Loading...
HomeMy WebLinkAboutJEROME STREET STATION - PDP210009 - DOCUMENT MARKUPS - ROUND 4 - UTILITY PLANS (3)VAULT ELEC VAULT CABLE VAULT ELEC VAULT ELEC VAULT CABLE TRAFFICVAULT VAULT ELEC HY DVAULT CABLE VAULT ELEC VAULT ELEC VAULT CABLE VAULT ELEC VAULT CABLE VAULT ELEC VAULT CABLE VAULT ELEC VAULT ELECHYDHYDHYD CONTROL IRR CONTROL IRR CONTROL IRR CONTROL IRR CONTROL IRR CONTROL IRR CONTROL IRR CONTROL IRR CONTROL IRR V.P. V.P. S S D D S S S D D D / / / / / / / // / / / / / / // / / / / / / // / / / / / / /X/ / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / /XXXXXXWWWWWWWWWWWW EEWWWWWWWWE EEEEEGGGGGGGGGGGGGGGG ST ST ST ST SSSSSSSSSSSSSSSSSSSSSSSSSS SS SS SS SS SS SS SS SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS STSS VAULT ELEC HY DD S CONTROLIRR CONTROL IRR GAS XXXXXXXXXXXXXEEEEEFOFOFOFOFOGGGWWXXSSS S SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSOHUOHUOHUFESWGGGGGGGGGGGGGGGG G E E E ELID MHE / / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / /FE SFE SFE SST STST F ES FE SFE SXXGASSSSSSSSSSSSSSSSSSSSSS D ST ST ST ST STSTALL KINDS INVESTMENTS, 910 N COLLEGE AVE REMOVE EXISTING 8' CONCRETE PAN REMOVE & REPLACE EXISTING 8' CONCRETE PAN REMOVE & REPLACE EXISTING PEDESTRIAN RAMP REMOVE & REPLACE EXISTING PEDESTRIAN RAMP REMOVE & REPLACE EXISTING PEDESTRIAN RAMP REMOVE & REPLACE EXISTING PEDESTRIAN RAMP REMOVE EXISTING BLOW OFF HYDRANT CLOSE VALVE AT CONNECTION IN STREET REMOVE EXISTING BLOW OFF HYDRANT REMOVE EXISTING 3' CONCRETE TRICKLE CHANNEL EXISTING TREE TO REMAIN (TYP.) REMOVE EXISTING METAL POSTS (TYP.) REMOVE EXISTING GRAVEL ROAD EXISTING SIGN EXISTING FES EXISTING 18" RCP EX-STORM MH RIM=4964.97 INV OUT=4960.75 (S) EXISTING FES EX-STORM MH RIM=4965.35 EX-STORM MH RIM=4965.34 EX-STORM MH RIM=4965.18 INV OUT=4961.45 (S) 24" RCP EX-STORM MH RIM=4970.03 INV=4959.43 (W, E) EX-STORM MH RIM=4970.54 INV=4958.66 (W, E) EXISTING 36" RCP (STORM) EX-CHAIN LINK FENCE EX-SAN MH RIM=4968.77 INV IN=4960.95 (E) INV OUT=4960.87 (S) EX-SAN MH RIM=4967.69 INV IN=4959.99 (N) INV OUT=4959.82 (S) EX-SAN MH RIM=4966.47 INV=4958.78 (N, E, SE) EX-SAN MH RIM=4963.95 INV IN=4956.53 (N) INV IN=4956.25 (W) INV OUT=4955.75 (S) EX-SAN MH RIM=4964.48 INV IN=4957.66 (N) INV OUT=4957.48 (E) EX-SAN MH RIM=4965.40 INV=4958.74 (N, S) EX-SAN MH RIM=4966.71 INV=4960.03 (W, S) EXISTING SAN MH RIM=4964.63 INV IN=4957.59 (NW, E) INV OUT=4957.42 (S) EX-SAN MH RIM=4964.02 INV IN=4958.97 (N) INV OUT=4957.74 (S) LOT 1, BLOCK 1, WILL SUBDIVISION EX-30' UTILITY & DRAINAGE EASEMENT R.O.W. PER WILL SUBDIVISIONNORTH COLLEGE AVENUE(PUBLIC R.O.W. VARIES)EXISTING 24" SANITARY PVC EXISTING 15' UTILITY EASEMENT EXISTING FIRE HYDRANT BOWL FORT COLLINS LLC, 830 N COLLEGE AVE LAND W PROPERTIES 742 N COLLEGE AVE EXISTING STREET LIGHT (TYP.) EXISTING 8" WATER LINE EXISTING GAS LINE EXISTING FIRE HYDRANT EXISTING ELECTRICAL VAULT (TYP.) EXISTING 20' SEWER LINE EASEMENT EXISTING 9' UTILITY EASEMENT EXISTING 30' GAS LINE EASEMENT EXISTING 20' SEWER LINE EASEMENT LAKE CANAL COMPANY EASEMENT PER PLAT OF OLD TOWN NORTH 50' - EXISTING UNDERGROUND ELECTRIC UTILITY EXISTING TREE TO REMAIN (TYP.) EXISTING 8" WATER LINE VACATE EXISTING TEMPORARY EMERGENCY ACCESS EASEMENT 31' (WIDTH VARIES) TEMPORARY TURN-AROUND EASEMENT PER PLAT OF OLD TOWN NORTH TO BE VACATED REMOVE EXISTING CONCRETE PAD & STORM INLETS EXISTING 10' DRAINAGE EASEMENT EX-STORM LINE REMOVE EX-CHAIN LINK FENCE 30' UTILITY EASEMENT PER WILL SUBDIVISION VACATE EXISTING 20' TEMPORARY EMERGENCY ACCESS EASEMENT EXISTING SIDEWALK AND CHASE TO REMAIN CONTRACTOR TO ENSURE EXISTING SANITARY LINE REMAINS UNDAMAGED DURING REMOVAL OF TREES IN THIS AREA TRACT JJJ TO BE VACATED LAKE CANAL EASEMENT PER PLAT OF OLD TOWN NORTH REMOVE EXISTING VERTICAL PIPE 100 YR FLOODPLAIN (CURRENT EFFECTIVE) 100 YR FLOODPLAIN (CURRENT EFFECTIVE) 500 YR FLOODPLAIN (CURRENT EFFECTIVE) 100 YR FLOODPLAIN (CURRENT EFFECTIVE) 500 YR FLOODPLAIN (CURRENT EFFECTIVE)100 YR FLOODPLAIN (CURRENT EFFECTIVE)500 YR FLOODPLAIN (CURRENT EFFECTIVE) 100 YR FLOODPLAIN (CURRENT EFFECTIVE) 500 YR FLOODPLAIN (CURRENT EFFECTIVE) 500 YR FLOODPLAIN (CURRENT EFFECTIVE) 500 YR FLOODPLAIN (CURRENT EFFECTIVE) 500 YR FLOODPLAIN (CURRENT EFFECTIVE) 500 YR FLOODPLAIN (CURRENT EFFECTIVE) NHBZ-BOUNDARY LINE SheetJEROME STREET STATIONThese drawings areinstruments of serviceprovided by NorthernEngineering Services, Inc.and are not to be used forany type of constructionunless signed and sealed bya Professional Engineer inthe employ of