Loading...
HomeMy WebLinkAboutNORTH LEMAY PLAZA PUD - FINAL - 57-87A - SUBMITTAL DOCUMENTS - ROUND 1 - TRAFFIC STUDYADDENDUM REVISED PRELIMINARY TRAFFIC REPORT FOR LEMAY PLAZA P.U.D. OCTOBER 26, 1987 Prepared by: Parsons & Associates 432 Link Lane Plaza Fort'Collins, Colorado 80524 (303) 221-2400 PROJECT NO. 87.18 PDQ ADDENDUM REVISED PRELIMINARY 'TRAFFIC REPORT LEMAY PLAZA P.U.D. This addendum is a more detailed analysis of the Conifer and Lemay intersection: performing a capacity and level of service analysis assuming the intersection has been signalized (for 20- year future traffic), and examining the curb cut on Conifer to see if the distance from Lemay is adequate to minimize conflict with those attempting to turn into -.the site. The Highway Capacity Manual was used to, perform the analysis. N ASSUMPTIONS The twenty-year analysis,is based on a percentage increase in the A.D.T. (from the City of Fort Collins Transportation Division). These figures are: Lemay - 11,000 ADT -an increase of 33% Conifer 6,000 ADT an increase of 30.0% These percentages were applied to the peak hour traffic volumes in order to perform the analysis. The traffic signal cycle time, for the purpose of this preliminary analysis, is assumed to be 75 seconds. Also the signal is assumed to be 3-phase and pre -timed. The phase times - are further estimated to be: 1. Conifer, left and right = 20 seconds 2. Lemay, northbound left and through = 10 seconds- 3. Lemay, north and southbound through = 45 seconds These phase timings were calculated using the method.found in Appendix II. CONCLUSIONS: Using these assumptions, the level -of -service for the intersection is B. The intersection operates at a level under capacity. Based on. Figure I.9-1, the left -turn bay storage in feet for the 20-year future volume on Conifer is 90 feet. The distance of the curb cut to Lemay (center line from drive to west edge of Lemay) is 130 feet. UNSIGNALIZED INTERSECTIONS 10-37 WORKSHEET FOR ANALYSIS OF T INTERSECTIONS ` CbQ�[Fij� 1.►nk`( NAME: -fVP_D LOCATION: VOLUMES IN PCPI /• I q-C>Tu ST✓ r-- ALT HOURLY VOLUMES 0 Major Street: Nt N _ e- V5 N _ M V5 5 Grade 2-4L-0-II'' V2 V4 - N=� —� V3 ril- — VZ— V4 L2o — V 3�� 17 Vy V7 V9 Date of Counts:. I 1 0 STOP Ti Period: .5 !prev) - . 0 YIELD me Average Running Speed: N = M Minor Street Co n1 F�12 PHF: - - Grade .. .. 96 - VOLUME ADJUSTMENTS Movement No. 2 - 3 .4 - 5 7 _ 9 Volume (vph) �.� % 1_ !U$ ¢ors Z -1 �9 _ Vol. (pcph), see Table 101 Z v fl -7(p STEP 1: RT from Minor Street V9 . Cdnflicting Flow, Vc 1 /2 V3 + Vz = —� + 200. _ -A�vph (Vc9) Critical Gap, T� ,and. Potential _Capacity, cp T = • 1 sec (Table 10-2) cpq = S 8 `� h (Fi � - pcph g' 10-3) Actual Capacity, co, C.9 = Cp9 = g8 U pcph STEP 2: IT From Major Street -Vi Conflicting Flow, V� V3 + VZ = I I + 1�LU = H vph (V,a) Critical Gap, Tc , and Potential Capacity, cp T. = 5.o sec (Table 10-2) Cp4 = 70 pcph (Fig.10-3) Percent of cp Utilized and Impedance Factor (Fig.10-5) (v4/cp4) X 100 = -2' /P4 Actual Capacity, C . Cm4 = Cp4 = � Mh _ - STEP 3: IT From Minor Street V7 -- Conflicting Flow, Vc 1/2 V3+V2+VS+V4 = +++L$=9 Vph (V,7) Critical Gap, T, , and Potential Capacity, cp TC _ sec (Table 10-2) cp7 = 01pcph (fig. 10-3) Actual Capacity, c, cm7 = Cp7 X P4 X SHARED -LANE CAPACITY SH = v7 + v9 if lane is shared (V7/Cm7) + (V9/Cm0_ Movement No. - V( h) cm _ c (.. h) LOS CR - 7 __ o 7U 22 L,,(pcph) 00 r a - 9 4 /20 G70 q"7 _ 6 s-o