HomeMy WebLinkAboutCHAPARRAL PUD - PRELIMINARY - 60-87 - SUBMITTAL DOCUMENTS - ROUND 1 - PROJECT NARRATIVEDevelopment Plan
Chaparral P.U.D.'
This project will consist of 55 single family homes. The anticipated
completion date will be three years after start up. We intend to start.
the project the beginning of the spring construction season in 1988. The
anticipated absorption rate of the project will be 1} homes per month.
We will be building the project out in three phases.. The first phase
will consist of Lots 5 thru 8, Block 3 and Lots 7 thru 20, Block 2. These
lots are on Laredo Court. In order to access these lots we anticipate
completing Laredo Lane with our initial phase of construction. The .initial
spec homes and models will be on Lots 5 thru 8. Block 3 soas to gain the
maximum exposure for the subdivision from Shields Street. The initial earth
work of the subdivision will include the construction of the dentention area
on the corner of Casa Grande Blvd. and Shields Street. Also to gain the
maximum curb appeal for the subdivision this area will be landscaped when
building permits are issued on the initial lots.
The south half of the tract will be landscaped late in 1988, also
corresponding.to the issuance of building permits that border the open
space. The next phase to be developed will be Lots 1 thru 6 Block 2;
I nd Lots 1 thru 4 Block 3; and Lots 16 thru 27 Block 1. These lots line
Laredo Lane. The final phase of the project will be those lots on Cactus Ct.
and Hickok Dr. These are Lots 1 thru 15, Block 1.
Sincerely
�=yjj�
o Carney
Secretary, PLS, Inc.