHIO\RIPRGHUDWHO\GHHSRUGHHSPRGHUDWHO\ZHOOGUDLQHGRUZHOO
GUDLQHGVRLOVWKDWKDYHPRGHUDWHO\ILQHWH[WXUHWRPRGHUDWHO\FRDUVHWH[WXUH
7KHVHVRLOVKDYHDPRGHUDWHUDWHRIZDWHUWUDQVPLVVLRQ
*URXS&6RLOVKDYLQJDVORZLQILOWUDWLRQUDWHZKHQWKRURXJKO\ZHW7KHVHFRQVLVW
FKLHIO\RIVRLOVKDYLQJDOD\HUWKDWLPSHGHVWKHGRZQZDUGPRYHPHQWRIZDWHURU
VRLOVRIPRGHUDWHO\ILQHWH[WXUHRUILQHWH[WXUH7KHVHVRLOVKDYHDVORZUDWHRI
ZDWHUWUDQVPLVVLRQ
*URXS'6RLOVKDYLQJDYHU\VORZLQILOWUDWLRQUDWHKLJKUXQRIISRWHQWLDOZKHQ
WKRURXJKO\ZHW7KHVHFRQVLVWFKLHIO\RIFOD\VWKDWKDYHDKLJKVKULQNVZHOO
SRWHQWLDOVRLOVWKDWKDYHDKLJKZDWHUWDEOHVRLOVWKDWKDYHDFOD\SDQRUFOD\
OD\HUDWRUQHDUWKHVXUIDFHDQGVRLOVWKDWDUHVKDOORZRYHUQHDUO\LPSHUYLRXV
PDWHULDO7KHVHVRLOVKDYHDYHU\VORZUDWHRIZDWHUWUDQVPLVVLRQ
,IDVRLOLVDVVLJQHGWRDGXDOK\GURORJLFJURXS$'%'RU&'WKHILUVWOHWWHULV
IRUGUDLQHGDUHDVDQGWKHVHFRQGLVIRUXQGUDLQHGDUHDV2QO\WKHVRLOVWKDWLQ
WKHLUQDWXUDOFRQGLWLRQDUHLQJURXS'DUHDVVLJQHGWRGXDOFODVVHV
+\GURORJLF6RLO*URXS²/DULPHU&RXQW\$UHD&RORUDGR
1DWXUDO5HVRXUFHV
&RQVHUYDWLRQ6HUYLFH
:HE6RLO6XUYH\
1DWLRQDO&RRSHUDWLYH6RLO6XUYH\
3DJHRI
5DWLQJ2SWLRQV
$JJUHJDWLRQ0HWKRG'RPLQDQW&RQGLWLRQ
&RPSRQHQW3HUFHQW&XWRII1RQH6SHFLILHG
7LHEUHDN5XOH+LJKHU
+\GURORJLF6RLO*URXS²/DULPHU&RXQW\$UHD&RORUDGR
1DWXUDO5HVRXUFHV
&RQVHUYDWLRQ6HUYLFH
:HE6RLO6XUYH\
1DWLRQDO&RRSHUDWLYH6RLO6XUYH\
3DJHRI
18,0563,009.3FCMaps Floodplain & FloodwayThis map is a user generated static output from the City of Fort Collins FCMapsInternet mapping site and is for reference only. Data layers that appear on thismap may or may not be accurate, current, or otherwise reliable.City of Fort Collins - GIS2,286.01:WGS_1984_Web_Mercator_Auxiliary_SphereFeet2,286.00 1,143.00NotesLegend13,719FEMA FloodplainFEMA High Risk - FloodwayFEMA High Risk - 100 YearFEMA Moderate Risk - 100 / 500 YearCity FloodplainsCity High Risk - FloodwayCity High Risk - 100 YearCity Moderate Risk - 100 YearCity LimitsWorld Hillshade
400 North Link Lane | Fort Collins, Colorado 80524
Telephone: 970-206-9455 Fax: 970-206-9441
September 21, 2022
Miller United
6900 E Belleview Avenue
Suite 300
Greenwood Village, Colorado 80111
Attn: Mr. Steven Shoflick
Subject: Piezometer Installation and Groundwater Measurements
NE I-25 & Mulberry
Fort Collins, Colorado
CTL|T Project Number: FC10289-112
CTL|Thompson, Inc. is performing a groundwater monitoring study at the NE I-25
and Mulberry development in Fort Collins, Colorado. This letter presents the most
recentgroundwater measurements from the piezometers at this site.
