Loading...
HomeMy WebLinkAboutNORTH LEMAY PLAZA PUD - FINAL - 57-87A - CORRESPONDENCE - LUC REQUIREMENTSi • CITY OF FORT COLLINS DEVELOPMENT SERVICES - BUILDING PERMITS & INSPECTIONS February 11, 1988 Ted Shepard Planning Dept. City of Ft. Collins Re: North Lemay P.U.D. Energy Code Compliance Ted I have reviewed the documentation provided to the building department on the North Lemay P.U.D. for compliance with the adopted Model Energy Code. The calculations appear to address sections of Chapter 5 from that Code. As far as those calculations go, the design does seem to meet and exceed minimum standards for heat loss. To quantify this statement, it could be said that this design exceeds the state code by 40% for the Convenience store and by 39% on the Retail store. However, Chapter 5 code compliance mechanical systems, service water, heat loss. Howard Stimely Permit Coordinator Building Inspection requires analysis of cooling load, and electrical power as well as just