Loading...
HomeMy WebLinkAboutFORT COLLINS NISSAN-KIA - FDP220011 - SUBMITTAL DOCUMENTS - ROUND 2 - DRAINAGE REPORTFINAL DRAINAGE REPORT 19 OLD TOWN SQUARE #238 | FORT COLLINS, CO 80524 | 970-530-4044 | www.unitedcivil.com F ORT C OLLINS N ISSAN -K IA Fossil Creek Subdivision Fort Collins, CO Prepared for: Fort Collins Nissan-Kia 5811 S College Ave Fort Collins, CO 80526 Date: September 14, 2022 F INAL D RAINAGE R EPORT F ORT C OLLINS N ISSAN -K IA F ORT C OLLINS ,CO i U21004_Drainage Report September 14, 2022 City of Fort Collins Stormwater Utility 700 Wood Street Fort Collins, Colorado 80521 RE: Fort Collins Nissan-Kia Fort Collins, Colorado Project Number: U21004 Dear Staff: United Civil Design Group, LLC. is pleased to submit this Final Drainage Report for the Fort Collins Nissan-Kia site in Fort Collins, Colorado. In general, this report serves to document the stormwater impacts associated with the proposed improvements related to the existing site. We understand that review by the City of Fort Collins is to assure general compliance with standardized criteria contained in the Fort Collins Stormwater Criteria Manual (FCSCM). This report was prepared in compliance with technical criteria set forth in the Fort Collins Stormwater Criteria Manual. If you should have any questions or comments as you review this report, please feel free to contact us at your convenience. Sincerely, United Civil Design Group Colton Beck, PE Kevin Brazelton, PE Project Engineer Principal F INAL D RAINAGE R EPORT F ORT C OLLINS N ISSAN -K IA F ORT C OLLINS ,CO ii U21004_Drainage Report TABLE OF CONTENTS I. General Location and Description ...................................................................................................................................... 1 A. General Location & Existing Site Information ............................................................................................. 1 B. Description of Property ............................................................................................................................... 2 C. Project Description ..................................................................................................................................... 2 D. Floodplains .................................................................................................................................................. 3 II. Drainage Basins and Sub-Basins ......................................................................................................................................... 3 A. Major Basin Description .............................................................................................................................. 3 B. Sub-Basin Description ................................................................................................................................. 3 III. Drainage Design Criteria ..................................................................................................................................................... 3 A. Regulations ................................................................................................................................................. 3 B. Directly Connected Impervious Area (DCIA) ............................................................................................... 4 C. Hydrological Criteria ................................................................................................................................... 4 D. Hydraulic Criteria ........................................................................................................................................ 4 E. Modifications of Criteria ............................................................................................................................. 5 IV. Drainage Facility Design ..................................................................................................................................................... 5 A. General Concept ......................................................................................................................................... 5 B. Specific Details ............................................................................................................................................ 5 V. Erosion Control ................................................................................................................................................................. 14 VI. Conclusions ...................................................................................................................................................................... 15 A. Compliance with Standards ...................................................................................................................... 15 B. Drainage Concept...................................................................................................................................... 15 C. Stormwater Quality................................................................................................................................... 15 VII. References .................................................................................................................................................................... 15 APPENDICES APPENDIX A – Hydrology Calculations APPENDIX B – Hydraulic Calculations B.1 – Low Impact Development Calculations B.2 – Water Quality Calculations B.3 – Detention Pond and Orifice Calculations B.4 – Inlet Sizing Calculations B.5 – Storm Pipe Calculations B.6 – Channel Capacity Calculations B.7 – Riprap Calculations APPENDIX C – Referenced Materials APPENDIX D – Drainage Exhibits F INAL D RAINAGE R EPORT F ORT C OLLINS N ISSAN -K IA F ORT C OLLINS ,CO 1 U21004_Drainage Report I.GENERAL LOCATION AND DESCRIPTION A.GENERAL LOCATION &EXISTING SITE INFORMATION The Fort Collins Nissan-Kia site (referred herein as “the site”) is located within the Fossil Creek Subdivision, situated in the northeast quarter of Section 11, T6N, R69W of the 6th P.M., City of Fort Collins, Larimer County, Colorado. The property, consisting of approximately 17.0 acres, is located immediately west of S College Ave. The site is split into two separate areas divided by Crestridge St. South of Crestridge St. exists a car dealership to be redesigned and redeveloped. This portion of the property is bounded by Crestridge St to the north, S College Ave to the east, a school facility and residential land to the west, and a commercial property to the south. On-site stormwater drains off-site undetained to either S College Ave, Crestridge St, or off-site to the west. The northern, undeveloped portion of the site is bounded by Crestridge St to the south, S College Ave to the east, and undeveloped land to the north and west. Stormwater on this portion of the site largely drains the northwest via overland flow to Fossil Creek. A portion of the site adjacently north of Crestridge St drains to the south via overland flow. All on-site runoff drains downstream within the City of Fort Collins Fossil Creek master drainage basin. Storm sewer infrastructure exists on-site south of Crestridge St and drains to the off-site to the east. This storm pipe exists as an irrigation bypass system. A City of Fort Collins Floodway and an Erosion Buffer are established with Fossil Creek and Lang Gulch. Also, existing on-site is an underground irrigation pipe owned by North Louden Ditch Company. This irrigation pipe drains from south to north through the site, ultimately to infrastructure that drains across S College Ave to the east. The on- site portion of this ditch lateral is planned to be relocated; however, this relocation is unrelated to the drainage design of the site. An existing residential subdivision and small commercial property are constructed to drain runoff to Venus Ave, conveyed through an existing wetland area west of Venus Ave to Lang Gulch and ultimately to Fossil Creek. FIGURE 1:SITE VICINITY MAP Smokey St S College AveBueno Dr Venus AveCrestridge St F INAL D RAINAGE R EPORT F ORT C OLLINS N ISSAN -K IA F ORT C OLLINS ,CO 2 U21004_Drainage Report B.DESCRIPTION OF PROPERTY The northern portion of the project site currently exists largely as grass/weed landscape. The southern portion of the site includes concrete and asphalt pavement, a commercial building, and gravel landscaping. In its historic condition, the site primarily sheet flows in two general directions: north and south, all conveyed to Fossil Creek. Below are summaries of key components of the site in its existing conditions. Land Use - The site’s current land use is commercial. Ground Cover - The northern portion of the site exists as grass/weed landscape. The weed/grass cover is good (ie., heavy or dense cover with nearly all ground surfaces protected by vegetation). The southern portion of the site is fully developed as consists largely of impervious hardscaping. Existing Topography – The northern, undeveloped portion of the site is bounded by Crestridge St to the south, S College Ave to the east, and undeveloped land to the north and west. Stormwater on this portion of the site largely drains the northwest via overland flow to Fossil Creek. A portion of the site adjacently north of Crestridge St drains to the south via overland flow. All on-site runoff drains downstream within with the City of Fort Collins Fossil Creek master drainage basin. Grades – In general, the northern portion of the site slopes northwesterly at approximately 1.0% to 15.0%; the southern portion of the site is sloped in several directions at approximately 1.0% to 3.0% Soil Type – The USDA’s Web Soil Survey shows that the site consists of “Type B”, “Type C”, and “Type D” soils. The Web Soil Survey indicates the site is comprised of Kim Loam (5.0 to 9.0% slopes), Kim Thedalund Loams (3.0 to 15.0% slopes), Midway Clay Loam (5.0% to 25.0% slopes) and Thedalund Loam (3.0% to 9.0% slopes). The on-site soils provide moderate infiltration and are suitable for development. Utilities – The following utilities exist adjacent to the site in Crestridge St, College Avenue and Venus Drive: potable water, sanitary sewer, natural gas, electric and telecommunications. Irrigation Facilities – An existing on-site underground irrigation pipe owned by North Louden Ditch Company. This irrigation pipe drains from south to north through the site, ultimately to infrastructure that drains across S College Ave to the east. Drainage Features and Storm Sewer – Storm sewer infrastructure exists on-site south of Crestridge St. North of the site exists the Fossil Creek. For development purposes, a City of Fort Collins Floodway and an Erosion Buffer are established with Fossil Creek. The western side of the site drains via sheet flow to the Lang Gulch. This portion of the Lang Gulch exists immediately upstream of Fossil Creek and is accounted for within the City of Fort Collins Floodway boundary. C.PROJECT DESCRIPTION The proposed Fort Collins Nissan-Kia site improvements are limited to approximately 19.0 acres of disturbance. South of Crestridge St, the proposed site improvements consist of the demolition of the existing car dealership building and associated paving, and ultimately the construction of a new building with associated drive lanes and inventory parking lot. North of Crestridge St, site improvements include the extension of Venus Ave, and the addition of a car dealership building and associated drive lanes and inventory parking lot. Designed with the proposed commercial buildings and paving include underground utilities, underground water quality, and underground detention. On-site stormwater south of Crestridge Dr is designed to be conveyed via storm sewer to proposed drainage facilities west of Venus Ave. In addition to an existing school facility adjacent to the site at the intersection of the Venus Ave and Crestridge St, the existing Skyview Subdivision to the south is associated with the site in regard to stormwater runoff. In its existing state, this development along with the school facility drains approximately 3.3-acres to an existing on-site wetland area. With a proposed relocation of the mentioned wetlands, runoff is now designed to be conveyed to a proposed on-site detention facility. F INAL D RAINAGE R EPORT F ORT C OLLINS N ISSAN -K IA F ORT C OLLINS ,CO 3 U21004_Drainage Report D.FLOODPLAINS The proposed development is not in a FEMA designated floodplain. According to the FEMA Flood Insurance Rate Map Panel (08069C1000F), the site is zoned in an area of minimal flood hazard. The FEMA FIRM Map is included in the appendix. West and Northwest of the site improvements exists a “High Risk – Floodway” boundary and erosion buffer along Lang Gulch and Fossil Creek, established by the City of Fort Collins. The Nissan-Kia property boundaries exist within the City of Fort Collins Floodway boundary and erosion buffer; however, the bounds of grading construction is to be completed outside of this boundary. The City of Fort Collins Floodway boundary is provided on the Drainage Plan (see Appendix D) and a City of Fort Collins floodplain map is included in Appendix C. Should construction be required within the floodway, a Floodplain Use Permit with a No-Rise Certification will be required and all work will be required to be in compliance with Chapter 10 of the City Municipal Code. If work within the erosion buffer is required, a erosion buffer waiver will be required. II.DRAINAGE BASINS AND SUB-BASINS A.MAJOR BASIN DESCRIPTION The proposed development is located within the Fossil Creek Basin and will adhere to the Fossil Creek Basin Master Drainage Plan. In conformance with master plan, the site is designed to release on-site runoff at a rate not to exceed 0.2 cfs/acre. B.SUB-BASIN DESCRIPTION Historically the southern portion of the property has been utilized for commercial purposes. The site is designed to operate in a similar fashion (i.e., commercial), though with significant site improvements. Despite these significant improvements, the proposed site is largely designed to conform to existing drainage patterns – downstream within the Fossil Creek Basin. In its existing condition, stormwater on the northern portion of the site is largely conveyed the north to Fossil Creek. The southern portion of the property drains in a multitude of directions: west to a neighboring property, east to US 287, and north to Crestridge St. In its improved condition, on-site runoff is intended to drain to multiple downstream underground water quality and detention facilities by way of sheet flow, swales, pans, inlets, and storm sewer. III.DRAINAGE DESIGN CRITERIA A.REGULATIONS The design criteria for this study are directly from the City of Fort Collins Storm Drainage Design Criteria and Construction Standards Manual and the Urban Storm Drainage Criteria Manual’s (referred to herein as USDCM) Volumes 2, and 3, used for supplement only. FIGURE 2:FLOODPLAIN MAP F INAL D RAINAGE R EPORT F ORT C OLLINS N ISSAN -K IA F ORT C OLLINS ,CO 4 U21004_Drainage Report B.DIRECTLY CONNECTED IMPERVIOUS AREA (DCIA) The City drainage criteria has also adopted the “Four Step Process” that is recommended in Volume 3 of the USDCM in selecting structural BMPs for the redeveloping urban areas. The following portions of this summary describe each step and how it has been utilized for this project: Step 1 – Employ Runoff Reduction Practices The objective of this step is to reduce runoff peaks and volumes and to employ the technique of “minimizing directly connected impervious areas” (MDCIA). This project accomplishes this by: Routing the roof and pavement flows through a bioretention facility, underground water quality treatment/infiltration facilities and vegetated swales to increase time of concentration, promote infiltration and provide water quality. Step 2 – Provide Water Quality Capture Volume (WQCV) The objective of providing WQCV is to reduce the sediment load and other pollutants that exit the site. For this project WQCV is provided within underground treatment facilities, a bioretention pond and an extended detention pond. Step 3 – Stabilize Drainageways The site exists adjacent to lang Gulch and Fossil Creek. Although the project will not be directly connecting or stabilizing either drainageway, the project will enhance the stabilization of the existing drainageways by reducing peak flows to the drainageways via extended detention; and in the case of Lang Gulch, detaining a portion of an offsite basin that currently free releases to the drainageway. In addition, this project will pay stormwater development and stormwater utility fees which the City uses, in part, to maintain the stability of the City drainageway systems. Step 4 – Consider Need for Site Specific and Source Control BMPs Site specific and source control BMPs are generally considered for large industrial and commercial sites. The redevelopment of the existing site will include multiple site specific and source controls, including: Covered storage areas for vehicles and materials. Dedicated vehicle maintenance areas within each build with appropriate internal waste collection systems. Sand/oil separators are provided with the utility plans. Dedicated maintenance personnel providing landscape maintenance and snow and ice management. Bioretention water quality control ponds. C.HYDROLOGICAL CRITERIA City of Fort Collins Rainfall Intensity-Duration-Frequency Curves, provided by Table 3.4-1 of the Fort Collins Stormwater Criteria Manual, are utilized for all hydrologic computations related to the site in its existing/historic and proposed conditions. Since this site is relatively small and does not have complex drainage basins, the peak flow rates for design points have been calculated based on the Rational Method as described in the USDCM and the City of Fort Collins Stormwater Criteria Manual (FCSCM) with storm duration set equal to the time of concentration for each sub-basin. This method was used to analyze the developed runoff from the 2-year (minor) and the 100-year (major) storm events. The Rational Method is widely accepted for drainage design involving small drainage areas (less than 160 acres) and short time of concentrations. Runoff coefficients are assumed based on impervious area and are given in the Appendices. D.HYDRAULIC CRITERIA The developed site will convey runoff to the proposed pond or underground treatment facility via swales, concrete channels, and pipes. The City of Fort Collins Stormwater Criteria Manual (FCSCM) and USDCM are referenced for all hydraulic calculations. In addition, the following computer programs are utilized: Storm Sewer Extension for AutoCAD Civil3D Hydraflow Express Extension for AutoCAD Civil3D UD-Inlet by UDFCD F INAL D RAINAGE R EPORT F ORT C OLLINS N ISSAN -K IA F ORT C OLLINS ,CO 5 U21004_Drainage Report Drainage conveyance facility capacities proposed with the development project, including storm sewer, swales, and inlet capacities, are designed in accordance with criteria outlined in the FCSCM and/or the Urban Drainage and Flood Control District’s Urban Storm Drainage Criteria Manual (UDFCD) used for supplement purposes only. E.MODIFICATIONS OF CRITERIA The conveyance of a considerable amount of off-site stormwater, in addition to hardships related to on-site detention, present unique challenges concerning the release of stormwater in the site’s improved condition. To meet The Fossil Creek Basin release criterion of 0.2 cfs/acre, while decreasing the overall release within the Fossil Creek Basin relative to existing conditions, the solution presented in this report includes the “swapping” of detention throughout the site. We believe manipulating the release rate to Lang Gulch and Fossil Creek outside the bounds of 0.2 cfs/acre for specific on-site drainage basins, while overdetaining off-site stormwater, is beneficial to downstream features. Despite this variance, the overall release from the site meets the 0.2 cfs/acre criterion, and the overall release from the site is significantly reduced. IV.DRAINAGE FACILITY DESIGN A.GENERAL CONCEPT Developed runoff is designed to be conveyed in a safe and effective manner via swales, concrete channels, and storm sewer systems/inlets. Stormwater is designed to be released within the Fossil Creek Basin. Runoff that drains off-site to the west (south of Crestridge St) is heavily reduced with the proposed site. Runoff from the site in its improved condition is primarily conveyed to underground water quality and detention facilities. Due to grading constraints, not all on-site runoff is fully detained - these areas are considered in the overall release rate from the site. B.SPECIFIC DETAILS Hydrology As previously stated, hydrology from the developed site is designed to comply with criteria set forth in the City of Fort Collins Stormwater Criteria Manual. Referenced tables, charts, formulas, etc. are included in the appendices. The area, time of concentration, and runoff of each proposed sub-basin is summarized in Appendix A. The following information outlines the basin characteristics and drainage patterns for each basin. Existing Basins The following basins provide proposed drainage delineations for the site in its existing condition. Refer to Appendix A for hydrology computations and Appendix D for visual representation of existing basins. Basin EX1 Basin EX1 (refer to attached Existing Drainage Map) represents runoff associated with CDOT Right-of-Way in College Ave. This basin consists of concrete paving, asphalt paving, gravel, and landscaping. Runoff within this basin is conveyed north along College Ave and ultimately to Fossil Creek. Basin EX2 Basin EX2 represents on-site runoff that drains to College Ave. This basin consists of concrete paving, asphalt paving, gravel, and landscaping. Runoff within this basin is conveyed College Ave (i.e., Basin EX1) via sheet flow and concrete curb. Basin EX3 Basin EX3 represents runoff associated with CDOT Right-of-Way in College Ave. This basin consists of concrete paving, asphalt paving, gravel, and landscaping. Runoff within this basin is conveyed south along College Ave within the Fossil Creek Basin. Basin EX4 Basin EX4 represents on-site runoff that drains to College Ave. This basin consists of concrete paving, asphalt paving, gravel, and landscaping. Runoff within this basin is conveyed to College Ave (i.e., Basin EX3) via sheet flow and concrete curb. F INAL D RAINAGE R EPORT F ORT C OLLINS N ISSAN -K IA F ORT C OLLINS ,CO 6 U21004_Drainage Report Basin EX5 Basin EX5 represents on-site runoff that drains to Fossil Creek. This basin is to remain undeveloped, consisting of landscaped area. Runoff within this basin is conveyed to the northwest, designed to drain to off-site to a culvert system associated with Fossil Creek. Basin EX6 Basin EX6 represents on-site runoff that drains to the Lang Gulch, and ultimately Fossil Creek. A portion of this basin is developed and is designed to drain to existing wetlands located around the southwestern region of the site; other undeveloped areas drain directly to the Lang Gulch via sheet flow. This basin consists of concrete paving, asphalt paving, gravel, and landscaping. Basin OS1 Basin OS1 is a drainage basin associated with and adjacent commercial property and the Skyview Subdivision, located immediately south of the site. This basin is fully developed and drains on-site via sheet flow along Venus Ave. This basin accounts for approximately 3.3-acres of off-site