On April 8, 2022, eight monitoring holes were drilled at the locations shown on
Figure 1 using hollow and solid-stem augers and a truck-mounted drill rig. The
monitoring holes were fitted with PVC piezometers to facilitate monthly groundwater
measurements. On April 10, 2022, CTL|T began monitoring the piezometers at the site.
Table A summarizes our groundwater measurements to date.
As of September 19th, 2022, crops present on the site had been harvested. This
site activity destroyed piezometers TH-4, TH-5, and TH-7.
We appreciate the opportunity to work with you on this project. If you have any
additional questions or concerns, please contact the undersigned.
Sincerely,
CTL|THOMPSON, INC.
R.B. “Chip” Leadbetter, III, PE Spencer A. Schram, PE
Senior Geotechnical Engineer Geotechnical Project Manager
TH-5 TH-4
TH-3
TH-7
TH-2
Mulberry Street / CO-14 Cloverleaf WayTH-8
TH-6
TH-1Interstate 25Frontage RoadPr
o
po
s
ed
R
oa
dwa
y
s
MULBERRY STREET CLOVERLEAF WAYI25LEGEND:
INDICATES APPROXIMATE LOCATION OF
EXPLORATORY BORING
TH-1
VICINITY MAP
(FORT COLLINS, CO)
NOT TO SCALE
MILLER UNITED
NE I-25 & MULBERRY
CTL I T PROJECT NO. FC10289-112
FIGURE 1
Locations of
Monitoring
Wells
300'150'
APPROXIMATE
SCALE: 1" = 300'
0'
Table ADepth to Groundwater (feet)9/19/228/15/227/11/226/7/225/10/224/11/22TH-17.98.99.29.79.88.3TH-26.98.18.38.97.97.4TH-36.38.28.68.68.67.4TH-4-*7.77.77.88.67.4TH-5-*6.16.05.96.06.2TH-65.65.55.45.55.55.1TH-7-*6.06.06.26.05.6TH-84.55.55.25.55.04.6*Indicates Monitoring Well destroyed by crop harvestCTL | T PROJECT NO. FC10289-112NE I-25 & MULBERRYMILLER UNITED
I-25 & Mulberry Commercial Development Fort Collins
ODP Drainage Report
APPENDIX B – SWMM RESULTS
Conduit Surcharge SummaryHoursHours Hours Hours Above HoursBoth Ends Upstream Downstream Normal CapacityConduit Full Full Full Flow Limited24_Out 14.07 14.07 14.07 14.12 14.07SWMM 5Page 1
Link Flow SummaryMaximum Day of Hour of Maximum Max / Max /|Flow| Maximum Maximum |Velocity| Full FullLink Type CFS Flow Flow ft/sec Flow DepthIrr_Ditch1 CONDUIT 6.64 0 03:44 2.39 0.08 0.34Irr_Ditch2 CONDUIT 55.55 0 00:58 3.14 0.18 0.41N_Field CONDUIT 61.36 0 00:47 1.89 0.19 0.42Irr_Ditch3 CONDUIT 61.75 0 00:43 3.85 0.11 0.37Irr_Ditch4 CONDUIT 146.25 0 00:43 3.47 0.40 0.67Irr_Ditch5 CONDUIT 201.26 0 00:45 4.01 0.51 0.75Irr_Ditch6 CONDUIT 250.10 0 00:45 5.30 0.27 0.5824_Out CONDUIT 3.39 0 14:26 2.08 1.08 1.00Out_RR DUMMY 12.72 0 03:44Out_Vine DUMMY 6.64 0 03:29Out_ExPnd DUMMY 14.64 0 03:11Out_Swale DUMMY 5.99 0 03:11MulberryOverflow DUMMY 0.00 0 00:00SWMM 5Page 1
