Loading...
HomeMy WebLinkAboutWOODRIDGE (ARAPAHOE FARM) PUD, PHASE 1 - PRELIMINARY - 55-87B - CORRESPONDENCE - RESPONSE TO STAFF REVIEW COMMENTS0 Is May 1, 1991 Ted Shepard City of Fort Collins Planning Department P.O. Box 580 Fort Collins, CO 80522 Dear Ted; Co @Q o urban design, inc. 3030 south college ave., suite 200 fort collins, colorado 80525 (303) 226-4074 Attached are 5 sets of prints of the Preliminary Site and Landscape Plans for Woodridge (Arapahoe Farm) Phase One, indicating revisions made in response to Staff Comments. Specific responses include: 1. Complete lot and tract dimensions and areas, and exact easement descriptions will be included on (24 x 36) Final Plats to be submitted on May 6th. The area east of Harmony Road will be platted as "The Gates at Woodridge, First Filing"; while the area west of Harmony will be platted as "The Overlook at Woodridge, First Filing". 2,3. Final plats and landscape plans will be coordinated with gas lines as requested. 4. The applicant will coordinate the barricade installation with Poudre Fire Authority. 5. Hydrant locations on final plans have been modified as required. 6. Off site design of Harmony Road is being completed by RBD as requested. 7. Some time ago, we reviewed the phased construction of Harmony Road with both the Engineering and Transportation Departments. It was agreed that streets constructed, but not used will tend to deteriorate; that the undetermined status of Harmony Road (arterial or major arterial) makes it prudent to limit the extent of immediate construction; and that construction phases would be based on the project traffic study. Also, it should be pointed out that Lots 51 through 55 do not have Harmony Road frontage. • urban design, inc. 8. When driveways serving lots 22 and 23 are constructed, they will be designed to accommodate "three point turns" as requested in the Staff's Conceptual Review comments; or "circular drives" (similar to those constructed with two of the Lots in Regency Park that front on Seneca) will be provided. 9. Separate ownership, and the need to evaluate an alternative Convenience Center site, preclude the installation of landscape buffering behind lots 30 - 38 with Phase One construction. 10. A schematic fence design for the landscape tracts along Harmony Road has been added to the Preliminary Site and Landscape Plan, and will be included with Final PUD Plans. 11. The requested zoning note has been added. 12. The vicinity map has been clarified as requested. 13. Additional notations regarding adjacent zoning and land uses have been added. 14. The lots in question are not three sided, but are separated from Harmony Road by landscape tracts. Those tracts, in combination with the curb location 25' from the right-of-way line should eliminate any potential sight distance problems. 15. A detached walk to match that constructed along the Johnson/Weber school site will be provided along the north side of Seneca with Phase One. 16. Staff s applause is appreciated. Berming is planned, and will be illustrated on the Final Landscape Plans. 17. Entry feature and signage locations have been indicated on the site plan. 18. The open space west of Weber Junior High is planned to be landscaped. Installation of this landscaping will be completed with the drainage and pathway improvements in this area, to be constructed with future phases. i urban design, inc. Ten sets of prints, a colored plan, and 8 will be submitted by May 13, 1991, and Final submitted by May 16, 1991, for the May 20, Zoning Board Meeting. Sincerely, Eldon Ward, President Cityscape Urban Design, Inc. cc: Gary Berger, WoodCraft Homes Peter Kast, G.T. Land Colorado Inc. John Hutchinson, Hutchinson Management Lloyd McLaughlin, RBD, Inc. 1/2 X it reductions Documents will be 1991, Planning and