Loading...
HomeMy WebLinkAboutCHAPARRAL PUD - PRELIMINARY - 60-87 - REPORTS - RECOMMENDATION/REPORT W/ATTACHMENTSITEM NO- 5 PLANNING AND ZONING BOARD MEETING OF November 16, 1987 STAFF REPORT PROJECT: Chaparral PUD - Preliminary - #60-87 APPLICANT: Progressive Living Structures C/O Frederick Land Surveying 1528 N. Lincoln Avenue Loveland, CO OWNER: Progressive Living Structures 4190 N. Garfield Avenue Loveland, CO PROJECT PLANNER: Debbie deBesche PROJECT DESCRIPTION: Request for 55 single family homes on 10.04 acres, located at the southwest corner of South Shields and Casa Grande Boulevard, zoned R-P, Planned Residential. RECOAMENDATION: Approval EXECUTIVE SUMMARY: The applicant is requesting preliminary approval for 55 detached single family homes on 10.04 acres, resulting in 5.47 dwelling units per acre with an average lot size of 5,150 square feet. This project is a continuation of the build -out of the Wagon Wheel Casa Grande PUD. The project achieves 58% points on the "Residential Uses Density Chart" and is supported by the City Land Use Policies and is consistent with the Land Development Guidance System. Staff is recommending approval of Chaparral PUD Preliminary. OFFICE OF DEVELOPMENT 300 LaPorte Ave. • P.O. Box 580 • Fort Collins, Colorado 80522 • (303) 221-6750 SERVICES, PLANNING DEPARTMENT Chaparral PUD - Preliminary - #60-87 November 16, 1987 P & Z Meeting Page 2 1. Background: The surrounding zoning and land uses are as follows: N: RLP; existing single family residences (Wagon Wheel Subdivision► S: RP; existing single family and duplex residences and Williams- burg Horsetooth Commons E: RP- single family attached (Cunningham Corners) W: RLP; existing single family residences (Wagon Wheel Subdivision) In 1979, 117.8 acres were preliminary subdivided into 291 single family lots. A number of preliminary and final plans have been approved. Most recently the Planning and Zoning Board at it's June 24, 1985 meeting, granted preliminary approval for 66 attached units for this site. This par- ticular site was Phase Three of a three phase plan. Presently, the appli- cant is requesting approval for 55 detached single family units. 2. Land Use: The project is supported by City Land Use Policies Plan as follows: 22. Preferential consideration shall be given to urban development pro- posals which are contiguous to existing development within the city limits or consistent with the phasing plan for the City's urban growth area. The proposed single family development meets the criteria of the LDGS and achieves 58% points on the "Residential Uses Density Chart". The project needed to score 54%. Shields Street is an arterial street as designated on the Master Street Plan. 3. Design: The buildings are a mix of tri-level, bi-level, and two types of two- storys, with lap siding. The colors will be further identified at final review. The site plan layout provides for no direct vehicular access on to Cas Grade Boulevard from adjacent lots. Sidewalks are provided adjacent to the streets through out the development and the plan includes a 5 foot pedestrian walk between Laredo Court and Casa Grande Boulevard. The landscaping includes one street three per lot provided by the developer and landscaping along Shields Street. Tract A, located adjacent to Shields Street, is designated as Common Open Space and will also serve as a drain- Chaparral PUD - Preliminary - #60-87 November 16, 1987 P & Z Meeting Page 3 age detention pond which will be maintained by the homeowners. The lands- caping along Shields has been increased at Staff's request and includes 10 Narrowleaf Cottonwood Populus Angustiflia. 