Node Depth SummaryMaximumAverage Maximum Maximum Day of Hour of ReportedDepth Depth HGL Maximum Maximum DepthNode Type Feet Feet Feet Depth Depth FeetNode_1 JUNCTION 0.08 0.67 4964.01 0 03:29 0.67Node_3 JUNCTION 0.11 1.40 4943.50 0 00:47 1.37Node_2 JUNCTION 0.01 1.40 4945.02 0 00:40 1.25Node_4 JUNCTION 0.02 1.53 4945.31 0 00:40 1.42Node_5 JUNCTION 0.04 2.71 4941.37 0 00:42 2.63Node_6 JUNCTION 0.04 3.01 4940.23 0 00:43 2.97Node_7 JUNCTION 0.04 2.99 4937.99 0 00:45 2.99Node_8 JUNCTION 0.64 5.00 4936.50 0 00:21 5.00outfall OUTFALL 0.00 0.00 4930.00 0 00:00 0.00Outfall_2 OUTFALL 0.00 0.00 4930.50 0 00:00 0.00Outfall_3 OUTFALL 0.23 1.50 4932.00 0 00:23 1.50RR STORAGE 0.50 3.22 4946.34 0 03:44 3.22Vine STORAGE 0.30 3.31 4966.65 0 03:29 3.31EXSite STORAGE 0.53 3.48 4932.56 0 03:11 3.48SWMM 5Page 1
Node Flooding SummaryTotal MaximumMaximum Day of Hour of Flood PondedHours Rate Maximum Maximum Volume VolumeNode Flooded CFS Flooding Flooding 10^6 gal 1000 ft³Node_8 14.07 266.40 0 00:45 6.268 0.000SWMM 5Page 1
Node Inflow SummaryMaximum MaximumLateral Total FlowLateral Total Day of Hour of Inflow Inflow BalanceInflow Inflow Maximum Maximum Volume Volume ErrorNode Type CFS CFS Inflow Inflow 10^6 gal 10^6 gal %Node_1 JUNCTION 0.00 6.64 0 03:29 0 2.15 0.000Node_3 JUNCTION 0.00 67.49 0 00:47 0 8 0.000Node_2 JUNCTION 73.95 73.95 0 00:40 1.2 1.2 0.000Node_4 JUNCTION 65.21 65.21 0 00:40 1.15 1.15 0.000Node_5 JUNCTION 91.71 148.18 0 00:42 1.62 2.78 0.000Node_6 JUNCTION 63.35 203.76 0 00:43 1.1 3.88 0.000Node_7 JUNCTION 59.32 251.21 0 00:44 1.06 4.94 0.000Node_8 JUNCTION 27.66 269.54 0 00:45 0.79 7.79 -0.000outfall OUTFALL 0.00 14.64 0 03:11 0 8.88 0.000Outfall_2 OUTFALL 0.00 0.00 0 00:00 0 0 0.000Outfall_3 OUTFALL 0.00 3.39 0 14:26 0 1.52 0.000RR STORAGE 89.54 92.34 0 01:00 4.64 6.79 0.016Vine STORAGE 53.91 53.91 0 00:40 2.15 2.15 0.029EXSite STORAGE 84.46 125.25 0 00:56 2.91 10.9 0.018SWMM 5Page 1
Outfall Loading SummaryFlow Avgerage Maximum TotalFrequency Flow Flow VolumeOutfall Node % CFS CFS 10^6 galoutfall 35.08 7.77 14.64 8.877Outfall_2 0.00 0.00 0.00 0.000Outfall_3 31.79 1.47 3.39 1.523SWMM 5Page 1
