HomeMy WebLinkAboutNORTH LEMAY PLAZA PUD - PRELIMINARY - 57-87 - REPORTS - TRAFFIC STUDYADDENDUM REVISED PRELIMINARY TRAFFIC REPORT FOR LEMAYgPLAZA P.U.D. /0 �� v OCTOBER 26, 1987 0 Prepared by: Parsons & Associates 432 Link Lane Plaza Port Collins, Colorado 80524 (303) 221-2400 PROJECT NO. 87.18'PDQ ADDENDUM REVISED PRELIMINARY TRAFFIC REPORT LEMAY PLAZA P.U.D. This addendum is a more detailed analysis of the Conifer and Lemay intersection: performing a capacity and level of service analysis assuming the intersection has been signalized (for 20- year future traffic), and examining the curb cut on Conifer :to see if the distance from Lemay is adequate to minimize conflict with those attempting to turn into the site. The Highway Capacity Manual was used to perform the analysis. ASSUMPTIONS The twenty-year analysis is based on a percentage increase in. the A.D.T. (from the City of Fort Collins Transportation Division). These figures are: Lemay - 11,000 ADT an increase of 33% Conifer - 6,000 ADT an increase of 300% These percentages were applied to the peak hour traffic volumes in order to perform the analysis. The traffic signal cycle time, for the purpose of this preliminary analysis, is assumed to be 7.5 seconds. Also the signal is assumed to be 3-phase and pre -timed. The phase times are further estimated to be: 1. Conifer, left and right = 20 seconds 2. Lemay, northbound left and through = 10 seconds 3. Lemay, north and southbound through = 4.5 seconds These phase timings were calculated using the method found in Appendix II. CONCLUSIONS: Using these assumptions, the level -of -service for the intersection is B. The intersection operates at a level under capacity. Based on Figure I.9-1, the left -turn bay storage in feet for. -the 20-year future volume on Conifer is 90 feet. The distance of the curb cut to Lemay (center line from drive to west edge of Lemay) is 130 feet.