4. Transportation: Staff has reviewed the traffic impact related to the project and determined that existing improvements are adequate to handle the increase. RECOMMENDATION The project achieves adequate percentage points on the "Residential Uses Density Chart" and is in conformance with the Land Development Guidance System and is supported by the City's Land Use Policies Plan. Staff is recommending approval of Chaparral PUD - Preliminary. al'!mt.0 \ '\ 9Ia e l PRELIMINARY P.U.D. SITE PLAN WAGON WHEEL FILING NO. 1 I i3tl \:\`\�\ 9bet ♦ e 9 t �W 1{ Bb I Y �\ t Z I, CHAPARRAL P.U.D. RL E 1 aaY .a i i..RLP i H BEING A REPLAT OF TRACT 3 AND TRACT 4, t ly I f [ a p. CASA ORANDE P.U.O., LOCATED IN THE BE. 1/4 OF ', a j 1 I f 4i I SECTION 27, T. 7 N., R. 69 W. OF THE Sth P.M., ter.__,.__ �.T�.__! 'I I I® CITY OF FORT COLLINS, COUNTY OF LARIMER, p• ` / _ - I STATE OF COLORADO. a aataY�4'nRL Atiat Dae xIP lox- av cart c lua.. v1«r v dw�lYr` l«ma pa .'f t 4pG V122 D°tO�a,:!ca ,o 0°irewli.rn.dr«i,...17 B (.—T TRACT A \ 1-1 °Po.. eaoi °.rnezwi ®rtwMery ee i8ai Comm OPan Ot T..°i i t°° a°i�a ar• 4 N o[ p•ci•�trt t l .F i�✓111 f• / aP // S.. 18 I Io18ELOPEIrr.. I 'I. �I—,BPaca� °roewfrh°[Sem°.°. e.au:ri �° errmi°a'w:w�l;°Ywt�° w°. teu.rla tip I`)aorN«�d1�t•16 �wet189, Sdtre or>acw fveterlr e1D- d. wr ° .! m.YOk Drlve « w • a vlet 1 Ga• Dr•na•1 f / 20 P D D w the be•Imlm of a e1Z`amcaw t. lee w Bh5 Oo � I I 1Y .w. 19 II I = w.i e i e° ::i °i:aL�:. a ens ae°r.�"iMe.p.ama smarm at Y Ufa curve lortn.miert> r1 9�te.tltOafW a it.r ii : it ar uMr, ~w . soZIT d .rwii . ,LAREDO COURT__— - tw°sou a:u ufnth"r :rrrlie. ° `1c ` ea . Y`o c.,'.m.ae n..i.Te.e mrsr�l r°ie°1m:ce. = eutB' `ud`a rWr� aiem DO frwpf `a curve eoutwmtert>r /�/ F /'• Y7 1 ! I-- -- I 9S ' ly, F zre'v.e .«a1.,,1::..1w• a CASA GRANGE P-U.D. I. °e •pie x rs°"i:."r.," TRACT 7 \ _ I , 11R I a� 77 - 3 I I F < xifht vt Y ! l.} 9Y Ootlxe 5 °aa1°itn°Bi Si f«•t nsvfra°a } qq W . 00 «a Y5 pp fm Y ., I I I p T aw "e $m.tM u°r1, 36�2e�tM"rod otO°eldh° RP B 9 Y2 I uo II a ef.ndd'nitnermt Mot- f-Ya> If« pr swm enl.ld t_ m a $ + I F. e t9 u aidn^o:`gin 1 .6 .m DD Od 54 �B°Sx rKt a he 7 axrfa zs 1(n t a sJ RP :, ;« n.mm..t.. w.trietlm.:°.'.d`...natl«. °f n ra. i �/ Y --� / �• ,i7(t1f• � 1 �` 15 10. / i f LL rlwa e."rmOe m niw°rr t D. naei.e ° tiri _ Sa'yl 10 VE GHAM 6 I—O aS�OOlaT1Ox OF —IF' l �a LAREDO. I (' t1 13 D.t. 9-114 60'vlo -w. -- I 7 I i ( BLO tY p f w o _ _ _ �- 1 err°Iaur cmr,n aoeasl I — — — — — L J ' o eeratnm te:s °ratanh`.twau a ��rit'd6n"lam!! .:tot'::fa mt.. re rW°r alrlaue3 lot, .aianet'ta mSa 0 tc0 esmw.rxay: 1IS70 w. 6repee tnermr .wit CASA GflANDE P.4.13. UnPlattfa a G� °l i°° wa ties° ek tm vww•.a r.r thf• a'Oit«hi •Hell w ew ° TRACT t /-. ., �%' ... __ ��)$$1 _ m RP a 3z ` °' pre]act. o n e1e . sm. Ywdeet .r• m w aaemsea RP / WaD w nTa, �i U � ;a .al.rel'r� vine-i-r•w.61 7 aYiw :4 :�' ..-It, ........ . rota am.:................ i n Tw wrfh.nr tr«wpt l,na,r.w ,nw.afm In rr. ct p. a.d ad•�vawvt ea 4eee x p! plm. LILaOaPIB IOOmlana: -. '.,-' I r m. f«u, e.s.mea,. .Ssra° •z .r etbl Owi�a . I....1 • ]ns r ae raw. w= oast....... _.......... an .tw+ wr1«ter wn.pne :*aa w .