Subcatchment Runoff SummaryTotal Total Total Total Imperv Perv Total Total PeakPrecip Runon Evap Infil Runoff Runoff Runoff Runoff RunoffSubcatchment in in in in in in in 10^6 gal CFSEX2 3.67 0.00 0.00 2.43 0.07 1.17 1.24 4.64 89.54EX1 3.67 0.00 0.00 2.57 0.18 0.91 1.09 2.15 53.91EX4 3.67 0.00 0.00 2.19 0.11 1.37 1.48 2.04 47.88EX3 3.67 0.00 0.00 0.80 2.15 0.67 2.82 1.20 73.95EX5 3.67 0.00 0.00 0.95 2.15 0.52 2.67 0.86 38.67EX6 3.67 0.00 0.00 0.84 2.15 0.63 2.78 1.15 65.21EX7 3.67 0.00 0.00 0.84 2.15 0.63 2.78 1.62 91.71EX8 3.67 0.00 0.00 0.96 2.15 0.51 2.66 1.10 63.35EX9 3.67 0.00 0.00 1.11 1.79 0.73 2.52 1.06 59.32EX10 3.67 0.00 0.00 2.41 0.36 0.89 1.25 0.79 27.66SWMM 5Page 1
Subcatchment Runoff SummaryRunoffSubcatchment CoeffEX2 0.338EX1 0.298EX4 0.404EX3 0.770EX5 0.728EX6 0.757EX7 0.757EX8 0.726EX9 0.687EX10 0.341SWMM 5Page 2
Storage Volume SummaryAverage Average Evaporation Exfiltration Maximum Maximum Day of Hour of MaximumStorage Volume Percent Loss Loss Volume Percent Maximum Maximum OutflowUnit 1000 ft³ Full % % 1000 ft³ Full Volume Volume CFSRR 61.543 9 0 0 551.435 81 0 03:44 12.72Vine 13.158 1 0 0 212.109 15 0 03:29 6.64EXSite 44.254 2 0 0 451.713 19 0 03:11 20.63SWMM 5Page 1
Node Inflow SummaryMaximum MaximumLateral Total FlowLateral Total Day of Hour of Inflow Inflow BalanceInflow Inflow Maximum Maximum Volume Volume ErrorNode Type CFS CFS Inflow Inflow 10^6 gal 10^6 gal %Node_4 JUNCTION 58.89 115.55 0 00:42 1.05 2.15 0.000Node_5 JUNCTION 82.82 186.71 0 00:43 1.47 3.62 0.000Node_6 JUNCTION 57.03 234.31 0 00:44 0.987 4.61 0.000Node_7 JUNCTION 59.32 280.55 0 00:45 1.06 5.66 0.00010 JUNCTION 66.21 66.21 0 00:40 1.1 1.1 -0.00011 JUNCTION 0.00 10.26 0 01:10 0 0.605 0.00012 JUNCTION 0.00 10.26 0 01:10 0 0.605 0.00013 JUNCTION 0.00 10.26 0 01:09 0 0.606 0.00014 JUNCTION 0.00 10.26 0 01:11 0 0.604 0.00015 JUNCTION 166.50 166.50 0 00:40 2.79 2.79 0.00018 JUNCTION 22.60 24.98 0 00:40 0.299 0.958 0.00019 JUNCTION 12.21 36.75 0 00:41 0.329 1.29 0.00020 JUNCTION 0.00 4.00 0 00:47 0 0.659 0.00021 JUNCTION 0.00 92.00 0 01:24 0 9.05 0.000MulberryChannel OUTFALL 0.00 36.48 0 00:41 0 1.29 0.000Boxelder OUTFALL 0.00 92.02 0 02:27 0 9.05 0.000PondA STORAGE 39.77 39.77 0 00:40 0.607 0.607 0.174PondC STORAGE 52.68 52.68 0 00:40 0.66 0.66 0.069PondB STORAGE 0.00 432.33 0 00:46 0 9.06 0.101SWMM 5Page 1
Outfall Loading SummaryFlow Avgerage Maximum TotalFrequency Flow Flow VolumeOutfall Node % CFS CFS 10^6 galMulberryChannel 11.45 3.45 36.48 1.286Boxelder 34.96 7.94 92.02 9.048SWMM 5Page 1