NorthernEngineering Services, Inc.NOT FOR CONSTRUCTIONREVIEW SETof 14 EX1 DEMOLITION PLANEXISTING CONDITIONS &3 NORTH ( IN FEET ) 1 inch = ft. Feet05050 50 100 150 EXISTING ELECTRIC E LEGEND: G T EXISTING STORM SEWER SS EXISTING TELEPHONE EXISTING GAS EXISTING IRRIGATION BOX EXISTING GAS METER EXISTING TELEPHONE PEDESTAL EXISTING TREES (TO REMAIN) FIELD SURVEY BY: NOTES: EXISTING SANITARY SEWER SS EXISTING WATER W EXISTING FENCE X EXISTING WATER METER EXISTING FIRE HYDRANT EXISTING ELECTRIC VAULT PROJECT BOUNDARY EXISTING RIGHT-OF-WAY EXISTING MAJOR CONTOUR EXISTING MINOR CONTOUR VAULT ELEC CONTROL IRR EXISTING TREES (TO BE REMOVED) EXISTING CABLE CTV EXISTING FIBER OPTIC FO 1. THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR ALL UNKNOWN UNDERGROUND UTILITIES. 2.CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING DEMOLITION, REMOVAL, REPLACEMENT, AND DISPOSAL OF ALL FACILITIES AND MATERIAL. 3.CONTRACTOR IS ENCOURAGED TO PERFORM DEMOLITION IN A MANNER THAT MAXIMIZES SALVAGE, RE-USE, AND RECYCLING OF MATERIALS. THIS INCLUDES APPROPRIATE SORTING AND STORING. IN PARTICULAR, DEMOLISHED CONCRETE, ASPHALT, AND BASE COURSE SHOULD BE RECYCLED IF POSSIBLE. 4.ALL SYMBOLS ARE ONLY GRAPHICALLY REPRESENTED AND ARE NOT TO SCALE. 5.CONTACT THE PROJECT SURVEYOR FOR ANY INQUIRIES RELATED TO THE EXISTING SITE SURVEY. 6.THE NATURAL HABITAT BUFFER ZONE IS INTENDED TO BE MAINTAINED IN A NATIVE LANDSCAPE. PLEASE SEE SECTION 3.4.1 OF THE LAND USE CODE FOR ALLOWABLE USES WITHIN THE NHBZ. EXISTING OVERHEAD UTILITY OHE ORIGINAL FIELD SURVEY: NORTHERN ENGINEERING PROJECT NO. 1124-005 DATE: JUNE 16, 2020 EXISTING GRAVEL (TO BE REMOVED) EXISTING CONCRETE (TO BE DEMOED) CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. before you dig.Call R NHBZ-BOUNDARY LINE C.O.CONTROL IRR CONTROL IRR C.O. C.O.C.O.CONTROL IRR CONTROL IRR CONTROL IRR CONTROL IRR CONTROL IRR CONTROL IRR CONTROL IRR CONTROL IRR CONTROL IRR CONTROL IRRD D / / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / /XX/ / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / /XX XXXXXXXXST ST ST ST ST ST ST ST ST ALL KINDS INVESTMENTS, 910 N COLLEGE AVE BOWL FORT COLLINS LLC 830 N COLLEGE AVE (70.38)(70.42)(70.57)(70.59)(7 0 . 6 8 )(70.70)(70 .76 )(70.79)(70 .87 )(70.02)(70.63)(70.51)(70.36)(70.87)(70.59)(67.27)(66.84)(70.89)(71.06)(71 .03 )0.7%0.6%67.20 67.01 (66.60) (66.63) FFE=4968.92 FFE=4968.91 FFE=4969.70 FFE=4969.98 FFE=4971.56FFE=4971.29 FFE=4972.22 20' - 5. 8 %2.1% 2.3% 2.1% 2.1% 2.1%3.8%0. 7%3.2%0.7%1.7%2.3%3.7% 2.3% 1.7% 2.2% 1.7% 2.0% 2.0% 2.0% 18.8% 17.0% 4.9%5.6%5.7%8.9% 3.6% 5.2% 1.3% 7.0%4.9%7.8%2.7% BUILDING 1 (6 PLEX) BUILDING 3 (4 PLEX) BUILDING 2 (4 PLEX) BUILDING 7 (6 PLEX)BUILDING 6 (7 PLEX) BUILDING 6 (4 PLEX) BUILDING 4 (5 PLEX) 70.45 70.49PROPOSED CURB CUT PROPOSED CHASE PROPOSED CHASE71.5571.5571.557 1 . 5 5 70.8970.627 0 . 8 9 7 0 . 6 2 70.6270.6270.8970.8969.5869.3169.0769.0369.036 9 . 0 3 68. 2 4 6 8 . 2 4 68.246 8 . 2 4 68.5368.5368.5368.5368.3968.3067. 0 6 6 6 . 3 266.976 7 . 0 767.5267.7767.9968.1968.526 9 . 1 5 68.7368.666 9 . 0 070.487 0 . 2 0 69.316 9 . 2 0 69.0168.8068.516 8 . 3 868.9968.166 7 . 8 5 68.0567.466 7 . 4 2 68.1967.786 7 . 4 6 67.2467.0466.6266.4466.9867.2067.4769.1069.24TRACT A AD&UE PROPOSED 25' UTILITY EASEMENT EXISTING 20' SEWER LINE EASEMENT PROPOSED STORM DRAIN B SheetJEROME STREET STATIONThese drawings areinstruments of serviceprovided by NorthernEngineering Services, Inc.and are not to be used forany type of constructionunless signed and sealed bya Professional Engineer inthe employ of NorthernEngineering Services, Inc.NOT FOR CONSTRUCTIONREVIEW SETof 14 G1 GRADING PLAN9 NORTH ( IN FEET ) 1 inch = ft. Feet03030 30 60 90 E. VINE DRIVEN. COLLEGE AVENUEKEYMAP JEROME STREETCAJETA N S T . PROPOSED CONTOUR EXISTING STORM SEWER PROPOSED STORM SEWER PROPOSED SWALE EXISTING CONTOUR PROPOSED CURB & GUTTER PROPERTY BOUNDARY PROPOSED SPOT ELEVATION PROPOSED SLOPES 1.THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR FOR ALL UNKNOWN UNDERGROUND UTILITIES. 2.REFER TO THE PLAT FOR LOT AREAS, TRACT SIZES, EASEMENTS, LOT DIMENSIONS, UTILITY EASEMENTS, OTHER EASEMENTS, AND OTHER SURVEY INFORMATION. 3.ALL PROJECT DATA IS ON VERTICAL DATUM; NAVD 88. SEE COVER SHEET FOR BENCHMARK REFERENCES. 4.ALL CURB SPOTS SHOWN ARE FLOWLINE ELEVATIONS. ALL OTHER SPOTS ARE FINISHED GRADE ELEVATIONS. 