HomeMy WebLinkAboutARAPAHOE/MOUNTAINRIDGE FARM - AMENDED MASTER PLAN - 55-87A - MINUTES/NOTES - CORRESPONDENCE-NEIGHBORHOOD MEETINGDevelop&nt Services •
Planning Department
NEIGHBORHOOD MEETING MINUTES
City of Fort Collins
PROJECT: Arapahoe Farm Amended Master Plan and First Phase P.U.D.
DATE: February 28, 1991
APPLICANT: Gary Berger, WoodCraft Homes
REPRESENTATIVE:Eldon Ward, Cityscape Urban Design
PROJECT PLANNER:Ted Shepard
QUESTIONS, COMMENTS, CONCERNS
1. How many homes will be built under the amended master plan and
what is the density?
RESPONSE: Approximately 432 homes at a density of 3.5 dwelling
units per acre. Proposed build -out would be over an 8 year period
with roughly 50 homes built per year.
2. What is the average cost per home?
RESPONSE: There will be two areas. The east side of new Harmony
Road will have homes ranging from $120,000 to $160,000. The west
side will have homes ranging from $95,000 to $120,000. These
estimates are subject to market conditions but that is the plan at
this stage.
3. Woodcraft is not buying all the tracts in the master plan.
What are these tracts designated?
RESPONSE: woodcraft is not buying the tracts designated "Multi
Family", "open Space", and "Business Services".
4. When will old Harmony Road be re -aligned?
RESPONSE: A new Harmony Road curb cut on old Harmony Road will be
constructed with the first phase. This spur will serve the first
phase only. The new Harmony will be extended incrementally as each
phase progresses. It is anticipated that when the project is about
75% built -out, the new Harmony Road will be completed to intersect
with County Road 38E. At that time, the old Harmony Road will be
abandoned.
1
281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (303) 221-6750
•
0
5. We live in Imperial Estates, on Royal Drive, and are very
concerned about the construction traffic that cuts through our
neighborhood. Construction crews use Royal Drive as a short
cut to Horsetooth Road. This raises a lot of dust and is a
nuisance. A barricade needs to be put up to prevent this and
force the construction traffic to use the streets instead of
cutting across the open field.
RESPONSE: The owner, G.T. Land, has not given permission for any
construction traffic to cut across the open field. Since Royal
Drive is located in the County, it is suggested that you contact
the County to see about a barricade. The developer is sympathetic
since barricades have a way of slowly coming down over time due to
wind and abuse. During the construction of Woodcraft homes, the
developer will work with contractors to try to get this problem
solved.
6. Please describe the greenbelt that runs east -west.
RESPONSE: This greenbelt is a drainage Swale that directs storm
flows from west to east into a regional detention pond. The swale
may also feature a sidewalk that leads to the schools. The open
space associated with the swale will vary in width but may be about
50 feet wide at a minimum. At the intersection with new Harmony
Road, the swale and sidewalk, will go under the street in the form
of a culvert and underpass. Final design details have not been
worked out.
7. When will Seneca be extended north to Horsetooth Road?
RESPONSE: This will occur when the vacant property between Johnson
School and Horsetooth road develops.
8. Will the re -aligned Harmony Road be four lanes?
RESPONSE: The current Master Street Plan shows Harmony Road to be
classified as a major arterial street with six lanes at full build -
out. However, the Fort Collins Area Transportation Plan is
currently underway and investigating the need for a major arterial
at this location. If Harmony is downgraded from major arterial to
arterial, then it would have four lanes at full build -out.
9. Where will Overland Trail connect after it is extended?
RESPONSE: Overland Trail will be extended south from Drake Road,
and stay west of Taft Hill Road, and intersect with County Road
38E. The final alignment has not been worked out yet but concept
is to stay west of the mobile home park.
F,
0
•
10. When does WoodCraft Homes expect construction to begin?
RESPONSE: We expect construction to begin in late June or early
July depending on when final approvals are obtained from the City.