[ m. ca.nu.... en. f°ai. eml lot w.m.. .wife: . Tnr<0. ®m • De vans:......... ...............5.6 aufec nwr arm wr u:ie::::............. : afTfaa t eossnw ®moef 1alevRn® cIt> n '°eiwrf.: .......... A-r nel s Ne_... aw......so v.ri.m.. rra .t ri n a.,lw er1 Inmrw:.t.atr se mla .wi.ee. 1 veer. 1. Opa wee wrf«. a e f, Nu emewlw —1w a Its feet lv L•wa0 Tnl, n Iem nm tw hlelo ! zip fuse e.a .ewe. ca«ap wwl. Li : o®.. aKwttnOn we ° ,nn aan a.mam.ri ew= « _ rim ,ravel ae A riN ma aemre[We butter rM testa n n vevriae a haedr. u ....... r to oat .i................. 1 • eruiae:n: Builacm.=..........-. ee, 5Y6 er YYk • .t ,1 a .: rllrueim «r.law In tai '! w"oleo m .w m ene Lms. ,tmeeN Th1e v,rnvn w. tun aw+vved br tw eler prior ea ehly eubl<tal. cove riN Im «fvt•e«c, r,wfrmevt,. • TTPICAL tRi mWPIP06 Ta hwti«t r wlem m al Ol ...... c) Be�wret°R�O. Y.:...............11— °r sf t dl as Open 6wes.......... lsi - P d«.tn • variebla e.twek awe. a v' 0. 1„a tw 1pptmt`ewrt .anewt�m"ml,s n W[wcb n shut arm . v try TI Ne t. eater Pm In m ea o p P velw. x311 w reau r. mall «ter eervin Ifvn. f Color elw ep,uw, e. tvnleee fsttm«ve yr 6krine el ace . xeee«tfwal n•.... -- lv raaucfm [q+et• " !a• tlmvntfw nlief ter Both ,te°eeu�mwV«efw • t a Yw coat , ,ewgBv.. B1 me ,scut tree ewll ee plmted vv teen tat b> cee aew,vmr, or • wrnllc•t. fm tw purewee °} aaia [r.• atoll ee vrmned t. tw w« wwweer e> eb wllaee. b i�� •i,tuw .r f«t errata a«nuow eeNraepue «welal,, Y Drlvarnprwa wlt real car avwl.p«es.................... EPO a SIT"•^ irereilrile«n•n.w .tY. e..1o.•ma aArr ape{: r...i ritn,a mi. Prai«t toss tBaa e.f.. '�'e«t°e: . er l• • 1 m1p Irrleetlm ,>,t«a .1n a pr..ia.a e.r war plmelm .+«.. • cat® hw°mtar: Arai � e.cd. ,nett e. .nova .i[ nai.lwa lr"at , m tw Film eterat'tl omfa li.raY•r ar•Wa..yB WYDecen rrooNro: at to sal.la�st� t,fe awe .r• - cantor«. Tr.. (^J - D«Sa°«, a« : s .= ar;.rrI :..a....... ..... • VICINITY MAP • .a'R°�°lalm ........................::::zs m xmiw:... naloxe x[o. of sT.Pp o•'• 9E—PTtN-6`"—'$'—"°—' "`"' �S FREDERICK LAND SURVEYING S l PRELIMINARY P.U.D. SITE PLAN °iEC "° " [* ° .•' "° ate',. ` sae-r „. _ '-1 _-- „ „ F:•Ia 9oM w. xf r• PROGRESSIVE LIVING STRUCTURES, INC. IS2e M. Lincoln Arena• CHAPARRAL P.U.D. s7asfso _ _ ac•N Lor.lana, Color.ao 90a3] (30318a9-39a� FORT COLLINS, COLORADO. ___ v.•.. P,ell,nber7 P.U.D. SNe Plan - CHAPARRAL P.U.D. Project No.: 87-08-250 LEGAL DESCRIPTION: CHAPARRAL P.U.D., City of Fort Collins, Larimer County, Colorado All that portion of Casa Grande P.U.D., City of Fort Collins, Larimer County, Colorado more particularly described as follows: Beginning at the Southeast corner of Tract 4 of said Casa Grande P.U.D.; Thence along the South line of said Tract 4 North 890 40' 04" West 484.55 feet to the Westerly line of said Tract 4; Thence along said Westerly line and it's Northerly prolongation North 300 22'12" West 82.53 feet to the centerline of Laredo Lane as per the recorded plat of said Casa Grande P.U.D. and the beginning of a curve concave to the Northwest having a central angle of 300 42' 44" and a radius of 175.00 feet; Thence along said centerline of Laredo Lane and along the arc of said curve Southwesterly 93.81 feet to the end of said curve; Thence tangent from said curve and continuing along said centerline of Laredo