5.LOT GRADING IS DESIGNED FOR TYPICAL RECTANGULAR FOOTPRINT WITH DIMENSIONS AS SHOWN HEREON. SHOULD BUILDING FOOTPRINT CHANGE, GRADING SHALL BE ADJUSTED BY PLOT PLAN FOR THE SPECIFIC FOOTPRINT. ALL MINIMUM OPENINGS SHALL BE A MINIMUM OF 18" ABOVE FRONT LOT ELEVATIONS AND PLOT PLAN DESIGN SHALL BEET FHA GRADING GUIDELINES AND BUILDING CODE REQUIREMENTS. 6.THE NATURAL HABITAT BUFFER ZONE IS INTENDED TO BE MAINTAINED IN A NATIVE LANDSCAPE. PLEASE SEE SECTION 3.4.1 OF THE LAND USE CODE FOR ALLOWABLE USES WITHIN THE NHBZ 7."PORTIONS OF THIS PROPERTY ARE LOCATED IN THE FEMA REGULATED, 100-YEAR AND 500-YEAR POUDRE RIVER FLOODPLAIN. ANY DEVELOPMENT WITHIN THE FLOODPLAIN MUST COMPLY WITH THE SAFETY REGULATIONS OF CHAPTER 10 OF CITY MUNICIPAL CODE. 8."ANY CONSTRUCTION ACTIVITIES IN THE FLOOD FRINGE (E.G. STRUCTURES, SIDEWALK OR CURB & GUTTER INSTALLATION/REPLACEMENT, UTILITY WORK, LANDSCAPING, ETC.) MUST BE PRECEDED BY AN APPROVED FLOODPLAIN USE PERMIT, THE APPROPRIATE PERMIT APPLICATION FEES, AND APPROVED PLANS. 9.CONSTRUCTION OF RESIDENTIAL AND/OR MIXED-USE STRUCTURES IS PROHIBITED IN THE POUDRE RIVER 100-YEAR FLOODPLAIN. 10.OUTSIDE STORAGE OF EQUIPMENT OR FLOATABLE MATERIALS WHETHER PERMANENT OR TEMPORARY IS PROHIBITED IN THE 100-YEAR FLOODPLAIN." 11.AT-RISK POPULATIONS, ESSENTIAL SERVICES, HAZARDOUS MATERIALS, AND GOVERNMENT SERVICES CRITICAL FACILITIES ARE PROHIBITED IN THE 100-YEARFLOODPLAIN. 12.THE APPLICANT ACKNOWLEDGES THAT THIS SITE DEVELOPMENT PLAN DOES NOT COMPLY WITH THE CURRENT REGULATORY FLOODPLAIN. PERMITS CANNOT BE ISSUED FOR RESIDENTIAL STRUCTURES IN THE REGULATORY FLOODPLAIN UNTIL A LOMR IS APPROVED THROUGH FEMA. IT IS AT OUR OWN RISK THAT WE CONTINUE THROUGH THE PLANNING PROCESS NOTES: PROPOSED STORM INLET 2.0% (47.45 ) EXISTING SPOT ELEVATION EXISTING LOT LINE PROPOSED CONCRETE CROSS PAN (TYP.) 33.43 EXISTING RIGHT OF WAY PROPOSED LOT LINE PROPOSED RIGHT OF WAY LEGEND: PROPOSED GRADE BREAK PROPOSED OVERLAND FLOW PROPOSED STORM SEWER UD G1 G2 CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. before you dig.Call R D D D/ / / / / / / // / / / / / / // / / / / / / // / / / / / / /STXOHUOHUOHUOHUOHUOHUF E SMH / / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / /FE SF E SFE S ST STST STST STOHUD ST ST ST ST ST ST ST STSTSTUDUDUD UD UD UD UD BOWL FORT COLLINS LLC 830 N COLLEGE AVE (65.26)(65.00)(65.37)(65.90)(63.58)(64.07)(63.81)(66.18)6 5 . 2 365.11FFE=4969.47 FFE=4967.28 FFE=4968.00 FFE=4968.88 FFE=4969.06 FFE=4968.92 FFE=4968.91 PROPOSED POND PROPOSED POND EXISTING 18" STORM LINE (RCP) PROPOSED TOP OF POND PROPOSED SIDEWALK CHASE (TYP.) PROPOSED CURB CUT 2.0% 2.0% 2.0% 2.1% 2.1% 2.2% 2.2% 3 . 9%3.2%2.4%3.4%2.4%2.5%8.6%9.3%10.0%4.4%5.8%6.3%7.1%3.0%36.1%17.5%30.1%8.4%4.5% 35. 6 %2.1%2.0%2.1%2.3%2.3%0.6% 0.5%2.0%12.7%3.9%0.4%2.4%8.5% 18.8% 17.0% 4.9% 11.6%1.0%BUILDING 7 (6 PLEX)BUILDING 6 (7 PLEX) BUILDING 8 (7 PLEX) BUILDING 9 (6 PLEX) BUILDING 10 (7 PLEX) BUILDING 11 (7 PLEX) BUILDING 12 (4 PLEX) PROPOSED RAIN GARDEN & UNDERDRAIN PROPOSED RAIN GARDEN & UNDERDRAIN PROPOSED RAIN GARDEN & UNDERDRAIN PROPOSED CURB CUT68.246 8 . 2 4 6 8 . 5 3 68.536 8 . 3 9 68.3068.4368.346 8 . 7 1 6 7 . 5 6 68.226 8 . 2 2 6 6 . 6 1 6 6 . 6 1 66.6166.6168.806 8 . 8 0 68.8068.8068.8067.3367.3367.3367.3366.2663.7063.7063.7067.00 65.9662.496 1 . 5 0 64.68 64.5364.3864.1863.946 5 . 2 2 63.9464.5165.0866.006 5 . 7 2 65.506 6 . 2 6 67. 0 6 66.326 7 . 4 6 67.2467.0466.626 6 . 4 4 66.986 7 . 2 9 6 7 . 5 3 6 6 . 8 1 63. 5 5 64.0664.60 65.28 63.006 2 . 1 9 62.376 2 . 1 0 61.9561.7164.0062.8565.006 5 . 9 967.0067.0066.0063.706 7 . 2 067.4763.806 4 . 8 0 64.7565.45TRACT B AD&UE TRACT B AD&UE TRACT A AD&UE EXISTING 30' UTILITY & DRAINAGE EASEMENT PROPOSED 30' SEWER LINE EASEMENT EXISTING 10' DRAINAGE EASEMENT PROPOSED 25' UTILITY EASEMENT 5' UTILITY EASEMENT EXISTING 20' SEWER LINE EASEMENT EXISTING 20' SEWER LINE EASEMENT EXISTING 15' DRAINAGE EASEMENT EXISTING 30' UTILITY EASEMENT PROPOSED STORM DRAIN A PROPOSED POND OUTFALL PROPOSED STORM DRAIN B PROPOSED STORM DRAIN C SheetJEROME STREET STATIONThese drawings areinstruments of serviceprovided by NorthernEngineering Services, Inc.and are not to be used forany type of constructionunless signed and sealed bya Professional Engineer inthe employ of NorthernEngineering Services, Inc.NOT FOR CONSTRUCTIONREVIEW SETof 14 G2 GRADING PLAN10 NORTH ( IN FEET ) 1 inch = ft. Feet03030 30 60 90 PROPOSED CONTOUR EXISTING STORM SEWER PROPOSED STORM SEWER PROPOSED SWALE EXISTING CONTOUR PROPOSED CURB & GUTTER PROPERTY BOUNDARY PROPOSED SPOT ELEVATION PROPOSED SLOPES 1.THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR FOR ALL UNKNOWN UNDERGROUND UTILITIES. 