11. What will be the impact on the two schools with the additional
students? Won't this project lead to overcrowding?
RESPONSE: The students currently attending the elementary school
come from a large geographical area to take advantage of the new
facility. It does not make sense to build the new school and not
try to fill it. As new schools are built in other areas of the
City, students will be moved out to attend a school closer to their
home. The Arapahoe Farm Master Plan was on record and available to
school facility planners. The current master plan calls for more
multi -family units than does the proposed amendment. Therefore,
the impact on the schools should actually be less in terms of the
number of units being served. It is anticipated that the students
attending Johnson will be all walk-in with no busing. Since there
is a new elementary school planned to open in southwest Fort
Collins in 1992, Johnson should be able to accommodate students
from Arapahoe Farm.
12. It would be a nuisance if construction traffic were to impact
the local streets. The developer should take steps to make
sure construction traffic stays off Wakerobin and Regency to
protect students walking to school.
RESPONSE: This is a good comment. The developer will encourage
all construction traffic to use the new Harmony Road entrance off
old Harmony Road. This will keep traffic out of existing areas.
13. Why would the City consider approving this project when there
are subdivisions that have not built -out yet. Do we need
another subdivision in Fort Collins?
RESPONSE: The schedule is to build about 50 units per year. In a
City of 88,000, this is not a major impact on the housing market.
All indications are that other subdivisions are doing well. The
market has an ability to absorb additional supply to meet
anticipated demand. The City does not currently evaluate
subdivision requests based on market need as this would be an
unfair restriction on the marketplace. It may be that Woodcraft
Homes has a market niche, or a "better mousetrap" that will compete
successfully in the marketplace. It would be very dangerous for
the City to regulate the subdivisions based on market conditions.
The City does not pretend to have the expertise to judge which
projects will succeed and which projects will fail. The risk of
making a wrong determination could affect housing choice for all
consumers. This risk is best borne by the private sector.
�3
14. Will there be a single builder or multiple builders?
RESPONSE: WoodCraft Homes will be the only builder.
15. What will be the lot sizes?
RESPONSE: The lots will range from 6,500 to 9,000 square feet.
16. These lot sizes seem small compared to Regency Park. If the
lot sizes are incompatible, then our property values will be
reduced. We've got our life savings invested in our homes and
do not want our property values jeopardized.
17. Why does the City have a 3 dwelling units per acre minimum
density requirement?
RESPONSE: The minimum density is designed to promote the goal of
the Land Use Policies Plan that the City grow with a moderate
growth rate with concentrated land use. This form was one of four
possible growth scenarios that were debated by the City during the
adoption of the Land Use Policies Plan. This form of growth also
is the minimum at which essential services can be delivered at an
efficient level. A variance procedure is available to develop
below three dwelling units per acre with review and approval by the
Planning and Zoning Board.
18. Will Arapahoe Farm be similar to WoodCraft's project in Golden
Meadows Fourth Filing?
RESPONSE: Yes, with some lots and houses being smaller than in
Golden Meadows Fourth Filing.
19. How will Woodcraft compete with other subdivisions? What will
be competitive about this project that will stand out to
consumers?
RESPONSE: Woodcraft Homes is competitive in the marketplace with
price and quality. We have been in business since 1984, many other
firms have not survived these last several years. Proximity to two
schools and a neighborhood park are locational advantages.
20. Will drainage and grading be designed so that the your project
and Regency will blend together? I am concerned that if your
project is upstream, then Regency will accept drainage which
could cause problems on our properties.
4
0 •
RESPONSE: Drainage and grading will be designed to meet the City
Stormwater Utility criteria. New developments are not allowed to
impact adjacent developments. If the developer does not grade
property according to City approved plans, then he is in violation
and liable for damages.
The Drainage Basin Study, on record with the City, determines the
direction and flow of the natural drainage patterns. Street
grades, utilities, swales, and detention ponds are sized and
located to accommodate this natural drainage.