Subcatchment Runoff SummaryTotal Total Total Total Imperv Perv Total Total PeakPrecip Runon Evap Infil Runoff Runoff Runoff Runoff RunoffSubcatchment in in in in in in in 10^6 gal CFSEX3 3.67 0.00 0.00 1.05 1.80 0.79 2.58 1.10 66.21EX6 3.67 0.00 0.00 1.11 1.79 0.73 2.52 1.05 58.89EX7 3.67 0.00 0.00 1.11 1.79 0.73 2.52 1.47 82.82EX8 3.67 0.00 0.00 1.25 1.79 0.59 2.38 0.99 57.03EX9 3.67 0.00 0.00 1.11 1.79 0.73 2.52 1.06 59.32EX10 3.67 0.00 0.00 1.84 0.36 1.46 1.82 0.33 12.21B1 3.67 0.00 0.00 0.35 2.87 0.38 3.25 2.79 166.50A1 3.67 0.00 0.00 0.72 2.23 0.67 2.90 0.61 39.77C1 3.67 0.00 0.00 0.49 2.52 0.62 3.13 0.66 52.68EX11 3.67 0.00 0.00 0.69 2.16 0.79 2.94 0.30 22.60SWMM 5Page 1
Subcatchment Runoff SummaryRunoffSubcatchment CoeffEX3 0.704EX6 0.687EX7 0.687EX8 0.649EX9 0.687EX10 0.497B1 0.886A1 0.791C1 0.854EX11 0.802SWMM 5Page 2
Storage Volume SummaryAverage Average Evaporation Exfiltration Maximum Maximum Day of Hour of MaximumStorage Volume Percent Loss Loss Volume Percent Maximum Maximum OutflowUnit 1000 ft³ Full % % 1000 ft³ Full Volume Volume CFSPondA 0.451 0 0 0 31.544 32 0 01:09 10.26PondC 2.001 3 0 0 61.818 80 0 02:07 4.00PondB 12.114 2 0 0 555.306 88 0 01:58 92.00SWMM 5Page 1
Link Flow SummaryMaximum Day of Hour of Maximum Max / Max /|Flow| Maximum Maximum |Velocity| Full FullLink Type CFS Flow Flow ft/sec Flow DepthIrr_Ditch3 CONDUIT 113.73 0 00:44 3.69 0.27 0.56Irr_Ditch4 CONDUIT 185.69 0 00:44 4.19 0.43 0.69Irr_Ditch5 CONDUIT 232.27 0 00:45 3.79 0.67 0.8413 CONDUIT 10.26 0 01:10 4.17 0.50 0.5014 CONDUIT 10.26 0 01:10 4.44 0.46 0.4815 CONDUIT 4.00 0 04:13 3.31 0.11 0.2317 CONDUIT 24.76 0 00:41 5.47 0.46 0.4818 CONDUIT 36.48 0 00:41 5.47 0.55 0.5319 CONDUIT 10.26 0 01:11 4.46 0.28 0.3620 CONDUIT 161.55 0 00:42 5.37 0.50 0.7321 CONDUIT 10.26 0 01:11 8.99 0.10 0.2222 CONDUIT 92.02 0 02:27 16.26 0.74 0.6423 CONDUIT 278.82 0 00:46 3.52 0.28 0.5624 CONDUIT 61.33 0 00:43 3.68 0.30 0.614 DUMMY 4.00 0 00:476 DUMMY 92.00 0 01:248 DUMMY 10.26 0 01:09SWMM 5Page 1
Node Depth SummaryMaximumAverage Maximum Maximum Day of Hour of ReportedDepth Depth HGL Maximum Maximum DepthNode Type Feet Feet Feet Depth Depth FeetNode_4 JUNCTION 0.03 2.26 4939.73 0 00:42 2.18Node_5 JUNCTION 0.04 2.78 4937.85 0 00:43 2.75Node_6 JUNCTION 0.05 3.37 4936.40 0 00:44 3.36Node_7 JUNCTION 0.05 3.40 4934.90 0 00:45 3.4010 JUNCTION 0.02 1.90 4944.10 0 00:40 1.7211 JUNCTION 0.03 1.19 4937.53 0 01:10 1.1912 JUNCTION 0.03 1.25 4937.91 0 01:10 1.2513 JUNCTION 0.03 1.25 4938.25 0 01:09 1.2514 JUNCTION 0.03 1.08 4936.24 0 01:11 1.0815 JUNCTION 0.03 2.23 4938.23 0 00:40 2.1018 JUNCTION 0.05 1.69 4933.57 0 00:40 1.4619 JUNCTION 0.05 1.68 4933.18 0 00:41 1.4820 JUNCTION 0.04 0.68 4934.18 0 00:47 0.6821 JUNCTION 0.11 2.87 4933.37 0 01:24 2.87MulberryChannel OUTFALL 0.03 1.05 4931.55 0 00:41 0.96Boxelder OUTFALL 0.11 2.87 4929.68 0 02:27 2.87PondA STORAGE 0.03 1.80 4938.80 0 01:09 1.79PondC STORAGE 0.11 2.67 4936.17 0 02:07 2.67PondB STORAGE 0.17 5.66 4936.16 0 01:58 5.66SWMM 5Page 1