Lane North 890 39' 28" West 132.00 feet to the Southerly prolongation of the Westerly line of Tract 3 of said Casa Grande P.U.D.; Thence along said prolongation and said Westerly line North 000 20' 32" East 283.49 feet; Thence continuing along said Westerly line the following two courses and distances: (1)North 690 11' 07" West 206.21 feet; (2)North 400 28' 35" West 63.71 feet to the Easterly Right -of -Way line of Hickok Drive as per said recorded plat of Casa Grande P.U.D. and the beginning of a curve concave to the Northwest having a central angle of 120 48' 25" and a radius of 355.00 feet; Thence along said Easterly Right -of -Way line and along the arc of said curve Northeasterly 79.35 feet to the end of said curve; Thence continuing along said Easterly Right -of -Way line and tangent from said curve North 310 13' 15" East 65.59 feet to the beginning of a tangent curve concave to the Southeast having a central angle of 820 02' 28" and a radius of 15.00 feet; Thence continuing along said Easterly Right -of -Way line and along the arc of said curve Northeasterly 21.48 feet to the end of said curve,to the Southerly Right -of -Way line of Casa Grande Boulevard as per said recorded plat of Casa Grande P.U.D., and to the beginning of a curve concave to the Northeast having a central angle of 230 11' 48" and a radius of 310.00 feet; Thence along said Northerly Right -of -Way line and along the arc of said curve Southeasterly 125.51 feet to the end of said curve; Thence continuing along said Northerly Right -of -Way line and tangent from said curve South 890 56' 05" East 541.60 feet; Thence continuing along said Northerly Right -of -Way line South 820 56' 05" East 195.57 feet to the beginning of a tangent curve concave to the Southwest having a central angle of 830 00' 00" and a radius of 25.00 feet; Thence continuing along said Northerly Right -of -Way line and along the arc of said curve Southeasterly 36.22 feet to the end of said curve and to the West Right -of -Way line of South Shields Street as per said recorded plat of Casa Grande P.U.D.; Thence along said West Right -of -Way line South 000 03' 55" West 506.12 feet to the Point of Beginning. The above described tract contains 10.04 acres, more or less, and is subject to easements, restrictions, and reservations of record, if any. ft a CHAPARRAL P.U.D. Fort Collins, Colorado LAND USE DATA: * Total Area: ................................... 10.04 Ac. 437,342 sf * Total Dwellings (all single family detached)..55 * Number of Bedrooms per Unit...................3 * Gross Density; ................................ 5.5 du/ac * Average Floor Area per Unit;..................1330 sf * Total Floor area for development: ............. 73,150 sf * Average Lot Size:.............................5150 sf * Ratio of Floor area to Lot size: .............. 1 . 4 * Coverage Breakdown: a) Buildings: .................. 96,525 sf 22% b) Driveways: .................. 22,770 sf 5% c) Street R.O.W.•..............87,574 sf 20% d) Common Open Space ........... 55,118 sf 13% e) Active Recreational Area.... --- 0% * Off -Street Parking: 2 Garage spaces per Unit 2 Driveway spaces per Unit Total for development: .................... 