drainage. Basin OS2 Basin OS2 represents off-site runoff that drains to Fossil Creek. This basin is to remain undeveloped, consisting of landscaped area. Similar to Basin EX5, runoff within this basin is conveyed to the northwest to a 12” culvert system associated with Fossil Creek. Proposed Basins The following basins provide proposed drainage delineations for the site in its improved condition. Refer to Appendix A for hydrology computations and Appendix B for calculations related to Detention, Water Quality, Low Impact Development, and other hydraulic features. Basin A Sub-basins A1-A16 (see Drainage Plans attached) are generally located around the southern region of the site. These basins consist of roofs, asphalt and concrete paving, and landscaping. Runoff within these Basins is conveyed to a Bioretention Pond (Pond A2) via sheet flow, curb, inlets, and storm sewer. Runoff conveyed to the Bioretention Pond is further discharged southwest to a detention facility (Pond A1). Runoff from Basin A is released to Lang Gulch and ultimately to Fossil Creek. Basin B Sub-basins B1-B7 represent on-site drainage basins generally located around the central region of the site. These basins consist of roofs, asphalt and concrete paving, and landscaping. Runoff within these basins is conveyed to Bioretention Pond A3 and Detention Pond A1. Runoff from Basin B is released to Lang Gulch via Pond A1 and ultimately to Fossil Creek. Basin C Sub-basins C1-C6 represent on-site drainage basins generally located around the northern region of the site. These basins consist of roofs, asphalt and concrete paving, and landscaping. Runoff within Basins C3 and C4 is conveyed to a proposed underground water quality and detention pond facility (Pond C) via inlets and storm sewer. Basin C1 and C2 (i.e., Venus Ave) is conveyed to storm sewer in Venus Ave, and treated within underground water quality chambers prior to being released downstream to Fossil Creek. Basin D Basin D1 represents CDOT Right-of-Way in College Ave at the Southeast corner of the site. In accordance with established drainage patterns, this area of College Ave drains south along College Ave, ultimately to Fossil Creek. The basin consists of concrete pavement, asphalt pavement, and landscaping. F INAL D RAINAGE R EPORT F ORT C OLLINS N ISSAN -K IA F ORT C OLLINS ,CO 7 U21004_Drainage Report Basin E Basin E1, similar to Basins D1, represents CDOT Right-of-Way in College Ave; however, this portion of College Ave drains to the north. In accordance with established drainage patterns, this area of College Ave drains north along College Ave, ultimately to Fossil Creek. The basin consists of concrete pavement, asphalt pavement, and landscaping. Basin OS1 Basin OS1 is a drainage basin associated with and adjacent commercial property and the Skyview Subdivision, located immediately south of the site. This basin is fully developed and drains on-site via sheet flow along Venus Ave. This basin accounts for approximately 3.3-acres of off-site drainage. In its improved condition, Venus Ave is designed to convey Basin OS1 to a proposed detention facility (i.e., Pond A1) via storm sewer infrastructure. Basin OS2 Basin OS2 represents off-site runoff that drains to Fossil Creek. This basin is to remain similar to its existing condition, though the basin is designed to drain to an improved culvert system to be provided at the downstream Fossil Creek Trail. Stormwater Quality I.Bioretention Bioretention is designed to remove sediment and pollution from stormwater runoff via infiltration through an engineered sand media. This slows the conveyance rate of storm water runoff, reduces runoff and provides a flow path across a vegetated surface. Bioretention ponds are proposed with the site improvements and are utilized to convey and treat stormwater prior to release to downstream proposed detention facilities and ultimately Fossil Creek. Bioretention Pond A2 is designed to provide approximately 11,600-sf of bioretention area. Provided 12-inches of depth, the bioretention pond provides an approximate volume of 12,430-cf – this volume exceeds the required WQCV for Basin A2 and Basins A4-16 (7,220-cf). Ponding above the initial 12-inches of pond depth is intended for head purposes to discharge the 100-year event through the outlet structure. Runoff is ultimately conveyed to the adjacent Detention Pond A1. Below is a summary of Bioretention Pond A2: Pond Bottom of Pond Elevation Bioretention WSEL Bioretention Volume Required (cf) Bioretention Volume Provided (cf) Pond A2 5009.00 5010.00 7,220 12,430 Bioretention Pond A3 is designed to provide about 3,940-sf of bioretention area. Provided 12-inches of depth, the bioretention pond provided an approximate volume of 3,630-cf – this volume exceeds the required WQCV for Basins B2-B7 (2,854-cf). Ponding above the initial 12-inches of pond depth is intended for head purposes to discharge the 100-year event over an overflow weir. On the is a summary of the bioretention pond, recognized as Pond A3: Pond Bottom of Pond Elevation Bioretention WSEL Bioretention Volume Required (cf) Bioretention Volume Provided (cf) Pond A3 5006.40 5007.40 2,854 3,630 II.Underground Water Quality An underground water quality facility is designed to divert storm water runoff during the water quality event and treat the flows through infiltration prior to being collected within an underdrain system. This provides for the removal of sediment and other pollutants from the runoff while also promoting infiltration. Underground water quality chambers are designed in two separate locations on-site to collect and treat storm water runoff within Basin C prior to being released to downstream storm sewer associated with Basin C. F INAL D RAINAGE R EPORT F ORT C OLLINS N ISSAN -K IA F ORT C OLLINS ,CO 8 U21004_Drainage Report The first underground water quality system, designated as “Pond C1”, is designed with a volume equivalent to the required WQCV (i.e., 3,691-cf). The insulator row designed with the underground detention system will exceed the volume required for water quality purposes; additional volume will be accounted for with the rest of the chambers designed for detention purposes. Below is a summary table for water quality related to Basins C3 and C4. Refer to Appendix B for additional information. Pond WQCV Required (cf) WQCV Provided (cf) Pond C1 3,691 3,691 The other underground water quality system, designated as “Pond C2”, is designed with a volume of 1,567-cf which exceeds the minimum design requirements for the area (1,487-cf). Below is a summary table for water quality related to Basins C1 and C2. Refer to Appendix B for additional information. Pond WQCV Required (cf) WQCV Provided (cf) Pond C2 1,487 1,567 Water quality treatment for Basin C1 is ultimately the responsibility of the adjacent development; however, due to the build out of the Venus Ave roadway, water quality treatment is required with the installation of the northwestern half of Venus Ave. The underground chambers are designed to be a permanent facility for the proposed Basins C1 and C2 only. Future off-site development of the neighboring property to the northwest is to provide a separate private water quality system for the basin west of Venus Avenue. Downstream of the Pond C1 and Pond C2 outfall is a 12” culvert under the Fossil Creek Trail. In its existing condition, approximately 4.7-cfs is conveyed through the 12” culvert prior to overtopping the Fossil Creek Trail – this culvert is not sufficient to convey the historic 10-year event (i.e., 12.41-cfs). In the site’s improved condition, larger storm events would continue to overtop the Fossil Creek Trail at a 10-year event of 9.60-cfs. Designed upstream of the Fossil Creek culvert is a drainage channel (Channel C), sized to convey stormwater from Underground Ponds C1 and C2. Turf Reinforcement Matting would be included with the design of Channel C for channel stabilization purposes. A channel capacity analysis is included in Appendix B. Channel C would remain within the drainage easement until the landowner pursues development of the property. In the case of future development, the landowner would potentially be required to replace the conveyance feature with an improved feature if removed. III.Extended Detention - WQCV The proposed site improvements include water quality for Basins A1, A3, A6, and B1. The accumulation of these basins necessitates a WQCV approximately 939-cf. Pond A1 is sufficiently sized to provide this combined treatment volume with additional capacity. Below is a summary table for water quality related to Basins A1, A3, A6, and B1. Refer to Appendix B for additional information. Pond Treated Area (acre) % Impervious WQCV Required (cf) WQCV Provided (cf) Pond A1 2.1 24.7 939 2,461 * Required WQCV represents the sum of each sub-basin. See Appendix B for calculation breakdown. F INAL D RAINAGE R EPORT F ORT C OLLINS N ISSAN -K IA F ORT C OLLINS ,CO 9 U21004_Drainage Report IV.Forebays The proposed site improvements also include several forebay basins located upstream of the Lang Gulch Outfall. In addition to bioretention and extended detention methods, four forebay basins are designed to treat all “A” Basins, “B” Basins, and Basin OS1. Mile High Flood District design criteria (Table EDV-4 of Volume 3 of the UDFCD manual) is referenced with the design of each forebay. Calculations related to the forebay designs are provided in Appendix B. Low Impact Development (LID) In December of 2015, Fort Collins City Council adopted the revised Low Impact Development (LID) policy and criteria which requires developments within City limits to meet certain enhanced stormwater treatment requirements in addition to more standard treatment techniques. The proposed development will be required to meet the newly adopted LID criteria which requires the following: -Treat no less than 75% of any newly added impervious area using one or a combination of LID techniques. -Treat no less than 50% of any newly added impervious area using one or a combination of LID techniques when at least 25% of any newly added pavement is provided with permeable pavement. The following measures are implemented with this proposed development: I.Underground Water Quality Basins C1-C6, combined for 144,990-sf of proposed impervious area, are designed to be routed through underground water quality systems located in the northern region of the site. The proposed impervious area treated through underground water quality chambers includes proposed parking, driveway, roof areas, and landscaping. The underground water quality systems are designed with an overall combined capacity of 6,572-cf which exceeds the minimum design requirements for the area. Refer to Appendix B for additional information. II.Bioretention Basins A2, A4-A5, and A7-A16, accounting for 227,748-sf of proposed impervious area, are designed to be conveyed to Bioretention Pond A2. All new or modified impervious area related to Basins A2, A4-A5, and A7-A16 is to be treated by Pond A2. Basins B2-B7, accounting for 84,158-sf of proposed impervious area, are designed to be conveyed to Bioretention Pond A3. All new or modified impervious area related to Basins B2-B7 is to be treated by Pond A3. Provided the LID measures noted above, approximately 83.6% of the site is treated in its improved condition. Refer to Appendix B for LID calculations and Appendix D for a LID Treatment Map. Below is a summary LID treatment table for reference. 75% On-Site Treatment by LID Requirement New or Modified Impervious Area (Total) 12.16 acre Required Minimum Impervious Area to be Treated 9.12 acre Impervious Area Treated by LID Treatment Method #1 (Bioretention) 6.84 acre Impervious Area Treated by LID Treatment Method #2 (Underground WQ Chambers) 3.33 acre Total Impervious Area Treated 10.17 acre Percent of Impervious Areas Treated by LID 83.6 % F INAL D RAINAGE R EPORT F ORT C OLLINS N ISSAN -K IA F ORT C OLLINS ,CO 10 U21004_Drainage Report Detention I.Pond A1 The design of Pond A1 is intended for extended detention purposes for all ‘A” Basins (8.43-acres), “B” Basins (3.41- acres), Basin C1 (0.61-acres), and Basin C2 (0.90-acres). Though Pond A1 is not physically related to Basins C1 and C2, these basins are analyzed to provide for an area swap with Basin OS1. Sub-basins C1 and C2 will free release along the northern flow path with exchange for additional "area swap" detention in Pond A1. This detention facility is designed to release captured runoff at a rate of 2.67-cfs in the 100-yr event, equivalent to the 0.2-cfs/acre criterion. For emergency situations, the pond is designed to spill stormwater through the emergency overflow structure which is located at the western end of the detention pond. Water discharged from the emergency overflow will be conveyed directly to the Lang Gulch. Below is a summary of Pond A1 utilizing the FAA method: Pond Bottom of Pond Detention WSEL Top of Pond Elevation Detention Volume Required (ac-ft) Detention Volume Provided (ac-ft) 100-yr Release Rate (cfs) Pond A1 5002.41 5010.00 5011.00 3.03 3.09 2.67 * Refer to the provided tables in the Drainage Summary section on the following pages for context related to the 100-yr release for Pond A1. Pond A1 is designed to release upstream of Lang Gulch avoiding the floodplain, erosion buffer and existing wetlands near the channel bottom. Flows from the pond release will be directed to a level spreader prior to discharging onto existing dense vegetation. A side slope analysis will be provided during final; however, due to existing vegetation and exposed rock along the side slope, initial analysis anticipates the side slope to be stable in the proposed conditions. II.Pond C1 Runoff captured within Basins C3-C6 (i.e., 2.45-acres) is routed to underground chambers, designed to collect and detain storm water runoff prior to being released to Fossil Creek. Stormwater events that exceed the water quality event (see section Stormwater Quality narrative above) are designed to exceed the capacity of the system’s isolator row and be further conveyed throughout the underground facility to other chambers for detention purposes. The minimum 100-yr release via underground detention is established by a release rate per chamber to an underdrain – this release rate is limited by flow through geotextile with accumulated sediment. Below is a summary of Pond C1 utilizing the FAA method: Pond Detention Volume Required (ac-ft) Detention Volume Provided (ac-ft) 100-yr Release Rate (cfs) Pond C1 0.67 0.68 *0.49 * Refer to the provided tables in the Drainage Summary section on the following pages for context related to the 100-yr release for Pond C1. F INAL D RAINAGE R EPORT F ORT C OLLINS N ISSAN -K IA F ORT C OLLINS ,CO 11 U21004_Drainage Report Drainage Summary A basin summary table is included below: Existing/Historic Basins Basin Area %I C2 C10 C100 Q2 Q10 Q100 (acre) (cfs) (cfs) (cfs) EX1 2.12 65.0% 0.70 0.70 0.87 3.40 5.81 14.85 EX2 1.70 60.6% 0.67 0.67 0.84 2.63 4.49 11.47 EX3 0.41 82.1% 0.82 0.82 1.00 0.85 1.46 3.65 EX4 0.38 88.9% 0.89 0.89 1.00 0.96 1.65 3.80 EX5 7.97 2.0% 0.25 0.25 0.31 4.08 6.97 17.83 EX6 6.44 24.7% 0.41 0.41 0.52 5.46 9.33 23.85 OS1 3.27 43.0% 0.55 0.55 0.69 3.58 6.13 15.63 OS2 6.22 2.0% 0.25 0.25 0.31 3.19 5.44 13.91 Proposed Basins Basin Area %I C2 C10 C100 Q2 Q10 Q100 (acre) (cfs) (cfs) (cfs) A1 0.95 2.0% 0.25 0.25 0.31 0.51 0.86 2.21 A2 0.57 2.0% 0.25 0.25 0.31 0.30 0.52 1.32 A3 0.49 72.9% 0.76 0.76 0.95 0.79 1.35 4.64 A4 0.60 63.3% 0.69 0.69 0.86 0.88 1.50 4.80 A5 0.40 92.3% 0.89 0.89 1.00 0.77 1.30 3.74 A6 0.20 65.8% 0.71 0.71 0.88 0.30 0.52 1.66 A7 0.39 86.0% 0.85 0.85 1.00 0.74 1.27 3.93 A8 0.11 100.0% 0.95 0.95 1.00 0.28 0.48 1.10 A9 0.14 100.0% 0.95 0.95 1.00 0.34 0.59 1.43 A10 0.68 76.6% 0.78 0.78 0.98 1.13 1.93 6.19 A11 0.31 77.8% 0.79 0.79 0.99 0.52 0.89 2.86 A12 0.56 81.0% 0.81 0.81 1.00 1.01 1.74 4.96 A13 0.94 90.0% 0.95 0.95 1.00 1.90 3.25 7.26 A14 0.44 78.0% 0.79 0.79 0.99 0.77 1.32 3.66 A15 0.86 89.6% 0.88 0.88 1.00 1.67 2.86 7.23 A16 0.77 90.0% 0.95 0.95 1.00 1.68 2.87 7.16 B1 0.46 2.0% 0.25 0.25 0.31 0.25 0.42 1.07 B2 0.48 2.0% 0.25 0.25 0.31 0.26 0.44 1.12 B3 1.10 70.8% 0.74 0.74 0.93 1.74 2.96 7.88 B4 0.38 91.8% 0.89 0.89 1.00 0.75 1.29 2.95 B5 0.54 85.4% 0.85 0.85 1.00 0.97 1.66 4.53 B6 0.18 68.8% 0.73 0.73 0.91 0.30 0.51 1.56 B7 0.25 80.4% 0.81 0.81 1.00 0.45 0.78 2.52 C1 0.61 84.9% 0.84 0.84 1.00 1.05 1.80 5.68 C2 0.90 58.0% 0.65 0.65 0.81 1.20 2.04 6.79 C3.1 0.93 94.5% 0.91 0.91 1.00 1.86 3.19 7.15 C3.2 0.64 95.6% 0.91 0.91 1.00 1.29 2.21 5.11 C4 0.65 90.7% 0.88 0.88 1.00 1.22 2.07 6.01 C5 0.20 90.0% 0.88 0.88 1.00 0.38 0.65 1.70 C6 0.04 90.0% 0.95 0.95 1.00 0.09 0.16 0.39 D1 0.48 69.1% 0.73 0.73 0.91 0.74 1.27 4.34 E1 2.08 73.5% 0.76 0.76 0.95 2.95 5.04 17.36 OS1 3.27 43.0% 0.55 0.55 0.69 3.58 6.13 15.63 OS2 6.36 2.0% 0.25 0.25 0.31 3.26 5.57 14.23 F INAL D RAINAGE R EPORT F ORT C OLLINS N ISSAN -K IA F ORT C OLLINS ,CO 12 U21004_Drainage Report 100-year Event: Proposed Runoff to College Ave Basin Designation Flowrate (cfs) Basin D1 4.34 Basin E1 17.36 Proposed Runoff 21.70 Refer to Appendix D for an Existing Drainage Map that provides a visual representation of Existing Basins EX1-EX6 and OS1- OS2. In the site’s existing condition, nearly 2.1-acres (i.e., Basin EX2 and EX4) of on-site runoff drains undetained to College Ave. In addition to on-site basins EX2 and EX4, Basins EX1 and EX2 (i.e., College Ave) also contribute runoff to the west half of College Ave – the entirety of Basins EX1-EX4 account for approximately 33.77-cfs in the 100-year event. In the site’s improved condition, this 2.1-acre area is captured and conveyed to on-site detention; runoff related to all “A” basins are detained. Moreover, the improved site is designed to convey 0.35-acres of College Ave runoff (see Basin A10). Despite the addition of a drive lane to College Ave (i.e., additional impervious area), there is a significant reduction in runoff conveyed by College Ave in the 100-year Event. The tables below summarize the impacts of the proposed improvements to College Ave relative to the site’s existing condition. In the site’s its improved condition, the total runoff related to College Ave during the 100-year event is significantly reduced. 100-year Event: Existing Runoff to College Ave In relation to the Fossil Creek, the site is designed to outfall to the west at two locations, including Lang Gulch. Ultimately, all runoff conveyed to the west (i.e., Lang Gulch and Fossil Creek) has a similar design point in Fossil Creek, northwest of the site. Per coordination with the City of Fort Collins Stormwater Engineering Department, swapping of basin areas is permitted given grading constraints while maintain an overall release rate from each detention pond of 0.2 cfs/acre. The tables on the following page summarize the impacts of the proposed improvements to Lang Gulch and Fossil Creek relative to the site’s limiting criteria. Basin Designation Flowrate (cfs) Basin EX1 14.85 Basin EX2 11.47 Basin EX3 3.65 Basin EX4 3.80 Existing Runoff 33.77 F INAL D RAINAGE R EPORT F ORT C OLLINS N ISSAN -K IA F ORT C OLLINS ,CO 13 U21004_Drainage Report Lang Gulch Outfall 100-year Event: Existing Flows to Lang Gulch Fossil Creek Outfall 100-year Event: Existing Flows to Fossil Creek Overall Release to Fossil Creek 100-year Event: Overall Flows to Fossil Creek (Including upstream Lang Gulch) Basin Designation Flowrate (cfs) Basin OS1 15.63 Basin EX6 23.85 Total Release 39.48 Basin Designation Flowrate (cfs) Basin EX5 17.83 Basin OS2 13.91 Total Flows 31.74 Basin Designation Flowrate (cfs) Basin EX5 17.83 Basin EX6 23.85 Basin OS1 15.63 Basin OS2 13.91 Total Flows 71.22 100-yr Event: Proposed Flows to Fossil Creek Basin/Pond Designation Area (acre) Flowrate (cfs) Pond C1 2.45 0.49 Basin C1 0.61 5.68* Basin C2 0.90 6.79* Basin OS2 6.36 14.23 Total Flows 27.19 * Flowrate of Basins C1 & C2 assumes no detention. A portion of Basin OS1, however, is detained via an area swap with Basins C1 and C2. Basins C1 & C2 are accounted for in the detention design of Pond A1. 100-yr Event: Proposed On-Site Flows to Lang Gulch Basin/Pond Designation Area (acre) Flowrate (cfs) Pond A1 13.35 2.67 Basin OS1 3.27 15.63* Total Flows 18.30 * Flowrate of Basin OS1 assumes no detention. A portion of Basin OS1, however, is detained via an area swap with Basins C1 and C2. The remainder of the flows from Basin OS1 will overtop the spillway of Pond A1 (approximated at 4-cfs). 