Subdivision:0Project Name:1-25 & MulberryLocation:Fort CollinsProject No.:39737.01By:AJHVolume=1/3 x Depth x (A+B+(A*B)^0.5)Checked By:0A - Upper SurfaceDate:9/30/22B - Lower SurfaceStage Stage Elevation Stage Surface Area Stage Volume Cumulative Volume Cumulative Volume(square feet) (cubic feet) (cubic feet) (acre feet)0.00 4930.50 200 0 0 0.001.00 4931.00 1,085 584 584 0.012.00 4932.00 30,721 12,526 13,110 0.303.00 4933.00 106,618 64,856 77,966 1.794.00 4934.00 186,834 144,862 222,828 5.125.00 4935.00 202,308 194,518 417,346 9.585.50 4935.50 208,879 102,791 520,137 11.94POND VOLUME CALCULATIONSPOND BX:\3970000.all\3978900\Excel\Drainage\3978900 Existing Calcs.xlsmPage 1 of 2 10/3/2022
Subdivision:0Project Name:1-25 & MulberryLocation:Fort CollinsProject No.39737.01By:AJHChecked By:0Date:9/30/22POND VOLUME CALCULATIONS4930.004931.004932.004933.004934.004935.004936.00-2.00 0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00Elevation (ft)Pond Volume (ac-ft)Pond Stage-StorageX:\3970000.all\3978900\Excel\Drainage\3978900 Existing Calcs.xlsmPage 2 of 2 10/3/2022
Subdivision:0Project Name:1-25 & MulberryLocation:Fort CollinsProject No.:39737.01By:AJHVolume=1/3 x Depth x (A+B+(A*B)^0.5)Checked By:0A - Upper SurfaceDate:9/30/22B - Lower SurfaceStage Stage Elevation Stage Surface Area Stage Volume Cumulative Volume Cumulative Volume(square feet) (cubic feet) (cubic feet) (acre feet)0.00 4933.50 50 0 0 0.001.00 4934.00 18,463 6,491 6,491 0.152.00 4935.00 33,906 25,796 32,287 0.742.50 4935.50 42,204 37,979 51,277 1.18POND VOLUME CALCULATIONSPOND CX:\3970000.all\3978900\Excel\Drainage\3978900 Existing Calcs.xlsmPage 1 of 2 9/30/2022
Subdivision:0Project Name:1-25 & MulberryLocation:Fort CollinsProject No.39737.01By:AJHChecked By:0Date:9/30/22POND VOLUME CALCULATIONS4933.004933.504934.004934.504935.004935.504936.000.00 0.20 0.40 0.60 0.80 1.00 1.20 1.40Elevation (ft)Pond Volume (ac-ft)Pond Stage-StorageX:\3970000.all\3978900\Excel\Drainage\3978900 Existing Calcs.xlsmPage 2 of 2 9/30/2022
Subdivision:0 Project Name:1-25 & Mulberry
Location:Fort Collins Project No.:39737.01
Calculated By:AJH
Checked By:0
Date:9/30/22
Basin
Area
(ac)% Imp.