220 * Active Recreational Use: There is no Active Recreational area designated within this project. * Common Open Areas: Tract A, located adjacent to Shields Street, is designated as Common Open area. The area is +1.25 acres, and will serve to accommodate a drainage detention pond. * Maximum Building Height;......................25 feet * Existing Zoning: .............................. RP POPULATION PROJECTIONS PROPOSAL: CHAPpYJIAL PUD 60-87 DESCRIPTION: 55 single family units on 10.04 acres DENSITY: 5.47 du/ac General Population 55 (units) x 3.5 (persons/unit) = 192.5 School Age Population Elementary - 55 (units) x .422 (pupils/units) = 23.21 Junior High - 55 (units) x .148 (pupils/unit) = 8.14 Senior High - 55 (units) x .127 (pupils/unit) = 6.99 Affected Schools Design Enrollment Capacity Lopez Elementary 546 (+50 mobile) 700 Blevins Junior High 900 849 Rocky Mountain Senior High 1250 1330 ft Ift PROGRESSIVE LIVING STRUCTURES INC. September 25, 1987 Development Plan Chaparral P.U.D. This project will consist of 55 single family homes. The anticipated completion date will be three years after start up. We intend to start the project the beginning of the spring construction season in 1988. The anticipated absorption rate of the project will be 1} homes per month. We will be building the project out in three phases. The first phase will consist of Lots 5 thru 8, Block 3 and Lots 7 thru 20, Block 2. These lots are on Laredo Court. In order to access these lots we anticipate completing Laredo Lane with our initial phase of construction. The initial spec homes and models will be on Lots 5 thru 8, Block 3 so as to gain the maximum exposure for the subdivision from Shields Street. The initial earth work of the subdivision will include the construction of the dentention area on the corner of Casa Grande Blvd. and Shields Street. Also to gain the maximum curb appeal for the subdivision this area will be landscaped when building permits are issued on the initial lots. The south half of the tract will be landscaped late in 1988, also corresponding to the issuance of building permits that border the open space. The next phase to be developed will be Lots I thru 6 Block 2; and Lots 1 thru 4 Block 3; and Lots 16 thru 27 Block 1. These lots line Laredo Lane. The final phase of the project will be those lots on Cactus Ct. and Hickok Dr. These are Lots 1 thru 15, Block 1. Sincerefl/yyy%� o Carney Secretary, PLS, Inc. JC/st 4190 N. GARFIELD Hwy. 287 & E. 42nd LOVELAND, CO 80537 669.0870 • • CHAPARRAL P.U.D. SUMMARY OF PLANNING OBJECTIVES 87-08-250 Chaparral P.U.D. is a 55 unit residential development consisting of 10 acres and located southwest of the intersection of South Shields Street and Casa Grande Boulevard. The nature of the units are single family detached. The project is currently abutted on the west, north and east by existing residential development. Fully developed streets and utilities also exist on all sides of the project. This area was approved for residential development with the approval of the Wagon Wheel P.U.D. master plan in the early 1980s. Subsequently, in 1985, this area was included in the approved preliminary site plan for Casa Grande P.U.D., and approved for 66 condominium units (6.6 du/ac). The current proposal requests development for densities of 5.5 du/ac. This density will blend densities from the +7 du/ac on the southwest, to the +4 du/ac on the north. A drainage detention facility intended to serve the southerly portion of the Wagon Wheel area, including the