2.REFER TO THE PLAT FOR LOT AREAS, TRACT SIZES, EASEMENTS, LOT DIMENSIONS, UTILITY EASEMENTS, OTHER EASEMENTS, AND OTHER SURVEY INFORMATION. 3.ALL PROJECT DATA IS ON VERTICAL DATUM; NAVD 88. SEE COVER SHEET FOR BENCHMARK REFERENCES. 4.ALL CURB SPOTS SHOWN ARE FLOWLINE ELEVATIONS. ALL OTHER SPOTS ARE FINISHED GRADE ELEVATIONS. 5.LOT GRADING IS DESIGNED FOR TYPICAL RECTANGULAR FOOTPRINT WITH DIMENSIONS AS SHOWN HEREON. SHOULD BUILDING FOOTPRINT CHANGE, GRADING SHALL BE ADJUSTED BY PLOT PLAN FOR THE SPECIFIC FOOTPRINT. ALL MINIMUM OPENINGS SHALL BE A MINIMUM OF 18" ABOVE FRONT LOT ELEVATIONS AND PLOT PLAN DESIGN SHALL BEET FHA GRADING GUIDELINES AND BUILDING CODE REQUIREMENTS. 6.THE NATURAL HABITAT BUFFER ZONE IS INTENDED TO BE MAINTAINED IN A NATIVE LANDSCAPE. PLEASE SEE SECTION 3.4.1 OF THE LAND USE CODE FOR ALLOWABLE USES WITHIN THE NHBZ 7."PORTIONS OF THIS PROPERTY ARE LOCATED IN THE FEMA REGULATED, 100-YEAR AND 500-YEAR POUDRE RIVER FLOODPLAIN. ANY DEVELOPMENT WITHIN THE FLOODPLAIN MUST COMPLY WITH THE SAFETY REGULATIONS OF CHAPTER 10 OF CITY MUNICIPAL CODE. 8."ANY CONSTRUCTION ACTIVITIES IN THE FLOOD FRINGE (E.G. STRUCTURES, SIDEWALK OR CURB & GUTTER INSTALLATION/REPLACEMENT, UTILITY WORK, LANDSCAPING, ETC.) MUST BE PRECEDED BY AN APPROVED FLOODPLAIN USE PERMIT, THE APPROPRIATE PERMIT APPLICATION FEES, AND APPROVED PLANS. 9.CONSTRUCTION OF RESIDENTIAL AND/OR MIXED-USE STRUCTURES IS PROHIBITED IN THE POUDRE RIVER 100-YEAR FLOODPLAIN. 10.OUTSIDE STORAGE OF EQUIPMENT OR FLOATABLE MATERIALS WHETHER PERMANENT OR TEMPORARY IS PROHIBITED IN THE 100-YEAR FLOODPLAIN." 11.AT-RISK POPULATIONS, ESSENTIAL SERVICES, HAZARDOUS MATERIALS, AND GOVERNMENT SERVICES CRITICAL FACILITIES ARE PROHIBITED IN THE 100-YEARFLOODPLAIN. 12.THE APPLICANT ACKNOWLEDGES THAT THIS SITE DEVELOPMENT PLAN DOES NOT COMPLY WITH THE CURRENT REGULATORY FLOODPLAIN. PERMITS CANNOT BE ISSUED FOR RESIDENTIAL STRUCTURES IN THE REGULATORY FLOODPLAIN UNTIL A LOMR IS APPROVED THROUGH FEMA. IT IS AT OUR OWN RISK THAT WE CONTINUE THROUGH THE PLANNING PROCESS NOTES: PROPOSED STORM INLET 2.0% (47.45 ) EXISTING SPOT ELEVATION EXISTING LOT LINE PROPOSED CONCRETE CROSS PAN (TYP.) 33.43 EXISTING RIGHT OF WAY PROPOSED LOT LINE PROPOSED RIGHT OF WAY LEGEND: PROPOSED GRADE BREAK PROPOSED OVERLAND FLOW PROPOSED STORM SEWER UD E. VINE DRIVEN. COLLEGE AVENUEKEYMAP JEROME STREETCAJETA N S T . G1 G2 CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. before you dig.Call R VAULT ELEC VAULT CABLE VAULT ELEC VAULT ELEC VAULT CABLE TRAFFIC VAULT VAULT ELEC VAULT CABLE VAULT ELEC VAULT ELEC VAULT CABLE VAULT ELEC VAULT CABLE VAULT ELEC VAULT CABLE VAULT ELEC VAULT ELEC CONTROL IRR CONTROL IRR CONTROL IRR CONTROL IRR CONTROL IRR CONTROL IRR CONTROL IRR CONTROL IRR CONTROL IRRD D D D D / / / / / / / // / / / / / / // / / / / / / // / / / / / / /X/ / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / /XXXXXXST ST ST ST STVAULT ELEC D CONTROL IRR CONTROL IRR GASFOFO FOFOFOFOOHUOHUOHUFE SLID MH / / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / /FE SFE SFE SST ST ST GAS D ST ST ST ST STSTS F SF SF SF SF SF SF SF SF SF SF SF SFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSF SF SF SF SFSFSFSFSFSFSFSFSFSFSFSFSFSFJEROME STREET OSIANDER STREET CAJETAN STREET PASCA L S T R E E T UDUD UD UD SheetJEROME STREET STATIONThese drawings areinstruments of serviceprovided by NorthernEngineering Services, Inc.and are not to be used forany type of constructionunless signed and sealed bya Professional Engineer inthe employ of NorthernEngineering Services, Inc.NOT FOR CONSTRUCTIONREVIEW SETof 14 EC1 & FLOODPLAIN EXHIBITEROSION CONTROL12 CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. before you dig.Call R NORTH ( IN FEET ) 0 1 INCH = 50 FEET 50 50 100 150 PROPOSED CONTOUR PROPOSED STORM SEWER PROPOSED SWALE EXISTING CONTOUR PROPOSED CURB & GUTTER 100-YR FLOODPLAIN - EFFECTIVE BENCHMARK/BASIS OF BEARING: SILT FENCE ROCK SOCK RIPRAP 1.CONTRACTOR SHALL IMMEDIATELY STABILIZE ALL DISTURBED SLOPES BY CRIMP MULCHING OR SIMILAR METHODS. 2.SWMP ADMINISTRATOR: Contact ________________________________ Company ________________________________ Address ________________________________ Phone________________________________ 3.CONTRACTOR TO PROVIDE VEHICLE TRACKING CONTROL FOR CONCRETE WASHOUT AREA IF ACCESS IS OFF PAVEMENT. 4.REFER TO THE PRELIMINARY DRAINAGE REPORT BY NORTHERN ENGINEERING FOR ADDITIONAL INFORMATION. 