A 31.65 80.0%
Total 31.65 80.0%
WQCV Drain Time (hr):40
Coefficient, a (Table 3-2):1.0
WQCV (in):0.33
WQCV (ac-ft):0.87
Detention Pond Tributary Areas
POND B
X:\3970000.all\3978900\Excel\Drainage\3978900 Existing Calcs.xlsm Page 1 of 1 9/30/2022
Subdivision:0 Project Name:1-25 & Mulberry
Location:Fort Collins Project No.:39737.01
Calculated By:AJH
Checked By:0
Date:9/30/22
Basin
Area
(ac)% Imp.
C1 7.75 70.0%
Total 7.75 70.0%
WQCV Drain Time (hr):40
Coefficient, a (Table 3-2):1.0
WQCV (in):0.28
WQCV (ac-ft):0.18
Detention Pond Tributary Areas
POND C
X:\3970000.all\3978900\Excel\Drainage\3978900 Existing Calcs.xlsm Page 1 of 1 9/30/2022
Subdivision:0Project Name:1-25 & MulberryLocation:Fort CollinsProject No.:39737.01By:AJHVolume=1/3 x Depth x (A+B+(A*B)^0.5)Checked By:0A - Upper SurfaceDate:9/30/22B - Lower SurfaceStage Stage Elevation Stage Surface Area Stage Volume Cumulative Volume Cumulative Volume(square feet) (cubic feet) (cubic feet) (acre feet)0.00 4937.00 0 0 0 0.001.00 4938.00 20,391 6,797 6,797 0.162.00 4939.00 36,614 28,109 34,906 0.802.50 4939.50 38,202 37,405 72,311 1.66POND VOLUME CALCULATIONSPOND AX:\3970000.all\3978900\Excel\Drainage\3978900 Existing Calcs.xlsmPage 1 of 2 9/30/2022
Subdivision:0Project Name:1-25 & MulberryLocation:Fort CollinsProject No.39737.01By:AJHChecked By:0Date:9/30/22POND VOLUME CALCULATIONS4936.504937.004937.504938.004938.504939.004939.504940.000.00 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80Elevation (ft)Pond Volume (ac-ft)Pond Stage-StorageX:\3970000.all\3978900\Excel\Drainage\3978900 Existing Calcs.xlsmPage 2 of 2 9/30/2022
I-25 & Mulberry Commercial Development Fort Collins
ODP Drainage Report
APPENDIX C – HYDRAULIC CALCULATIONS
Culvert Report
Hydraflow Express Extension for Autodesk® Civil 3D® by Autodesk, Inc.Wednesday, Sep 28 2022
24Inch CPP EX Outfall
Invert Elev Dn (ft) = 4927.28
Pipe Length (ft) = 366.00
Slope (%) = 0.49
Invert Elev Up (ft) = 4929.08
Rise (in) = 24.0
Shape = Circular
Span (in) = 24.0
No. Barrels = 1
n-Value = 0.013
Culvert Type = Circular Corrugate Metal Pipe