Casa Grande and Chaparral properties, has been master planned to be located on this property, being the last portion of the Wagon Wheel master plan to be developed. Our lay -out locates this detention area at the east end of the project, adjacent to Shields, and utilizes it as an open space buffer area between the arterial and the development. This Open Space will be owned and maintained by the homeowners within Chaparral P.U.D. Along with standard front and rear setbacks, this project will utilize a variable side setback system. This system maintains the minimum required separation between buildings, but accomplishes this separation based on the adjacent structure location more so than the common property line. This allows the builder more flexibility in the mix of units. A prominent natural feature located within this project is a stand of large, established trees adjacent to Casa Grande Boulevard. It should be noted that the layout proposed preserves most of these trees. CHAPARRAL P.U.D. ALL DEVELOPMENT; NUMBERED CRITERIA CHART ALL CRITERIA APPLICABLE CRITERIA ONLY Wdl the crdenon Is the cotenon applicable° t e sahsfiea? CRITERION pNFNo if no, please explain NEIGHBORHOOD COMPATABILITY 1. Social Compatibility 2. Neighborhood Character 3. Land Use Conflicts` 4, Adverse Traffic Impact PLANS AND POLICIES 5. Comprehensive Plan PUBLIC FACILITIES & SAFETY 6. Street Capacity 7. Utility Capacity 8. Design Standards 9. Emergency Access 10 Security Lighting 11 Water Hazards RESOURCE PROTECTION 12. Soils & Slope Hazard 13. Significant Vegetation 14, Wildlife Habitat a3 15. Historical Landmark 16. Mineral Deposit 17. Eco Sensitive Areas 18. Agricultural Lands ENVIRONMENTAL STANDARDS 19. Air Quality X 20. Water Quality 21. Noise 22. Glare & Heat 23. Vibrations 24, Exterior Lighting 25. Sewage & Wastes SITE DESIGN 26, Community Organization Y. ' :" ?<; 27. Site Organization 28. Natural Features 29. Energy Conservation 30. Privacy X 31. Open Space Arrangement: 32. Building Height C8 4. z.,. a: 33. Vehicular Movement 34. Vehicular Design 35. Parking 36. Active Recreational Areas ;<:M. 37. Private Outdoor Areas 38. Pedestrian Convenience» 39. Pedestrian Conflicts 40. Landscaping/Open Areas 41. Landscaping/Buildings 42. Landscaping/Screening a'< 43. Public Access 44. Signs.>: -12- w Residential • DEFINITION All residential uses. Uses would include single family attached dwellings, townhomes, duplexes, mobile homes, and multiple family dwellings; group homes; boarding and rooming houses; fraternity and sorority houses; nursing homes; public and private schools; public and non-profit quasi -public recreational uses as a principal use; uses providing meeting places and places for public assembly with inciden- tal office space; and child-care centers. Each of the following applicable criteria must be CRITERIA answered "yes" and implemented within the development plan. Yes No 1. On a gross acreage basis, is the average resi- dential density in the project at least three (3) dwelling units per acre (calculated for residential portion of the site only)? 