HomeMy WebLinkAboutCHAPARRAL PUD - FINAL - 60-87A - CORRESPONDENCE - RESPONSE TO STAFF REVIEW COMMENTS•
FREDERTCK LAND �LJRVEYTNG
1528 N Lir�coln Avg nuc
L,CD, vEE�:lE�kricl, CCD1C�rac3o 80538
January 6, 1988
Debbie deBesche D LE
City
City of Fort Collins
Planning Department
P.O. Box 580 `W'6ft
Fort Collins, Colorado 80522
Re: Chaparral P.U.D.
Dear Debbie;
This is our response to your letter of December 18, 1987,
regarding the City's review of the Final Plans for Chaparral
P.U.D..
1. Mountain Bell's existing facilities will be shown on the
construction drawings, and conflicts will be avoided where
possible.
2. This utility easement has been shown on all drawings and
specifically labeled on the Filing Plat.
3. All drainage matters have been worked out, and copies of the
Final Drainage Report have been included with today's
resubmittal.
4. This developer has been using the proposed "Variable
Setback" concept within on -going projects outside of Fort
Collins, and would like to use the concept on this project.
It affords the builder more flexibility in his mix of units,
while still complying with fire code guidelines for
separation of units. We would be glad to discuss the concept
further with staff, if there are questions.
6. Maintenance note has been added to site plan.
7. Tree planting restriction note has been added to site plan.
12. Copies of elevations where submitted to Ted Shephard at
preliminary, and are still current. I have enclosed one
additional copy, along with a description of the proposed
exterior treatment of the units.
It is my understanding that items 5, 8, 9, 10, 11, 13, 14 and 15
have been addressed by Progressive Living Structures on the
enclosed Landscaping Plan and/or in a letter comming to you under
separate cover.
I have enclosed three copies of the revised Final
the revised Final Landscaping Plan for your review
free to call me with any questions you might have.
final comments.
Respectfully;
Dan Herlihey
Frederick Land Surve
Site Plan, and
Please feel
I await your