Culvert Entrance = Mitered to slope (C)
Coeff. K,M,c,Y,k = 0.021, 1.33, 0.0463, 0.75, 0.7
Embankment
Top Elevation (ft) = 4948.00
Top Width (ft) = 135.00
Crest Width (ft) = 20.00
Calculations
Qmin (cfs) = 5.00
Qmax (cfs) = 50.00
Tailwater Elev (ft) = 0.00
Highlighted
Qtotal (cfs) = 23.00
Qpipe (cfs) = 23.00
Qovertop (cfs) = 0.00
Veloc Dn (ft/s) = 8.06
Veloc Up (ft/s) = 7.32
HGL Dn (ft) = 4928.99
HGL Up (ft) = 4932.83
Hw Elev (ft) = 4934.25
Hw/D (ft) = 2.58
Flow Regime = Outlet Control
Culvert Report
Hydraflow Express Extension for Autodesk® Civil 3D® by Autodesk, Inc. Wednesday, Sep 28 2022
48 Inch Pond C Outfall
Invert Elev Dn (ft) = 4927.50
Pipe Length (ft) = 1010.00
Slope (%) = 0.30
Invert Elev Up (ft) = 4930.50
Rise (in) = 48.0
Shape = Circular
Span (in) = 48.0
No. Barrels = 1
n-Value = 0.013
Culvert Type = Circular Concrete
Culvert Entrance = Square edge w/headwall (C)
Coeff. K,M,c,Y,k = 0.0098, 2, 0.0398, 0.67, 0.5
Embankment
Top Elevation (ft) = 4936.00
Top Width (ft) = 1000.00
Crest Width (ft) = 20.00
Calculations
Qmin (cfs) = 40.00
Qmax (cfs) = 150.00
Tailwater Elev (ft) = (dc+D)/2
Highlighted
Qtotal (cfs) = 88.00
Qpipe (cfs) = 88.00
Qovertop (cfs) = 0.00
Veloc Dn (ft/s) = 7.69
Veloc Up (ft/s) = 7.00
HGL Dn (ft) = 4930.92
HGL Up (ft) = 4934.74
Hw Elev (ft) = 4935.14
Hw/D (ft) = 1.16
Flow Regime = Inlet Control
I-25 & Mulberry Commercial Development Fort Collins
ODP Drainage Report
APPENDIX D – MAPS
A Westrian Company I-25 & MULBERRY - OVERALL DEVELOPMENT PLANFORT COLLINS, COLORADOPOND A - 1.66 AC-FTINV: 4937.00POND B - 11.72 AC-FTINV: 4930.50POND C - 1.20 AC-FTINV: 4933.50MULBERRY STREETCLOVERLEAF WAYEX FRONTAGE RDMAPLECOTTONWOODLOCUSTBIRCHI-25ASPENWILLOWOFFSITE FLOW:12.7 CFSOFFSITE FLOW:54.8 CFSCUMULATIVE OFFSITE FLOWCLOVERLEAF:251.0 CFSSPRUCE LNFRONTAGE ROAD (COLLECTOR)
A Westrian Company
I-25 & MULBERRY - ODP
EXISTING CONDITIONS CONCEPTUAL DRAINAGE EXHIBIT
MULBERRY STREETI-25CLOVERLEAF WAYNE FRON
T
A
G
E
R
D
MAPLE
COTTONWOOD
LOCUST
BIRCH
SPRUCE
RAILROAD TRACKSI-25I-25HWY 14
E VINE DR
B
D
INADVERTENT
DETENTION
INADVERTENT
DETENTION
INADVERTENT
DETENTION
A
C