5.PORTIONS OF THIS PROPERTY ARE LOCATED IN THE FEMA REGULATED, 100 YEAR AND 500 YEAR POUDRE RIVER FLOODPLAIN. ANY DEVELOPMENT WITHIN THE FLOODPLAIN MUST COMPLY WITH THE SAFETY REGULATIONS OF CHAPTER 10 OF CITY MUNICIPAL CODE. 6.ANY CONSTRUCTION ACTIVITIES IN THE FLOOD FRINGE (E.G. STRUCTURES, SIDEWALK OR CURB & GUTTER INSTALLATION/REPLACEMENT, UTILITY WORK, LANDSCAPING, ETC.) MUST BE PRECEDED BY AN APPROVED FLOODPLAIN USE PERMIT, THE APPROPRIATE PERMIT APPLICATION FEES, AND APPROVED PLANS. 7.CONSTRUCTION OF RESIDENTIAL AND/OR MIXED USE STRUCTURES IS PROHIBITED IN THE POUDRE RIVER 100YEAR FLOODPLAIN. 8.OUTSIDE STORAGE OF EQUIPMENT OR FLOATABLE MATERIALS WHETHER PERMANENT OR TEMPORARY IS PROHIBITED IN THE 100YEAR FLOODPLAIN. 9.AT RISK POPULATIONS, ESSENTIAL SERVICES, HAZARDOUS MATERIALS, AND GOVERNMENT SERVICES CRITICAL FACILITIES ARE PROHIBITED IN THE 100YEAR FLOODPLAIN. 10.THE APPLICANT ACKNOWLEDGES THAT THIS SITE DEVELOPMENT PLAN DOES NOT COMPLY WITH THE CURRENT REGULATORY FLOODPLAIN. PERMITS CANNOT BE ISSUED FOR RESIDENTIAL STRUCTURES IN THE REGULATORY FLOODPLAIN UNTIL A LOMR IS APPROVED THROUGH FEMA. IT IS AT OUR OWN RISK THAT WE CONTINUE THROUGH THE PLANNING PROCESS. 6.THE NATURAL HABITAT BUFFER ZONE IS INTENDED TO BE MAINTAINED IN A NATIVE LANDSCAPE. PLEASE SEE SECTION 3.4.1 OF THE LAND USE CODE FOR ALLOWABLE USES WITHIN THE NHBZ. GENERAL NOTES: WATTLE DIKE CONCRETE WASH AREA SEDIMENT TRAP BALE INLET PROTECTION SLOPE DRAIN EROSION CONTROL FABRIC LEGEND: BALE OUTLET PROTECTION INLET PROTECTION VEHICLE TRACKING CONTROL PAD SF 500-YR FLOODPLAIN - EFFECTIVE 100-YR FLOODPLAIN - WHITEWATER PARK UPDATE 500-YR FLOODPLAIN - WHITEWATER PARK UPDATE APPROXIMATE 100-YR FLOODPLAIN - JEROME ST. FLOODPLAIN CROSS SECTION (WHITEWATER PARK UPDATE - ANDERSON) EROSION CONTROL NOTES: 1.IT SHOULD BE NOTED THAT ANY EROSION CONTROL PLAN SERVES ONLY AS A GUIDELINE TO THE CONTRACTOR. STAGING AND/OR PHASING OF BEST MANAGEMENT PRACTICES (BMPs) IS EXPECTED. ADDITIONAL AND/OR DIFFERENT BMPs FROM THOSE ORIGINALLY DEPICTED MAY BE NECESSARY DURING CONSTRUCTION DUE TO CHANGING SITE CONDITIONS OR AS REQUIRED BY LOCAL AUTHORITIES. 2.THIS EROSION CONTROL PLAN IS SCHEMATIC IN NATURE. AS SUCH, GRAPHICAL SYMBOLS MAY NOT BE TO SCALE, NOR ARE THEY NECESSARILY SHOWN IN THEIR EXACT LOCATION. 3.THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL PERMITTING (CITY, STATE DISCHARGE PERMIT, ETC.) AND COMPLIANCE WITH GOVERNING AUTHORITIES. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR (OR PERMIT HOLDER) TO ENSURE EROSION CONTROL MEASURES ARE PROPERLY MAINTAINED AND FOLLOWED. 4.CONTRACTOR SHALL IMPLEMENT THE APPROPRIATE EROSION CONTROL MEASURES ACCORDING THE THE CONSTRUCTION SEQUENCING AND LEVEL OF SITE STABILIZATION. 5.CONTRACTOR SHALL IMPLEMENT APPROPRIATE INLET PROTECTION FOR ALL STORM DRAINS, SWALES, UNTIL SITE IS FULLY STABILIZED. 6.CONTRACTOR SHALL IMPLEMENT APPROPRIATE INLET PROTECTION FOR DOWNSPOUT CONNECTIONS, TO THE STORM DRAIN SYSTEM, UNTIL CONNECTION IS ESTABLISHED WITH DOWNSPOUT. 7.INLET PROTECTION SHALL BE ADAPTED, AS NECESSARY, TO THE SURROUNDING SURFACE TYPE AND CONDITION (i.e., STAKE-DRIVEN WATTLES FOR BARE SOIL, GRAVEL SOCKS FOR PAVEMENT, ETC.) 8.CONTRACTOR IS RESPONSIBLE FOR STABILIZING ALL SLOPES, PARTICULARLY THOSE STEEPER THAN 6:1. CRIMP MULCHING, HYDRO MULCHING, EROSION MATS, TEMPORARY IRRIGATION, AND ADDITIONAL WATTLES OR SILT FENCING MAY BE NECESSARY TO ESTABLISH VEGETATIVE COVER AND STABILIZE THE SLOPE. 9.CONTRACTOR IS RESPONSIBLE FOR PREVENTING SEDIMENT FROM UNSTABILIZED LANDSCAPE AREAS FROM MIGRATING ONTO AND ENTERING THE PERMEABLE PAVER SYSTEMS UNTIL UPGRADIENT TRIBUTARY AREAS ARE FULLY STABILIZED. 10.ADDITIONAL WATTLES, SILT FENCE, OR OTHER MEASURES, MAY BE NECESSARY TO ENSURE THAT EACH BUILDING PAD IS STABILIZED THROUGHOUT CONSTRUCTION. WATTLES SHALL BE PROVIDED AROUND BUILDING PAD SIDES TO ENSURE AT NO TIME SHALL SEDIMENT BE ALLOWED TO CROSS THE PUBLIC SIDEWALKS. 