100-yr Event: Overall Flows to Fossil Creek (Including upstream Lang Gulch) Basin/Pond Designation Area (acre) Flowrate (cfs) Pond A1 13.35 2.67 Pond C1 2.45 0.49 Basin C1 0.61 5.68* Basin C2 0.90 6.79* Basin OS1 3.27 15.63* Basin OS2 6.36 14.23 Total Flows 45.49 * Flowrate of Basin OS1 assumes no detention. A portion of Basin OS1, however, is detained via an area swap with Basins C1 and C2. The remainder of the flows from Basin OS1 will overtop the spillway of Pond A1 (approximated at 4-cfs). F INAL D RAINAGE R EPORT F ORT C OLLINS N ISSAN -K IA F ORT C OLLINS ,CO 14 U21004_Drainage Report Standard Operating Procedures (SOPs) In order for physical stormwater Best Management Practices (BMPs) to be effective, proper maintenance is essential. Maintenance includes both routinely scheduled activities, as well as non-routine repairs that may be required after large storms, or as a result of other unforeseen problems. Standard Operating Procedures should clearly identify BMP maintenance responsibility. BMP maintenance is typically the responsibility of the entity owning the BMP. Identifying who is responsible for maintenance of BMPs and ensuring that an adequate budget is allocated for maintenance is critical to the long-term success of BMPs. Maintenance responsibility may be assigned either publicly or privately. For this project, the privately owned BMPs including grass swales, underground water quality and detention, and the bioretention pond, are to be maintained by the property owner. Level Spreader Limited to a release rate of 2.67-cfs, the outfall to Lang Gulch proposed with the site improvements, namely a level spreader, is designed to ensure non-erosive sheet flow into Lang Gulch. This level spreader is 8-inches in depth (equivalent to the depth of the Pond A1 outfall pipe) and 35-ft in length, designed at a recommended flowrate of approximately 13-ft per 1-cfs. Referenced for the design of the level spreader are criteria per the “Low Impact Development Stormwater Management Planning and Design Guide” by the Sustainable Technologies Evaluation Program. A memorandum composed by Ayres Associates is included in Appendix C. This letter affirms the proposed level spreader and its design to limit erosion of the Lang Gulch. Storm Sewers There are multiple storm sewer networks proposed with the site improvements. Several networks including roof drains, storm drains, and underground water quality and detention features are proposed ultimately with outfalls to Fossil Creek. Proposed storm sewer systems are both private and public, designed to accommodate the flows from the 100-year storm event. Hydraulic computations of these systems are provided in Appendix B. Inlets There are multiple inlets proposed with the site improvements, including Nyloplast drain basins and Type R inlets. Type R Inlets are designed throughout the site on-grade and in sump to capture developed runoff for detention. On-site drain basins are designed in a sump condition and are designed to convey runoff produced within smaller interior basins to on-site bioretention and detention facilities. All inlets on the site are sized to provide adequate capacity and convey the 100-year storm event. Hydraulic computations of these systems are provided in Appendix B. V.EROSION CONTROL A separate Erosion Control Report / Storm Water Management Plan (SWMP) will be prepared for the site in accordance with the Stormwater Discharge Permit for Colorado Department of Public Health and Environment as the site will disturb an area greater than 1-acre. The Erosion Control Report will be completed during the Final Compliance phase of the project and will include more detailed information on the sediment and erosion control items for this project. It is intended that the proposed improvements will comply with Erosion Control Criteria per the FCSCM, and all Erosion Control Materials will be provided with the Final Drainage Report. At a minimum, the following temporary BMP’s will be installed and maintained to control on-site erosion and prevent sediment from traveling off-site during construction: Silt Fence – a woven synthetic fabric that filters runoff. The silt fence is a temporary barrier that is placed at the base of a disturbed area. Vehicle Tracking Control – a stabilized stone pad located at points of ingress and egress on a construction site. The stone pad is designed to reduce the amount of mud transported onto public roads by construction traffic. Riprap – Riprap will be used downstream of all storm sewer outfalls to control erosion of the receiving channels. F INAL D RAINAGE R EPORT F ORT C OLLINS N ISSAN -K IA F ORT C OLLINS ,CO 15 U21004_Drainage Report Inlet Protection – acts as a sediment filter. It is a temporary BMP and requires proper installation and maintenance to ensure their performance. Straw Wattles – wattles act as a sediment filter in swales around inlets. They are a temporary BMP and require proper installation and maintenance to ensure their performance. Slope Protection – Slopes should be terraced using a “tracked” vehicle, run perpendicular to slope to inhibit rill/gulley erosion. The contractor shall store all construction materials and equipment and shall provide maintenance and fueling of equipment in confined areas on-site from which runoff will be contained and filtered. Temporary Best Management Practices (BMP’s) will be inspected by the contractor at a minimum of once every two weeks and after each significant storm event. VI.CONCLUSIONS A.COMPLIANCE WITH STANDARDS Storm drainage calculations have followed the guidelines provided by the Urban Storm Drainage Criteria Manuals Volumes 1, 2 and 3 and the City of Fort Collins Stormwater Criteria Manual. Moreover, Chapter 10 of the City Code has been adhered to. Detention Pond A1 also adheres to State Senate Bill 15-212 drain time requirements (refer to Appendix C for calculations). B.DRAINAGE CONCEPT The drainage system has been designed to convey the runoff to the designated design points and the existing public infrastructure in an effective, safe manner. No negative impacts are anticipated to the City of Fort Collins Master Drainage Plan or to downstream properties or infrastructure due to the proposed improvements. C.STORMWATER QUALITY Multiple long-term stormwater quality measures have been selected for the site that will provide treatment of stormwater prior it to being discharged from the site. For this site this includes grass swales, bioretention ponds, and underground water quality. VII.REFERENCES 1.City of Fort Collins Stormwater Criteria Manual, City of Fort Collins, Colorado, December 2018. 2.Urban Storm Drainage Criteria Manual Volume 1 and 2, Urban Drainage and Flood Control District, Denver, Colorado, June 2001, Revised April 2008. 3.Natural Resources Conservation Service Web Soil Survey at: websoilsurvey.nrcs.usda.gov/app 4.Preliminary Flood Insurance Rate Map, FEMA, Panel 2079E, https://hazards.fema.gov/femaportal/ 5.Stormwater Discharges Associated with Construction Activity, Stormwater Management Plan Preparation Guides, State of Colorado, www.colorado.com 6.Low Impact Development Stormwater Management Planning and Design Guide, Sustainable Technologies Evaluation Program, June 2022. A PPENDIX A D RAINAGE C ALCULATIONS RUNOFF COEFFICIENTS AND % IMPERVIOUS Nissan - Kia Dealership, Fort Collins, CO Basin Design Pt.Composite Total Total Roof (1)Asphalt Concrete(1)Gravel(1)Lawns(1)Imperviousness C2 C10 C100 acres %I = 90%%I = 100%%I = 100%%I =40%%I=2%(%I) C=0.95 C=0.95 C=0.95 C=0.50 C=0.25 sf sf sf sf sf sf EX1 EX1 2.12 92,255 54,030 3,425 4,665 30,135 65.0%0.70 0.70 0.87 EX2 EX2 1.70 74,165 4,185 5,225 32,995 6,200 25,560 60.6%0.67 0.67 0.84 EX3 EX3 0.41 18,045 10,235 2,435 5,375 -82.1%0.82 0.82 1.00 EX4 EX4 0.38 16,625 4,145 10,100 2,380 -88.9%0.89 0.89 1.00 EX5 EX5 7.97 347,140 347,140 2.0%0.25 0.25 0.31 EX6 EX6 6.44 280,470 7,095 15,390 42,290 2,450 213,245 24.7%0.41 0.41 0.52 OS1 OS1 3.27 142,330 20,800 36,360 4,460 80,710 43.0%0.55 0.55 0.69 OS2 OS2 6.22 270,840 270,840 2.0%0.25 0.25 0.31 Composite Runoff Coefficients (2)Areas Existing Basins Date: 9/13/2022 C:\United Civil Dropbox\Projects\U21004 - Nissan Dealership\Reports\Drainage\Calculations\U21004-Drain Calcs-FDP RUNOFF COEFFICIENTS AND % IMPERVIOUS Nissan - Kia Dealership, Fort Collins, CO Basin Design Pt.Composite Total Total Roof (1)Asphalt Concrete(1)Pavers(1)Lawns(1)Imperviousness C2 C10 C100 acres sf %I = 90%%I = 100%%I = 100%%I =40%%I=2%(%I) C=0.95 C=0.95 C=0.95 C=0.50 C=0.25 sf sf sf sf sf A1 A1 0.95 41,480 41,480 2.0%0.25 0.25 0.31 A2 A2 0.57 24,770 24,770 2.0%0.25 0.25 0.31 A3 A3 0.49 21,460 11,730 3,805 5,925 72.9%0.76 0.76 0.95 A4 A4 0.60 26,110 14,590 1,735 9,785 63.3%0.69 0.69 0.86 A5 A5 0.40 17,495 13,325 2,795 1,375 92.3%0.89 0.89 1.00 A6 A6 0.20 8,780 5,145 575 3,060 65.8%0.71 0.71 0.88 A7 A7 0.39 17,195 12,690 2,045 2,460 86.0%0.85 0.85 1.00 A8 A8 0.11 4,805 4,570 235 -100.0%0.95 0.95 1.00 A9 A9 0.14 6,250 5,310 940 -100.0%0.95 0.95 1.00 A10 A10 0.68 29,595 19,110 3,405 7,080 76.6%0.78 0.78 0.98 A11 A11 0.31 13,525 9,965 500 3,060 77.8%0.79 0.79 0.99 A12 A12 0.56 24,565 17,870 1,920 4,775 81.0%0.81 0.81 1.00 A13 A13 0.94 40,990 40,990 -90.0%0.95 0.95 1.00 A14 A14 0.44 19,170 13,235 1,635 4,300 78.0%0.79 0.79 0.99 A15 A15 0.86 37,570 25,750 7,850 3,970 89.6%0.88 0.88 1.00 A16 A16 0.77 33,500 33,500 -90.0%0.95 0.95 1.00 Storm Line E 1 3.96 172,570 20,800 53,235 8,840 -89,695 47.9%0.59 0.59 0.73 Storm Line H 2 6.22 270,770 74,490 136,415 23,060 -36,805 83.9%0.85 0.85 1.00 B1 B1 0.46 20,160 20,160 2.0%0.25 0.25 0.31 B2 B2 0.48 21,090 21,090 2.0%0.25 0.25 0.31 B3 B3 1.10 47,980 33,665 14,315 70.8%0.74 0.74 0.93 B4 B4 0.38 16,646 15,246 1,400 91.8%0.89 0.89 1.00 B5 B5 0.54 23,550 18,230 1,800 3,520 85.4%0.85 0.85 1.00 B6 B6 0.18 8,045 4,225 1,260 2,560 68.8%0.73 0.73 0.91 B7 B7 0.25 11,040 7,620 1,210 2,210 80.4%0.81 0.81 1.00 Storm Line G 5 1.36 59,281 -45,321 4,270 -9,690 84.0%0.84 0.84 1.00 C1 C1 0.61 26,565 16,845 5,625 4,095 84.9%0.84 0.84 1.00 C2 C2 0.90 39,100 16,340 6,020 16,740 58.0%0.65 0.65 0.81 C3.1 C3.1 0.93 40,354 29,825 8,260 2,269 94.5%0.91 0.91 1.00 C3.2 C3.2 0.64 27,731 20,725 5,750 1,256 95.6%0.92 0.92 1.00 C4 C4 0.65 28,140 23,780 1,680 2,680 90.7%0.88 0.88 1.00 C5 C5 0.20 8,825 6,230 1,695 900 90.0%0.88 0.88 1.00 C6 C6 0.04 1,840 1,840 -90.0%0.95 0.95 1.00 Storm Line A 3 1.51 65,665 -33,185 11,645 -20,835 68.9%0.73 0.73 0.91 Trail Culvert 4 7.87 342,730 -33,185 11,645 -297,900 14.8%0.34 0.34 0.43 D1 D1 0.48 20,830 12,950 1,315 6,565 69.1%0.73 0.73 0.91 E1 E1 2.08 90,425 54,180 11,755 24,490 73.5%0.76 0.76 0.95 OS1 OS1 3.27 142,330 20,800 36,360 4,460 80,710 43.0%0.55 0.55 0.69 OS2 OS2 6.36 277,065 277,065 2.0%0.25 0.25 0.31 Notes: (1) Recommended % Imperviousness Values per Table 4.1-3 Surface Type - Percent Impervious in Fort Collins Stormwater Criteria Manual (2) Runoff C is based Table 3.2-2. Surface Type - Runoff Coefficients and Table 3.2-3. Frequency Adjustment Factors in Fort Collins Stormwater Manual (3) Storm Line E is an analysis of the routed flows between Basin A3, A6, and OS1 (4) Storm Line H is an analysis of the routed flows between Basins A4-A5, and A7-A16 (5) Storm Line A is an analysis of the routed flows between Basins C1 and Basin C2, plus the addition of Pond C1 release rate (6) Trail Culvert calculations is an analysis of the routed flows between Basins C1-C2 and Basin OS2, plus the addition of Pond C1 release rate Areas Composite Runoff Coefficients (2) Proposed Basins (3) (4) (5) (6) Date: 9/13/2022 C:\United Civil Dropbox\Projects\U21004 - Nissan Dealership\Reports\Drainage\Calculations\U21004-Drain Calcs-FDP TIME OF CONCENTRATION (2-YR) Nissan - Kia Dealership, Fort Collins, CO Basin Design Pt.Area CXCF(1)Length Slope Ti(2)Slope Length n R Velocity (3)Tt(4)Tc max (5) acres ft %min %ft fps min min min min EX1 EX1 2.12 0.70 50 2.2%18.7 2.3%1180 0.016 0.2 4.8 4.1 22.8 16.6 16.6 EX2 EX2 1.70 0.67 160 2.8%33.0 1.0%155 0.016 0.2 3.2 0.8 33.8 10.9 10.9 EX3 EX3 0.41 0.82 40 2.0%12.2 2.5%730 0.016 0.2 5.0 2.4 14.6 14.1 14.1 EX4 EX4 0.38 0.89 45 2.0%9.8 3.5%165 0.016 0.2 6.0 0.5 10.2 10.9 10.2 EX5 EX5 7.97 0.25 500 10.0%76.0 2.0%320 0.25 0.2 0.3 18.5 94.5 11.8 11.8 EX6 EX6 6.44 0.41 200 1.8%68.3 2.6%376 0.016 0.2 5.1 1.2 69.5 12.1 12.1 OS1 OS1 3.27 0.55 65 2.0%30.0 2.0%475 0.016 0.2 4.5 1.8 31.7 12.6 12.6 OS2 OS2 6.22 0.25 380 10.0%66.2 2.0%360 0.25 0.2 0.3 20.8 87.1 12.0 12.0 Travel/Channelized Time of Flow (Tt) Existing Basins Ti+Tt Final Tc (6) Overland Flow (Ti) Date: 9/13/2022 C:\United Civil Dropbox\Projects\U21004 - Nissan Dealership\Reports\Drainage\Calculations\U21004-Drain Calcs-FDP TIME OF CONCENTRATION (2-YR) Nissan - Kia Dealership, Fort Collins, CO Basin Design Pt.Area CXCF(1)Length Slope Ti(2)Slope Length n R Velocity (3)Tt(4)Tc max (5) acres ft %min %ft fps min min min min A1 A1 0.95 0.25 120 14.0%33.3 1.0%160 0.016 0.2 3.2 0.8 34.2 10.9 10.9 A2 A2 0.57 0.25 45 12.0%21.5 0.5%170 0.016 0.2 2.3 1.3 22.7 10.9 10.9 A3 A3 0.49 0.76 40 2.0%14.8 1.5%210 0.016 0.2 3.9 0.9 15.7 11.2 11.2 A4 A4 0.60 0.69 70 2.6%21.5 2.8%170 0.016 0.2 5.3 0.5 22.0 10.9 10.9 A5 A5 0.40 0.89 95 3.9%10.9 0.6%100 0.016 0.2 2.5 0.7 11.6 10.6 10.6 A6 A6 0.20 0.71 65 2.2%20.9 2.0%90 0.016 0.2 4.5 0.3 21.3 10.5 10.5 A7 A7 0.39 0.85 45 3.0%10.0 1.0%70 0.016 0.2 3.2 0.4 10.3 10.4 10.3 A8 A8 0.11 0.95 45 2.9%6.1 0.6%50 0.016 0.2 2.5 0.3 6.4 10.3 6.4 A9 A9 0.14 0.95 45 2.2%6.6 0.8%110 0.016 0.2 2.8 0.6 7.3 10.6 7.3 A10 A10 0.68 0.78 60 2.0%16.7 0.8%210 0.016 0.2 2.8 1.2 17.9 11.2 11.2 A11 A11 0.31 0.79 50 2.0%14.8 0.6%130 0.016 0.2 2.5 0.9 15.7 10.7 10.7 A12 A12 0.56 0.81 80 2.0%17.4 0.6%85 0.016 0.2 2.5 0.6 18.0 10.5 10.5 A13 A13 0.94 0.95 200 2.0%14.4 2.0%100 0.016 0.2 4.5 0.4 14.8 10.6 10.6 A14 A14 0.44 0.79 160 3.3%22.4 0.5%40 0.016 0.2 2.3 0.3 22.7 10.2 10.2 A15 A15 0.86 0.88 160 3.3%16.3 0.5%80 0.016 0.2 2.3 0.6 16.9 10.4 10.4 A16 A16 0.77 0.95 75 2.0%8.8 2.0%60 0.016 0.2 4.5 0.2 9.1 10.3 9.1 Storm Line E 1 3.96 0.85 65 2.0%13.4 2.0%475 0.016 0.2 4.5 1.8 15.2 12.6 12.6 Storm Line H 2 6.22 0.85 145 4.0%16.0 1.3%750 0.016 0.2 3.6 3.4 19.4 14.2 14.2 B1 B1 0.46 0.25 50 25.0%17.8 0.5%110 0.016 0.2 2.3 0.8 18.6 10.6 10.6 B2 B2 0.48 0.25 50 25.0%17.8 1.5%130 0.016 0.2 3.9 0.6 18.3 10.7 10.7 B3 B3 1.10 0.74 200 2.0%34.5 0.8%115 0.016 0.2 2.8 0.7 35.2 10.6 10.6 B4 B4 0.38 0.89 195 1.6%21.3 1.6%15 0.016 0.2 4.0 0.1 21.4 10.1 10.1 B5 B5 0.54 0.85 130 2.7%17.9 0.5%110 0.016 0.2 2.3 0.8 18.7 10.6 10.6 B6 B6 0.18 0.73 95 2.5%23.0 4.0%50 0.016 0.2 6.4 0.1 23.1 10.3 10.3 B7 B7 0.25 0.81 55 3.7%11.9 5.2%40 0.016 0.2 7.3 0.1 12.0 10.2 10.2 Storm Line G 5 1.36 0.84 85 2.2%16.1 0.5%350 0.016 0.2 2.3 2.6 18.7 11.9 11.9 C1 C1 0.61 0.84 55 2.5%12.1 5.0%380 0.016 0.2 7.1 0.9 13.0 12.1 12.1 C2 C2 0.90 0.65 60 2.5%22.0 5.0%300 0.016 0.2 7.1 0.7 22.7 11.7 11.7 C3.1 C3.1 0.93 0.91 375 5.0%18.4 2.0%50 0.016 0.2 4.5 0.2 18.6 10.3 10.3 C3.2 C3.2 0.64 0.92 275 5.0%15.1 2.5%75 0.016 0.2 5.0 0.2 15.4 10.4 10.4 C4 C4 0.65 0.88 130 5.0%12.4 1.5%165 0.016 0.2 3.9 0.7 13.1 10.9 10.9 C5 C5 0.20 0.88 180 3.0%17.7 1.8%95 0.016 0.2 4.3 0.4 18.0 10.5 10.5 C6 C6 0.04 0.95 65 2.0%8.2 2.0%75 0.016 0.2 4.5 0.3 8.5 10.4 8.5 Storm Line A 3.00 1.51 0.73 55 2.5%17.4 5.0%380 0.016 0.2 7.1 0.9 18.3 12.1 12.1 Trail Culvert 4 7.87 0.34 55 2.5%35.5 5.0%580 0.016 0.2 7.1 1.4 36.9 13.2 13.2 D1 D1 0.48 0.73 40 2.0%15.9 2.5%210 0.016 0.2 5.0 0.7 16.6 11.2 11.2 E1 E1 2.08 0.76 40 2.0%14.6 2.5%940 0.016 0.2 5.0 3.1 17.7 15.2 15.2 OS1 OS1 3.27 0.55 65 2.0%30.0 2.0%475 0.016 0.2 4.5 1.8 31.7 12.6 12.6 OS2 OS2 6.36 0.25 380 10.0%66.2 2.0%360 0.25 0.2 0.3 20.8 87.1 12.0 12.0 Notes: (1) C=CX*CF is less than or equal to 1.0 (Cf = 1.0) (2) ti = [1.87(1.1-CXCF)L1/2]/S1/3, S= slope in %, L=length of overland flow (200' max urban, 500' max rural) (3) V=(1.49/n)R2/3S1/2, S = slope in ft/ft, FCSCM Equation 5-4 (4) tt=L/(V*60 sec/min) (5) Maximum tc = total length/180 + 10 (6) Minimum tc = 5 min Proposed Basins Overland Flow (Ti)Travel/Channelized Time of Flow (Tt) Ti+Tt Final Tc (6) Date: 9/13/2022 C:\United Civil Dropbox\Projects\U21004 - Nissan Dealership\Reports\Drainage\Calculations\U21004-Drain Calcs-FDP TIME OF CONCENTRATION (10-YR) Nissan - Kia Dealership, Fort Collins, CO Basin Design Pt.Area CXCF(1)Length Slope Ti(2)Slope Length n R Velocity (3)Tt(4)Tc max (5) acres ft %min %ft fps min min min min EX1 EX1 2.12 0.70 50 2.2%18.7 2.3%1180 0.016 0.2 4.8 4.1 22.8 16.6 16.6 EX2 EX2 1.70 0.67 160 2.8%33.0 1.0%155 0.016 0.2 3.2 0.8 33.8 10.9 10.9 EX3 EX3 0.41 0.82 40 2.0%12.2 2.5%730 0.016 0.2 5.0 2.4 14.6 14.1 14.1 EX4 EX4 0.38 0.89 45 2.0%9.8 3.5%165 0.016 0.2 6.0 0.5 10.2 10.9 10.2 EX5 EX5 7.97 0.25 500 10.0%76.0 2.0%320 0.25 0.2 0.3 18.5 94.5 11.8 11.8 EX6 EX6 6.44 0.41 200 1.8%68.3 2.6%376 0.016 0.2 5.1 1.2 69.5 12.1 12.1 OS1 OS1 3.27 0.55 65 2.0%30.0 2.0%475 0.016 0.2 4.5 1.8 31.7 12.6 12.6 OS2 OS2 6.22 0.25 380 10.0%66.2 2.0%360 0.25 0.2 0.3 20.8 87.1 12.0 12.0 Existing Basins Overland Flow (Ti)Travel/Channelized Time of Flow (Tt) Ti+Tt Final Tc (6) Date: 9/13/2022 C:\United Civil Dropbox\Projects\U21004 - Nissan Dealership\Reports\Drainage\Calculations\U21004-Drain Calcs-FDP TIME OF CONCENTRATION (10-YR) Nissan - Kia Dealership, Fort Collins, CO Basin Design Pt.Area CXCF(1)Length Slope Ti(2)Slope Length n R Velocity (3)Tt(4)Tc max (5) acres ft %min %ft fps min min min min A1 A1 0.95 0.25 120 14.0%33.3 1.0%160 0.016 0.2 3.2 0.8 34.2 10.9 10.9 A2 A2 0.57 0.25 45 12.0%21.5 0.5%170 0.016 0.2 2.3 1.3 22.7 10.9 10.9 A3 A3 0.49 0.76 40 2.0%14.8 1.5%210 0.016 0.2 3.9 0.9 15.7 11.2 11.2 A4 A4 0.60 0.69 70 2.6%21.5 2.8%170 0.016 0.2 5.3 0.5 22.0 10.9 10.9 A5 A5 0.40 0.89 95 3.9%10.9 0.6%100 0.016 0.2 2.5 0.7 11.6 10.6 10.6 A6 A6 0.20 0.71 65 2.2%20.9 2.0%90 0.016 0.2 4.5 0.3 21.3 10.5 10.5 A7 A7 0.39 0.85 45 3.0%10.0 1.0%70 0.016 0.2 3.2 0.4 10.3 10.4 10.3 A8 A8 0.11 0.95 45 2.9%6.1 0.6%50 0.016 0.2 2.5 0.3 6.4 10.3 6.4 A9 A9 0.14 0.95 45 2.2%6.6 0.8%110 0.016 0.2 2.8 0.6 7.3 10.6 7.3 A10 A10 0.68 0.78 60 2.0%16.7 0.8%210 0.016 0.2 2.8 1.2 17.9 11.2 11.2 A11 A11 0.31 0.79 50 2.0%14.8 0.6%130 0.016 0.2 2.5 0.9 15.7 10.7 10.7 A12 A12 0.56 0.81 80 2.0%17.4 0.6%85 0.016 0.2 2.5 0.6 18.0 10.5 10.5 A13 A13 0.94 0.95 200 2.0%14.4 2.0%100 0.016 0.2 4.5 0.4 14.8 10.6 10.6 A14 A14 0.44 0.79 160 3.3%22.4 0.5%40 0.016 0.2 2.3 0.3 22.7 10.2 10.2 A15 A15 0.86 0.88 160 3.3%16.3 0.5%80 0.016 0.2 2.3 0.6 16.9 10.4 10.4 A16 A16 0.77 0.95 75 2.0%8.8 2.0%60 0.016 0.2 4.5 0.2 9.1 10.3 9.1 Storm Line E 1 3.96 0.85 65 2.0%13.4 2.0%475 0.016 0.2 4.5 1.8 15.2 12.6 12.6 Storm Line H 2 6.22 0.85 145 4.0%16.0 1.3%750 0.016 0.2 3.6 3.4 19.4 14.2 14.2 B1 B1 0.46 0.25 50 25.0%17.8 0.5%110 0.016 0.2 2.3 0.8 18.6 10.6 10.6 B2 B2 0.48 0.25 50 25.0%17.8 1.5%130 0.016 0.2 3.9 0.6 18.3 10.7 10.7 B3 B3 1.10 0.74 200 2.0%34.5 0.8%115 0.016 0.2 2.8 0.7 35.2 10.6 10.6 B4 B4 0.38 0.89 195 1.6%21.3 1.6%15 0.016 0.2 4.0 0.1 21.4 10.1 10.1 B5 B5 0.54 0.85 130 2.7%17.9 0.5%110 0.016 0.2 2.3 0.8 18.7 10.6 10.6 B6 B6 0.18 0.73 95 2.5%23.0 4.0%50 0.016 0.2 6.4 0.1 23.1 10.3 10.3 B7 B7 0.25 0.81 55 3.7%11.9 5.2%40 0.016 0.2 7.3 0.1 12.0 10.2 10.2 Storm Line G 5 1.36 0.84 85 2.2%16.1 0.5%350 0.016 0.2 2.3 2.6 18.7 11.9 11.9 C1 C1 0.61 0.84 55 2.5%12.1 5.0%380 0.016 0.2 7.1 0.9 13.0 12.1 12.1 C2 C2 0.90 0.65 60 2.5%22.0 5.0%300 0.016 0.2 7.1 0.7 22.7 11.7 11.7 C3.1 C3.1 0.93 0.91 375 5.0%18.4 2.0%50 0.016 0.2 4.5 0.2 18.6 10.3 10.3 C3.2 C3.2 0.64 0.92 275 5.0%15.1 2.0%75 0.016 0.2 4.5 0.3 15.4 10.4 10.4 C4 C4 0.65 0.88 130 5.0%12.4 1.5%165 0.016 0.2 3.9 0.7 13.1 10.9 10.9 C5 C5 0.20 0.88 180 3.0%17.7 1.8%95 0.016 0.2 4.3 0.4 18.0 10.5 10.5 C6 C6 0.04 0.95 65 2.0%8.2 2.0%75 0.016 0.2 4.5 0.3 8.5 10.4 8.5 Storm Line A 3.00 1.51 0.73 55 2.5%17.4 5.0%380 0.016 0.2 7.1 0.9 18.3 12.1 12.1 Trail Culvert 4.00 7.87 0.34 55 2.5%35.5 5.0%580 0.016 0.2 7.1 1.4 36.9 13.2 13.2 D1 D1 0.48 0.73 40 2.0%15.9 2.5%210 0.016 0.2 5.0 0.7 16.6 11.2 11.2 E1 E1 2.08 0.76 40 2.0%14.6 2.5%940 0.016 0.2 5.0 3.1 17.7 15.2 15.2 OS1 OS1 3.27 0.55 65 2.0%30.0 2.0%475 0.016 0.2 4.5 1.8 31.7 12.6 12.6 OS2 OS2 6.36 0.25 380 10.0%66.2 2.0%360 0.25 0.2 0.3 20.8 87.1 12.0 12.0 Notes: (1) C=CX*CF is less than or equal to 1.0 (Cf = 1.0) (2) ti = [1.87(1.1-CXCF)L1/2]/S1/3, S= slope in %, L=length of overland flow (200' max urban, 500' max rural) (3) V=(1.49/n)R2/3S1/2, S = slope in ft/ft, FCSCM Equation 5-4 (4) tt=L/(V*60 sec/min) (5) Maximum tc = total length/180 + 10 (6) Minimum tc = 5 min Proposed Basins Overland Flow (Ti)Travel/Channelized Time of Flow (Tt) Ti+Tt Final Tc (6) Date: 9/13/2022 C:\United Civil Dropbox\Projects\U21004 - Nissan Dealership\Reports\Drainage\Calculations\U21004-Drain Calcs-FDP TIME OF CONCENTRATION (100-YR) Nissan - Kia Dealership, Fort Collins, CO Basin Design Pt.Area CXCF(1)Length Slope Ti(2)Slope Length n R Velocity (3)Tt(4)Tc max (5) acres ft %min %ft fps min min min min EX1 EX1 2.12 1.00 50 2.2%4.7 2.3%1180 0.016 0.2 4.8 4.1 8.8 16.6 8.8 EX2 EX2 1.70 1.00 160 2.8%7.7 1.0%155 0.016 0.2 3.2 0.8 8.5 10.9 8.5 EX3 EX3 0.41 1.00 40 2.0%4.3 2.5%730 0.016 0.2 5.0 2.4 6.7 14.1 6.7 EX4 EX4 0.38 1.00 45 2.0%4.6 3.5%165 0.016 0.2 6.0 0.5 5.0 10.9 5.0 EX5 EX5 7.97 0.39 500 10.0%63.4 2.0%320 0.25 0.2 0.3 18.5 81.9 11.8 11.8 EX6 EX6 6.44 0.65 200 1.8%45.1 2.6%376 0.016 0.2 5.1 1.2 46.4 12.1 12.1 OS1 OS1 3.27 0.86 65 2.0%12.9 2.0%475 0.016 0.2 4.5 1.8 14.7 12.6 12.6 OS2 OS2 6.22 0.39 380 10.0%55.3 2.0%360 0.25 0.2 0.3 20.8 76.1 12.0 12.0 Existing Basins Overland Flow (Ti)Travel/Channelized Time of Flow (Tt) Ti+Tt Final Tc (6) Date: 9/13/2022 C:\United Civil Dropbox\Projects\U21004 - Nissan Dealership\Reports\Drainage\Calculations\U21004-Drain Calcs-FDP TIME OF CONCENTRATION (100-YR) Nissan - Kia Dealership, Fort Collins, CO Basin Design Pt.Area CXCF(1)Length Slope Ti(2)Slope Length n R Velocity (3)Tt(4)Tc max (5) acres ft %min %ft fps min min min min A1 A1 0.95 0.39 120 14.0%27.8 1.0%160 0.016 0.2 3.2 0.8 28.6 10.9 10.9 A2 A2 0.57 0.39 45 12.0%17.9 0.5%170 0.016 0.2 2.3 1.3 19.2 10.9 10.9 A3 A3 0.49 1.00 40 2.0%4.3 1.5%210 0.016 0.2 3.9 0.9 5.2 11.2 5.2 A4 A4 0.60 1.00 70 2.6%5.2 2.8%170 0.016 0.2 5.3 0.5 5.7 10.9 5.7 A5 A5 0.40 1.00 95 3.9%5.3 0.6%100 0.016 0.2 2.5 0.7 6.0 10.6 6.0 A6 A6 0.20 1.00 65 2.2%5.3 2.0%90 0.016 0.2 4.5 0.3 5.6 10.5 5.6 A7 A7 0.39 1.00 45 3.0%4.0 1.0%70 0.016 0.2 3.2 0.4 4.4 10.4 5.0 A8 A8 0.11 1.00 45 2.9%4.0 0.6%50 0.016 0.2 2.5 0.3 4.4 10.3 5.0 A9 A9 0.14 1.00 45 2.2%4.4 0.8%110 0.016 0.2 2.8 0.6 5.1 10.6 5.1 A10 A10 0.68 1.00 60 2.0%5.3 0.8%210 0.016 0.2 2.8 1.2 6.5 11.2 6.5 A11 A11 0.31 1.00 50 2.0%4.8 0.6%130 0.016 0.2 2.5 0.9 5.7 10.7 5.7 A12 A12 0.56 1.00 80 2.0%6.1 0.6%85 0.016 0.2 2.5 0.6 6.7 10.5 6.7 A13 A13 0.94 1.00 200 2.0%9.6 2.0%100 0.016 0.2 4.5 0.4 10.0 10.6 10.0 A14 A14 0.44 1.00 160 3.3%7.3 0.5%40 0.016 0.2 2.3 0.3 7.6 10.2 7.6 A15 A15 0.86 1.00 160 3.3%7.3 0.5%80 0.016 0.2 2.3 0.6 7.9 10.4 7.9 A16 A16 0.77 1.00 75 2.0%5.9 2.0%60 0.016 0.2 4.5 0.2 6.1 10.3 6.1 Storm Line E 1 3.96 1.00 65 2.0%5.5 2.0%475 0.016 0.2 4.5 1.8 7.2 12.6 7.2 Storm Line H 2 6.22 1.00 145 4.0%6.5 1.3%750 0.016 0.2 3.6 3.4 10.0 14.2 10.0 B1 B1 0.46 0.39 50 25.0%14.8 0.5%110 0.016 0.2 2.3 0.8 15.6 10.6 10.6 B2 B2 0.48 0.39 50 25.0%14.8 1.5%130 0.016 0.2 3.9 0.6 15.4 10.7 10.7 B3 B3 1.10 1.00 200 2.0%9.6 0.8%115 0.016 0.2 2.8 0.7 10.3 10.6 10.3 B4 B4 0.38 1.00 195 1.6%10.2 1.6%15 0.016 0.2 4.0 0.1 10.3 10.1 10.1 B5 B5 0.54 1.00 130 2.7%7.0 0.5%110 0.016 0.2 2.3 0.8 7.8 10.6 7.8 B6 B6 0.18 1.00 95 2.5%6.2 4.0%50 0.016 0.2 6.4 0.1 6.3 10.3 6.3 B7 B7 0.25 1.00 55 3.7%4.1 5.2%40 0.016 0.2 7.3 0.1 4.2 10.2 5.0 Storm Line G 5 1.36 1.00 85 2.2%6.1 0.5%350 0.016 0.2 2.3 2.6 8.7 11.9 8.7 C1 C1 0.61 1.00 55 2.5%4.7 5.0%380 0.016 0.2 7.1 0.9 5.6 12.1 5.6 C2 C2 0.90 1.00 60 2.5%4.9 5.0%300 0.016 0.2 7.1 0.7 5.6 11.7 5.6 C3.1 C3.1 0.93 1.00 375 5.0%9.7 0.5%50 0.016 0.2 2.3 0.4 10.1 10.3 10.1 C3.2 C3.2 0.64 1.00 275 5.0%8.3 2.0%75 0.016 0.2 4.5 0.3 8.6 10.4 8.6 C4 C4 0.65 1.00 130 5.0%5.7 1.5%165 0.016 0.2 3.9 0.7 6.4 10.9 6.4 C5 C5 0.20 1.00 180 3.0%8.0 1.8%95 0.016 0.2 4.3 0.4 8.4 10.5 8.4 C6 C6 0.04 1.00 65 2.0%5.5 2.0%75 0.016 0.2 4.5 0.3 5.8 10.4 5.8 Storm Line A 3 1.51 1.00 55 2.5%4.7 5.0%380 0.016 0.2 7.1 0.9 5.6 12.1 5.6 Trail Culvert 4.00 7.87 0.53 55 2.5%26.5 5.0%580 0.016 0.2 7.1 1.4 27.9 13.2 13.2 D1 D1 0.48 1.00 40 2.0%4.3 2.5%210 0.016 0.2 5.0 0.7 5.0 11.2 5.0 E1 E1 2.08 1.00 40 2.0%4.3 2.5%940 0.016 0.2 5.0 3.1 7.4 15.2 7.4 OS1 OS1 3.27 0.86 65 2.0%12.9 2.0%475 0.016 0.2 4.5 1.8 14.7 12.6 12.6 OS2 OS2 6.36 0.39 380 10.0%55.3 2.0%360 0.25 0.2 0.3 20.8 76.1 12.0 12.0 Notes: (1) C=CX*CF is less than or equal to 1.0 (Cf = 1.25) (2) ti = [1.87(1.1-CXCF)L1/2]/S1/3, S= slope in %, L=length of overland flow (200' max urban, 500' max rural) (3) V=(1.49/n)R2/3S1/2, S = slope in ft/ft, FCSCM Equation 5-4 (4) tt=L/(V*60 sec/min) (5) Maximum tc = total length/180 + 10 (6) Minimum tc = 5 min Proposed Basins Overland Flow (Ti)Travel/Channelized Time of Flow (Tt) Ti+Tt Final Tc (6) Date: 9/13/2022 C:\United Civil Dropbox\Projects\U21004 - Nissan Dealership\Reports\Drainage\Calculations\U21004-Drain Calcs-FDP RATIONAL METHOD PEAK RUNOFF Nissan - Kia Dealership, Fort Collins, CO Basin Design Pt.Contributing Area 2-Year 100-Year Basins acre tc tc C2 C10 C100 I2 I10 I100 Q2 Q10 Q100 min min in/hr in/hr in/hr cfs cfs cfs EX1 EX1 EX1 2.12 17 9 0.70 0.70 0.87 1.75 2.99 8.03 2.59 4.42 14.85 EX2 EX2 EX2 1.70 11 9 0.67 0.67 0.84 2.13 3.63 8.03 2.43 4.15 11.47 EX3 EX3 EX3 0.41 14 7 0.82 0.82 1.00 1.92 3.29 8.80 0.65 1.11 3.65 EX4 EX4 EX4 0.38 10 5 0.89 0.89 1.00 2.21 3.78 9.95 0.75 1.28 3.80 EX5 EX5 EX5 7.97 12 12 0.25 0.25 0.31 2.05 3.50 7.16 4.08 6.97 17.83 EX6 EX6 EX6 6.44 12 12 0.41 0.41 0.52 2.05 3.50 7.16 5.46 9.33 23.85 OS1 OS1 OS1 3.27 13 13 0.55 0.55 0.69 1.98 3.39 6.92 3.58 6.13 15.63 OS2 OS2 OS2 6.22 12 12 0.25 0.25 0.31 2.05 3.50 7.16 3.19 5.44 13.91 Existing Basins Peak DischargeRainfall IntensityRunoff Coefficients Date: 9/13/2022 C:\United Civil Dropbox\Projects\U21004 - Nissan Dealership\Reports\Drainage\Calculations\U21004-Drain Calcs-FDP RATIONAL METHOD PEAK RUNOFF Nissan - Kia Dealership, Fort Collins, CO Existing Basins Basin Design Pt.Contributing Area 2-Year 100-Year Basins acre tc tc C2 C10 C100 I2 I10 I100 Q2 Q10 Q100 min min in/hr in/hr in/hr cfs cfs cfs A1 A1 A1 0.95 11 11 0.25 0.25 0.31 2.13 3.63 7.42 0.51 0.86 2.21 A2 A2 A2 0.57 11 11 0.25 0.25 0.31 2.13 3.63 7.42 0.30 0.52 1.32 A3 A3 A3 0.49 11 5 0.76 0.76 0.95 2.13 3.63 9.95 0.79 1.35 4.64 A4 A4 A4 0.60 11 6 0.69 0.69 0.86 2.13 3.63 9.31 0.88 1.50 4.80 A5 A5 A5 0.40 11 6 0.89 0.89 1.00 2.13 3.63 9.31 0.77 1.30 3.74 A6 A6 A6 0.20 11 6 0.71 0.71 0.88 2.13 3.63 9.31 0.30 0.52 1.66 A7 A7 A7 0.39 10 5 0.85 0.85 1.00 2.21 3.78 9.95 0.74 1.27 3.93 A8 A8 A8 0.11 6 5 0.95 0.95 1.00 2.67 4.56 9.95 0.28 0.48 1.10 A9 