21. How are the depths of the sewer taps determined?
RESPONSE: The depth of the sewer tap is determined by the minimum
grade available to the sewer main and, eventually, to the sewer
treatment plant. Sewer mains flow to the plant by a gravity
system. Therefore, all taps and mains must be upstream of the
plant.
22. Is Arapahoe Farm "upstream" of Regency Park?
RESPONSE: Yes, the grade is such that the lots in Arapahoe Farm
rise about 20 feet above Regency over a certain distance.
23. Will Hilburn Street be fixed so the grade difference is
corrected? As it stands now, somebody screwed up and it looks
terrible.
RESPONSE: This problem will be brought to the attention of the
City Engineering Department.
24. What is the buffer treatment along Harmony Road? If this is
to be a four or six lane arterial, then the homes that back
onto it will need to be buffered.
RESPONSE: There will be a meandering buffer along Harmony that
will feature landscaping and a detached sidewalk. Fencing will be
varied to minimize the "canyon effect". There will be a mix of
sideyards and backyards along Harmony. The swale/greenbelt will
intersect with Harmony. Rear property lines will not be platted to
the edge of the right-of-way so there will be increased setbacks to
break up the streetscape.
25. Will there be traffic signals on the new Harmony Road?
RESPONSE: Yes, it is likely that signals will be warranted at the
intersections with County Road 38E/Taft, Seneca, and Regency.
There will not be signals at the intersections with the minor
streets.
0 •
26. What happened to the Youth Sports Park?
RESPONSE: The Youth Sports Park was listed as an alternative use
on the Master Plan approved in 1987. Since then, the Parks and Rec
Department has lost interest in this site and is looking elsewhere.
Although Parks and Rec has not yet selected a site, Arapahoe Farm
has been eliminated from the selection process.
27. How long has G.T. Land been planning the Arapahoe Farm?
RESPONSE: Four years.
28. Will there be covenants?
RESPONSE: It is likely there will be covenants but WoodCraft Homes
has not begun to put any together yet. Writing of covenants will
come later in the process.
29. What will the typical setbacks be?
RESPONSE: Front yard - 20 feet, Side yard - 5 feet interior, 15
feet corner, Rear yard - 15 feet. These are minimums. In all
likelihood, rear yards will exceed the 15 foot minimum.
30. What kind of homes will be built?
RESPONSE: WoodCraft will build two-story and tri-level homes,
ranging in size from 1,600 to 2,000 square feet. East of Harmony
Road, the homes will have brick fronts and wood shake shingles.
31. Will the covenants exclude the storage of R.V.'s, boats, and
trailers on the street?
RESPONSE: This is a good comment but, again, the covenants have
not been drafted at this point.
32. Will Troutman be extended from Shields with this project? It
is needed now to relieve traffic during school hours. Also,
is Troutman anticipated to extend to Taft?
RESPONSE: No, Troutman will be extended when the land adjacent to
it is developed, and Troutman is not to be extended to Taft but
only to form a tee intersection with Seneca.
6
33. Will the citizens have an opportunity, through the City
approval process, to comment on the covenants?
RESPONSE: No, the covenants are private contractual agreements
between private parties. The City can only address ordinances and
policies that have been adopted by the City Council.
34. Will our water be shut off during construction like it was for
development of Regency Second Filing? This was a major
inconvenience that we should not have to suffer through.
RESPONSE: It is likely that this will not occur since Arapahoe
Farm will be served by a separate water main.
7
MINL,-,ZS:
s PROJECT: P.'1i0,r p"m
TYPE OF MEETING: NE/GH SOA Hoao 2:,j p6X 1qA Tion1
DATE: � BiE'UA.4ey 7
DID You PkEc.Elvi
WRITTEN
NOTIFICATION Do
NAME YES:'NO Aa[ you 010 you
ADDRESS I OWNER REr
E4
1111/¢
/
p 5
y
le C �J
,
Lam�r
�y. �r L(3c�,eN 0T �y
441
y A
yes
14
I
I ,Lu f >-,
Cn) i.r Re-D 0-
yFs
'rJ 0