Loading...
HomeMy WebLinkAboutCHAPARRAL PUD - PRELIMINARY - 60-87 - CORRESPONDENCE - RESPONSE TO STAFF REVIEW COMMENTSFREDERICK LAN SURVEYING 1528 N. Lincoln Loveland, Co. 80537 (303) 669-3652 October 30, 1987 Debbie deBesche City of Fort Collins Office of Development P.O. Box 580 Fort Collins, Colorado Services - Planning 80522 Re: Chaparral P.U.D., Preliminary submittal Dear Debbie; Having reviewed your staff comments pertaining to the review of the above referenced project, and having met with you, Mike Herzig and Glen Schlueter to discuss said comments, I enclose copies of the revised drawings and offer the following information. 1. The location of the Storm Sewer under the curb and gutter is consistent with previous projects. Mike Herzig indicated he will speak with the affected utility companies to verify their concerns with this location. No deveation from this location is planned at this time. 2. The referenced fire hydrant has been moved east, as shown on the Preliminary Plat. 3. It is understood that the City will not maintain the common opera space. 4. The range of lot sizes is shown by a note on Preliminary Site Plan. Lot areas will be shown on the individual lots on the Final Plat. 5. It is understood that prior to the issuance of a C.O., landscaping will be in place or an acceptable guarantee for the placement of the landscaping will be submitted to the city. At the time of Final Site Plan, we will provide the City with an example of a Landscaping Certificate that we propose to use in leu of a letter of credit for the required individual lot landscaping. Also at the time of Final Site Plan, we will work out a phasing schedule with the City tieing the improvements of the common open space to the phasing of lot development. 6. It is understood that all signs will conform to the sign code. 7. As discussed with Mike Herzig, the suggested sanitary sewer connection between Laredo Court and Laredo Lane is not necessary to provide service to this specific development. If it is being requested by the City to relieve some larger regional collection problem, it should not be this developers responsibility to bear the expense of this improvement. Mike is to check further with the wastewater utility regarding this. • Page 2 B. It is understood that no structures can be placed in the sewer easement crossing Lot 1, Block 2. The building envelope as shown on the Site Plan reflects this restriction. 9. The sewer between Lots 14 and 15, Block 2, has been adjusted to be generally centered in the 20 foot easement, as shown on the Preliminary Plat. 10. The referenced water pressure note has been added to the Site Plan and Preliminary Plat. 11. The Cactus Court R.O.W. has been standardized, with the excess area being included in Lots 7 and 8, as shown on all drawings 12. The east -west street is a portion of Laredo Court and has been labeled as such on the drawings. 13. Access ramp locations have been added to all drawings. 14. The ten street trees of the size and type requested by the City have been added to the Site Plan. It should be noted that the specific location of these trees will be subject to the existence of several utilities in the vicinity. We feel that with the addition of these requested trees, and in light of the stand of large existing trees to be preserved, our plan for the open space landscaping is sufficient. 15. Curvilenear storm sewer was approved in this same location in 1981 with the Wagon Wheel Filing No. 3 plans, and again in 1985 with the replat as Casa Grande F.U.D. It is our understanding that the 1985 approval is still in force. It should be noted that based on those previous designs and approvals, utilities., including a curvilenear sanitary sewer have been constructed in this immediate vicinity, and subsequent storm sewer placement will be restricted by these existing constraints. We will be submitting a letter requesting a variance from current standards to allow for the construction of this curvilenear storm sewer. 16. The requested information has been added to the Grading and Drainage plan, and is included in the attached exhibits. It should be noted that we anticipate being able to provide approximately 0.5 feet of freeboard, as shown in the attached exhibits. It is understood that at time of final submittal, we will detail the hydraulic grade line, as requested by Glen Schlueter. 17. This incorrect basin designation will be corrected at time of final submittal. 18. It is understood that erosion control will be provided during construction. We will select and detail the specific method of said control at the time of final submittal. 0 • Page 3 19. It was my understanding from Ted Shepard, early on in this process, that no amendments to the Master Plan would be required for this, project. you indicated that you would check on this, and also check on the magnitude of the amendment process, if required. I await your reply and reserve further discussion on this. 20. The applicant has agreed to provide the requested street tree per lot, and a note regarding these trees has been added to the Site Plan. The applicant would like to explore with the City the option of providing a Landscaping Certificate to the home buyer for these trees (see comment #5). If any further discussion is needed regarding these items, please feel free to contact me. I will be submitting the requested reductions, renderings and prints by November 9th. Respectfully; Daniel Herlihey Frederick Land Surve ' g enc. cc: Leo Schuster