A9 A9 0.14 7 5 0.95 0.95 1.00 2.52 4.31 9.95 0.34 0.59 1.43 A10 A10 A10 0.68 11 6 0.78 0.78 0.98 2.13 3.63 9.31 1.13 1.93 6.19 A11 A11 A11 0.31 11 6 0.79 0.79 0.99 2.13 3.63 9.31 0.52 0.89 2.86 A12 A12 A12 0.56 10 7 0.81 0.81 1.00 2.21 3.78 8.80 1.01 1.74 4.96 A13 A13 A13 0.94 11 10 0.95 0.95 1.00 2.13 3.63 7.72 1.90 3.25 7.26 A14 A14 A14 0.44 10 8 0.79 0.79 0.99 2.21 3.78 8.38 0.77 1.32 3.66 A15 A15 A15 0.86 10 8 0.88 0.88 1.00 2.21 3.78 8.38 1.67 2.86 7.23 A16 A16 A16 0.77 9 6 0.95 0.95 1.00 2.30 3.93 9.31 1.68 2.87 7.16 Storm Line E 1 A3, A6, OS1 3.96 13 7 0.59 0.59 0.73 1.98 3.39 8.80 4.60 7.87 25.54 Storm Line H 2 A4, A5, A7 - A16 6.22 14 10 0.85 0.85 1.00 1.92 3.29 7.72 10.20 17.48 47.99 B1 B1 B1 0.46 11 11 0.25 0.25 0.31 2.13 3.63 7.42 0.25 0.42 1.07 B2 B2 B2 0.48 11 11 0.25 0.25 0.31 2.13 3.63 7.42 0.26 0.44 1.12 B3 B3 B3 1.10 11 10 0.74 0.74 0.93 2.13 3.63 7.72 1.74 2.96 7.88 B4 B4 B4 0.38 10 10 0.89 0.89 1.00 2.21 3.78 7.72 0.75 1.29 2.95 B5 B5 B5 0.54 11 8 0.85 0.85 1.00 2.13 3.63 8.38 0.97 1.66 4.53 B6 B6 B6 0.18 10 6 0.73 0.73 0.91 2.21 3.78 9.31 0.30 0.51 1.56 B7 B7 B7 0.25 10 5 0.81 0.81 1.00 2.21 3.78 9.95 0.45 0.78 2.52 Storm Line G 5 B4 - B7 1.36 12 9 0.84 0.84 1.00 2.05 3.50 8.03 2.33 3.98 10.93 C1 C1 C1 0.61 12 6 0.84 0.84 1.00 2.05 3.50 9.31 1.05 1.80 5.68 C2 C2 C2 0.90 12 6 0.65 0.65 0.81 2.05 3.50 9.31 1.20 2.04 6.79 C3.1 C3.1 C3.1 0.93 10 10 0.91 0.91 1.00 2.21 3.78 7.72 1.86 3.19 7.15 C3.2 C3.2 C3.2 0.64 10 9 0.92 0.92 1.00 2.21 3.78 8.03 1.29 2.21 5.11 C4 C4 C4 0.65 11 6 0.88 0.88 1.00 2.13 3.63 9.31 1.22 2.07 6.01 C5 C5 C5 0.20 11 8 0.88 0.88 1.00 2.13 3.63 8.38 0.38 0.65 1.70 C6 C6 C6 0.04 9 6 0.95 0.95 1.00 2.30 3.93 9.31 0.09 0.16 0.39 Storm Line A 3 C1, C2 1.51 12 6 0.73 0.73 0.91 2.05 3.50 9.31 2.74 4.33 13.26 Trail Culvert 4 C1, C2, OS2 7.87 13 13 0.34 0.34 0.43 1.98 3.39 6.92 5.81 9.60 23.74 D1 D1 D1 0.48 11 5 0.73 0.73 0.91 2.13 3.63 9.95 0.74 1.27 4.34 E1 E1 E1 2.08 15 7 0.76 0.76 0.95 1.87 3.19 8.80 2.95 5.04 17.36 -- OS1 OS1 OS1 3.27 13 13 0.55 0.55 0.69 1.98 3.39 6.92 3.58 6.13 15.63 OS2 OS2 OS2 6.36 12 12 0.25 0.25 0.31 2.05 3.50 7.16 3.26 5.57 14.23 (1) Storm Line A is an analysis of the routed flows between Basins C1 and Basin C2, plus the addition of Pond C1 release rate (2) Trail Culvert calculations is an analysis of the routed flows between Basins C1-C2 and Basin OS2, plus the addition of Pond C1 release rate Proposed Basins Runoff Coefficients Rainfall Intensity Peak Discharge (1)(1)(1) (2)(2)(2) Date: 9/13/2022 C:\United Civil Dropbox\Projects\U21004 - Nissan Dealership\Reports\Drainage\Calculations\U21004-Drain Calcs-FDP A PPENDIX B H YDRAULIC C ALCULATIONS LOW IMPACT DEVELOPMENT SUMMARY Nissan - Kia Dealership, Fort Collins, CO Basin Proposed Impervious Area LID Treatment Area Treated % of Site Treated (sf)(acres)(sf)(%) A1 830 None 0 0.0% A2 495 Bioretention 495 0.1% A3 15,654 None 0 0.0% A4 16,521 Bioretention 16,521 3.1% A5 16,148 Bioretention 16,148 3.0% A6 5,781 None 0 0.0% A7 14,784 Bioretention 14,784 2.8% A8 4,805 Bioretention 4,805 0.9% A9 6,250 Bioretention 6,250 1.2% A10 17,269 Bioretention 17,269 3.3% A11 10,526 Bioretention 2,065 0.4% A12 19,886 Bioretention 19,886 3.8% A13 36,891 Bioretention 36,891 7.0% A14 14,956 Bioretention 14,956 2.8% A15 33,679 Bioretention 33,679 6.4% A16 30,150 Bioretention 30,150 5.7% B1 403 None 0 0.0% B2 422 Bioretention 422 0.1% B3 33,951 Bioretention 33,951 6.4% B4 15,274 Bioretention 15,274 2.9% B5 20,100 Bioretention 20,100 3.8% B6 5,536 Bioretention 5,536 1.0% B7 8,874 Bioretention 8,874 1.7% C1 22,552 Underground Water Quality 22,552 4.3% C2 22,695 Underground Water Quality 22,695 4.3% C3.1 38,130 Underground Water Quality 38,130 7.2% C3.2 26,500 Underground Water Quality 26,500 5.0% C4 25,514 Underground Water Quality 25,514 4.8% C5 7,943 Underground Water Quality 7,943 1.5% C6 1,656 Underground Water Quality 1,656 0.3% D1 6,881 None 0 0.0% E1 48,795 None 0 0.0% Total New/Modified Site 529,851 443,046 83.6% Low Impact Development (LID) Treated Areas Date: 9/12/2022 C:\United Civil Dropbox\Projects\U21004 - Nissan Dealership\Reports\Drainage\Calculations\U21004-Drain Calcs-FDP (Revised)-CDB WATER QUALITY Nissan - Kia Dealership, Fort Collins, CO Required Water Quality Capture Volume Basin Area Area Imperviousness Watershed WQCV WQ Treatment (sf)(acres)(%)(inches)(cf)Method A1 41,480 0.952 2%0.02 63 Extended Detention A2 24,770 0.569 2%0.01 30 Bioretention A3(3)21,460 0.493 73%0.29 620 Extended Detention A4 26,110 0.599 63%0.20 517 Bioretention A5 17,495 0.402 92%0.34 590 Bioretention A6(3)8,780 0.202 66%0.26 226 Extended Detention A7 17,195 0.395 86%0.30 508 Bioretention A8 4,805 0.110 100%0.40 192 Bioretention A9 6,250 0.143 100%0.40 250 Bioretention A10 29,595 0.679 77%0.25 729 Bioretention A11 13,525 0.310 78%0.25 341 Bioretention A12 24,565 0.564 81%0.27 657 Bioretention A13 40,990 0.941 90%0.32 1,317 Bioretention A14 19,170 0.440 78%0.25 485 Bioretention A15 37,570 0.862 90%0.32 1,198 Bioretention A16 33,500 0.769 90%0.32 1,076 Bioretention B1 20,160 0.463 2%0.02 31 Extended Detention B2 21,090 0.484 2%0.01 26 Bioretention B3 47,980 1.101 71%0.22 1,069 Bioretention B4 16,646 0.382 92%0.33 555 Bioretention B5 23,550 0.541 85%0.29 687 Bioretention B6 8,045 0.185 69%0.22 174 Bioretention B7 11,040 0.253 80%0.26 292 Bioretention C1 26,565 0.610 85%0.29 768 Underground Water Quality C2 39,100 0.898 58%0.18 719 Underground Water Quality C3.1 40,354 0.926 94%0.35 1,428 Underground Water Quality C3.2 27,731 0.637 96%0.36 1,005 Underground Water Quality C4 28,140 0.646 91%0.33 917 Underground Water Quality C5 8,825 0.203 90%0.32 283 Underground Water Quality C6 1,840 0.042 90%0.32 59 Underground Water Quality D1 20,830 0.478 69%0.27 565 None E1 90,425 2.076 73%0.29 2,636 None OS1 142,330 3.267 43%0.19 2,671 None (1)Water quality provided by bioretention and based on 12-hour storage (2)Water quality provided by underground detention and based on 12-hour storage (3) Based on 40 hr storage (4) Basins D1 & E1 are related to CDOT R.O.W and are not captured with the site improvemens (5) The larger Isolated row related to Pond C1 is designed to treat Basins C3.1, C3.2, C5, C6 - this required volume is 2,775 cf. (6) The smaller Isolated row related to Pond C1 is designed to treat Basins C4 - this required volume is 917 cf. BMP Facility Summary Required Proposed Facility WQCV WQCV Designation ac-ft ac-ft Detention Pond A1 0.02 0.06 Bioretention Pond A2 0.18 0.29 Bioretention Pond A3 0.06 0.08 Underground Pond C1 0.08 0.08 Underground Pond C2 0.02 0.04 (2, 5) (2, 5) (3) (3) (1) (1) (1) (1) (2, 6) (2, 5) (2, 5) Date: 9/12/2022 C:\United Civil Dropbox\Projects\U21004 - Nissan Dealership\Reports\Drainage\Calculations\U21004-Drain Calcs-FDP (Revised)-CDB UNDERGROUND DETENTION & WATER QUALITY Nissan - Kia Dealership, Fort Collins, CO Required Underground Detention/WQ Volume Chamber Total Required Detention/ Chamber Chamber Chamber *Installed Min.End Cap *Installed Min.Min. Req'd Design No. of No. of Provided Provided Total ID Detention/WQ WQ Type Unit Unit Chamber Unit No. of Unit End Cap WQ Isolator Row Controli Chambers End Caps Release Isolator Installed Volumea Inflowb Release Volumed Volume inc.Chambersf Volumed Volume inc. Release Volume by Provided Provided Ratej Row System Ratec Aggregatee Aggregatee Rateg FAA Methodh Volumek Volumel (cf)(cfs)(cfs)(cf)(cf)(sf)(cf)(cf)(cfs)(cf)(cfs)(cf)(cf) Pond C1 (Larger LID/WQ)2,775 1.17 MC-7200 0.043 175.90 267.30 10 39.50 115.30 0.43 1,078 WQCV 11 2 0.47 2,014 3,171 Pond C1 (Smaller LID/WQ)917 0.61 MC-7200 0.043 175.90 267.30 3 39.50 115.30 0.13 249 WQCV 6 2 0.26 1,134 1,834 Pond C1 (Detention)28,975 20.37 MC-7200 0.043 175.90 267.30 98 39.50 115.30 ---95 26 0.49 N/A 28,391 TOTAL Pond C1 32,667 MC-7200 0.043 175.90 267.30 111 39.50 115.30 0.43 1,078 WQCV 112 30 0.49 3,148 33,397 Pond C2 (LID/WQ)1,487 1.12 MC-7200 0.043 175.90 267.30 5 39.50 115.30 0.21 898 WQCV 5 2 0.2 959 1,567 *Volume assumes minimum aggregate depth below chamber. a. Total required WQCV calculated per 12-hr drain time. b. WQ inflow is approximated as one-half the 2-yr peak runoff rate. c. Release rate per chamber, limited by flow through geotextile with accumulated sediment. d. Volume within chamber only, not accounting for void spaces in surrounding aggregate. The Isolator Row(s) are sized per this unit volume. e. Volume includes chamber and void spaces (40%) in surrounding aggregate, per chamber unit. The total system WQCV is sized per this unit volume. f. Number of chambers required to provide full WQCV within total installed system, including aggregate. g. Release rate per chamber times number of chambers. This is used at the 'outlet control' for the FAA calculations. h. Minimum 'chamber-only' volume to ensure dirty water is fully contained within Isolator Row. i. Determines whether the design is controlled by the Isolator Row volume or WQCV. j. Release rate per chamber times number of chambers provided. k. Volume provided in chambers only (no aggregate storage). This number must meet or exceed the required FAA storage volume. l. System volume includes total number of chambers, plus surrounding aggregate. This number must meet or exceed the required 12-hr WQCV. Date: 9/12/2022 C:\United Civil Dropbox\Projects\U21004 - Nissan Dealership\Reports\Drainage\Calculations\U21004-Drain Calcs-FDP (Revised)-CDB DETENTION POND VOLUME (FAA Method) Nissan - Kia Dealership, Fort Collins, CO POND ID:Pond A1 100 Year Storm Into Detention Facility Area =581,436 square feet Area =13.35 acres C 2 = 0.72 C 100 = 0.86 0.903689051 Release Rate Out of Pond Q OUT = 2.67 cfs Notes: 1. Pond Area includes all "A" Basins, all "B" Basins, and Basins C1 and C2. The C Basins are used to provide for an area swap from Basin OS1. 2. C100 value shown is a weighted average of the C values calculated using each sub-basin. 3. Release rate is equal to the Pond Area x 0.2 cfs/acre. Detention Volume Calculations Rainfall Rainfall Inflow Rate Inflow Volume Adjustment Factor Average Outflow Volume Required Duration (T)Intensity (I)Qin= ∑C100*Area*I Vi=(Qin*T*60)Factor Outflow Rate Vo=Qav*T *60 Storage Volume m= 0.5(1 + Tc/T) Qav = m*Qout Vs=Vi-Vo min in/hr cfs ft 3 cfs ft 3 ft 3 5 9.95 113.7 34,104 1.00 2.67 801 33,303 10 7.72 88.2 52,921 1.00 2.67 1,602 51,319 15 6.52 74.5 67,043 1.00 2.67 2,403 64,640 20 5.60 64.0 76,777 1.00 2.67 3,204 73,573 25 4.98 56.9 85,346 1.00 2.67 4,004 81,341 30 4.52 51.6 92,955 1.00 2.67 4,805 88,150 35 4.08 46.6 97,890 1.00 2.67 5,606 92,284 40 3.74 42.7 102,552 1.00 2.67 6,407 96,145 45 3.46 39.5 106,734 1.00 2.67 7,208 99,526 50 3.23 36.9 110,709 1.00 2.67 8,009 102,701 55 3.03 34.6 114,240 1.00 2.67 8,810 105,430 60 2.86 32.7 117,633 1.00 2.67 9,611 108,023 70 2.59 29.6 124,283 1.00 2.67 11,212 113,070 80 2.38 27.2 130,521 1.00 2.67 12,814 117,707 90 2.21 25.2 136,347 1.00 2.67 14,416 121,932 100 2.06 23.5 141,215 1.00 2.67 16,018 125,197 110 1.94 22.2 146,287 1.00 2.67 17,619 128,668 120 1.84 21.0 151,360 1.00 2.67 19,221 132,139 Required Detention Volume V 100 = 132,139 cubic feet V 100 = 3.03 acre-ft Date: 9/12/2022 C:\United Civil Dropbox\Projects\U21004 - Nissan Dealership\Reports\Drainage\Calculations\U21004-Drain Calcs-FDP (Revised)-CDB DETENTION POND VOLUME (FAA Method) Nissan - Kia Dealership, Fort Collins, CO POND ID:Pond C1 - Underground Water Quality (Larger Isolated Row) WQ Basin Characateristics Area =78,750 square feet Area =1.81 acres C 2 = 0.91 C 100 = 1.00 WQ Release Rate Determined from Number of Chambers and Chamber Release Rate Q OUT = 0.47 cfs Notes: 1. Release rate out of pond based on number of chambers multiplied by release rate per chamber. 2. Rainfall intensities approximated as one-half the 2-yr peak runoff rate. 3. C2 utilized for water quality event detention calculation. 4. Isolated is designed to provide WQ for Basins C3, C5, C6. Detention Volume Calculations Rainfall Rainfall Inflow Rate Inflow Volume Adjustment Factor Average Outflow Volume Required Duration (T)Intensity (I)Qin= ∑C100*Area*I Vi=(Qin*T*60)Factor Outflow Rate Vo=Qav*T *60 Storage Volume m= 0.5(1 + Tc/T) Qav = m*Qout Vs=Vi-Vo min in/hr cfs ft 3 cfs ft 3 ft 3 5 1.425 2.3 704 1.00 0.47 141 562 10 1.105 1.8 1,092 1.00 0.47 283 809 15 0.935 1.5 1,385 1.00 0.47 424 961 20 0.805 1.3 1,590 1.00 0.47 565 1,025 25 0.715 1.2 1,766 1.00 0.47 707 1,059 30 0.650 1.1 1,926 1.00 0.47 848 1,078 35 0.585 1.0 2,023 1.00 0.47 989 1,033 40 0.535 0.9 2,114 1.00 0.47 1,131 983 45 0.495 0.8 2,200 1.00 0.47 1,272 928 50 0.460 0.8 2,272 1.00 0.47 1,414 858 55 0.435 0.7 2,363 1.00 0.47 1,555 808 60 0.410 0.7 2,430 1.00 0.47 1,696 734 65 0.385 0.6 2,472 1.00 0.47 1,838 634 70 0.365 0.6 2,524 1.00 0.47 1,979 545 75 0.345 0.6 2,556 1.00 0.47 2,120 436 80 0.330 0.5 2,608 1.00 0.47 2,262 346 85 0.315 0.5 2,645 1.00 0.47 2,403 242 90 0.305 0.5 2,712 1.00 0.47 2,544 167 95 0.290 0.5 2,721 1.00 0.47 2,686 36 100 0.280 0.5 2,766 1.00 0.47 2,827 -61 105 0.270 0.4 2,800 1.00 0.47 2,968 -168 110 0.260 0.4 2,825 1.00 0.47 3,110 -285 115 0.255 0.4 2,897 1.00 0.47 3,251 -354 120 0.245 0.4 2,904 1.00 0.47 3,393 -488 Required Detention Volume V 100 = 1,078 cubic feet V 100 = 0.02 acre-ft Date: 9/12/2022 C:\United Civil Dropbox\Projects\U21004 - Nissan Dealership\Reports\Drainage\Calculations\U21004-Drain Calcs-FDP (Revised)-CDB DETENTION POND VOLUME (FAA Method) Nissan - Kia Dealership, Fort Collins, CO POND ID:Pond C1 - Underground Water Quality (Smaller Isolated Row) WQ Basin Characateristics Area =28,140 square feet Area =0.65 acres C 2 = 0.88 C 100 = 1.00 WQ Release Rate Determined from Number of Chambers and Chamber Release Rate Q OUT = 0.26 cfs Notes: 1. Release rate out of pond based on number of chambers multiplied by release rate per chamber. 2. Rainfall intensities approximated as one-half the 2-yr peak runoff rate. 3. C2 utilized for water quality event detention calculation. 4. Isolated Row is designed to provide WQ for Basin C4. Detention Volume Calculations Rainfall Rainfall Inflow Rate Inflow Volume Adjustment Factor Average Outflow Volume Required Duration (T)Intensity (I)Qin= ∑C100*Area*I Vi=(Qin*T*60)Factor Outflow Rate Vo=Qav*T *60 Storage Volume m= 0.5(1 + Tc/T) Qav = m*Qout Vs=Vi-Vo min in/hr cfs ft 3 cfs ft 3 ft 3 5 1.425 0.8 244 1.00 0.26 77 167 10 1.105 0.6 378 1.00 0.26 154 224 15 0.935 0.5 480 1.00 0.26 231 249 20 0.805 0.5 551 1.00 0.26 308 243 25 0.715 0.4 612 1.00 0.26 386 226 30 0.650 0.4 668 1.00 0.26 463 205 35 0.585 0.3 701 1.00 0.26 540 161 40 0.535 0.3 733 1.00 0.26 617 116 45 0.495 0.3 763 1.00 0.26 694 69 50 0.460 0.3 787 1.00 0.26 771 16 55 0.435 0.2 819 1.00 0.26 848 -29 60 0.410 0.2 842 1.00 0.26 925 -83 65 0.385 0.2 857 1.00 0.26 1,002 -146 70 0.365 0.2 875 1.00 0.26 1,079 -205 75 0.345 0.2 886 1.00 0.26 1,157 -271 80 0.330 0.2 904 1.00 0.26 1,234 -330 85 0.315 0.2 917 1.00 0.26 1,311 -394 90 0.305 0.2 940 1.00 0.26 1,388 -448 95 0.290 0.2 943 1.00 0.26 1,465 -522 100 0.280 0.2 959 1.00 0.26 1,542 -583 105 0.270 0.2 971 1.00 0.26 1,619 -649 110 0.260 0.1 979 1.00 0.26 1,696 -717 115 0.255 0.1 1,004 1.00 0.26 1,773 -769 120 0.245 0.1 1,007 1.00 0.26 1,850 -844 Required Detention Volume V 100 = 249 cubic feet V 100 = 0.01 acre-ft Date: 9/12/2022 C:\United Civil Dropbox\Projects\U21004 - Nissan Dealership\Reports\Drainage\Calculations\U21004-Drain Calcs-FDP (Revised)-CDB DETENTION POND VOLUME (FAA Method) Nissan - Kia Dealership, Fort Collins, CO POND ID:Pond C1 - Underground Detention 100 Year Storm Into Detention Facility Area =106,890 square feet Area =2.45 acres C 2 = 0.90 C 100 = 1.00 Release Rate Out of Pond Q OUT = 0.49 cfs Notes: 1. Pond area includes Basins C3 - C6. 2. C100 value shown is a weighted average of the C values calculated using each sub-basin. 3. Release rate is equal to the Pond Area x 0.2 cfs/acre. Detention Volume Calculations Rainfall Rainfall Inflow Rate Inflow Volume Adjustment Factor Average Outflow Volume Required Duration (T)Intensity (I)Qin= ∑C100*Area*I Vi=(Qin*T*60)Factor Outflow Rate Vo=Qav*T *60 Storage Volume m= 0.5(1 + Tc/T) Qav = m*Qout Vs=Vi-Vo min in/hr cfs ft 3 cfs ft 3 ft 3 5 9.95 24.4 7,325 1.00 0.49 147 7,178 10 7.72 18.9 11,366 1.00 0.49 294 11,072 15 6.52 16.0 14,399 1.00 0.49 442 13,958 20 5.60 13.7 16,490 1.00 0.49 589 15,901 25 4.98 12.2 18,330 1.00 0.49 736 17,594 30 4.52 11.1 19,965 1.00 0.49 883 19,081 35 4.08 10.0 21,025 1.00 0.49 1,031 19,994 40 3.74 9.2 22,026 1.00 0.49 1,178 20,848 45 3.46 8.5 22,924 1.00 0.49 1,325 21,599 50 3.23 7.9 23,778 1.00 0.49 1,472 22,306 55 3.03 7.4 24,536 1.00 0.49 1,620 22,917 60 2.86 7.0 25,265 1.00 0.49 1,767 23,498 70 2.59 6.4 26,693 1.00 0.49 2,061 24,632 80 2.38 5.8 28,033 1.00 0.49 2,356 25,677 90 2.21 5.4 29,284 1.00 0.49 2,650 26,634 100 2.06 5.1 30,330 1.00 0.49 2,945 27,385 110 1.94 4.8 31,419 1.00 0.49 3,239 28,180 120 1.84 4.5 32,509 1.00 0.49 3,534 28,975 Required Detention Volume V 100 = 28,975 cubic feet V 100 = 0.67 acre-ft Date: 9/12/2022 C:\United Civil Dropbox\Projects\U21004 - Nissan Dealership\Reports\Drainage\Calculations\U21004-Drain Calcs-FDP (Revised)-CDB DETENTION POND VOLUME (FAA Method) Nissan - Kia Dealership, Fort Collins, CO POND ID:Pond C2 - Underground Water Quality WQ Basin Characateristics Area =65,665 square feet Area =1.51 acres C 2 = 0.73 C 100 = 0.89 WQ Release Rate Determined from Number of Chambers and Chamber Release Rate Q OUT = 0.21 cfs Notes: 1. Release rate out of pond based on number of chambers multiplied by release rate per chamber. 2. Rainfall intensities approximated as one-half the 2-yr peak runoff rate. 3. C2 utilized for water quality event detention calculation. 4. Pond is designed to provide WQ for Basins C1 & C2. Detention Volume Calculations Rainfall Rainfall Inflow Rate Inflow Volume Adjustment Factor Average Outflow Volume Required Duration (T)Intensity (I)Qin= ∑C100*Area*I Vi=(Qin*T*60)Factor Outflow Rate Vo=Qav*T *60 Storage Volume m= 0.5(1 + Tc/T) Qav = m*Qout Vs=Vi-Vo min in/hr cfs ft 3 cfs ft 3 ft 3 5 1.425 1.6 469 1.00 0.21 64 405 10 1.105 1.2 727 1.00 0.21 129 599 15 0.935 1.0 923 1.00 0.21 193 731 20 0.805 0.9 1,060 1.00 0.21 257 803 25 0.715 0.8 1,177 1.00 0.21 321 856 30 0.650 0.7 1,284 1.00 0.21 386 898 35 0.585 0.6 1,348 1.00 0.21 450 898 40 0.535 0.6 1,409 1.00 0.21 514 895 45 0.495 0.5 1,467 1.00 0.21 578 888 50 0.460 0.5 1,514 1.00 0.21 643 872 55 0.435 0.5 1,575 1.00 0.21 707 868 60 0.410 0.4 1,620 1.00 0.21 771 849 65 0.385 0.4 1,648 1.00 0.21 835 812 70 0.365 0.4 1,682 1.00 0.21 900 783 75 0.345 0.4 1,704 1.00 0.21 964 740 80 0.330 0.4 1,738 1.00 0.21 1,028 710 85 0.315 0.3 1,763 1.00 0.21 1,092 670 90 0.305 0.3 1,807 1.00 0.21 1,157 651 95 0.290 0.3 1,814 1.00 0.21 1,221 593 100 0.280 0.3 1,843 1.00 0.21 1,285 558 105 0.270 0.3 1,866 1.00 0.21 1,349 517 110 0.260 0.3 1,883 1.00 0.21 1,414 469 115 0.255 0.3 1,931 1.00 0.21 1,478 453 120 0.245 0.3 1,936 1.00 0.21 1,542 394 Required Detention Volume V 100 = 898 cubic feet V 100 = 0.02 acre-ft Date: 9/12/2022 C:\United Civil Dropbox\Projects\U21004 - Nissan Dealership\Reports\Drainage\Calculations\U21004-Drain Calcs-FDP (Revised)-CDB DETENTION POND STORAGE AND ORIFICE CALCULATIONS Nissan - Kia Dealership, Fort Collins, CO POND ID:Detention Pond A1 Stage Storage Calculations Elevation Area (sf)Depth (ft) Incremental Volume (cf)Volume total (cf) Volume total (ac- ft) 5,002.50 202.00 0.00 0 0 0.00 5,003.00 2,140.22 0.50 500 500 0.01 5,003.40 4,888.71 0.40 1,368 1,868 0.04 5,003.80 7,028.85 0.40 2,371 4,239 0.10 5,004.20 7,815.93 0.40 2,968 7,207 0.17 5,004.60 8,595.09 0.40 3,281 10,488 0.24 5,005.00 9,384.86 0.40 3,595 14,082 0.32 5,005.40 10,334.53 0.40 3,942 18,025 0.41 5,005.80 11,782.15 0.40 4,420 22,445 0.52 5,006.20 13,540.69 0.40 5,060 27,505 0.63 5,006.60 15,585.03 0.40 5,820 33,326 0.77 5,007.00 17,600.00 0.40 6,633 39,959 0.92 5,007.40 19,704.40 0.40 7,457 47,416 1.09 5,007.80 27,999.93 0.40 9,492 56,908 1.31 5,008.20 30,714.19 0.40 11,739 68,647 1.58 5,008.60 33,513.63 0.40 12,841 81,488 1.87 5,009.00 36,309.19 0.40 13,961 95,449 2.19 5,009.40 39,205.48 0.40 15,099 110,548 2.54 5,009.80 42,388.52 0.40 16,315 126,863 2.91 5,010.00 44,179.21 0.20 8,656 135,519 3.11 Detention Pond Storage & Water Quality Detention Volume Required =132,139 ft3 Water Quality Volume Required =939 ft3 3.03 ac-ft 0.02 ac-ft Elev81 - Elev80 (VolRequired-Vol80)+Elev80 Elev81 - Elev80 (VolRequired-Vol80)+Elev80 Vol81 - Vo80 Vol81 - Vo80 Required W.S. Elevation = 5009.93 ft Required W.S. Elevation = 5003.13 ft Provided W.S. Elevation = 5010.00 ft Provided W.S. Elevation = 5003.50 ft Detention Volume Provided =134,580 ft3 Water Quality Volume Provided =2,461 ft3 3.09 ac-ft 0.06 ac-ft 100-year Depth D = 7.50 ft Water Quality Depth D = 1.00 ft Top-of-Berm = 5011.00 ft 100-year W.S. Elevation = 5010.00 ft Freeboard = 1.00 ft Freeboard = 6.50 ft Orifice Opening and Water Quality Plate Orifice Flow Rate, Q = CoAo(2gHo)0.5 cfs Area Required per WQ Plate Row 0.42 in2 Area of orifice Ao, ft2 = Q diam of WQ Hole = 0.74 in Co(2gHo)0.5 diam of WQ Hole (fraction) = 3/4 in C o = 0.65 Space Between Rows 4 in Q = Q out of pond = 2.67 cfs Number of Columns 1 gravitational acceleration g = 32.2 ft/sec2 Number of Rows 4 diam = 0.492 ft Effective head on orifice H o = D-1/2diam =7.25 ft Area of orifice A o = 0.19 ft2 Area of orifice A o = 27.36 in2 100-Year Orifice Diameter = 5.90 5 7/8 inches 100-Year Detention Volume and Elevations Water Quality Volume and Elevations W.S. Elevation, ft = W.S. Elevation, ft = 100-Year Orifice Calculation Water Quality Plate Calculation Date: 9/12/2022 C:\United Civil Dropbox\Projects\U21004 - Nissan Dealership\Reports\Drainage\Calculations\U21004-Drain Calcs-FDP (Revised)-CDB DETENTION POND STORAGE AND ORIFICE CALCULATIONS Nissan - Kia Dealership, Fort Collins, CO POND ID:Underground Pond C1 Stage Storage Calculations Elevation Area (sf)Depth (ft) Incremental Volume (cf)Volume total (cf) Volume total (ac- ft) 5,000.25 6,679 0.00 0 0 0.00 5,001.25 6,679 1.00 6,679 6,479 0.15 5,002.25 6,679 1.00 6,679 12,055 0.28 5,003.25 6,679 1.00 6,679 18,836 0.43 5,004.25 6,679 1.00 6,679 25,592 0.59 5,005.25 6,679 1.00 6,679 32,395 0.74 5,005.57 6,679 0.32 2,137 33,397 0.77 Detention Pond Storage Detention Volume Required =32,667 ft3 0.75 ac-ft Elev81 - Elev80 (VolRequired-Vol80)+Elev80 Vol81 - Vo80 Required W.S. Elevation = 5005.29 ft Provided W.S. Elevation = 5005.57 ft Detention Volume Provided =33,397 ft3 0.77 ac-ft 100-year Depth D = 5.32 ft Finished Grade At Orifice = 5008.05 ft Freeboard = 2.48 ft 100-Year Orifice Opening Orifice Flow Rate, Q = CoAo(2gHo)0.5 cfs Area of orifice Ao, ft2 = Q Co(2gHo)0.5 C o = 0.65 Q = Q out of pond = 0.49 cfs gravitational acceleration g = 32.2 ft/sec2 diam = 0.229 ft Effective head on orifice H o = D-1/2diam =5.21 ft Area of orifice A o = 0.04 ft2 Area of orifice A o = 5.94 in2 100-Year Orifice Diameter = 2.75 2 3/4 inches 100-Year Detention Volume and Elevations W.S. Elevation, ft = 100-Year Orifice Calculation Date: 9/12/2022 C:\United Civil Dropbox\Projects\U21004 - Nissan Dealership\Reports\Drainage\Calculations\U21004-Drain Calcs-FDP (Revised)-CDB BIORETENTION POND STORAGE CALCULATIONS Nissan - Kia Dealership, Fort Collins, CO POND ID:Bioretention Pond A2 Stage Storage Calculations Elevation Area (sf) Depth (ft) Incremental Volume (cf) Volume total (cf) Volume total (ac-ft) 5,009.00 11,254.68 0.00 0 0 0.00 5,009.20 11,773.11 0.20 2,303 2,303 0.05 5,009.40 12,253.02 0.20 2,402 4,705 0.11 5,009.60 12,684.44 0.20 2,494 7,199 0.17 5,009.80 13,081.77 0.20 2,577 9,775 0.22 5,010.00 13,472.06 0.20 2,655 12,430 0.29 Date: 9/2/2022 C:\United Civil Dropbox\Projects\U21004 - Nissan Dealership\Reports\Drainage\Calculations\U21004-Drain