11.CONTRACTOR SHALL IMPLEMENT APPROPRIATE PERIMETER PROTECTION FOR AREAS DIRECTING DRAINAGE OFFSITE. PERIMETER PROTECTION SHALL BE ADAPTED, AS NECESSARY, TO THE SURROUNDING SURFACE TYPE AND CONDITION (i.e., STAKE-DRIVEN SEDIMENT CONTROL LOGS OR SILT FENCE FOR BARE SOIL, GRAVEL SOCKS FOR PAVEMENT, ETC.) 12.FUELING FACILITIES SHALL BE LOCATED AT LEAST ONE HUNDRED (100) FEET FROM NATURAL BODY OF WATER, WETLAND, NATURAL DRAINAGE WAY OR MANMADE DRAINAGE WAY. THE FUEL TANKS AND FUELING AREA MUST BE SET IN A CONTAINMENT AREA THAT WILL NOT ALLOW A FUEL SPILL TO DIRECTLY FLOW, SEEP, RUN OFF, OR BE WASHED INTO A BODY OF WATER, WETLAND OR DRAINAGE WAY. 13.CONSTRUCTION WASTE STORAGE (DUMPSTERS) AND PORTABLE SANITATION UNITS (CONSTRUCTION TOILETS) SHALL BE LOCATED AT LEAST FIFTY (50) FEET FROM ANY STORMWATER INLET, WETLAND, OR DRAINAGE WAY. SAID FACILITIES MUST BE SET IN A CONTAINMENT AREA THAT WILL NOT ALLOW POLLUTANTS TO DIRECTLY FLOW, SEEP, RUN OFF, OR BE WASHED INTO A BODY OF WATER, WETLAND OR DRAINAGE WAY. DUMPSTERS SHALL BE LOCATED ON FLAT, STABLE GROUND, AND CONSTRUCTION TOILETS SHALL BE STAKED DOWN. 14.THE CONTRACTOR AND ALL SUBCONTRACTORS WILL COOPERATE WITH THE CITY'S CONSTRUCTION INSPECTORS BY CEASING OPERATIONS WHEN WINDS ARE OF SUFFICIENT VELOCITY TO CREATE BLOWING DUST WHICH, IN THE INSPECTOR'S OPINION, IS HAZARDOUS TO THE PUBLIC HEALTH AND WELFARE. 15.WHERE SEASONAL CONSTRAINTS (E.G., DURING SUMMER AND WINTER MONTHS) INHIBIT PERMANENT SEEDING OPERATIONS, DISTURBED AREAS WILL BE TREATED WITH MULCH AND MULCH TACKIFIER OR OTHER MATERIALS APPROVED BY EROSION CONTROL STAFF TO PREVENT EROSION. 16.SEE LANDSCAPE PLANS FOR ADDITIONAL INFORMATION ON PLANTING, REVEGETATION, HARDSCAPE AND OTHER PERMANENT SITE STABILIZATION METHODS. 17.DIRT AND DEBRIS FROM CONSTRUCTION ACTIVITIES TRACKED ON CITY STREETS SHALL BE KEPT TO A MINIMUM AND CLEANED IMMEDIATELY OR AT THE SUGGESTION OF THE CITY'S EROSION CONTROL INSPECTOR. 18.CONTRACTOR SHALL KEEP CONSTRUCTION VEHICLES ENTERING AND EXITING SITE TO A MINIMUM. 19.THE CONTRACTOR SHALL, AT ALL TIMES DURING AND AFTER SYSTEM INSTALLATION, PREVENT SEDIMENT, DEBRIS, AND DIRT FROM ANY SOURCE FROM ENTERING THE PERMEABLE PAVEMENT SYSTEM. LOOSE MATERIALS SHALL NOT BE STORED ON THE PERMEABLE PAVEMENT AREA. MUD AND SEDIMENT-LADEN RUNOFF SHOULD BE KEPT AWAY FROM THE PAVEMENT AREA. TEMPORARILY DIVERT RUNOFF OR INSTALL SEDIMENT CONTROL MEASURES AS NECESSARY TO REDUCE THE AMOUNT OF SEDIMENT RUN-ON TO THE PAVEMENT. SURFACE PROTECTION COULD INCLUDE COVERING AREAS OF THE PAVEMENT, PROVIDING ALTERNATIVE CONSTRUCTION VEHICLE ACCESS, AND PROVIDING EDUCATION TO ALL PARTIES WORKING ONSITE. BENCHMARK: #1 City of Fort Collins Benchmark 1-00 Elevation=4968.740 BENCHMARK: #2 NGS Benchmark Z-401 Elevation=4962.740 Basis of Bearings The Basis of Bearings is the West line line of the Southwest Quarter of Section 1-7-69 as bearing South 00° 38' 34" West (assumed bearing) and monumented as shown on the Plat. VAULT ELEC VAULT CABLE VAULT ELEC VAULT ELEC VAULT CABLE TRAFFICVAULT VAULT ELEC VAULT CABLE VAULT ELEC VAULT ELEC VAULT CABLE VAULT ELEC VAULT CABLE VAULT ELEC VAULT CABLE VAULT ELEC VAULT ELEC CONTROL IRR CONTROL IRR CONTROL IRR CONTROL IRR CONTROL IRR CONTROL IRR CONTROL IRR CONTROL IRR CONTROL IRRD D D D D / / / / / / / // / / / / / / // / / / / / / // / / / / / / /X/ / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / /XXXXXXEEEEEEEEST ST ST ST STVAULT ELEC D CONTROL IRR CONTROL IRR GASEE EEEFOFOFOFOFOOHUOHUOHUFE S E E E ELID MHE / / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / /F E SFE SFE SST STST GAS D ST ST ST ST STSTNORTH COLLEGE AVENUE(PUBLIC R.O.W. VARIES)UDUD UD UD 26' - 85' ROW 50' - EXISTING 30' UTILITY & DRAINAGE EASEMENT EXISTING 20' SEWER LINE EASEMENT EXISTING 10' DRAINAGE EASEMENT LAKE CANAL EASEMENT PER PLAT OF OLD TOWN NORTH EXISTING 30' GAS LINE EASEMENT LAKE CANAL COMPANY EASEMENT PER PLAT OF OLD TOWN NORTH PROJECT BOUNDARY PROPOSED STORM LINE PROPOSED STORM LINE PROPOSED STORM LINE PROPOSED DETENTION POND-2 0.44 ACRE-FT OUTLET STRUCTURE RIPRAP (TYP.) PROPOSED SIDEWALK CHASE (TYP.) PROPOSED SIDEWALK CHASE (TYP.) PROPOSED DETENTION POND-1 0.11 ACRE-FT PROPOSED CURB CUT (TYP.) j1 g h l k d c b j f a BUILDING 1 (6 PLEX) BUILDING 3 (4 PLEX) BUILDING 2 (4 PLEX) BUILDING 7 (6 PLEX) BUILDING 6 (7 PLEX) BUILDING 8 (7 PLEX) BUILDING 9 (6 PLEX) BUILDING 10 (7 PLEX) BUILDING 11 (7 PLEX) BUILDING 12 (4 PLEX) BUILDING 6 (4 PLEX) BUILDING 4 (5 PLEX) A 1.87 ac. J1 0.75 ac F 0.46 ac C 1.43 ac E 1.18 ac B 0.31 ac D 0.36 ac J2 0.16 ac G 0.40 ac H 0.04 ac I 0.98 ac J 0.04 ac K 0.02 ac L 0.06 ac PROPOSED NORTH RAIN GARDEN PROPOSED SOUTH RAIN GARDEN EXISTING CONCRETE CULVERT e j2 FFE=71.29 FFE=71.56 FFE=72.22 FFE=69.70 FFE=69.98 FFE=68.91 FFE=68.92 FFE=69.06 FFE=68.88 FFE=68.00 FFE=67.28 FFE=69.47 CONCRETE WEIR SLOPE PROTECTION (SCOUR-STOP) CONCRETE WEIR SLOPE PROTECTION (SCOUR-STOP) SLOPE PROTECTION (SCOUR-STOP) PROPOSED SIDEWALK CHASE (TYP.) PROPOSED SIDEWALK CHASE (TYP.) PROPOSED SIDEWALK CHASE (TYP.) PROPOSED SIDEWALK CHASE (TYP.) PROPOSED SIDEWALK CHASE (TYP.) PROPOSED JEROME RAIN GARDEN 100 YR FLOODPLAIN (CURRENT EFFECTIVE) 100 YR FLOODPLAIN (CURRENT EFFECTIVE)500 YR FLOODPLAIN (CURRENT EFFECTIVE) 100 YR FLOODPLAIN (CURRENT EFFECTIVE) 500 YR FLOODPLAIN (CURRENT EFFECTIVE) 100 YR FLOODPLAIN (CURRENT EFFECTIVE)500 YR FLOODPLAIN (CURRENT EFFECTIVE) 100 YR FLOODPLAIN (CURRENT EFFECTIVE) 500 YR FLOODPLAIN (CURRENT EFFECTIVE) 500 YR FLOODPLAIN (CURRENT EFFECTIVE) 500 YR FLOODPLAIN (CURRENT EFFECTIVE) i NHBZ BOUNDARY DR1DRAINAGE EXHIBIT13 NORTH ( IN FEET ) 0 1 INCH = 50 FEET 50 50 100 150 PROPOSED CONTOUR PROPOSED STORM SEWER PROPOSED SWALE EXISTING CONTOUR PROPOSED CURB & GUTTER PROPERTY BOUNDARY PROPOSED INLET A DESIGN POINT FLOW ARROW DRAINAGE BASIN LABEL DRAINAGE BASIN BOUNDARY PROPOSED SWALE SECTION 11 NOTES: 1.REFER TO THE PRELIMINARY DRAINAGE REPORT, DATED JULY 20TH, 2022 FOR ADDITIONAL INFORMATION. 2.PORTIONS OF THIS PROPERTY ARE LOCATED IN THE FEMA REGULATED, 100 YEAR AND 500 YEAR POUDRE RIVER FLOODPLAIN. ANY DEVELOPMENT WITHIN THE FLOODPLAIN MUST COMPLY WITH THE SAFETY REGULATIONS OF CHAPTER 10 OF CITY MUNICIPAL CODE. 3.ANY CONSTRUCTION ACTIVITIES IN THE FLOOD FRINGE (E.G. STRUCTURES, SIDEWALK OR CURB & GUTTER INSTALLATION/REPLACEMENT, UTILITY WORK, LANDSCAPING, ETC.) MUST BE PRECEDED BY AN APPROVED FLOODPLAIN USE PERMIT, THE APPROPRIATE PERMIT APPLICATION FEES, AND APPROVED PLANS. 4.CONSTRUCTION OF RESIDENTIAL AND/OR MIXED_USE STRUCTURES IS PROHIBITED IN THE POUDRE RIVER 100_YEAR FLOODPLAIN. 5.OUTSIDE STORAGE OF EQUIPMENT OR FLOATABLE MATERIALS WHETHER PERMANENT OR TEMPORARY IS PROHIBITED IN THE 100_YEAR FLOODPLAIN. 6.AT_RISK POPULATIONS, ESSENTIAL SERVICES, HAZARDOUS MATERIALS, AND GOVERNMENT SERVICES CRITICAL FACILITIES ARE PROHIBITED IN THE 100_YEAR FLOODPLAIN. 7.THE APPLICANT ACKNOWLEDGES THAT THIS SITE DEVELOPMENT PLAN DOES NOT COMPLY WITH THE CURRENT REGULATORY FLOODPLAIN. PERMITS CANNOT BE ISSUED FOR RESIDENTIAL STRUCTURES IN THE REGULATORY FLOODPLAIN UNTIL A LOMR IS APPROVED THROUGH FEMA. IT IS AT OUR OWN RISK THAT WE CONTINUE THROUGH THE PLANNING PROCESS. 8.PORTIONS OF THIS PROPERTY ARE LOCATED IN THE FEMA REGULATED, 100 YEAR AND 500 YEAR POUDRE RIVER FLOODPLAIN. ANY DEVELOPMENT WITHIN THE FLOODPLAIN MUST COMPLY WITH THE SAFETY REGULATIONS OF CHAPTER 10 OF CITY MUNICIPAL CODE. 9.ANY CONSTRUCTION ACTIVITIES IN THE FLOOD FRINGE (E.G. STRUCTURES, SIDEWALK OR CURB & GUTTER INSTALLATION/REPLACEMENT, UTILITY WORK, LANDSCAPING, ETC.) MUST BE PRECEDED BY AN APPROVED FLOODPLAIN USE PERMIT, THE APPROPRIATE PERMIT APPLICATION FEES, AND APPROVED PLANS. 10.CONSTRUCTION OF RESIDENTIAL AND/OR MIXED USE STRUCTURES IS PROHIBITED IN THE POUDRE RIVER 100YEAR FLOODPLAIN. 11.OUTSIDE STORAGE OF EQUIPMENT OR FLOATABLE MATERIALS WHETHER PERMANENT OR TEMPORARY IS PROHIBITED IN THE 100YEAR FLOODPLAIN. 12.AT RISK POPULATIONS, ESSENTIAL SERVICES, HAZARDOUS MATERIALS, AND GOVERNMENT SERVICES CRITICAL FACILITIES ARE PROHIBITED IN THE 100YEAR FLOODPLAIN. 13.THE APPLICANT ACKNOWLEDGES THAT THIS SITE DEVELOPMENT PLAN DOES NOT COMPLY WITH THE CURRENT REGULATORY FLOODPLAIN. PERMITS CANNOT BE ISSUED FOR RESIDENTIAL STRUCTURES IN THE REGULATORY FLOODPLAIN UNTIL A LOMR IS APPROVED THROUGH FEMA. IT IS AT OUR OWN RISK THAT WE CONTINUE THROUGH THE PLANNING PROCESS. 6.THE NATURAL HABITAT BUFFER ZONE IS INTENDED TO BE MAINTAINED IN A NATIVE LANDSCAPE. PLEASE SEE SECTION 3.4.1 OF THE LAND USE CODE FOR ALLOWABLE USES WITHIN THE NHBZ. A LEGEND: FOR DRAINAGE REVIEW ONLY NOT FOR CONSTRUCTION SheetJEROME STREET STATIONThese drawings areinstruments of serviceprovided by NorthernEngineering Services, Inc.and are not to be used forany type of constructionunless signed and sealed bya Professional Engineer inthe employ of NorthernEngineering Services, Inc.NOT FOR CONSTRUCTIONREVIEW SETof 14 CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. before you dig.Call R UDPROPOSED UNDERDRAIN C2 C100 Q2 (cfs) Q100 (cfs) CONTROL IRR CONTROL IRR CONTROL IRR CONTROL IRR CONTROL IRR CONTROL IRR CONTROL IRR CONTROL IRR CONTROL IRRD D D D D / / / / / / / // / / / / / / // / / / / / / // / / / / / / /X/ / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / /XXXXXXST ST ST ST STVAULT ELEC VAULT ELEC D CONTROL IRR CONTROL IRR GAS M FOFOFOFOFOEOHUOHU OHU OHUSSSSSSOHUOHUOHUFESLID MH / / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / /FE SFE SFE SST STST GAS D ST ST ST ST STST930 72312351341 4967 (NAVD88)4965 (NAV D88)4966 (NAVD88)496 4. 