Planning Department
City of Fort Collins
ly'14 V•co_�DIN
TO: Mike Herzig, Engineering Roger Frasco, Poudre Fire
Mark Taylor, Water & Sewer Leslie Bryson, Parks & Rec
Glen Schlueter, Stormwater Gary Huett, Public Service
Doug Martine, Light & Power Ed Heinz, U.S. West
Rick Ensdorff, Transportation ich Montoya, Columbine Cable
Bob Wilkinson, Natural Resources Ken Sylvester, Transfort
FROM: Ted Shepard, Project Planner C)EwNiS 6P6efjW<
DATE: February 26, 1991
RE: Extension Request for North Lemay Plaza P.U.D.
On March 28, 1988, the Planning and Zoning Board approved the North
Lemay Plaza Final P.U.D. This project consists of a convenience store
and small retail building at the southwest corner of North Lemay and
Conifer. Under current regulations, this P.U.D. is schedule to expire
on March 28, 1991.
The P.U.D. is allowed to be extended by administrative approval for two,
six month extensions. The first six month extension would grant current
status to September 28, 1991. Please indicate your concerns, if any,
regarding this extension request.
Please respond by Friday, March 8, 1991.
No Concerns
Yes, We Have the Following Concerns:
281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (303) 221-6750
ColumbineCableVision
March 8, 1991
Ted Shepard
City of Fort Collins
281 North College Avenue
Fort Collins, CO 80522
Dear Ted:
In regards to your extension request for North Lemay Plaza
P.U.D., we have the following concerns:
1. The extension will require Columbine CableVision o 0`>0"2
replace approximately 907 feet of trunk cable, as rj
well as, approximately 331 feet of feeder cable.
2. If any lines are damaged, Columbine CableVision
will be required to repair and replace the lines at,
our own expense.
We are confident that these concerns will be considered
before the approval of the requested extension. If you have
any further questions, please don't hesitate to call me at
493-7400.
Sincerely,
Dennis Greenwalt
Construction Coordinator
Columbine CableVision
'2-0-11
;"Y-I S Iry �, L A4�E i-ni �Gfl� �.. �_ �✓. fiG ON CdN r Aim f
GEMAyj fiNO /t`orJ 6 TME-
G�I�AENI,Jt� SAND GA41-E HA's 7D Be A&ZdeA7F THIS
A i Dt;TEL D P£R 5 -:�, Y`PEn1 SF,