Calcs-FDP BIORETENTION POND STORAGE CALCULATIONS Nissan - Kia Dealership, Fort Collins, CO POND ID:Bioretention Pond A3 Stage Storage Calculations Elevation Area (sf) Depth (ft) Incremental Volume (cf) Volume total (cf) Volume total (ac-ft) 5,006.40 0.08 0.00 0 0 0.00 5,006.60 1,972.25 0.20 132 132 0.00 5,006.80 4,120.17 0.20 596 729 0.02 5,007.00 4,619.05 0.20 873 1,602 0.04 5,007.20 5,059.89 0.20 968 2,570 0.06 5,007.40 5,521.54 0.20 1,058 3,627 0.08 Date: 9/2/2022 C:\United Civil Dropbox\Projects\U21004 - Nissan Dealership\Reports\Drainage\Calculations\U21004-Drain Calcs-FDP MHFD-Inlet, Version 5.01 (April 2021) Worksheet Protected INLET NAME Inlet A3.2 Inlet A3.3 Inlet G5 Site Type (Urban or Rural)URBAN URBAN URBAN Inlet Application (Street or Area)STREET STREET STREET Hydraulic Condition In Sump In Sump On Grade Inlet Type CDOT Type R Curb Opening CDOT Type R Curb Opening CDOT Type R Curb Opening USER-DEFINED INPUT User-Defined Design Flows Minor QKnown (cfs)1.2 1.1 0.5 Major QKnown (cfs)6.2 5.7 3.0 Bypass (Carry-Over) Flow from Upstream Receive Bypass Flow from:No Bypass Flow Received No Bypass Flow Received No Bypass Flow Received Minor Bypass Flow Received, Qb (cfs)0.0 0.0 0.0 Major Bypass Flow Received, Qb (cfs)0.0 0.0 0.0 Watershed Characteristics Subcatchment Area (acres) Percent Impervious NRCS Soil Type Watershed Profile Overland Slope (ft/ft) Overland Length (ft) Channel Slope (ft/ft) Channel Length (ft) Minor Storm Rainfall Input Design Storm Return Period, Tr (years) One-Hour Precipitation, P1 (inches) Major Storm Rainfall Input Design Storm Return Period, Tr (years) One-Hour Precipitation, P1 (inches) CALCULATED OUTPUT Minor Total Design Peak Flow, Q (cfs)1.2 1.1 0.5 Major Total Design Peak Flow, Q (cfs)6.2 5.7 3.0 Minor Flow Bypassed Downstream, Qb (cfs)N/A N/A 0.0 Major Flow Bypassed Downstream, Qb (cfs)N/A N/A 0.8 INLET MANAGEMENT DP C2 DP C1 DP B7 MHFD-Inlet, Version 5.01 (April 2021) Worksheet Protected INLET NAME Site Type (Urban or Rural) Inlet Application (Street or Area) Hydraulic Condition Inlet Type USER-DEFINED INPUT User-Defined Design Flows Minor QKnown (cfs) Major QKnown (cfs) Bypass (Carry-Over) Flow from Upstream Receive Bypass Flow from: Minor Bypass Flow Received, Qb (cfs) Major Bypass Flow Received, Qb (cfs) Watershed Characteristics Subcatchment Area (acres) Percent Impervious NRCS Soil Type Watershed Profile Overland Slope (ft/ft) Overland Length (ft) Channel Slope (ft/ft) Channel Length (ft) Minor Storm Rainfall Input Design Storm Return Period, Tr (years) One-Hour Precipitation, P1 (inches) Major Storm Rainfall Input Design Storm Return Period, Tr (years) One-Hour Precipitation, P1 (inches) CALCULATED OUTPUT Minor Total Design Peak Flow, Q (cfs) Major Total Design Peak Flow, Q (cfs) Minor Flow Bypassed Downstream, Qb (cfs) Major Flow Bypassed Downstream, Qb (cfs) INLET MANAGEMENT Inlet G4 Inlet A12 Inlet A14.2 URBAN URBAN URBAN STREET STREET STREET On Grade In Sump In Sump CDOT Type R Curb Opening Denver No. 16 Combination Denver No. 16 Combination 0.3 1.2 0.4 1.8 6.0 1.7 No Bypass Flow Received No Bypass Flow Received No Bypass Flow Received 0.0 0.0 0.0 0.0 0.0 0.0 0.3 1.2 0.4 1.8 6.0 1.7 0.0 N/A N/A 0.2 N/A N/A DP B6 DP C4 DP C5 MHFD-Inlet, Version 5.01 (April 2021) Worksheet Protected INLET NAME Site Type (Urban or Rural) Inlet Application (Street or Area) Hydraulic Condition Inlet Type USER-DEFINED INPUT User-Defined Design Flows Minor QKnown (cfs) Major QKnown (cfs) Bypass (Carry-Over) Flow from Upstream Receive Bypass Flow from: Minor Bypass Flow Received, Qb (cfs) Major Bypass Flow Received, Qb (cfs) Watershed Characteristics Subcatchment Area (acres) Percent Impervious NRCS Soil Type Watershed Profile Overland Slope (ft/ft) Overland Length (ft) Channel Slope (ft/ft) Channel Length (ft) Minor Storm Rainfall Input Design Storm Return Period, Tr (years) One-Hour Precipitation, P1 (inches) Major Storm Rainfall Input Design Storm Return Period, Tr (years) One-Hour Precipitation, P1 (inches) CALCULATED OUTPUT Minor Total Design Peak Flow, Q (cfs) Major Total Design Peak Flow, Q (cfs) Minor Flow Bypassed Downstream, Qb (cfs) Major Flow Bypassed Downstream, Qb (cfs) INLET MANAGEMENT Inlet E2 Inlet H3.2 Inlet H3.3 URBAN URBAN URBAN STREET STREET STREET In Sump In Sump In Sump CDOT Type R Curb Opening CDOT Type R Curb Opening CDOT Type R Curb Opening 4.6 0.8 0.9 25.5 4.5 4.0 No Bypass Flow Received No Bypass Flow Received No Bypass Flow Received 0.0 0.0 0.0 0.0 0.0 0.0 4.6 0.8 0.9 25.5 4.5 4.0 N/A N/A N/A N/A N/A N/A DP 1 DP A4 DP A5 MHFD-Inlet, Version 5.01 (April 2021) Worksheet Protected INLET NAME Site Type (Urban or Rural) Inlet Application (Street or Area) Hydraulic Condition Inlet Type USER-DEFINED INPUT User-Defined Design Flows Minor QKnown (cfs) Major QKnown (cfs) Bypass (Carry-Over) Flow from Upstream Receive Bypass Flow from: Minor Bypass Flow Received, Qb (cfs) Major Bypass Flow Received, Qb (cfs) Watershed Characteristics Subcatchment Area (acres) Percent Impervious NRCS Soil Type Watershed Profile Overland Slope (ft/ft) Overland Length (ft) Channel Slope (ft/ft) Channel Length (ft) Minor Storm Rainfall Input Design Storm Return Period, Tr (years) One-Hour Precipitation, P1 (inches) Major Storm Rainfall Input Design Storm Return Period, Tr (years) One-Hour Precipitation, P1 (inches) CALCULATED OUTPUT Minor Total Design Peak Flow, Q (cfs) Major Total Design Peak Flow, Q (cfs) Minor Flow Bypassed Downstream, Qb (cfs) Major Flow Bypassed Downstream, Qb (cfs) INLET MANAGEMENT Inlet H4.1 Inlet H6 Inlet H7 URBAN URBAN URBAN STREET STREET STREET In Sump In Sump In Sump CDOT Type R Curb Opening CDOT Type R Curb Opening CDOT Type R Curb Opening 0.7 0.8 1.7 4.2 3.7 7.2 No Bypass Flow Received No Bypass Flow Received No Bypass Flow Received 0.0 0.0 0.0 0.0 0.0 0.0 0.7 0.8 1.7 4.2 3.7 7.2 N/A N/A N/A N/A N/A N/A DP A7 DP A14 DP A15 MHFD-Inlet, Version 5.01 (April 2021) Worksheet Protected INLET NAME Site Type (Urban or Rural) Inlet Application (Street or Area) Hydraulic Condition Inlet Type USER-DEFINED INPUT User-Defined Design Flows Minor QKnown (cfs) Major QKnown (cfs) Bypass (Carry-Over) Flow from Upstream Receive Bypass Flow from: Minor Bypass Flow Received, Qb (cfs) Major Bypass Flow Received, Qb (cfs) Watershed Characteristics Subcatchment Area (acres) Percent Impervious NRCS Soil Type Watershed Profile Overland Slope (ft/ft) Overland Length (ft) Channel Slope (ft/ft) Channel Length (ft) Minor Storm Rainfall Input Design Storm Return Period, Tr (years) One-Hour Precipitation, P1 (inches) Major Storm Rainfall Input Design Storm Return Period, Tr (years) One-Hour Precipitation, P1 (inches) CALCULATED OUTPUT Minor Total Design Peak Flow, Q (cfs) Major Total Design Peak Flow, Q (cfs) Minor Flow Bypassed Downstream, Qb (cfs) Major Flow Bypassed Downstream, Qb (cfs) INLET MANAGEMENT Inlet H4.2-1 Inlet H4.4 Inlet H4.5 URBAN URBAN URBAN STREET STREET STREET In Sump In Sump In Sump Denver No. 16 Combination CDOT Type R Curb Opening CDOT Type C Grate 0.3 1.1 0.5 1.1 5.8 2.9 No Bypass Flow Received No Bypass Flow Received No Bypass Flow Received 0.0 0.0 0.0 0.0 0.0 0.0 0.3 1.1 0.5 1.1 5.8 2.9 N/A N/A N/A N/A N/A N/A DP A8 DP A10 DP A11 MHFD-Inlet, Version 5.01 (April 2021) Worksheet Protected INLET NAME Site Type (Urban or Rural) Inlet Application (Street or Area) Hydraulic Condition Inlet Type USER-DEFINED INPUT User-Defined Design Flows Minor QKnown (cfs) Major QKnown (cfs) Bypass (Carry-Over) Flow from Upstream Receive Bypass Flow from: Minor Bypass Flow Received, Qb (cfs) Major Bypass Flow Received, Qb (cfs) Watershed Characteristics Subcatchment Area (acres) Percent Impervious NRCS Soil Type Watershed Profile Overland Slope (ft/ft) Overland Length (ft) Channel Slope (ft/ft) Channel Length (ft) Minor Storm Rainfall Input Design Storm Return Period, Tr (years) One-Hour Precipitation, P1 (inches) Major Storm Rainfall Input Design Storm Return Period, Tr (years) One-Hour Precipitation, P1 (inches) CALCULATED OUTPUT Minor Total Design Peak Flow, Q (cfs) Major Total Design Peak Flow, Q (cfs) Minor Flow Bypassed Downstream, Qb (cfs) Major Flow Bypassed Downstream, Qb (cfs) INLET MANAGEMENT Inlet H4.6 Inlet H4.7 Inlet G3 URBAN URBAN URBAN STREET STREET STREET In Sump In Sump In Sump CDOT Type C Grate CDOT Type R Curb Opening Denver No. 16 Combination 1.0 0.3 1.0 4.7 1.4 4.5 No Bypass Flow Received No Bypass Flow Received No Bypass Flow Received 0.0 0.0 0.0 0.0 0.0 0.0 1.0 0.3 1.0 4.7 1.4 4.5 N/A N/A N/A N/A N/A N/A DP A12 DP A9 DP B5 MHFD-Inlet, Version 5.01 (April 2021) Worksheet Protected INLET NAME Site Type (Urban or Rural) Inlet Application (Street or Area) Hydraulic Condition Inlet Type USER-DEFINED INPUT User-Defined Design Flows Minor QKnown (cfs) Major QKnown (cfs) Bypass (Carry-Over) Flow from Upstream Receive Bypass Flow from: Minor Bypass Flow Received, Qb (cfs) Major Bypass Flow Received, Qb (cfs) Watershed Characteristics Subcatchment Area (acres) Percent Impervious NRCS Soil Type Watershed Profile Overland Slope (ft/ft) Overland Length (ft) Channel Slope (ft/ft) Channel Length (ft) Minor Storm Rainfall Input Design Storm Return Period, Tr (years) One-Hour Precipitation, P1 (inches) Major Storm Rainfall Input Design Storm Return Period, Tr (years) One-Hour Precipitation, P1 (inches) CALCULATED OUTPUT Minor Total Design Peak Flow, Q (cfs) Major Total Design Peak Flow, Q (cfs) Minor Flow Bypassed Downstream, Qb (cfs) Major Flow Bypassed Downstream, Qb (cfs) INLET MANAGEMENT Inlet G2 Inlet F2 Inlet A8 URBAN URBAN URBAN STREET STREET STREET On Grade In Sump In Sump Denver No. 16 Combination Denver No. 16 Combination Denver No. 16 Combination 0.8 1.7 1.9 3.0 7.9 7.2 No Bypass Flow Received No Bypass Flow Received No Bypass Flow Received 0.0 0.0 0.0 0.0 0.0 0.0 0.8 1.7 1.9 3.0 7.9 7.2 0.0 N/A N/A 0.0 N/A N/A DP B4 DP B3 DP C3.1 MHFD-Inlet, Version 5.01 (April 2021) Worksheet Protected INLET NAME Site Type (Urban or Rural) Inlet Application (Street or Area) Hydraulic Condition Inlet Type USER-DEFINED INPUT User-Defined Design Flows Minor QKnown (cfs) Major QKnown (cfs) Bypass (Carry-Over) Flow from Upstream Receive Bypass Flow from: Minor Bypass Flow Received, Qb (cfs) Major Bypass Flow Received, Qb (cfs) Watershed Characteristics Subcatchment Area (acres) Percent Impervious NRCS Soil Type Watershed Profile Overland Slope (ft/ft) Overland Length (ft) Channel Slope (ft/ft) Channel Length (ft) Minor Storm Rainfall Input Design Storm Return Period, Tr (years) One-Hour Precipitation, P1 (inches) Major Storm Rainfall Input Design Storm Return Period, Tr (years) One-Hour Precipitation, P1 (inches) CALCULATED OUTPUT Minor Total Design Peak Flow, Q (cfs) Major Total Design Peak Flow, Q (cfs) Minor Flow Bypassed Downstream, Qb (cfs) Major Flow Bypassed Downstream, Qb (cfs) INLET MANAGEMENT Inlet A7.3 User-Defined URBAN STREET In Sump Denver No. 16 Combination 1.3 5.1 No Bypass Flow Received 0.0 0.0 1.3 5.1 N/A N/A DP C3.2 Project: Inlet ID: Gutter Geometry: Maximum Allowable Width for Spread Behind Curb TBACK =20.0 ft Side Slope Behind Curb (leave blank for no conveyance credit behind curb)SBACK =0.020 ft/ft Manning's Roughness Behind Curb (typically between 0.012 and 0.020)nBACK =0.015 Height of Curb at Gutter Flow Line HCURB =6.00 inches Distance from Curb Face to Street Crown TCROWN =25.0 ft Gutter Width W =2.00 ft Street Transverse Slope SX =0.020 ft/ft Gutter Cross Slope (typically 2 inches over 24 inches or 0.083 ft/ft)SW =0.083 ft/ft Street Longitudinal Slope - Enter 0 for sump condition SO =0.000 ft/ft Manning's Roughness for Street Section (typically between 0.012 and 0.020)nSTREET =0.015 Minor Storm Major Storm Max. Allowable Spread for Minor & Major Storm TMAX =17.0 25.0 ft Max. Allowable Depth at Gutter Flowline for Minor & Major Storm dMAX =6.0 6.0 inches Check boxes are not applicable in SUMP conditions MINOR STORM Allowable Capacity is based on Depth Criterion Minor Storm Major Storm MAJOR STORM Allowable Capacity is based on Depth Criterion Qallow =SUMP SUMP cfs MHFD-Inlet, Version 5.01 (April 2021) ALLOWABLE CAPACITY FOR ONE-HALF OF STREET (Minor & Major Storm) (Based on Regulated Criteria for Maximum Allowable Flow Depth and Spread) Nissan - Kia Inlet A3.2 MHFD-Inlet_v5.01, Inlet A3.2 9/12/2022, 12:06 PM Design Information (Input)MINOR MAJOR Type of Inlet Type = Local Depression (additional to continuous gutter depression 'a' from above)alocal =3.00 3.00 inches Number of Unit Inlets (Grate or Curb Opening)No =1 1 Water Depth at Flowline (outside of local depression)Ponding Depth =5.6 6.0 inches Grate Information MINOR MAJOR Length of a Unit Grate Lo (G) =N/A N/A feet Width of a Unit Grate Wo =N/A N/A feet Area Opening Ratio for a Grate (typical values 0.15-0.90)Aratio =N/A N/A Clogging Factor for a Single Grate (typical value 0.50 - 0.70)Cf (G) =N/A N/A Grate Weir Coefficient (typical value 2.15 - 3.60)Cw (G) =N/A N/A Grate Orifice Coefficient (typical value 0.60 - 0.80)Co (G) =N/A N/A Curb Opening Information MINOR MAJOR Length of a Unit Curb Opening Lo (C) =10.00 10.00 feet Height of Vertical Curb Opening in Inches Hvert =6.00 6.00 inches Height of Curb Orifice Throat in Inches Hthroat =6.00 6.00 inches Angle of Throat (see USDCM Figure ST-5)Theta =63.40 63.40 degrees Side Width for Depression Pan (typically the gutter width of 2 feet)Wp =2.00 2.00 feet Clogging Factor for a Single Curb Opening (typical value 0.10)Cf (C) =0.10 0.10 Curb Opening Weir Coefficient (typical value 2.3-3.7)Cw (C) =3.60 3.60 Curb Opening Orifice Coefficient (typical value 0.60 - 0.70)Co (C) =0.67 0.67 Low Head Performance Reduction (Calculated)MINOR MAJOR Depth for Grate Midwidth dGrate =N/A N/A ft Depth for Curb Opening Weir Equation dCurb =0.30 0.33 ft Combination Inlet Performance Reduction Factor for Long Inlets RFCombination =0.53 0.57 Curb Opening Performance Reduction Factor for Long Inlets RFCurb =0.91 0.93 Grated Inlet Performance Reduction Factor for Long Inlets RFGrate =N/A N/A MINOR MAJOR Total Inlet Interception Capacity (assumes clogged condition)Qa =6.9 8.3 cfs Inlet Capacity IS GOOD for Minor and Major Storms(>Q PEAK)Q PEAK REQUIRED =1.2 6.2 cfs CDOT Type R Curb Opening INLET IN A SUMP OR SAG LOCATION MHFD-Inlet, Version 5.01 (April 2021) H-VertH-Curb W Lo (C) Lo (G) Wo WP CDOT Type R Curb Opening Override Depths MHFD-Inlet_v5.01, Inlet A3.2 9/12/2022, 12:06 PM Project: Inlet ID: Gutter Geometry: Maximum Allowable Width for Spread Behind Curb TBACK =20.0 ft Side Slope Behind Curb (leave blank for no conveyance credit behind curb)SBACK =0.020 ft/ft Manning's Roughness Behind Curb (typically between 0.012 and 0.020)nBACK =0.015 Height of Curb at Gutter Flow Line HCURB =6.00 inches Distance from Curb Face to Street Crown TCROWN =25.0 ft Gutter Width W =2.00 ft Street Transverse Slope SX =0.020 ft/ft Gutter Cross Slope (typically 2 inches over 24 inches or 0.083 ft/ft)SW =0.083 ft/ft Street Longitudinal Slope - Enter 0 for sump condition SO =0.000 ft/ft Manning's Roughness for Street Section (typically between 0.012 and 0.020)nSTREET =0.015 Minor Storm Major Storm Max. Allowable Spread for Minor & Major Storm TMAX =17.0 25.0 ft Max. Allowable Depth at Gutter Flowline for Minor & Major Storm dMAX =6.0 6.0 inches Check boxes are not applicable in SUMP conditions MINOR STORM Allowable Capacity is based on Depth Criterion Minor Storm Major Storm MAJOR STORM Allowable Capacity is based on Depth Criterion Qallow =SUMP SUMP cfs MHFD-Inlet, Version 5.01 (April 2021) ALLOWABLE CAPACITY FOR ONE-HALF OF STREET (Minor & Major Storm) (Based on Regulated Criteria for Maximum Allowable Flow Depth and Spread) Nissan - Kia Inlet A3.3 MHFD-Inlet_v5.01, Inlet A3.3 9/12/2022, 12:06 PM Design Information (Input)MINOR MAJOR Type of Inlet Type = Local Depression (additional to continuous gutter depression 'a' from above)alocal =3.00 3.00 inches Number of Unit Inlets (Grate or Curb Opening)No =1 1 Water Depth at Flowline (outside of local depression)Ponding Depth =5.6 6.0 inches Grate Information MINOR MAJOR Length of a Unit Grate Lo (G) =N/A N/A feet Width of a Unit Grate Wo =N/A N/A feet Area Opening Ratio for a Grate (typical values 0.15-0.90)Aratio =N/A N/A Clogging Factor for a Single Grate (typical value 0.50 - 0.70)Cf (G) =N/A N/A Grate Weir Coefficient (typical value 2.15 - 3.60)Cw (G) =N/A N/A Grate Orifice Coefficient (typical value 0.60 - 0.80)Co (G) =N/A N/A Curb Opening Information MINOR MAJOR Length of a Unit Curb Opening Lo (C) =10.00 10.00 feet Height of Vertical Curb Opening in Inches Hvert =6.00 6.00 inches Height of Curb Orifice Throat in Inches Hthroat =6.00 6.00 inches Angle of Throat (see USDCM Figure ST-5)Theta =63.40 63.40 degrees Side Width for Depression Pan (typically the gutter width of 2 feet)Wp =2.00 2.00 feet Clogging Factor for a Single Curb Opening (typical value 0.10)Cf (C) =0.10 0.10 Curb Opening Weir Coefficient (typical value 2.3-3.7)Cw (C) =3.60 3.60 Curb Opening Orifice Coefficient (typical value 0.60 - 0.70)Co (C) =0.67 0.67 Low Head Performance Reduction (Calculated)MINOR MAJOR Depth for Grate Midwidth dGrate =N/A N/A ft Depth for Curb Opening Weir Equation dCurb =0.30 0.33 ft Combination Inlet Performance Reduction Factor for Long Inlets RFCombination =0.53 0.57 Curb Opening Performance Reduction Factor for Long Inlets RFCurb =0.91 0.93 Grated Inlet Performance Reduction Factor for Long Inlets RFGrate =N/A N/A MINOR MAJOR Total Inlet Interception Capacity (assumes clogged condition)Qa =6.9 8.3 cfs Inlet Capacity IS GOOD for Minor and Major Storms(>Q PEAK)Q PEAK REQUIRED =1.1 5.7 cfs CDOT Type R Curb Opening INLET IN A SUMP OR SAG LOCATION MHFD-Inlet, Version 5.01 (April 2021) H-VertH-Curb W Lo (C) Lo (G) Wo WP CDOT Type R Curb Opening Override Depths MHFD-Inlet_v5.01, Inlet A3.3 9/12/2022, 12:06 PM Project: Inlet ID: Gutter Geometry: Maximum Allowable Width for Spread Behind Curb TBACK =20.0 ft Side Slope Behind Curb (leave blank for no conveyance credit behind curb)SBACK =0.020 ft/ft Manning's Roughness Behind Curb (typically between 0.012 and 0.020)nBACK =0.015 Height of Curb at Gutter Flow Line HCURB =6.00 inches Distance from Curb Face to Street Crown TCROWN =25.0 ft Gutter Width W =2.00 ft Street Transverse Slope SX =0.020 ft/ft Gutter Cross Slope (typically 2 inches over 24 inches or 0.083 ft/ft)SW =0.083 ft/ft Street Longitudinal Slope - Enter 0 for sump condition SO =0.050 ft/ft Manning's Roughness for Street Section (typically between 0.012 and 0.020)nSTREET =0.015 Minor Storm Major Storm Max. Allowable Spread for Minor & Major Storm TMAX =17.0 25.0 ft Max. Allowable Depth at Gutter Flowline for Minor & Major Storm dMAX =6.0 6.0 inches Allow Flow Depth at Street Crown (check box for yes, leave blank for no) MINOR STORM Allowable Capacity is based on Depth Criterion Minor Storm Major Storm MAJOR STORM Allowable Capacity is based on Depth Criterion Qallow =16.3 16.3 cfs Minor storm max. allowable capacity GOOD - greater than the design flow given on sheet 'Inlet Management' Major storm max. allowable capacity GOOD - greater than the design flow given on sheet 'Inlet Management' MHFD-Inlet, Version 5.01 (April 2021) ALLOWABLE CAPACITY FOR ONE-HALF OF STREET (Minor & Major Storm) (Based on Regulated Criteria for Maximum Allowable Flow Depth and Spread) Nissan - Kia Inlet G5 MHFD-Inlet_v5.01, Inlet G5 9/12/2022, 12:06 PM Design Information (Input)MINOR MAJOR Type of Inlet Type = Local Depression (additional to continuous gutter depression 'a')aLOCAL =3.0 3.0 inches Total Number of Units in the Inlet (Grate or Curb Opening)No =1 1 Length of a Single Unit Inlet (Grate or Curb Opening)Lo =5.00 5.00 ft Width of a Unit Grate (cannot be greater than W, Gutter Width) Wo =N/A N/A ft Clogging Factor for a Single Unit Grate (typical min. value = 0.5)Cf-G =N/A N/A Clogging Factor for a Single Unit Curb Opening (typical min. value = 0.1)Cf-C =0.10 0.10 Street Hydraulics: OK - Q < Allowable Street Capacity'MINOR MAJOR Total Inlet Interception Capacity Q =0.5 2.2 cfs Total Inlet Carry-Over Flow (flow bypassing inlet)Qb =0.0 0.8 cfs Capture Percentage = Qa/Qo =C% =100 73 % INLET ON A CONTINUOUS GRADE MHFD-Inlet, Version 5.01 (April 2021) CDOT Type R Curb OpeningCDOT Type R Curb Opening MHFD-Inlet_v5.01, Inlet G5 9/12/2022, 12:06 PM Project: Inlet ID: Gutter Geometry: Maximum Allowable Width for Spread Behind Curb TBACK =20.0 ft Side Slope Behind Curb (leave blank for no conveyance credit behind curb)SBACK =0.020 ft/ft Manning's Roughness Behind Curb (typically between 0.012 and 0.020)nBACK =0.015 Height of Curb at Gutter Flow Line HCURB =6.00 inches Distance from Curb Face to Street Crown TCROWN =25.0 ft Gutter Width W =2.00 ft Street Transverse Slope SX =0.020 ft/ft Gutter Cross Slope (typically 2 inches over 24 inches or 0.083 ft/ft)SW =0.083 ft/ft Street Longitudinal Slope - Enter 0 for sump condition SO =0.050 ft/ft Manning's Roughness for Street Section (typically between 0.012 and 0.020)nSTREET =0.015 Minor Storm Major Storm Max. Allowable Spread for Minor & Major Storm TMAX =17.0 25.0 ft Max. Allowable Depth at Gutter Flowline for Minor & Major Storm dMAX =6.0 6.0 inches Allow Flow Depth at Street Crown (check box for yes, leave blank for no) MINOR STORM Allowable Capacity is based on Depth Criterion Minor Storm Major Storm MAJOR STORM Allowable Capacity is based on Depth Criterion Qallow =16.3 16.3 cfs Minor storm max. allowable capacity GOOD - greater than the design flow given on sheet 'Inlet Management' Major storm max. allowable capacity GOOD - greater than the design flow given on sheet 'Inlet Management' MHFD-Inlet, Version 5.01 (April 2021) ALLOWABLE CAPACITY FOR ONE-HALF OF STREET (Minor & Major Storm) (Based on Regulated Criteria for Maximum Allowable Flow Depth and Spread) Nissan - Kia Inlet G4 MHFD-Inlet_v5.01, Inlet G4 9/12/2022, 12:06 PM Design Information (Input)MINOR MAJOR Type of Inlet Type = Local Depression (additional to continuous gutter depression 'a')aLOCAL =3.0 3.0 inches Total Number of Units in the Inlet (Grate or Curb Opening)No =1 1 Length of a Single Unit Inlet (Grate or Curb Opening)Lo =5.00 5.00 ft Width of a Unit Grate (cannot be greater than W, Gutter Width) Wo =N/A N/A ft Clogging Factor for a Single Unit Grate (typical min. value = 0.5)Cf-G =N/A N/A Clogging Factor for a Single Unit Curb Opening (typical min. value = 0.1)Cf-C =0.10 0.10 Street Hydraulics: OK - Q < Allowable Street Capacity'MINOR MAJOR Total Inlet Interception Capacity Q =0.3 1.6 cfs Total Inlet Carry-Over Flow (flow bypassing inlet)Qb =0.0 0.2 cfs Capture Percentage = Qa/Qo =C% =100 90 % INLET ON A CONTINUOUS GRADE MHFD-Inlet, Version 5.01 (April 2021) CDOT Type R Curb OpeningCDOT Type R Curb Opening MHFD-Inlet_v5.01, Inlet G4 9/12/2022, 12:06 PM Project: Inlet ID: Gutter Geometry: Maximum Allowable Width for Spread Behind Curb TBACK =1.0 ft Side Slope Behind Curb (leave blank for no conveyance credit behind curb)SBACK =0.020 ft/ft Manning's Roughness Behind Curb (typically between 0.012 and 0.020)nBACK =0.015 Height of Curb at Gutter Flow Line HCURB =6.00 inches Distance from Curb Face to Street Crown TCROWN =20.0 ft Gutter Width W =2.00 ft Street Transverse Slope SX =0.020 ft/ft Gutter Cross Slope (typically 2 inches over 24 inches or 0.083 ft/ft)SW =0.083 ft/ft Street Longitudinal Slope - Enter 0 for sump condition SO =0.000 ft/ft Manning's Roughness for Street Section (typically between 0.012 and 0.020)nSTREET =0.015 Minor Storm Major Storm Max. Allowable Spread for Minor & Major Storm TMAX =20.0 20.0 ft Max. Allowable Depth at Gutter Flowline for Minor & Major Storm dMAX =6.0 6.0 inches Check boxes are not applicable in SUMP conditions MINOR