3 4966.04967.64964.2ALL KINDS INVESTMENTS, 910 N COLLEGE AVE, BOWL FORT COLLINS LLC 830 N COLLEGE AVE, LAND W PROPERTIES 742 N COLLEGE AVE FFE=68.00 FFE=67.28 FFE=69.47 FFE=68.88 FFE=69.06 FFE=68.91 FFE=68.92 FFE=69.98FFE=69.70 FFE=71.56 FFE=71.29 FFE=72.22 100 YR FLOODPLAIN (CURRENT EFFECTIVE) 100 YR FLOODPLAIN (CURRENT EFFECTIVE)500 YR FLOODPLAIN (CURRENT EFFECTIVE) 100 YR FLOODPLAIN (CURRENT EFFECTIVE) 500 YR FLOODPLAIN (CURRENT EFFECTIVE)100 YR FLOODPLAIN (CURRENT EFFECTIVE)500 YR FLOODPLAIN (CURRENT EFFECTIVE) 100 YR FLOODPLAIN (CURRENT EFFECTIVE) 500 YR FLOODPLAIN (CURRENT EFFECTIVE) 500 YR FLOODPLAIN (CURRENT EFFECTIVE) 500 YR FLOODPLAIN (CURRENT EFFECTIVE) NHBZ - BOUNDARY LINE FP1FLOODPLAIN EXHIBIT13 NORTH ( IN FEET ) 0 1 INCH = 50 FEET 50 50 100 150 FOR DRAINAGE REVIEW ONLY NOT FOR CONSTRUCTION SheetJEROME STREET STATIONThese drawings areinstruments of serviceprovided by NorthernEngineering Services, Inc.and are not to be used forany type of constructionunless signed and sealed bya Professional Engineer inthe employ of NorthernEngineering Services, Inc.NOT FOR CONSTRUCTIONREVIEW SETof 14 CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. before you dig.Call R Original Field Survey: Northern Engineering Project No. 1124-005 Date: June 16, 2020 LEGEND: PROPOSED CONTOUR EXISTING STORM SEWER PROPOSED STORM SEWER PROPOSED SWALE EXISTING CONTOUR PROPOSED CURB & GUTTER PROPOSED STORM INLET PROPOSED CONCRETE CROSS PAN (TYP.) PEDESTRIAN ACCESS RAMPS PROPERTY BOUNDARY NOTES: FIELD SURVEY BY: BENCHMARKS: CITY OF FORT COLLINS BENCHMARK 1-00 On a catch basin at the southeast corner of Vine Dr. and College Ave. ELEV.=4968.74 BENCHMARK # Z-401 Described by National Geodetic Survey 1984. In Fort Collins, at the junction of east Vine Drive and Linden Street, in the south edge of a highline tower footing, 14.2 meters (46.6 ft) north of the centerline of east Vine Drive, 10.3 meters (33.8 ft) west 'of the extended centerline of Linden Street, and 0.3 meter (1.0 ft) north of the south edge of the footing. note--the footing is '96-inches in diameter, 33 feet deep and set into 11 feet of bedrock. the mark is 0.6 m above the drive. ELEV.=4962.74 Please Note: this plan set is using NAVD88 for a vertical datum. Surrounding developments have used ngvd29 Unadjusted for their vertical datums. If NGVD29 Unadjusted datum is required for any purpose, the following equation should be used: NGVD29 Unadjusted = NAVD88 - 3.18' Basis of Bearings The Basis of Bearings is the West line line of the Southwest Quarter of Section 1-7-69 as bearing South 00° 38' 34" West (assumed bearing) and monumented as shown on the Plat. CROSS-SECTION (CSU CLOMR) 2446 5000ELEVATION NGVD 88 BASE FLOOD ELEVATION (CSU CLOMR) 100-YR FLOODPLAIN - (PER CSU CLOMR) MINIMUM FINISHED FLOOR ELEVATION (FFE) = C (FFE VARIES, SEE PLAN) BASE FLOOD ELEVATION (BFE) = A MINIMUM MECH./ELEC. EQUIPMENT ELEVATION = B BASE FLOOD ELEVATION (BFE) = A MECH. / ELEC. EQUIPMENT FLOODE LEVATION DETAIL NTS SLAB-ON-GRADE MIXED-USE BUILDING SUMMARY ELEV. DESIGNATION A B C NHBZ - BOUNDARY LINE 1.REFER TO THE PLAT FOR LOT AREAS, TRACT SIZES, EASEMENTS, LOT DIMENSIONS, UTILITY EASEMENTS, OTHER EASEMENTS, AND OTHER SURVEY INFORMATION 2.THIS PROJECT IS LOCATED WITHIN A FEMA DESIGNATED 100-YEAR FLOODPLAIN FRINGE AND MUST COMPLY WITH CHAPTER 10 OF THE CITY CODE. 3.ALL ELEVATIONS DEPICTED IN PLAN VIEW AND BENCHMARKS LISTED HEREON ARE PER THE CITY OF FORT COLLINS VERTICAL CONTROL DATUM (NAVD 88). 4.ANY ITEMS LOCATED IN THE FLOODPLAIN ON THE POUDRE RIVER THAT CAN FLOAT (E.G., PICNIC TABLES, BIKE RACKS, ETC.) MUST BE ANCHORED. 5.A FLOODPLAIN USE PERMIT SHALL BE REQUIRED FOR EACH SITE CONSTRUCTION ELEMENT IN THE FLOODPLAIN, INCLUDING BUILDING. THE FLOODPLAIN USE PERMIT FOR THE BUILDING WILL BE APPROVED AT THE TIME OF BUILDING PERMIT APPLICATION. 6.A FLOODPLAIN USE PERMIT AND NO RISE CERTIFICATION IS REQUIRED PRIOR TO PERFORMING ANY WORK WITHIN THE FLOODPLAIN (I.E., CURB CUT REMOVAL, LANDSCAPING). 7.NO OVERNIGHT STORAGE OF MATERIALS OR EQUIPMENT SHALL BE ALLOWED IN THE FLOODPLAIN, WHETHER TEMPORARY (DURING CONSTRUCTION) OR PERMANENT. LANDSCAPING SHALL ALSO MEET THE REQUIREMENTS FOR NO RISE IN THE FLOODPLAIN. 8.REFER TO THE PRELIMINARY DRAINAGE REPORT, DATED JULY 20TH, 2022 FOR ADDITIONAL INFORMATION. 9.A POST-CONSTRUCTION ELEVATION CERTIFICATE MUST BE APPROVED BEFORE A CERTIFICATE OF OCCUPANCY WILL BE ISSUED. 10.ALL HVAC EQUIPMENT IS TO BE PLACED AT OR ABOVE THE REGULATORY FLOOD PROTECTION ELEVATION. 11.HORIZONTAL CONTROL: CITY OF FORT COLLINS GROUND MASTER CONTROL.