Loading...
HomeMy WebLinkAboutCHAPARRAL PUD - FINAL - 60-87A - CORRESPONDENCE - RESPONSE TO STAFF REVIEW COMMENTS• FREDERTCK LAND �LJRVEYTNG 1528 N Lir�coln Avg nuc L,CD, vEE�:lE�kricl, CCD1C�rac3o 80538 January 6, 1988 Debbie deBesche D LE City City of Fort Collins Planning Department P.O. Box 580 `W'6ft Fort Collins, Colorado 80522 Re: Chaparral P.U.D. Dear Debbie; This is our response to your letter of December 18, 1987, regarding the City's review of the Final Plans for Chaparral P.U.D.. 1. Mountain Bell's existing facilities will be shown on the construction drawings, and conflicts will be avoided where possible. 2. This utility easement has been shown on all drawings and specifically labeled on the Filing Plat. 3. All drainage matters have been worked out, and copies of the Final Drainage Report have been included with today's resubmittal. 4. This developer has been using the proposed "Variable Setback" concept within on -going projects outside of Fort Collins, and would like to use the concept on this project. It affords the builder more flexibility in his mix of units, while still complying with fire code guidelines for separation of units. We would be glad to discuss the concept further with staff, if there are questions. 6. Maintenance note has been added to site plan. 7. Tree planting restriction note has been added to site plan. 12. Copies of elevations where submitted to Ted Shephard at preliminary, and are still current. I have enclosed one additional copy, along with a description of the proposed exterior treatment of the units. It is my understanding that items 5, 8, 9, 10, 11, 13, 14 and 15 have been addressed by Progressive Living Structures on the enclosed Landscaping Plan and/or in a letter comming to you under separate cover. I have enclosed three copies of the revised Final the revised Final Landscaping Plan for your review free to call me with any questions you might have. final comments. Respectfully; Dan Herlihey Frederick Land Surve Site Plan, and Please feel I await your