STORM Allowable Capacity is based on Depth Criterion Minor Storm Major Storm MAJOR STORM Allowable Capacity is based on Depth Criterion Qallow =SUMP SUMP cfs MHFD-Inlet, Version 5.01 (April 2021) ALLOWABLE CAPACITY FOR ONE-HALF OF STREET (Minor & Major Storm) (Based on Regulated Criteria for Maximum Allowable Flow Depth and Spread) Nissan - Kia Inlet A12 MHFD-Inlet_v5.01, Inlet A12 9/12/2022, 12:06 PM Design Information (Input)MINOR MAJOR Type of Inlet Type = Local Depression (additional to continuous gutter depression 'a' from above)alocal =2.00 2.00 inches Number of Unit Inlets (Grate or Curb Opening)No =2 2 Water Depth at Flowline (outside of local depression)Ponding Depth =6.0 6.0 inches Grate Information MINOR MAJOR Length of a Unit Grate Lo (G) =3.00 3.00 feet Width of a Unit Grate Wo =1.73 1.73 feet Area Opening Ratio for a Grate (typical values 0.15-0.90)Aratio =0.31 0.31 Clogging Factor for a Single Grate (typical value 0.50 - 0.70)Cf (G) =0.50 0.50 Grate Weir Coefficient (typical value 2.15 - 3.60)Cw (G) =3.60 3.60 Grate Orifice Coefficient (typical value 0.60 - 0.80)Co (G) =0.60 0.60 Curb Opening Information MINOR MAJOR Length of a Unit Curb Opening Lo (C) =3.00 3.00 feet Height of Vertical Curb Opening in Inches Hvert =6.50 6.50 inches Height of Curb Orifice Throat in Inches Hthroat =5.25 5.25 inches Angle of Throat (see USDCM Figure ST-5)Theta =0.00 0.00 degrees Side Width for Depression Pan (typically the gutter width of 2 feet)Wp =2.00 2.00 feet Clogging Factor for a Single Curb Opening (typical value 0.10)Cf (C) =0.10 0.10 Curb Opening Weir Coefficient (typical value 2.3-3.7)Cw (C) =3.70 3.70 Curb Opening Orifice Coefficient (typical value 0.60 - 0.70)Co (C) =0.66 0.66 Low Head Performance Reduction (Calculated)MINOR MAJOR Depth for Grate Midwidth dGrate =0.523 0.523 ft Depth for Curb Opening Weir Equation dCurb =0.33 0.33 ft Combination Inlet Performance Reduction Factor for Long Inlets RFCombination =0.71 0.71 Curb Opening Performance Reduction Factor for Long Inlets RFCurb =1.00 1.00 Grated Inlet Performance Reduction Factor for Long Inlets RFGrate =0.71 0.71 MINOR MAJOR Total Inlet Interception Capacity (assumes clogged condition)Qa =6.2 6.2 cfs Inlet Capacity IS GOOD for Minor and Major Storms(>Q PEAK)Q PEAK REQUIRED =1.2 6.0 cfs Denver No. 16 Combination INLET IN A SUMP OR SAG LOCATION MHFD-Inlet, Version 5.01 (April 2021) H-VertH-Curb W Lo (C) Lo (G) Wo WP Denver No. 16 Combination Override Depths MHFD-Inlet_v5.01, Inlet A12 9/12/2022, 12:06 PM Project: Inlet ID: Gutter Geometry: Maximum Allowable Width for Spread Behind Curb TBACK =0.5 ft Side Slope Behind Curb (leave blank for no conveyance credit behind curb)SBACK =0.020 ft/ft Manning's Roughness Behind Curb (typically between 0.012 and 0.020)nBACK =0.015 Height of Curb at Gutter Flow Line HCURB =6.00 inches Distance from Curb Face to Street Crown TCROWN =20.0 ft Gutter Width W =2.00 ft Street Transverse Slope SX =0.020 ft/ft Gutter Cross Slope (typically 2 inches over 24 inches or 0.083 ft/ft)SW =0.083 ft/ft Street Longitudinal Slope - Enter 0 for sump condition SO =0.000 ft/ft Manning's Roughness for Street Section (typically between 0.012 and 0.020)nSTREET =0.015 Minor Storm Major Storm Max. Allowable Spread for Minor & Major Storm TMAX =20.0 20.0 ft Max. Allowable Depth at Gutter Flowline for Minor & Major Storm dMAX =6.0 6.0 inches Check boxes are not applicable in SUMP conditions MINOR STORM Allowable Capacity is based on Depth Criterion Minor Storm Major Storm MAJOR STORM Allowable Capacity is based on Depth Criterion Qallow =SUMP SUMP cfs MHFD-Inlet, Version 5.01 (April 2021) ALLOWABLE CAPACITY FOR ONE-HALF OF STREET (Minor & Major Storm) (Based on Regulated Criteria for Maximum Allowable Flow Depth and Spread) Nissan - Kia Inlet A14.2 MHFD-Inlet_v5.01, Inlet A14.2 9/12/2022, 12:06 PM Design Information (Input)MINOR MAJOR Type of Inlet Type = Local Depression (additional to continuous gutter depression 'a' from above)alocal =2.00 2.00 inches Number of Unit Inlets (Grate or Curb Opening)No =1 1 Water Depth at Flowline (outside of local depression)Ponding Depth =6.0 6.0 inches Grate Information MINOR MAJOR Length of a Unit Grate Lo (G) =3.00 3.00 feet Width of a Unit Grate Wo =1.73 1.73 feet Area Opening Ratio for a Grate (typical values 0.15-0.90)Aratio =0.31 0.31 Clogging Factor for a Single Grate (typical value 0.50 - 0.70)Cf (G) =0.50 0.50 Grate Weir Coefficient (typical value 2.15 - 3.60)Cw (G) =3.60 3.60 Grate Orifice Coefficient (typical value 0.60 - 0.80)Co (G) =0.60 0.60 Curb Opening Information MINOR MAJOR Length of a Unit Curb Opening Lo (C) =3.00 3.00 feet Height of Vertical Curb Opening in Inches Hvert =6.50 6.50 inches Height of Curb Orifice Throat in Inches Hthroat =5.25 5.25 inches Angle of Throat (see USDCM Figure ST-5)Theta =0.00 0.00 degrees Side Width for Depression Pan (typically the gutter width of 2 feet)Wp =2.00 2.00 feet Clogging Factor for a Single Curb Opening (typical value 0.10)Cf (C) =0.10 0.10 Curb Opening Weir Coefficient (typical value 2.3-3.7)Cw (C) =3.70 3.70 Curb Opening Orifice Coefficient (typical value 0.60 - 0.70)Co (C) =0.66 0.66 Low Head Performance Reduction (Calculated)MINOR MAJOR Depth for Grate Midwidth dGrate =0.523 0.523 ft Depth for Curb Opening Weir Equation dCurb =0.33 0.33 ft Combination Inlet Performance Reduction Factor for Long Inlets RFCombination =0.94 0.94 Curb Opening Performance Reduction Factor for Long Inlets RFCurb =1.00 1.00 Grated Inlet Performance Reduction Factor for Long Inlets RFGrate =0.94 0.94 MINOR MAJOR Total Inlet Interception Capacity (assumes clogged condition)Qa =3.9 3.9 cfs Inlet Capacity IS GOOD for Minor and Major Storms(>Q PEAK)Q PEAK REQUIRED =0.4 1.7 cfs Denver No. 16 Combination INLET IN A SUMP OR SAG LOCATION MHFD-Inlet, Version 5.01 (April 2021) H-VertH-Curb W Lo (C) Lo (G) Wo WP Denver No. 16 Combination Override Depths MHFD-Inlet_v5.01, Inlet A14.2 9/12/2022, 12:06 PM Project: Inlet ID: Gutter Geometry: Maximum Allowable Width for Spread Behind Curb TBACK =11.0 ft Side Slope Behind Curb (leave blank for no conveyance credit behind curb)SBACK =0.020 ft/ft Manning's Roughness Behind Curb (typically between 0.012 and 0.020)nBACK =0.015 Height of Curb at Gutter Flow Line HCURB =6.00 inches Distance from Curb Face to Street Crown TCROWN =25.0 ft Gutter Width W =2.00 ft Street Transverse Slope SX =0.020 ft/ft Gutter Cross Slope (typically 2 inches over 24 inches or 0.083 ft/ft)SW =0.083 ft/ft Street Longitudinal Slope - Enter 0 for sump condition SO =0.000 ft/ft Manning's Roughness for Street Section (typically between 0.012 and 0.020)nSTREET =0.015 Minor Storm Major Storm Max. Allowable Spread for Minor & Major Storm TMAX =17.0 25.0 ft Max. Allowable Depth at Gutter Flowline for Minor & Major Storm dMAX =6.0 9.0 inches Check boxes are not applicable in SUMP conditions MINOR STORM Allowable Capacity is based on Depth Criterion Minor Storm Major Storm MAJOR STORM Allowable Capacity is based on Depth Criterion Qallow =SUMP SUMP cfs MHFD-Inlet, Version 5.01 (April 2021) ALLOWABLE CAPACITY FOR ONE-HALF OF STREET (Minor & Major Storm) (Based on Regulated Criteria for Maximum Allowable Flow Depth and Spread) Nissan - Kia Inlet E2 MHFD-Inlet_v5.01, Inlet E2 9/12/2022, 12:06 PM Design Information (Input)MINOR MAJOR Type of Inlet Type = Local Depression (additional to continuous gutter depression 'a' from above)alocal =3.00 3.00 inches Number of Unit Inlets (Grate or Curb Opening)No =1 1 Water Depth at Flowline (outside of local depression)Ponding Depth =5.6 9.0 inches Grate Information MINOR MAJOR Length of a Unit Grate Lo (G) =N/A N/A feet Width of a Unit Grate Wo =N/A N/A feet Area Opening Ratio for a Grate (typical values 0.15-0.90)Aratio =N/A N/A Clogging Factor for a Single Grate (typical value 0.50 - 0.70)Cf (G) =N/A N/A Grate Weir Coefficient (typical value 2.15 - 3.60)Cw (G) =N/A N/A Grate Orifice Coefficient (typical value 0.60 - 0.80)Co (G) =N/A N/A Curb Opening Information MINOR MAJOR Length of a Unit Curb Opening Lo (C) =15.00 15.00 feet Height of Vertical Curb Opening in Inches Hvert =6.00 6.00 inches Height of Curb Orifice Throat in Inches Hthroat =6.00 6.00 inches Angle of Throat (see USDCM Figure ST-5)Theta =63.40 63.40 degrees Side Width for Depression Pan (typically the gutter width of 2 feet)Wp =2.00 2.00 feet Clogging Factor for a Single Curb Opening (typical value 0.10)Cf (C) =0.10 0.10 Curb Opening Weir Coefficient (typical value 2.3-3.7)Cw (C) =3.60 3.60 Curb Opening Orifice Coefficient (typical value 0.60 - 0.70)Co (C) =0.67 0.67 Low Head Performance Reduction (Calculated)MINOR MAJOR Depth for Grate Midwidth dGrate =N/A N/A ft Depth for Curb Opening Weir Equation dCurb =0.30 0.58 ft Combination Inlet Performance Reduction Factor for Long Inlets RFCombination =0.53 0.85 Curb Opening Performance Reduction Factor for Long Inlets RFCurb =0.76 0.93 Grated Inlet Performance Reduction Factor for Long Inlets RFGrate =N/A N/A MINOR MAJOR Total Inlet Interception Capacity (assumes clogged condition)Qa =8.0 26.7 cfs Inlet Capacity IS GOOD for Minor and Major Storms(>Q PEAK)Q PEAK REQUIRED =4.6 25.5 cfs CDOT Type R Curb Opening INLET IN A SUMP OR SAG LOCATION MHFD-Inlet, Version 5.01 (April 2021) H-VertH-Curb W Lo (C) Lo (G) Wo WP CDOT Type R Curb Opening Override MHFD-Inlet_v5.01, Inlet E2 9/12/2022, 12:06 PM Project: Inlet ID: Gutter Geometry: Maximum Allowable Width for Spread Behind Curb TBACK =1.0 ft Side Slope Behind Curb (leave blank for no conveyance credit behind curb)SBACK =0.020 ft/ft Manning's Roughness Behind Curb (typically between 0.012 and 0.020)nBACK =0.015 Height of Curb at Gutter Flow Line HCURB =6.00 inches Distance from Curb Face to Street Crown TCROWN =26.0 ft Gutter Width W =2.00 ft Street Transverse Slope SX =0.020 ft/ft Gutter Cross Slope (typically 2 inches over 24 inches or 0.083 ft/ft)SW =0.083 ft/ft Street Longitudinal Slope - Enter 0 for sump condition SO =0.000 ft/ft Manning's Roughness for Street Section (typically between 0.012 and 0.020)nSTREET =0.015 Minor Storm Major Storm Max. Allowable Spread for Minor & Major Storm TMAX =26.0 26.0 ft Max. Allowable Depth at Gutter Flowline for Minor & Major Storm dMAX =6.0 6.0 inches Check boxes are not applicable in SUMP conditions MINOR STORM Allowable Capacity is based on Depth Criterion Minor Storm Major Storm MAJOR STORM Allowable Capacity is based on Depth Criterion Qallow =SUMP SUMP cfs MHFD-Inlet, Version 5.01 (April 2021) ALLOWABLE CAPACITY FOR ONE-HALF OF STREET (Minor & Major Storm) (Based on Regulated Criteria for Maximum Allowable Flow Depth and Spread) Nissan - Kia Inlet H3.2 MHFD-Inlet_v5.01, Inlet H3.2 9/12/2022, 12:06 PM Design Information (Input)MINOR MAJOR Type of Inlet Type = Local Depression (additional to continuous gutter depression 'a' from above)alocal =3.00 3.00 inches Number of Unit Inlets (Grate or Curb Opening)No =1 1 Water Depth at Flowline (outside of local depression)Ponding Depth =6.0 6.0 inches Grate Information MINOR MAJOR Length of a Unit Grate Lo (G) =N/A N/A feet Width of a Unit Grate Wo =N/A N/A feet Area Opening Ratio for a Grate (typical values 0.15-0.90)Aratio =N/A N/A Clogging Factor for a Single Grate (typical value 0.50 - 0.70)Cf (G) =N/A N/A Grate Weir Coefficient (typical value 2.15 - 3.60)Cw (G) =N/A N/A Grate Orifice Coefficient (typical value 0.60 - 0.80)Co (G) =N/A N/A Curb Opening Information MINOR MAJOR Length of a Unit Curb Opening Lo (C) =5.00 5.00 feet Height of Vertical Curb Opening in Inches Hvert =6.00 6.00 inches Height of Curb Orifice Throat in Inches Hthroat =6.00 6.00 inches Angle of Throat (see USDCM Figure ST-5)Theta =63.40 63.40 degrees Side Width for Depression Pan (typically the gutter width of 2 feet)Wp =2.00 2.00 feet Clogging Factor for a Single Curb Opening (typical value 0.10)Cf (C) =0.10 0.10 Curb Opening Weir Coefficient (typical value 2.3-3.7)Cw (C) =3.60 3.60 Curb Opening Orifice Coefficient (typical value 0.60 - 0.70)Co (C) =0.67 0.67 Low Head Performance Reduction (Calculated)MINOR MAJOR Depth for Grate Midwidth dGrate =N/A N/A ft Depth for Curb Opening Weir Equation dCurb =0.33 0.33 ft Combination Inlet Performance Reduction Factor for Long Inlets RFCombination =0.77 0.77 Curb Opening Performance Reduction Factor for Long Inlets RFCurb =1.00 1.00 Grated Inlet Performance Reduction Factor for Long Inlets RFGrate =N/A N/A MINOR MAJOR Total Inlet Interception Capacity (assumes clogged condition)Qa =5.4 5.4 cfs Inlet Capacity IS GOOD for Minor and Major Storms(>Q PEAK)Q PEAK REQUIRED =0.8 4.5 cfs CDOT Type R Curb Opening INLET IN A SUMP OR SAG LOCATION MHFD-Inlet, Version 5.01 (April 2021) H-VertH-Curb W Lo (C) Lo (G) Wo WP CDOT Type R Curb Opening Override Depths MHFD-Inlet_v5.01, Inlet H3.2 9/12/2022, 12:06 PM Project: Inlet ID: Gutter Geometry: Maximum Allowable Width for Spread Behind Curb TBACK =1.0 ft Side Slope Behind Curb (leave blank for no conveyance credit behind curb)SBACK =0.020 ft/ft Manning's Roughness Behind Curb (typically between 0.012 and 0.020)nBACK =0.015 Height of Curb at Gutter Flow Line HCURB =6.00 inches Distance from Curb Face to Street Crown TCROWN =20.0 ft Gutter Width W =2.00 ft Street Transverse Slope SX =0.020 ft/ft Gutter Cross Slope (typically 2 inches over 24 inches or 0.083 ft/ft)SW =0.083 ft/ft Street Longitudinal Slope - Enter 0 for sump condition SO =0.000 ft/ft Manning's Roughness for Street Section (typically between 0.012 and 0.020)nSTREET =0.015 Minor Storm Major Storm Max. Allowable Spread for Minor & Major Storm TMAX =20.0 20.0 ft Max. Allowable Depth at Gutter Flowline for Minor & Major Storm dMAX =6.0 6.0 inches Check boxes are not applicable in SUMP conditions MINOR STORM Allowable Capacity is based on Depth Criterion Minor Storm Major Storm MAJOR STORM Allowable Capacity is based on Depth Criterion Qallow =SUMP SUMP cfs MHFD-Inlet, Version 5.01 (April 2021) ALLOWABLE CAPACITY FOR ONE-HALF OF STREET (Minor & Major Storm) (Based on Regulated Criteria for Maximum Allowable Flow Depth and Spread) Nissan - Kia Inlet H3.3 MHFD-Inlet_v5.01, Inlet H3.3 9/12/2022, 12:06 PM Design Information (Input)MINOR MAJOR Type of Inlet Type = Local Depression (additional to continuous gutter depression 'a' from above)alocal =3.00 3.00 inches Number of Unit Inlets (Grate or Curb Opening)No =1 1 Water Depth at Flowline (outside of local depression)Ponding Depth =6.0 6.0 inches Grate Information MINOR MAJOR Length of a Unit Grate Lo (G) =N/A N/A feet Width of a Unit Grate Wo =N/A N/A feet Area Opening Ratio for a Grate (typical values 0.15-0.90)Aratio =N/A N/A Clogging Factor for a Single Grate (typical value 0.50 - 0.70)Cf (G) =N/A N/A Grate Weir Coefficient (typical value 2.15 - 3.60)Cw (G) =N/A N/A Grate Orifice Coefficient (typical value 0.60 - 0.80)Co (G) =N/A N/A Curb Opening Information MINOR MAJOR Length of a Unit Curb Opening Lo (C) =5.00 5.00 feet Height of Vertical Curb Opening in Inches Hvert =6.00 6.00 inches Height of Curb Orifice Throat in Inches Hthroat =6.00 6.00 inches Angle of Throat (see USDCM Figure ST-5)Theta =63.40 63.40 degrees Side Width for Depression Pan (typically the gutter width of 2 feet)Wp =2.00 2.00 feet Clogging Factor for a Single Curb Opening (typical value 0.10)Cf (C) =0.10 0.10 Curb Opening Weir Coefficient (typical value 2.3-3.7)Cw (C) =3.60 3.60 Curb Opening Orifice Coefficient (typical value 0.60 - 0.70)Co (C) =0.67 0.67 Low Head Performance Reduction (Calculated)MINOR MAJOR Depth for Grate Midwidth dGrate =N/A N/A ft Depth for Curb Opening Weir Equation dCurb =0.33 0.33 ft Combination Inlet Performance Reduction Factor for Long Inlets RFCombination =0.77 0.77 Curb Opening Performance Reduction Factor for Long Inlets RFCurb =1.00 1.00 Grated Inlet Performance Reduction Factor for Long Inlets RFGrate =N/A N/A MINOR MAJOR Total Inlet Interception Capacity (assumes clogged condition)Qa =5.4 5.4 cfs Inlet Capacity IS GOOD for Minor and Major Storms(>Q PEAK)Q PEAK REQUIRED =0.9 4.0 cfs CDOT Type R Curb Opening INLET IN A SUMP OR SAG LOCATION MHFD-Inlet, Version 5.01 (April 2021) H-VertH-Curb W Lo (C) Lo (G) Wo WP CDOT Type R Curb Opening Override Depths MHFD-Inlet_v5.01, Inlet H3.3 9/12/2022, 12:06 PM Project: Inlet ID: Gutter Geometry: Maximum Allowable Width for Spread Behind Curb TBACK =6.5 ft Side Slope Behind Curb (leave blank for no conveyance credit behind curb)SBACK =0.020 ft/ft Manning's Roughness Behind Curb (typically between 0.012 and 0.020)nBACK =0.015 Height of Curb at Gutter Flow Line HCURB =6.00 inches Distance from Curb Face to Street Crown TCROWN =20.0 ft Gutter Width W =2.00 ft Street Transverse Slope SX =0.020 ft/ft Gutter Cross Slope (typically 2 inches over 24 inches or 0.083 ft/ft)SW =0.083 ft/ft Street Longitudinal Slope - Enter 0 for sump condition SO =0.000 ft/ft Manning's Roughness for Street Section (typically between 0.012 and 0.020)nSTREET =0.015 Minor Storm Major Storm Max. Allowable Spread for Minor & Major Storm TMAX =20.0 20.0 ft Max. Allowable Depth at Gutter Flowline for Minor & Major Storm dMAX =6.0 6.0 inches Check boxes are not applicable in SUMP conditions MINOR STORM Allowable Capacity is based on Depth Criterion Minor Storm Major Storm MAJOR STORM Allowable Capacity is based on Depth Criterion Qallow =SUMP SUMP cfs MHFD-Inlet, Version 5.01 (April 2021) ALLOWABLE CAPACITY FOR ONE-HALF OF STREET (Minor & Major Storm) (Based on Regulated Criteria for Maximum Allowable Flow Depth and Spread) Nissan - Kia Inlet H4.1 MHFD-Inlet_v5.01, Inlet H4.1 9/12/2022, 12:06 PM Design Information (Input)MINOR MAJOR Type of Inlet Type = Local Depression (additional to continuous gutter depression 'a' from above)alocal =3.00 3.00 inches Number of Unit Inlets (Grate or Curb Opening)No =1 1 Water Depth at Flowline (outside of local depression)Ponding Depth =6.0 6.0 inches Grate Information MINOR MAJOR Length of a Unit Grate Lo (G) =N/A N/A feet Width of a Unit Grate Wo =N/A N/A feet Area Opening Ratio for a Grate (typical values 0.15-0.90)Aratio =N/A N/A Clogging Factor for a Single Grate (typical value 0.50 - 0.70)Cf (G) =N/A N/A Grate Weir Coefficient (typical value 2.15 - 3.60)Cw (G) =N/A N/A Grate Orifice Coefficient (typical value 0.60 - 0.80)Co (G) =N/A N/A Curb Opening Information MINOR MAJOR Length of a Unit Curb Opening Lo (C) =5.00 5.00 feet Height of Vertical Curb Opening in Inches Hvert =6.00 6.00 inches Height of Curb Orifice Throat in Inches Hthroat =6.00 6.00 inches Angle of Throat (see USDCM Figure ST-5)Theta =63.40 63.40 degrees Side Width for Depression Pan (typically the gutter width of 2 feet)Wp =2.00 2.00 feet Clogging Factor for a Single Curb Opening (typical value 0.10)Cf (C) =0.10 0.10 Curb Opening Weir Coefficient (typical value 2.3-3.7)Cw (C) =3.60 3.60 Curb Opening Orifice Coefficient (typical value 0.60 - 0.70)Co (C) =0.67 0.67 Low Head Performance Reduction (Calculated)MINOR MAJOR Depth for Grate Midwidth dGrate =N/A N/A ft Depth for Curb Opening Weir Equation dCurb =0.33 0.33 ft Combination Inlet Performance Reduction Factor for Long Inlets RFCombination =0.77 0.77 Curb Opening Performance Reduction Factor for Long Inlets RFCurb =1.00 1.00 Grated Inlet Performance Reduction Factor for Long Inlets RFGrate =N/A N/A MINOR MAJOR Total Inlet Interception Capacity (assumes clogged condition)Qa =5.4 5.4 cfs Inlet Capacity IS GOOD for Minor and Major Storms(>Q PEAK)Q PEAK REQUIRED =0.7 4.2 cfs CDOT Type R Curb Opening INLET IN A SUMP OR SAG LOCATION MHFD-Inlet, Version 5.01 (April 2021) H-VertH-Curb W Lo (C) Lo (G) Wo WP CDOT Type R Curb Opening Override Depths MHFD-Inlet_v5.01, Inlet H4.1 9/12/2022, 12:06 PM Project: Inlet ID: Gutter Geometry: Maximum Allowable Width for Spread Behind Curb TBACK =1.0 ft Side Slope Behind Curb (leave blank for no conveyance credit behind curb)SBACK =0.020 ft/ft Manning's Roughness Behind Curb (typically between 0.012 and 0.020)nBACK =0.015 Height of Curb at Gutter Flow Line HCURB =6.00 inches Distance from Curb Face to Street Crown TCROWN =20.0 ft Gutter Width W =2.00 ft Street Transverse Slope SX =0.020 ft/ft Gutter Cross Slope (typically 2 inches over 24 inches or 0.083 ft/ft)SW =0.083 ft/ft Street Longitudinal Slope - Enter 0 for sump condition SO =0.000 ft/ft Manning's Roughness for Street Section (typically between 0.012 and 0.020)nSTREET =0.015 Minor Storm Major Storm Max. Allowable Spread for Minor & Major Storm TMAX =20.0 20.0 ft Max. Allowable Depth at Gutter Flowline for Minor & Major Storm dMAX =6.0 6.0 inches Check boxes are not applicable in SUMP conditions MINOR STORM Allowable Capacity is based on Depth Criterion Minor Storm Major Storm MAJOR STORM Allowable Capacity is based on Depth Criterion Qallow =SUMP SUMP cfs MHFD-Inlet, Version 5.01 (April 2021) ALLOWABLE CAPACITY FOR ONE-HALF OF STREET (Minor & Major Storm) (Based on Regulated Criteria for Maximum Allowable Flow Depth and Spread) Nissan - Kia Inlet H6 MHFD-Inlet_v5.01, Inlet H6 9/12/2022, 12:06 PM Design Information (Input)MINOR MAJOR Type of Inlet Type = Local Depression (additional to continuous gutter depression 'a' from above)alocal =3.00 3.00 inches Number of Unit Inlets (Grate or Curb Opening)No =1 1 Water Depth at Flowline (outside of local depression)Ponding Depth =6.0 6.0 inches Grate Information MINOR MAJOR Length of a Unit Grate Lo (G) =N/A N/A feet Width of a Unit Grate Wo =N/A N/A feet Area Opening Ratio for a Grate (typical values 0.15-0.90)Aratio =N/A N/A Clogging Factor for a Single Grate (typical value 0.50 - 0.70)Cf (G) =N/A N/A Grate Weir Coefficient (typical value 2.15 - 3.60)Cw (G) =N/A N/A Grate Orifice Coefficient (typical value 0.60 - 0.80)Co (G) =N/A N/A Curb Opening Information MINOR MAJOR Length of a Unit Curb Opening Lo (C) =5.00 5.00 feet Height of Vertical Curb Opening in Inches Hvert =6.00 6.00 inches Height of Curb Orifice Throat in Inches Hthroat =6.00 6.00 inches Angle of Throat (see USDCM Figure ST-5)Theta =63.40 63.40 degrees Side Width for Depression Pan (typically the gutter width of 2 feet)Wp =2.00 2.00 feet Clogging Factor for a Single Curb Opening (typical value 0.10)Cf (C) =0.10 0.10 Curb Opening Weir Coefficient (typical value 2.3-3.7)Cw (C) =3.60 3.60 Curb Opening Orifice Coefficient (typical value 0.60 - 0.70)Co (C) =0.67 0.67 Low Head Performance Reduction (Calculated)MINOR MAJOR Depth for Grate Midwidth dGrate =N/A N/A ft Depth for Curb Opening Weir Equation dCurb =0.33 0.33 ft Combination Inlet Performance Reduction Factor for Long Inlets RFCombination =0.77 0.77 Curb Opening Performance Reduction Factor for Long Inlets RFCurb =1.00 1.00 Grated Inlet Performance Reduction Factor for Long Inlets RFGrate =N/A N/A MINOR MAJOR Total Inlet Interception Capacity (assumes clogged condition)Qa =5.4 5.4 cfs Inlet Capacity IS GOOD for Minor and Major Storms(>Q PEAK)Q PEAK REQUIRED =0.8 3.7 cfs CDOT Type R Curb Opening INLET IN A SUMP OR SAG LOCATION MHFD-Inlet, Version 5.01 (April 2021) H-VertH-Curb W Lo (C) Lo (G) Wo WP CDOT Type R Curb Opening Override Depths MHFD-Inlet_v5.01, Inlet H6 9/12/2022, 12:06 PM Project: Inlet ID: Gutter Geometry: Maximum Allowable Width for Spread Behind Curb TBACK =5.0 ft Side Slope Behind Curb (leave blank for no conveyance credit behind curb)SBACK =0.020 ft/ft Manning's Roughness Behind Curb (typically between 0.012 and 0.020)nBACK =0.015 Height of Curb at Gutter Flow Line HCURB =6.00 inches Distance from Curb Face to Street Crown TCROWN =25.0 ft Gutter Width W =2.00 ft Street Transverse Slope SX =0.020 ft/ft Gutter Cross Slope (typically 2 inches over 24 inches or 0.083 ft/ft)SW =0.083 ft/ft Street Longitudinal Slope - Enter 0 for sump condition SO =0.000 ft/ft Manning's Roughness for Street Section (typically between 0.012 