9 El 2. DOES THE PROJECT EARN THE MINIMUM PERCENTAGE POINTS AS CALCULATED ON THE FOLLOWING "DENSITY CHART" FOR ® a THE PROPOSED DENSITY OF THE RESIDENTIAL PROJECT? THE REQUIRED EARNED CREDIT FOR A RESIDENTIAL PROJECT SHALL BE BASED ON THE FOLLOWING: 30-40 PERCENTAGE POINTS = 3-4 DWELLING UNITS/ACRE; 40-50 PERCENTAGE POINTS = 4-5 DWELLING UNITS/ACRE; -;P- 50-60 PERCENTAGE POINTS = 5-6 DWELLING UNITS/ACRE; 60-70 PERCENTAGE POINTS = 6-7 DWELLING UNITS/ACRE; 70-80 PERCENTAGE POINTS = 7-8 DWELLING-UNITS/ACRE; 80-90 PERCENTAGE POINTS = 8-9 DWELLING UNITS/ACRE; 90-100 PERCENTAGE POINTS = 9-10 DWELLING UNITS/ACRE; 100 OR MORE -PERCENTAGE POINTS = 10 OR MORE DWELLING UNITS/ACRE. inued -29- dFbENSITY CHART Maximum Earned Criterion Credit If All Dwelling Units Are Within Credit a 20`a ::4.Mtn.tntonts,s+nacscoaasecne^^�^r�•ns^onnngcer.•• �� b 10% 650 feet of on e.neng transit star C 10% 40001eetotone.,stmpa� gorcootoveareonsn000rpcenter d 200/0 3500 feet of anex-sting or resemea ne-9^oMnooa Dc'l commurty pork of Commnun'N foc r. l `� We v< 100,10 1000 feet of o school meet.ng o : the reo., re•nerts of r+e comouisory eauconon lows of eve State Of Cola000 } 20% 3:00feet ofama:oremoovmerrcerr c+ 9 5% 1000 feet of O Chita care cenW h 20% -Nortn•Fort%ou,ns �— I 20% The Central gusrness.D,sir,ct --- A project whose bounaary n contiguous to eusiv+g urban oevelopment. Cfec+t may, be earnea Os fdgws- 0%—FIXprO,ectswhosecifo rtvbounoarvt%os0to1o'ocontigulty: I 10 to 154.—For protects -nose Droperry DOuncary has 10 to 20-.contiguity. ( j 30% 15to20°:- For prOleCts-noseD(ooemDounOaryhas 20to30`.configu,ty I 30 20 to 25 %- For proleos whose propemv pounaory t+os 30 to 40%Conitt)u ty. 25 to 33 .o ::For projects wnos property pounaarv, nos 40 to 50^s contiou,ty if if can be oerrionstratea mat the DrOOCt W+lt reojce non -fens woote energy useoge either through the application of alternative energy k systems or through comrrvnec energy conservation measures oevona that normally reQurea ov any Cooe, a 59. bonus may be earnea ^� tot every 5% reclucis rn energy, use. Calculate a 1% par" for every 50 acres Y1cluced in the protect. �• M Calculate the percentage of the total acres in the oro,ect mot are eevotea to recreot:onot use. enter 12 Of that Dercentooe as a bonus n me ailpl,cant -ml to pressing permanent onstfe Open space mat meets the C-N s minimum reounem+enfs. cis:culote the oercentOge n Of tna open space ocrecge to the total oevetoor-ent ocleage. enter ens oercentooe as O bx:nus IT all at the total aevelOprnent oudQet n to be spent On ne,groottsoea publ,c honyt IOck,ties which ate not omefw-se it tou,f ea o v C IN C alb. 0 enter-. bonus for every S100 per awellmg unit,nvestec if bon at the total development Duaget is to be spent on ne!gn=hr700 f aCt,ntes ona services wn,Cn are not Otnefw.se rwG,,aea cv C•rv, C oc e P enter a 1 % bonus for every S100 oaf aweu,ng unit unvestea Y o commitments being mace to oevelop a soeCJ,ea percentage of me total numDef Of dwe,.,ng uses lot tow ncome tone -es, entrr fr..;+ Q percentage as a bonus. up to a mos,mumn of 30. nacofmutmenfisbeingmacetooevelopospecifiedpercentageofthetotalnumberOfawell,ngurvtsforlvpe',+Cnalrca b'ranc;.Capfxa Z housing as aefinea by me City Of Fort Conlin& calculate the bonus as follows Of Typs'A'- .Slimes TT Wutssh M Type -F -1.0 times Tyoe V unin Total wis h no case shall the camorned bonus be greater than 30%. It the ste Or OCX Cenf property Contains on historic buila,ng or place, a bonus may, be sainea for the tolgw,vng 3%-For preventingarntlittpatrgoulsrdernhuencesle.genwonimil altarsouse.aesthetic. economic and sodatactuslOaversetoits $ preservation. 3 % - For assunrng that new structures will be ,n keeping with the CnaroCter of the bu,la,ng or place wh,te avae rC to`a, �r •s �. 3% - For proposing adOotrve use Of the Dwlorng Of place that wol leoo 10 its continuance. preservation Orq ,moro.4ment r+ On apprOpfgte mnannef. x a portion or all Of the rebutted oohing in the multiple fomufy protect is Drovraed unaergrouna within the button J cr it on e,avo+eo Da,s,rg structure as on accessory use to the pernril structure. a bonus may be somea as folows t 91. - For provtaing 75% at more of the porfi rn a structure. 6% - Forprovgtng50.74%ofnvporkrgnostructwe: 3% - Fofprovgtng25.49%tNmepohrngrnostructure u if a commitment t 6 being m ocil to rxwoe opprovea automatic lire extinguishing systems fa the aweii ng units enter a Donu3 of 13 TOTAL �g — 30— CM z cc w w z z w J_ U z 0 or or O z a U LL U_ a MEMORANDUM To: Dan Herlihey Leo Schuster Rick En_.dorff From: Matt Delir_h Cate: September 24, 1987 Subject: Chaparral PUD Traffic Analysis This memorandum addresses the traffic analyses related to the Chaparral PUD located in the southwest quadrant of the Shields/Casa Grande intersection in Fort Collins., Colorado. This parcel was previously submitted and approved as Phase 3 of the Casa Grande PUD. The overall traffic impacts of the Casa Grande PUD were addressed in the "Casa Grande PUD Traffic Impact Study" May 1985. In that study, Phase 3 was comprised of 66 multi -family dwelling units with all access. to Laredo Lane via five private driveways.. The trip generation from these 66 units as reported in the 1985 study is shown in Table 1. Operations at all interior intersections were reported at acceptable levels of service during the peak hours with stop sign control. Land Use Phase 3 Casa Grande PUD - 66 D.U. Chaparral PUD Accessing Hickok Drive - 3 D.U. Accessing Sharps. Street - 12 D.U. Accessing Laredo Lane - 40 D.U. Table 1 Trip Generation Daily A.M. Peak P.M Peak Trips Trips. Trips Trips. Trips in out in out 337 7 33 26 13 30 1 2 2 1 120 3 7 8 4 400 8 22 25 15 The Chaparral PUCE proposes to change the Phase 3 portion of the Casa Grande PUD to 55 single family lots dvie1 1 i ng units) . The proposed site plan is shown in Figure 1. Three units would gain direct driveway access to Hickok Drive. Twelve units would access the extension of Sharps Street as a cut -de -sac south of Casa Grande Boulevard. Forty units would access. Laredo Lane via either direct driveway access to Laredo Lane or a cul-de-sac east of Laredo Lane. Table 1 also shows the trip generation from the proposed Chaparral PUU delineated by their respective access points. While the land use change causes a potential 60 percent increase in daily travel and a potential 25 percent increase in average peak hour travel, the absolute increase in trips is quite small.There will be no change in the acceptable operation at the interior intersections. The operation at the Shields/Casa Grande intersection will be as reported in the 1985 traffic study. Delays that may be experienced by the left -turn exits from Casa Grande to northbound Shields are due to the expected traffic volumes on Shields Street. Provision of right- and left -turn lanes. on Casa Grande wi 1 1 confine delays to only those per•s.ons desiring to turn left. Good signal progression on Shields Street will improve the operation at this stop sign control intersection.