and 0.020)nSTREET =0.015 Minor Storm Major Storm Max. Allowable Spread for Minor & Major Storm TMAX =25.0 25.0 ft Max. Allowable Depth at Gutter Flowline for Minor & Major Storm dMAX =6.0 6.0 inches Check boxes are not applicable in SUMP conditions MINOR STORM Allowable Capacity is based on Depth Criterion Minor Storm Major Storm MAJOR STORM Allowable Capacity is based on Depth Criterion Qallow =SUMP SUMP cfs MHFD-Inlet, Version 5.01 (April 2021) ALLOWABLE CAPACITY FOR ONE-HALF OF STREET (Minor & Major Storm) (Based on Regulated Criteria for Maximum Allowable Flow Depth and Spread) Nissan - Kia Inlet H7 MHFD-Inlet_v5.01, Inlet H7 9/12/2022, 12:06 PM Design Information (Input)MINOR MAJOR Type of Inlet Type = Local Depression (additional to continuous gutter depression 'a' from above)alocal =3.00 3.00 inches Number of Unit Inlets (Grate or Curb Opening)No =1 1 Water Depth at Flowline (outside of local depression)Ponding Depth =6.0 10.0 inches Grate Information MINOR MAJOR Length of a Unit Grate Lo (G) =N/A N/A feet Width of a Unit Grate Wo =N/A N/A feet Area Opening Ratio for a Grate (typical values 0.15-0.90)Aratio =N/A N/A Clogging Factor for a Single Grate (typical value 0.50 - 0.70)Cf (G) =N/A N/A Grate Weir Coefficient (typical value 2.15 - 3.60)Cw (G) =N/A N/A Grate Orifice Coefficient (typical value 0.60 - 0.80)Co (G) =N/A N/A Curb Opening Information MINOR MAJOR Length of a Unit Curb Opening Lo (C) =5.00 5.00 feet Height of Vertical Curb Opening in Inches Hvert =6.00 6.00 inches Height of Curb Orifice Throat in Inches Hthroat =6.00 6.00 inches Angle of Throat (see USDCM Figure ST-5)Theta =63.40 63.40 degrees Side Width for Depression Pan (typically the gutter width of 2 feet)Wp =2.00 2.00 feet Clogging Factor for a Single Curb Opening (typical value 0.10)Cf (C) =0.10 0.10 Curb Opening Weir Coefficient (typical value 2.3-3.7)Cw (C) =3.60 3.60 Curb Opening Orifice Coefficient (typical value 0.60 - 0.70)Co (C) =0.67 0.67 Low Head Performance Reduction (Calculated)MINOR MAJOR Depth for Grate Midwidth dGrate =N/A N/A ft Depth for Curb Opening Weir Equation dCurb =0.33 0.67 ft Combination Inlet Performance Reduction Factor for Long Inlets RFCombination =0.77 1.00 Curb Opening Performance Reduction Factor for Long Inlets RFCurb =1.00 1.00 Grated Inlet Performance Reduction Factor for Long Inlets RFGrate =N/A N/A MINOR MAJOR Total Inlet Interception Capacity (assumes clogged condition)Qa =5.4 11.2 cfs Inlet Capacity IS GOOD for Minor and Major Storms(>Q PEAK)Q PEAK REQUIRED =1.7 7.2 cfs CDOT Type R Curb Opening INLET IN A SUMP OR SAG LOCATION MHFD-Inlet, Version 5.01 (April 2021) H-VertH-Curb W Lo (C) Lo (G) Wo WP CDOT Type R Curb Opening Override Depths MHFD-Inlet_v5.01, Inlet H7 9/12/2022, 12:06 PM Project: Inlet ID: Gutter Geometry: Maximum Allowable Width for Spread Behind Curb TBACK =4.5 ft Side Slope Behind Curb (leave blank for no conveyance credit behind curb)SBACK =0.020 ft/ft Manning's Roughness Behind Curb (typically between 0.012 and 0.020)nBACK =0.015 Height of Curb at Gutter Flow Line HCURB =6.00 inches Distance from Curb Face to Street Crown TCROWN =20.0 ft Gutter Width W =2.00 ft Street Transverse Slope SX =0.020 ft/ft Gutter Cross Slope (typically 2 inches over 24 inches or 0.083 ft/ft)SW =0.083 ft/ft Street Longitudinal Slope - Enter 0 for sump condition SO =0.000 ft/ft Manning's Roughness for Street Section (typically between 0.012 and 0.020)nSTREET =0.015 Minor Storm Major Storm Max. Allowable Spread for Minor & Major Storm TMAX =20.0 20.0 ft Max. Allowable Depth at Gutter Flowline for Minor & Major Storm dMAX =6.0 6.0 inches Check boxes are not applicable in SUMP conditions MINOR STORM Allowable Capacity is based on Depth Criterion Minor Storm Major Storm MAJOR STORM Allowable Capacity is based on Depth Criterion Qallow =SUMP SUMP cfs MHFD-Inlet, Version 5.01 (April 2021) ALLOWABLE CAPACITY FOR ONE-HALF OF STREET (Minor & Major Storm) (Based on Regulated Criteria for Maximum Allowable Flow Depth and Spread) Nissan - Kia Inlet H4.2-1 MHFD-Inlet_v5.01, Inlet H4.2-1 9/12/2022, 12:06 PM Design Information (Input)MINOR MAJOR Type of Inlet Type = Local Depression (additional to continuous gutter depression 'a' from above)alocal =2.00 2.00 inches Number of Unit Inlets (Grate or Curb Opening)No =1 1 Water Depth at Flowline (outside of local depression)Ponding Depth =6.0 6.0 inches Grate Information MINOR MAJOR Length of a Unit Grate Lo (G) =3.00 3.00 feet Width of a Unit Grate Wo =1.73 1.73 feet Area Opening Ratio for a Grate (typical values 0.15-0.90)Aratio =0.31 0.31 Clogging Factor for a Single Grate (typical value 0.50 - 0.70)Cf (G) =0.50 0.50 Grate Weir Coefficient (typical value 2.15 - 3.60)Cw (G) =3.60 3.60 Grate Orifice Coefficient (typical value 0.60 - 0.80)Co (G) =0.60 0.60 Curb Opening Information MINOR MAJOR Length of a Unit Curb Opening Lo (C) =3.00 3.00 feet Height of Vertical Curb Opening in Inches Hvert =6.50 6.50 inches Height of Curb Orifice Throat in Inches Hthroat =5.25 5.25 inches Angle of Throat (see USDCM Figure ST-5)Theta =0.00 0.00 degrees Side Width for Depression Pan (typically the gutter width of 2 feet)Wp =2.00 2.00 feet Clogging Factor for a Single Curb Opening (typical value 0.10)Cf (C) =0.10 0.10 Curb Opening Weir Coefficient (typical value 2.3-3.7)Cw (C) =3.70 3.70 Curb Opening Orifice Coefficient (typical value 0.60 - 0.70)Co (C) =0.66 0.66 Low Head Performance Reduction (Calculated)MINOR MAJOR Depth for Grate Midwidth dGrate =0.523 0.523 ft Depth for Curb Opening Weir Equation dCurb =0.33 0.33 ft Combination Inlet Performance Reduction Factor for Long Inlets RFCombination =0.94 0.94 Curb Opening Performance Reduction Factor for Long Inlets RFCurb =1.00 1.00 Grated Inlet Performance Reduction Factor for Long Inlets RFGrate =0.94 0.94 MINOR MAJOR Total Inlet Interception Capacity (assumes clogged condition)Qa =3.9 3.9 cfs Inlet Capacity IS GOOD for Minor and Major Storms(>Q PEAK)Q PEAK REQUIRED =0.3 1.1 cfs Denver No. 16 Combination INLET IN A SUMP OR SAG LOCATION MHFD-Inlet, Version 5.01 (April 2021) H-VertH-Curb W Lo (C) Lo (G) Wo WP Denver No. 16 Combination Override Depths MHFD-Inlet_v5.01, Inlet H4.2-1 9/12/2022, 12:06 PM Project: Inlet ID: Gutter Geometry: Maximum Allowable Width for Spread Behind Curb TBACK =10.0 ft Side Slope Behind Curb (leave blank for no conveyance credit behind curb)SBACK =0.020 ft/ft Manning's Roughness Behind Curb (typically between 0.012 and 0.020)nBACK =0.015 Height of Curb at Gutter Flow Line HCURB =6.00 inches Distance from Curb Face to Street Crown TCROWN =25.0 ft Gutter Width W =2.00 ft Street Transverse Slope SX =0.020 ft/ft Gutter Cross Slope (typically 2 inches over 24 inches or 0.083 ft/ft)SW =0.083 ft/ft Street Longitudinal Slope - Enter 0 for sump condition SO =0.000 ft/ft Manning's Roughness for Street Section (typically between 0.012 and 0.020)nSTREET =0.015 Minor Storm Major Storm Max. Allowable Spread for Minor & Major Storm TMAX =20.0 25.0 ft Max. Allowable Depth at Gutter Flowline for Minor & Major Storm dMAX =6.0 7.0 inches Check boxes are not applicable in SUMP conditions MINOR STORM Allowable Capacity is based on Depth Criterion Minor Storm Major Storm MAJOR STORM Allowable Capacity is based on Depth Criterion Qallow =SUMP SUMP cfs MHFD-Inlet, Version 5.01 (April 2021) ALLOWABLE CAPACITY FOR ONE-HALF OF STREET (Minor & Major Storm) (Based on Regulated Criteria for Maximum Allowable Flow Depth and Spread) Nissan - Kia Inlet H4.4 MHFD-Inlet_v5.01, Inlet H4.4 9/12/2022, 12:06 PM Design Information (Input)MINOR MAJOR Type of Inlet Type = Local Depression (additional to continuous gutter depression 'a' from above)alocal =3.00 3.00 inches Number of Unit Inlets (Grate or Curb Opening)No =1 1 Water Depth at Flowline (outside of local depression)Ponding Depth =6.0 7.0 inches Grate Information MINOR MAJOR Length of a Unit Grate Lo (G) =N/A N/A feet Width of a Unit Grate Wo =N/A N/A feet Area Opening Ratio for a Grate (typical values 0.15-0.90)Aratio =N/A N/A Clogging Factor for a Single Grate (typical value 0.50 - 0.70)Cf (G) =N/A N/A Grate Weir Coefficient (typical value 2.15 - 3.60)Cw (G) =N/A N/A Grate Orifice Coefficient (typical value 0.60 - 0.80)Co (G) =N/A N/A Curb Opening Information MINOR MAJOR Length of a Unit Curb Opening Lo (C) =5.00 5.00 feet Height of Vertical Curb Opening in Inches Hvert =6.00 6.00 inches Height of Curb Orifice Throat in Inches Hthroat =6.00 6.00 inches Angle of Throat (see USDCM Figure ST-5)Theta =63.40 63.40 degrees Side Width for Depression Pan (typically the gutter width of 2 feet)Wp =2.00 2.00 feet Clogging Factor for a Single Curb Opening (typical value 0.10)Cf (C) =0.10 0.10 Curb Opening Weir Coefficient (typical value 2.3-3.7)Cw (C) =3.60 3.60 Curb Opening Orifice Coefficient (typical value 0.60 - 0.70)Co (C) =0.67 0.67 Low Head Performance Reduction (Calculated)MINOR MAJOR Depth for Grate Midwidth dGrate =N/A N/A ft Depth for Curb Opening Weir Equation dCurb =0.33 0.42 ft Combination Inlet Performance Reduction Factor for Long Inlets RFCombination =0.77 0.90 Curb Opening Performance Reduction Factor for Long Inlets RFCurb =1.00 1.00 Grated Inlet Performance Reduction Factor for Long Inlets RFGrate =N/A N/A MINOR MAJOR Total Inlet Interception Capacity (assumes clogged condition)Qa =5.4 7.5 cfs Inlet Capacity IS GOOD for Minor and Major Storms(>Q PEAK)Q PEAK REQUIRED =1.1 5.8 cfs CDOT Type R Curb Opening INLET IN A SUMP OR SAG LOCATION MHFD-Inlet, Version 5.01 (April 2021) H-VertH-Curb W Lo (C) Lo (G) Wo WP CDOT Type R Curb Opening Override Depths MHFD-Inlet_v5.01, Inlet H4.4 9/12/2022, 12:06 PM Project: Inlet ID: Gutter Geometry: Maximum Allowable Width for Spread Behind Curb TBACK =15.0 ft Side Slope Behind Curb (leave blank for no conveyance credit behind curb)SBACK =0.010 ft/ft Manning's Roughness Behind Curb (typically between 0.012 and 0.020)nBACK =0.015 Height of Curb at Gutter Flow Line HCURB =6.00 inches Distance from Curb Face to Street Crown TCROWN =30.0 ft Gutter Width W =3.00 ft Street Transverse Slope SX =0.020 ft/ft Gutter Cross Slope (typically 2 inches over 24 inches or 0.083 ft/ft)SW =0.083 ft/ft Street Longitudinal Slope - Enter 0 for sump condition SO =0.000 ft/ft Manning's Roughness for Street Section (typically between 0.012 and 0.020)nSTREET =0.015 Minor Storm Major Storm Max. Allowable Spread for Minor & Major Storm TMAX =30.0 30.0 ft Max. Allowable Depth at Gutter Flowline for Minor & Major Storm dMAX =6.0 6.0 inches Check boxes are not applicable in SUMP conditions MINOR STORM Allowable Capacity is based on Depth Criterion Minor Storm Major Storm MAJOR STORM Allowable Capacity is based on Depth Criterion Qallow =SUMP SUMP cfs MHFD-Inlet, Version 5.01 (April 2021) ALLOWABLE CAPACITY FOR ONE-HALF OF STREET (Minor & Major Storm) (Based on Regulated Criteria for Maximum Allowable Flow Depth and Spread) Nissan - Kia Inlet H4.5 MHFD-Inlet_v5.01, Inlet H4.5 9/12/2022, 12:06 PM Design Information (Input)MINOR MAJOR Type of Inlet Type = Local Depression (additional to continuous gutter depression 'a' from above)alocal =0.00 0.00 inches Number of Unit Inlets (Grate or Curb Opening)No =1 1 Water Depth at Flowline (outside of local depression)Ponding Depth =6.0 8.3 inches Grate Information MINOR MAJOR Length of a Unit Grate Lo (G) =2.92 2.92 feet Width of a Unit Grate Wo =2.92 2.92 feet Area Opening Ratio for a Grate (typical values 0.15-0.90)Aratio =0.70 0.70 Clogging Factor for a Single Grate (typical value 0.50 - 0.70)Cf (G) =0.50 0.50 Grate Weir Coefficient (typical value 2.15 - 3.60)Cw (G) =2.41 2.41 Grate Orifice Coefficient (typical value 0.60 - 0.80)Co (G) =0.67 0.67 Curb Opening Information MINOR MAJOR Length of a Unit Curb Opening Lo (C) =N/A N/A feet Height of Vertical Curb Opening in Inches Hvert =N/A N/A inches Height of Curb Orifice Throat in Inches Hthroat =N/A N/A inches Angle of Throat (see USDCM Figure ST-5)Theta =N/A N/A degrees Side Width for Depression Pan (typically the gutter width of 2 feet)Wp =N/A N/A feet Clogging Factor for a Single Curb Opening (typical value 0.10)Cf (C) =N/A N/A Curb Opening Weir Coefficient (typical value 2.3-3.7)Cw (C) =N/A N/A Curb Opening Orifice Coefficient (typical value 0.60 - 0.70)Co (C) =N/A N/A Low Head Performance Reduction (Calculated)MINOR MAJOR Depth for Grate Midwidth dGrate =0.379 0.570 ft Depth for Curb Opening Weir Equation dCurb =N/A N/A ft Combination Inlet Performance Reduction Factor for Long Inlets RFCombination =N/A N/A Curb Opening Performance Reduction Factor for Long Inlets RFCurb =N/A N/A Grated Inlet Performance Reduction Factor for Long Inlets RFGrate =0.95 1.00 MINOR MAJOR Total Inlet Interception Capacity (assumes clogged condition)Qa =2.0 3.8 cfs Inlet Capacity IS GOOD for Minor and Major Storms(>Q PEAK)Q PEAK REQUIRED =0.5 2.9 cfs CDOT Type C Grate INLET IN A SUMP OR SAG LOCATION MHFD-Inlet, Version 5.01 (April 2021) H-VertH-Curb W Lo (C) Lo (G) Wo WP CDOT Type C Grate Override Depths MHFD-Inlet_v5.01, Inlet H4.5 9/12/2022, 12:06 PM Project: Inlet ID: Gutter Geometry: Maximum Allowable Width for Spread Behind Curb TBACK =30.0 ft Side Slope Behind Curb (leave blank for no conveyance credit behind curb)SBACK =0.020 ft/ft Manning's Roughness Behind Curb (typically between 0.012 and 0.020)nBACK =0.015 Height of Curb at Gutter Flow Line HCURB =6.00 inches Distance from Curb Face to Street Crown TCROWN =30.0 ft Gutter Width W =3.00 ft Street Transverse Slope SX =0.020 ft/ft Gutter Cross Slope (typically 2 inches over 24 inches or 0.083 ft/ft)SW =0.083 ft/ft Street Longitudinal Slope - Enter 0 for sump condition SO =0.000 ft/ft Manning's Roughness for Street Section (typically between 0.012 and 0.020)nSTREET =0.015 Minor Storm Major Storm Max. Allowable Spread for Minor & Major Storm TMAX =30.0 30.0 ft Max. Allowable Depth at Gutter Flowline for Minor & Major Storm dMAX =6.0 6.0 inches Check boxes are not applicable in SUMP conditions MINOR STORM Allowable Capacity is based on Depth Criterion Minor Storm Major Storm MAJOR STORM Allowable Capacity is based on Depth Criterion Qallow =SUMP SUMP cfs MHFD-Inlet, Version 5.01 (April 2021) ALLOWABLE CAPACITY FOR ONE-HALF OF STREET (Minor & Major Storm) (Based on Regulated Criteria for Maximum Allowable Flow Depth and Spread) Nissan - Kia Inlet H4.6 MHFD-Inlet_v5.01, Inlet H4.6 9/12/2022, 12:06 PM Design Information (Input)MINOR MAJOR Type of Inlet Type = Local Depression (additional to continuous gutter depression 'a' from above)alocal =2.00 2.00 inches Number of Unit Inlets (Grate or Curb Opening)No =1 1 Water Depth at Flowline (outside of local depression)Ponding Depth =6.0 8.3 inches Grate Information MINOR MAJOR Length of a Unit Grate Lo (G) =2.92 2.92 feet Width of a Unit Grate Wo =3.00 3.00 feet Area Opening Ratio for a Grate (typical values 0.15-0.90)Aratio =0.70 0.70 Clogging Factor for a Single Grate (typical value 0.50 - 0.70)Cf (G) =0.50 0.50 Grate Weir Coefficient (typical value 2.15 - 3.60)Cw (G) =2.41 2.41 Grate Orifice Coefficient (typical value 0.60 - 0.80)Co (G) =0.67 0.67 Curb Opening Information MINOR MAJOR Length of a Unit Curb Opening Lo (C) =N/A N/A feet Height of Vertical Curb Opening in Inches Hvert =N/A N/A inches Height of Curb Orifice Throat in Inches Hthroat =N/A N/A inches Angle of Throat (see USDCM Figure ST-5)Theta =N/A N/A degrees Side Width for Depression Pan (typically the gutter width of 2 feet)Wp =N/A N/A feet Clogging Factor for a Single Curb Opening (typical value 0.10)Cf (C) =N/A N/A Curb Opening Weir Coefficient (typical value 2.3-3.7)Cw (C) =N/A N/A Curb Opening Orifice Coefficient (typical value 0.60 - 0.70)Co (C) =N/A N/A Low Head Performance Reduction (Calculated)MINOR MAJOR Depth for Grate Midwidth dGrate =0.459 0.651 ft Depth for Curb Opening Weir Equation dCurb =N/A N/A ft Combination Inlet Performance Reduction Factor for Long Inlets RFCombination =N/A N/A Curb Opening Performance Reduction Factor for Long Inlets RFCurb =N/A N/A Grated Inlet Performance Reduction Factor for Long Inlets RFGrate =0.95 1.00 MINOR MAJOR Total Inlet Interception Capacity (assumes clogged condition)Qa =2.7 4.7 cfs WARNING: Inlet Capacity less than Q Peak for Major Storm Q PEAK REQUIRED =1.0 4.7 cfs CDOT Type C Grate INLET IN A SUMP OR SAG LOCATION MHFD-Inlet, Version 5.01 (April 2021) H-VertH-Curb W Lo (C) Lo (G) Wo WP CDOT Type C Grate Override Depths MHFD-Inlet_v5.01, Inlet H4.6 9/12/2022, 12:06 PM Project: Inlet ID: Gutter Geometry: Maximum Allowable Width for Spread Behind Curb TBACK =6.0 ft Side Slope Behind Curb (leave blank for no conveyance credit behind curb)SBACK =0.020 ft/ft Manning's Roughness Behind Curb (typically between 0.012 and 0.020)nBACK =0.015 Height of Curb at Gutter Flow Line HCURB =6.00 inches Distance from Curb Face to Street Crown TCROWN =20.0 ft Gutter Width W =2.00 ft Street Transverse Slope SX =0.020 ft/ft Gutter Cross Slope (typically 2 inches over 24 inches or 0.083 ft/ft)SW =0.083 ft/ft Street Longitudinal Slope - Enter 0 for sump condition SO =0.000 ft/ft Manning's Roughness for Street Section (typically between 0.012 and 0.020)nSTREET =0.015 Minor Storm Major Storm Max. Allowable Spread for Minor & Major Storm TMAX =20.0 20.0 ft Max. Allowable Depth at Gutter Flowline for Minor & Major Storm dMAX =6.0 6.0 inches Check boxes are not applicable in SUMP conditions MINOR STORM Allowable Capacity is based on Depth Criterion Minor Storm Major Storm MAJOR STORM Allowable Capacity is based on Depth Criterion Qallow =SUMP SUMP cfs MHFD-Inlet, Version 5.01 (April 2021) ALLOWABLE CAPACITY FOR ONE-HALF OF STREET (Minor & Major Storm) (Based on Regulated Criteria for Maximum Allowable Flow Depth and Spread) Nissan - Kia Inlet H4.7 MHFD-Inlet_v5.01, Inlet H4.7 9/12/2022, 12:06 PM Design Information (Input)MINOR MAJOR Type of Inlet Type = Local Depression (additional to continuous gutter depression 'a' from above)alocal =3.00 3.00 inches Number of Unit Inlets (Grate or Curb Opening)No =1 1 Water Depth at Flowline (outside of local depression)Ponding Depth =6.0 6.0 inches Grate Information MINOR MAJOR Length of a Unit Grate Lo (G) =N/A N/A feet Width of a Unit Grate Wo =N/A N/A feet Area Opening Ratio for a Grate (typical values 0.15-0.90)Aratio =N/A N/A Clogging Factor for a Single Grate (typical value 0.50 - 0.70)Cf (G) =N/A N/A Grate Weir Coefficient (typical value 2.15 - 3.60)Cw (G) =N/A N/A Grate Orifice Coefficient (typical value 0.60 - 0.80)Co (G) =N/A N/A Curb Opening Information MINOR MAJOR Length of a Unit Curb Opening Lo (C) =5.00 5.00 feet Height of Vertical Curb Opening in Inches Hvert =6.00 6.00 inches Height of Curb Orifice Throat in Inches Hthroat =6.00 6.00 inches Angle of Throat (see USDCM Figure ST-5)Theta =63.40 63.40 degrees Side Width for Depression Pan (typically the gutter width of 2 feet)Wp =2.00 2.00 feet Clogging Factor for a Single Curb Opening (typical value 0.10)Cf (C) =0.10 0.10 Curb Opening Weir Coefficient (typical value 2.3-3.7)Cw (C) =3.60 3.60 Curb Opening Orifice Coefficient (typical value 0.60 - 0.70)Co (C) =0.67 0.67 Low Head Performance Reduction (Calculated)MINOR MAJOR Depth for Grate Midwidth dGrate =N/A N/A ft Depth for Curb Opening Weir Equation dCurb =0.33 0.33 ft Combination Inlet Performance Reduction Factor for Long Inlets RFCombination =0.77 0.77 Curb Opening Performance Reduction Factor for Long Inlets RFCurb =1.00 1.00 Grated Inlet Performance Reduction Factor for Long Inlets RFGrate =N/A N/A MINOR MAJOR Total Inlet Interception Capacity (assumes clogged condition)Qa =5.4 5.4 cfs Inlet Capacity IS GOOD for Minor and Major Storms(>Q PEAK)Q PEAK REQUIRED =0.3 1.4 cfs CDOT Type R Curb Opening INLET IN A SUMP OR SAG LOCATION MHFD-Inlet, Version 5.01 (April 2021) H-VertH-Curb W Lo (C) Lo (G) Wo WP CDOT Type R Curb Opening Override Depths MHFD-Inlet_v5.01, Inlet H4.7 9/12/2022, 12:06 PM Project: Inlet ID: Gutter Geometry: Maximum Allowable Width for Spread Behind Curb TBACK =1.0 ft Side Slope Behind Curb (leave blank for no conveyance credit behind curb)SBACK =0.020 ft/ft Manning's Roughness Behind Curb (typically between 0.012 and 0.020)nBACK =0.015 Height of Curb at Gutter Flow Line HCURB =6.00 inches Distance from Curb Face to Street Crown TCROWN =25.0 ft Gutter Width W =2.00 ft Street Transverse Slope SX =0.020 ft/ft Gutter Cross Slope (typically 2 inches over 24 inches or 0.083 ft/ft)SW =0.083 ft/ft Street Longitudinal Slope - Enter 0 for sump condition SO =0.000 ft/ft Manning's Roughness for Street Section (typically between 0.012 and 0.020)nSTREET =0.015 Minor Storm Major Storm Max. Allowable Spread for Minor & Major Storm TMAX =25.0 25.0 ft Max. Allowable Depth at Gutter Flowline for Minor & Major Storm dMAX =5.5 5.5 inches Check boxes are not applicable in SUMP conditions MINOR STORM Allowable Capacity is based on Depth Criterion Minor Storm Major Storm MAJOR STORM Allowable Capacity is based on Depth Criterion Qallow =SUMP SUMP cfs MHFD-Inlet, Version 5.01 (April 2021) ALLOWABLE CAPACITY FOR ONE-HALF OF STREET (Minor & Major Storm) (Based on Regulated Criteria for Maximum Allowable Flow Depth and Spread) Nissan - Kia Inlet G3 MHFD-Inlet_v5.01, Inlet G3 9/12/2022, 12:06 PM Design Information (Input)MINOR MAJOR Type of Inlet Type = Local Depression (additional to continuous gutter depression 'a' from above)alocal =2.00 2.00 inches Number of Unit Inlets (Grate or Curb Opening)No =2 2 Water Depth at Flowline (outside of local depression)Ponding Depth =5.5 5.5 inches Grate Information MINOR MAJOR Length of a Unit Grate Lo (G) =3.00 3.00 feet Width of a Unit Grate Wo =1.73 1.73 feet Area Opening Ratio for a Grate (typical values 0.15-0.90)Aratio =0.31 0.31 Clogging Factor for a Single Grate (typical value 0.50 - 0.70)Cf (G) =0.50 0.50 Grate Weir Coefficient (typical value 2.15 - 3.60)Cw (G) =3.60 3.60 Grate Orifice Coefficient (typical value 0.60 - 0.80)Co (G) =0.60 0.60 Curb Opening Information MINOR MAJOR Length of a Unit Curb Opening Lo (C) =3.00 3.00 feet Height of Vertical Curb Opening in Inches Hvert =6.50 6.50 inches Height of Curb Orifice Throat in Inches Hthroat =5.25 5.25 inches Angle of Throat (see USDCM Figure ST-5)Theta =0.00 0.00 degrees Side Width for Depression Pan (typically the gutter width of 2 feet)Wp =2.00 2.00 feet Clogging Factor for a Single Curb Opening (typical value 0.10)Cf (C) =0.10 0.10 Curb Opening Weir Coefficient (typical value 2.3-3.7)Cw (C) =3.70 3.70 Curb Opening Orifice Coefficient (typical value 0.60 - 0.70)Co (C) =0.66 0.66 Low Head Performance Reduction (Calculated)MINOR MAJOR Depth for Grate Midwidth dGrate =0.481 0.481 ft Depth for Curb Opening Weir Equation dCurb =0.29 0.29 ft Combination Inlet Performance Reduction Factor for Long Inlets RFCombination =0.65 0.65 Curb Opening Performance Reduction Factor for Long Inlets RFCurb =1.00 1.00 Grated Inlet Performance Reduction Factor for Long Inlets RFGrate =0.65 0.65 MINOR MAJOR Total Inlet Interception Capacity (assumes clogged condition)Qa =4.9 4.9 cfs Inlet Capacity IS GOOD for Minor and Major Storms(>Q PEAK)Q PEAK REQUIRED =1.0 4.5 cfs Denver No. 16 Combination INLET IN A SUMP OR SAG LOCATION MHFD-Inlet, Version 5.01 (April 2021) H-VertH-Curb W Lo (C) Lo (G) Wo WP Denver No. 16 Combination Override Depths MHFD-Inlet_v5.01, Inlet G3 9/12/2022, 12:06 PM Project: Inlet ID: Gutter Geometry: Maximum Allowable Width for Spread Behind Curb TBACK =1.0 ft Side Slope Behind Curb (leave blank for no conveyance credit behind curb)SBACK =0.020 ft/ft Manning's Roughness Behind Curb (typically between 0.012 and 0.020)nBACK =0.015 Height of Curb at Gutter Flow Line HCURB =6.00 inches Distance from Curb Face to Street Crown TCROWN =25.0 ft Gutter Width W =2.00 ft Street Transverse Slope SX =0.020 ft/ft Gutter Cross Slope (typically 2 inches over 24 inches or 0.083 ft/ft)SW =0.083 ft/ft Street Longitudinal Slope - Enter 0 for sump condition SO =0.005 ft/ft Manning's Roughness for Street Section (typically between 0.012 and 0.020)nSTREET =0.015 Minor Storm Major Storm Max. Allowable Spread for Minor & Major Storm TMAX =25.0 25.0 ft Max. Allowable Depth at Gutter Flowline for Minor & Major Storm dMAX =6.0 6.0 inches Allow Flow Depth at Street Crown (check box for yes, leave blank for no) MINOR STORM Allowable Capacity is based on Depth Criterion Minor Storm Major Storm MAJOR STORM Allowable Capacity is based on Depth Criterion Qallow =10.4 10.4 cfs Minor storm max. allowable capacity GOOD - greater than the design flow given on sheet 'Inlet Management' Major storm max. allowable capacity GOOD - greater than the design flow given on sheet 'Inlet Management' MHFD-Inlet, Version 5.01 (April 2021) ALLOWABLE CAPACITY FOR ONE-HALF OF STREET (Minor & Major Storm) (Based on Regulated Criteria for Maximum Allowable Flow Depth and Spread) Nissan - Kia Inlet G2 MHFD-Inlet_v5.01, Inlet G2 9/12/2022, 12:06 PM Design Information (Input)MINOR MAJOR Type of Inlet Type = Local Depression (additional to continuous gutter depression 'a')aLOCAL =2.0 2.0 inches Total Number of Units in the Inlet (Grate or Curb Opening)No =3 3 Length of a Single Unit Inlet (Grate or Curb Opening)Lo =3.00 3.00 ft Width of a Unit Grate (cannot be greater than W, Gutter Width) Wo =1.73 1.73 ft Clogging Factor for a Single Unit Grate (typical min. value = 0.5)Cf-G =0.50 0.50 Clogging Factor for a Single Unit Curb Opening (typical min. value = 0.1)Cf-C =0.10 0.10 Street Hydraulics: OK - Q < Allowable Street Capacity'MINOR MAJOR Total Inlet Interception Capacity Q =0.8 2.9 cfs Total Inlet Carry-Over Flow (flow bypassing inlet)Qb =0.0 0.0 cfs Capture Percentage = Qa/Qo =C% =100 100 % INLET ON A CONTINUOUS GRADE MHFD-Inlet, Version 5.01 (April 2021) Denver No. 16 CombinationDenver No. 16 Combination MHFD-Inlet_v5.01, Inlet G2 9/12/2022, 12:06 PM Project: Inlet ID: Gutter Geometry: Maximum Allowable Width for Spread Behind Curb TBACK =1.0 ft Side Slope Behind Curb (leave blank for no conveyance credit behind curb)SBACK =0.020 ft/ft Manning's Roughness Behind Curb (typically between 0.012 and 0.020)nBACK =0.015 Height of Curb at Gutter Flow Line HCURB =6.00 inches Distance from Curb Face to Street Crown TCROWN =25.0 ft Gutter Width W =2.00 ft Street Transverse Slope SX =0.020 ft/ft Gutter Cross Slope (typically 2 inches over 24 inches or 0.083 ft/ft)SW =0.083 ft/ft Street Longitudinal Slope - Enter 0 for sump condition SO =0.000 ft/ft Manning's Roughness for Street Section (typically between 0.012 and 0.020)nSTREET =0.015 Minor Storm Major Storm Max. Allowable Spread for Minor & Major Storm TMAX =25.0 25.0 ft Max. Allowable Depth at Gutter Flowline for Minor & Major Storm dMAX =6.0 6.0 inches Check boxes are not applicable in SUMP conditions 6 MINOR STORM Allowable Capacity is based on Depth Criterion Minor Storm Major Storm MAJOR STORM Allowable Capacity is based on Depth Criterion Qallow =SUMP SUMP cfs MHFD-Inlet, Version 5.01 (April 2021) ALLOWABLE CAPACITY FOR ONE-HALF OF STREET (Minor & Major Storm) (Based on Regulated Criteria for Maximum Allowable Flow Depth and Spread) Nissan - Kia Inlet F2 MHFD-Inlet_v5.01, Inlet F2 9/12/2022, 12:06 PM Design Information (Input)MINOR MAJOR Type of Inlet Type = Local Depression (additional to continuous gutter depression 'a' from above)alocal =2.00 2.00 inches Number of Unit Inlets (Grate or Curb Opening)No =3 3 Water Depth at Flowline (outside of local depression)Ponding Depth =6.0 6.1 inches Grate Information MINOR MAJOR Length of a Unit Grate Lo (G) =3.00 3.00 feet Width of a Unit Grate Wo =1.73 1.73 feet Area Opening Ratio for a Grate (typical values 0.15-0.90)Aratio =0.31 0.31 Clogging Factor for a Single Grate (typical value 0.50 - 0.70)Cf (G) =0.50 0.50 Grate Weir Coefficient (typical value 2.15 - 3.60)Cw (G) =3.60 3.60 Grate Orifice Coefficient (typical value 0.60 - 0.80)Co (G) =0.60 0.60 Curb Opening Information MINOR MAJOR Length of a Unit Curb Opening Lo (C) =3.00 3.00 feet Height of Vertical Curb Opening in Inches Hvert =6.50 6.50 inches Height of Curb Orifice Throat in Inches Hthroat =5.25 5.25 inches Angle of Throat (see USDCM Figure ST-5)Theta =0.00 0.00 degrees Side Width for Depression Pan (typically the gutter width of 2 feet)Wp =2.00 2.00 feet Clogging Factor for a Single Curb Opening (typical value 0.10)Cf (C) =0.10 0.10 Curb Opening Weir Coefficient (typical value 2.3-3.7)Cw (C) =3.70 3.70 Curb Opening Orifice Coefficient (typical value 0.60 - 0.70)Co (C) =0.66 0.66 Low Head Performance Reduction (Calculated)MINOR MAJOR Depth for Grate Midwidth dGrate =0.523 0.531 ft Depth for Curb Opening Weir Equation dCurb =0.33 0.34 ft Combination Inlet Performance Reduction Factor for Long Inlets RFCombination =0.57 0.58 Curb Opening Performance Reduction Factor for Long Inlets RFCurb =0.97 0.98 Grated Inlet Performance Reduction Factor for Long Inlets RFGrate =0.57 0.58 MINOR MAJOR Total Inlet Interception Capacity (assumes clogged condition)Qa =7.6 7.9 cfs Inlet Capacity IS GOOD for Minor and Major Storms(>Q PEAK)Q PEAK REQUIRED =1.7 7.9 cfs Denver No. 16 Combination INLET IN A SUMP OR SAG LOCATION MHFD-Inlet, Version 5.01 (April 2021) H-VertH-Curb W Lo (C) Lo (G) Wo WP Denver No. 16 Combination Override Depths MHFD-Inlet_v5.01, Inlet F2 9/12/2022, 12:06 PM Project: Inlet ID: Gutter Geometry: Maximum Allowable Width for Spread Behind Curb TBACK =1.0 ft Side Slope Behind Curb (leave blank for no conveyance credit behind curb)SBACK =0.020 ft/ft Manning's Roughness Behind Curb (typically between 0.012 and 0.020)nBACK =0.015 Height of Curb at Gutter Flow Line HCURB =6.00 inches Distance from Curb Face to Street Crown TCROWN =30.0 ft Gutter Width W =2.00 ft Street Transverse Slope SX =0.020 ft/ft Gutter Cross Slope (typically 2 inches over 24 inches or 0.083 ft/ft)SW =0.083 ft/ft Street Longitudinal Slope - Enter 0 for sump condition SO =0.000 ft/ft Manning's Roughness for Street Section (typically between 0.012 and 0.020)nSTREET =0.015 Minor Storm Major Storm Max. Allowable Spread for Minor & Major Storm TMAX =30.0 30.0 ft Max. Allowable Depth at Gutter Flowline for Minor & Major Storm dMAX =6.0 6.0 inches Check boxes are not applicable in SUMP conditions MINOR STORM Allowable Capacity is based on Depth Criterion Minor Storm Major Storm MAJOR STORM Allowable Capacity is based on Depth Criterion Qallow =SUMP SUMP cfs MHFD-Inlet, Version 5.01 (April 2021) ALLOWABLE CAPACITY FOR ONE-HALF OF STREET (Minor & Major Storm) (Based on Regulated Criteria for Maximum Allowable Flow Depth and Spread) Nissan - Kia Inlet A8 MHFD-Inlet_v5.01, Inlet A8 9/12/2022, 12:06 PM Design Information (Input)MINOR MAJOR Type of Inlet Type = Local Depression (additional to continuous gutter depression 'a' from above)alocal =2.00 2.00 inches Number of Unit Inlets (Grate or Curb Opening)No =3 3 Water Depth at Flowline (outside of local depression)Ponding Depth =6.0 6.0 inches Grate Information MINOR MAJOR Length of a Unit Grate Lo (G) =3.00 3.00 feet Width of a Unit Grate Wo =1.73 1.73 feet Area Opening Ratio for a Grate (typical values 0.15-0.90)Aratio =0.31 0.31 Clogging Factor for a Single Grate (typical value 0.50 - 0.70)Cf (G) =0.50 0.50 Grate Weir Coefficient (typical value 2.15 - 3.60)Cw (G) =3.60 3.60 Grate Orifice Coefficient (typical value 0.60 - 0.80)Co (G) =0.60 0.60 Curb Opening Information MINOR MAJOR Length of a Unit Curb Opening Lo (C) =3.00 3.00 feet Height of Vertical Curb Opening in Inches Hvert =6.50 6.50 inches Height of Curb Orifice Throat in Inches Hthroat =5.25 5.25 inches Angle of Throat (see USDCM Figure ST-5)Theta =0.00 0.00 degrees Side Width for Depression Pan (typically the gutter width of 2 feet)Wp =2.00 2.00 feet Clogging Factor for a Single Curb Opening (typical value 0.10)Cf (C) =0.10 0.10 Curb Opening Weir Coefficient (typical value 2.3-3.7)Cw (C) =3.70 3.70 Curb Opening Orifice Coefficient (typical value 0.60 - 0.70)Co (C) =0.66 0.66 Low Head Performance Reduction (Calculated)MINOR MAJOR Depth for Grate Midwidth dGrate =0.523 0.523 ft Depth for Curb Opening Weir Equation dCurb =0.33 0.33 ft Combination Inlet Performance Reduction Factor for Long Inlets RFCombination =0.57 0.57 Curb Opening Performance Reduction Factor for Long Inlets RFCurb =0.97 0.97 Grated Inlet Performance Reduction Factor for Long Inlets RFGrate =0.57 0.57 MINOR MAJOR Total Inlet Interception Capacity (assumes clogged condition)Qa =7.6 7.6 cfs Inlet Capacity IS GOOD for Minor and Major Storms(>Q PEAK)Q PEAK REQUIRED =1.9 7.2 cfs Denver No. 16 Combination INLET IN A SUMP OR SAG LOCATION MHFD-Inlet, Version 5.01 (April 2021) H-VertH-Curb W Lo (C) Lo (G) Wo WP Denver No. 16 Combination Override Depths MHFD-Inlet_v5.01, Inlet A8 9/12/2022, 12:06 PM Project: Inlet ID: Gutter Geometry: Maximum Allowable Width for Spread Behind Curb TBACK =1.0 ft Side Slope Behind Curb (leave blank for no conveyance credit behind curb)SBACK =0.020 ft/ft Manning's Roughness Behind Curb (typically between 0.012 and 0.020)nBACK =0.015 Height of Curb at Gutter Flow Line HCURB =6.00 inches Distance from Curb Face to Street Crown TCROWN =30.0 ft Gutter Width W =2.00 ft Street Transverse Slope SX =0.020 ft/ft Gutter Cross Slope (typically 2 inches over 24 inches or 0.083 ft/ft)SW =0.083 ft/ft Street Longitudinal Slope - Enter 0 for sump condition SO =0.000 ft/ft Manning's Roughness for Street Section (typically between 0.012 and 0.020)nSTREET =0.015 Minor Storm Major Storm Max. Allowable Spread for Minor & Major Storm TMAX =30.0 30.0 ft Max. Allowable Depth at Gutter Flowline for Minor & Major Storm dMAX =6.0 6.0 inches Check boxes are not applicable in SUMP conditions MINOR STORM Allowable Capacity is based on Depth Criterion Minor Storm Major Storm MAJOR STORM Allowable Capacity is based on Depth Criterion Qallow =SUMP SUMP cfs MHFD-Inlet, Version 5.01 (April 2021) ALLOWABLE CAPACITY FOR ONE-HALF OF STREET (Minor & Major Storm) (Based on Regulated Criteria for Maximum Allowable Flow Depth and Spread) Nissan - Kia Inlet A7.3 MHFD-Inlet_v5.01, Inlet A7.3 9/12/2022, 12:06 PM Design Information (Input)MINOR MAJOR Type of Inlet Type = Local Depression (additional to continuous gutter depression 'a' from above)alocal =2.00 2.00 inches Number of Unit Inlets (Grate or Curb Opening)No =2 2 Water Depth at Flowline (outside of local depression)Ponding Depth =6.0 6.0 inches Grate Information MINOR MAJOR Length of a Unit Grate Lo (G) =3.00 3.00 feet Width of a Unit Grate Wo =1.73 1.73 feet Area Opening Ratio for a Grate (typical values 0.15-0.90)Aratio =0.31 0.31 Clogging Factor for a Single Grate (typical value 0.50 - 0.70)Cf (G) =0.50 0.50 Grate Weir Coefficient (typical value 2.15 - 3.60)Cw (G) =3.60 3.60 Grate Orifice Coefficient (typical value 0.60 - 0.80)Co (G) =0.60 0.60 Curb Opening Information MINOR MAJOR Length of a Unit Curb Opening Lo (C) =3.00 3.00 feet Height of Vertical Curb Opening in Inches Hvert =6.50 6.50 inches Height of Curb Orifice Throat in Inches Hthroat =5.25 5.25 inches Angle of Throat (see USDCM Figure ST-5)Theta =0.00 0.00 degrees Side Width for Depression Pan (typically the gutter width of 2 feet)Wp =2.00 2.00 feet Clogging Factor for a Single Curb Opening (typical value 0.10)Cf (C) =0.10 0.10 Curb Opening Weir Coefficient (typical value 2.3-3.7)Cw (C) =3.70 3.70 Curb Opening Orifice Coefficient (typical value 0.60 - 0.70)Co (C) =0.66 0.66 Low Head Performance Reduction (Calculated)MINOR MAJOR Depth for Grate Midwidth dGrate =0.523 0.523 ft Depth for Curb Opening Weir Equation dCurb =0.33 0.33 ft Combination Inlet Performance Reduction Factor for Long Inlets RFCombination =0.71 0.71 Curb Opening Performance Reduction Factor for Long Inlets RFCurb =1.00 1.00 Grated Inlet Performance Reduction Factor for Long Inlets RFGrate =0.71 0.71 MINOR MAJOR Total Inlet Interception Capacity (assumes clogged condition)Qa =6.2 6.2 cfs Inlet Capacity IS GOOD for Minor and Major Storms(>Q PEAK)Q PEAK REQUIRED =1.3 5.1 cfs Denver No. 16 Combination INLET IN A SUMP OR SAG LOCATION MHFD-Inlet, Version 5.01 (April 2021) H-VertH-Curb W Lo (C) Lo (G) Wo WP Denver No. 16 Combination Override Depths MHFD-Inlet_v5.01, Inlet A7.3 9/12/2022, 12:06 PM ALIGNMENT A7 ALIGNMENT A7.1 ALIGNMENT H ALIGNMENT H3 ALIGNMENT H4.1 ALIGNMENT H4.2 ALIGNMENT H4.2-1 ALIGNMENT H4.3 FOREBAY DESIGN Nissan - Kia Dealership, Fort Collins, CO Forebay ID:Forebay E1 Total Area:3.96 acres Imperviousness:48% Impervious Area:1.90 acres Min. Forebay Volume:35.17 cf (1% of WQCV) Max Forebay Depth:12 in Design Volume:43 cf Forebay ID:Forebay H1 Total Area:6.22 acres Imperviousness:84% Impervious Area:5.22 acres Min. Forebay Volume:157.21 cf (2% of WQCV) Max Forebay Depth:18 in Design Volume:190 cf Forebay ID:Forebay G1 Total Area:1.36 acres Imperviousness:84% Impervious Area:1.14 acres Min. Forebay Volume:17.08 cf (1% of WQCV) Max Forebay Depth:12 in Design Volume:26 cf Forebay ID:Forebay F1 Total Area:1.10 acres Imperviousness:71% Impervious Area:0.78 acres Min. Forebay Volume:10.69 cf (1% of WQCV) Max Forebay Depth:12 in Design Volume:21 cf Date: 6/13/2022 C:\United Civil Dropbox\Projects\U21004 - Nissan Dealership\Reports\Drainage\Calculations\U21004-Drain Calcs-FDP Channel Report Hydraflow Express Extension for Autodesk® Civil 3D® by Autodesk, Inc.Friday, Apr 8 2022 Channel C: 100-yr Event User-defined Invert Elev (ft)= 4971.27 Slope (%)= 4.00 N-Value = 0.033 Calculations Compute by:Known Q Known Q (cfs)= 12.94 (Sta, El, n)-(Sta, El, n)... ( 11.16, 4972.46)-(18.77, 4971.27, 0.033)-(23.77, 4971.27, 0.033)-(31.24, 4973.06, 0.033) Highlighted Depth (ft)= 0.43 Q (cfs)= 12.94 Area (sqft)= 3.13 Velocity (ft/s)= 4.14 Wetted Perim (ft)= 9.63 Crit Depth, Yc (ft)= 0.50 Top Width (ft)= 9.55 EGL (ft)= 0.70 5 10 15 20 25 30 35 40 Elev (ft)Depth (ft)Section 4970.50 -0.77 4971.00 -0.27 4971.50 0.23 4972.00 0.73 4972.50 1.23 4973.00 1.73 4973.50 2.23 4974.00 2.73 Sta (ft) Channel Section analyzed at the the location of smallest longitudinal slope (4.0%).Known Q is the routed flows between of Pond C1,Basin C1,and Basin C2. A Pipe End Riprap Sizing Calculations Nissan-Kia, Fort Collins, Colorado Circular D or Da, Pipe Diameter (ft) H or Ha, Culvert Height (ft) W, Culvert Width (ft) Yt/D Q/D1.5 Q/D2.5 Yt/H Q/WH0.5 Storm Line A Erosion Resistant 13.0 1.5 1.35 0.90 7.06 4.71 6.70 4.71 1.68 -1.69 Type L 4.5 5.0 1.50 Storm Line C Erosion Resistant 21.00 2.5 1.60 0.64 5.31 2.13 6.70 2.13 2.73 -5.33 Type L 7.5 5.0 1.50 Storm Line D Erosion Resistant 8.75 1.0 0.96 0.96 8.75 8.75 6.70 8.75 1.14 1.23 Type L 5.0 5.0 1.50 Pipe Parameters Calculations Circular Pipe (Figure MD-21) Froude Parameter Q/D2.5 Max 6.0 or Q/WH1.5 Max 8.0 Design Discharge (cfs) Pipe Designation Box Culvert Suggested Riprap Size Rectangular Pipe (Figure MD-22) ***Spec Min. Width of Riprap (ft) 2*d50, Depth of Riprap (ft) for L/2 Riprap Type (From Figure MD-21 or MD-22) Urban Drainage pg MD-107 *for purposes of outlet protection during major floods, the acceptable velocity is set at 5.5 ft/sec for erosive soils and at 7.7 ft/sect for erosion resistant soils. ***Use Pipe Diameter for circular conduits as a minimum width. **In no case should the length be less than 3H or 3D, nor does L need to be greater than 10H or 10D when the Froude Parameter is less than 8.0 or 6.0 respectively. Whenver the Froude parameter is greater than these maximums, increase the maximum L by 1/4 D or 1/4 H for each whole number by which the Froude Parameter is greater than 8.0 or 6.0 respectively. Soil Type L= 1/(2tanq)* [At/Yt)-W] (ft) **Spec Min. Length of Riprap (ft) Culvert Parameters *At=Q/V (ft) Expansion Factor 1/(2tanq) (From Figure MD-23 or MD-24) Yt, Tailwater Depth (ft) Date: 9/1/2022 C:\United Civil Dropbox\Projects\U21004 - Nissan Dealership\Reports\Drainage\Calculations\Riprap\RiprapSizing A PPENDIX C R EFERENCED M ATERIALS Stormwater Facility Name: Facility Location & Jurisdiction: User Input: Watershed Characteristics User Defined User Defined User Defined User Defined Selected BMP Type =EDB Stage [ft]Area [ft^2]Stage [ft]Discharge [cfs] Watershed Area =13.35 acres 0.00 0 0.00 0.000 Watershed Length =970 ft 1.00 4,890 1.00 0.031 Watershed Length to Centroid =515 ft 2.00 8,205 2.00 1.320 Watershed Slope =0.030 ft/ft 3.00 10,335 3.00 1.650 Watershed Imperviousness =65.0%percent 4.00 14,563 4.00 1.920 Percentage Hydrologic Soil Group A =0.0%percent 5.00 19,705 5.00 2.160 Percentage Hydrologic Soil Group B =60.0%percent 6.00 32,115 6.00 2.380 Percentage Hydrologic Soil Groups C/D =40.0%percent 7.00 39,205 7.00 2.58 Target WQCV Drain Time =40.0 hours 7.50 44,180 7.50 2.67 User Input After completing and printing this worksheet to a pdf, go to: https://maperture.digitaldataservices.com/gvh/?viewer=cswdif Create a new stormwater facility, and attach the PDF of this worksheet to that record. Routed Hydrograph Results Design Storm Return Period =WQCV 2 Year 5 Year 10 Year 50 Year 100 Year One-Hour Rainfall Depth =N/A 0.82 1.13 1.40 2.39 2.86 in CUHP Runoff Volume =0.283 0.523 0.781 1.048 2.172 2.731 acre-ft Inflow Hydrograph Volume =N/A 0.523 0.781 1.048 2.172 2.731 acre-ft Time to Drain 97% of Inflow Volume =32.3 28.5 24.9 22.0 15.1 16.8 hours Time to Drain 99% of Inflow Volume =39.5 38.3 36.9 35.9 33.3 32.7 hours Maximum Ponding Depth =2.39 2.61 3.48 4.21 6.19 6.84 ft Maximum Ponded Area =0.21 0.22 0.28 0.36 0.77 0.87 acres Maximum Volume Stored =0.284 0.330 0.542 0.775 1.827 2.368 acre-ft Once CUHP has been run and the Stage-Area-Discharge information has been provided, click 'Process Data' to interpolate the Stage-Area-Volume-Discharge data and generate summary results in the table below. Once this is complete, click 'Print to PDF'. Stormwater Detention and Infiltration Design Data Sheet Fort Collins Nissan-Kia Fort Collins SDI-Design Data v2.00, Released January 2020 Location for 1-hr Rainfall Depths (use dropdown): After providing required inputs above including 1-hour rainfall depths, click 'Run CUHP' to generate runoff hydrographs using the embedded Colorado Urban Hydrograph Procedure. SDI_Design_Data_v2.00.xlsm, Design Data 6/14/2022, 12:08 PM Booleans for Message Booleans for CUHP Watershed L:W 1 CUHP Inputs Complete Watershed Lc:L 1 CUHP Results Calculated Watershed Slope FALSE Time Interval RunOnce 1 CountA 1 Draintime Coeff 1.0 User Precip 1 Equal SA Inputs 1 Equal SD Inputs 1 Stormwater Detention and Infiltration Design Data Sheet 0 10 20 30 40 50 60 0.1 1 10FLOW [cfs]TIME [hr] 100YR IN 100YR OUT 50YR IN 50YR OUT 10YR IN 10YR OUT 5YR IN 5YR OUT 2YR IN 2YR OUT WQCV IN WQCV OUT 0 1 2 3 4 5 6 7 8 0.1 1 10 100PONDING DEPTH [ft]DRAIN TIME [hr] 100YR 50YR 10YR 5YR 2YR WQCV SDI_Design_Data_v2.00.xlsm, Design Data 6/14/2022, 12:08 PM Page 1 of 5 970.223.5556 | 3665 JFK Parkway, Bldg. 2, Suite 100 | Fort Collins, CO 80525-3152 www.AyresAssociates.com Project: 36-4743.00 File: Fort Collins Nissan-Kia Detention Pond Impacts Memo MEMORANDUM To: Sam Eliason, PE, Kevin Brazelton, PE From: Dusty Robinson, PE (Ayres), Mason Garfield, EI (Ayres) Date: May 25, 2022 Project No.: 36-4743.00 Re: Nissan-Kia Development – Lang Gulch Assessment This memorandum documents Ayres’ review of United Civil’s design plans and the expected impacts on the outfall area of Pond A1. Background Fort Collins Nissan-Kia plans to construct a new building with associated drive lanes and inventory parking lot. The proposed site grading plan incorporates bioretention treatment, underground chamber treatment, and detention ponds to account for the increased impervious area of the site. Ayres was tasked with determining the geomorphic impacts on the outfall area due to the outflow of a proposed detention pond named “Pond A1” (Figure 1), which will receive flows from the watershed name “Basin OS1” (Figure 2). Figure 1. The proposed outfall area with the proposed detention ponds from United Civil’s document, “Fort Collins Nissan-Kia Preliminary Drainage Report” Proposed outfall area Page 2 of 5 Project: 36-4743.00 File: Fort Collins Nissan-Kia Detention Pond Impacts Memo Figure 2. The proposed outfall area with the existing watersheds from United Civil’s document, “Fort Collins Nissan- Kia Preliminary Drainage Report” Existing Site Conditions The proposed outfall area receives flow from the Venus Avenue neighborhood, store parking lots, and the Fort Collins Nissan-Kia dealership. The majority of flow entering the proposed outfall area passes over Venus Ave and is channelized for approximately 300 ft. After the channel ends, the water travels as sheet flow over prairie grass for approximately 150 feet until reaching the steep bedrock banks of Lang Gulch (Figure 3). There were no signs of significant erosion during the site visit by Ayres on April 19, 2022, and the grass was intact near the proposed outfall area. Minor erosion was noted just upstream of the proposed outfall location, but it did not expose the bedrock (Figure 4). Based on the “Preliminary Drainage Report,” the 100-yr event would result in 39.5 cfs entering Lang Gulch for the current site conditions. A bedrock outcropping exists near the proposed outlet that extends to the banks of Lang Gulch (Figure 5). There were no signs of erosion of the bedrock banks of Lang Gulch during Ayres’ site visit. Based on the borings provided by Terracon, a claystone and sandstone bedrock layer exists 0.5 ft beneath a vegetative soil top layer near where the spillway will be located (“Geotechnical Engineering Report for Fort Collins Nissan and Kia Dealerships – Retention Pond”). The existing site conditions show that the concentrated stormwater flows from Venus Avenue naturally spread under the current hydrologic conditions due to the local topography (Figure 6). Therefore, the existing stormwater flow regime is not causing erosion of the grass cover or bedrock downstream of where the flow spreads. Proposed outfall area Page 3 of 5 Project: 36-4743.00 File: Fort Collins Nissan-Kia Detention Pond Impacts Memo Figure 3. The existing flow path and approximate proposed spillway location of Pond A1 looking downstream (west) Figure 4. Minor erosion slightly upstream of the proposed outfall location Figure 5. Bedrock outcropping at the banks of Lang Gulch looking north Page 4 of 5 Project: 36-4743.00 File: Fort Collins Nissan-Kia Detention Pond Impacts Memo Figure 6. Existing stormwater concentrated and spread flow paths. Proposed Conditions The proposed design directs flows from Basin OS1 to the outlet of Pond A1. This outlet includes a level spreader that will distribute shallow flow over a larger area than a standard stormwater outlet (Figure 7). The spread flow will mimic the natural flow pattern and travel as sheet flow over/through the grass until it flows down the bedrock banks of Lang Gulch. The maximum flow rate from the outlet pipe to the level spreader is 2.6 cfs. The calculated maximum flow rate overtopping the pond from offsite undetained flows is 4 cfs. Therefore, the approximate proposed condition 100-year event flow rate will reduce the peak discharge to 6.6 cfs. Riprap will be used downstream of all storm sewer outfalls. Figure 7. Proposed stormwater outlet and flow paths. Page 5 of 5 Project: 36-4743.00 File: Fort Collins Nissan-Kia Detention Pond Impacts Memo Evaluation Based on the evaluation of available resources and site visits, the discharge from the outlet of Pond A1 will not increase the erosion potential within the proposed outfall area due to the following reasons: · There was no significant sign of erosion in the proposed outfall area during the site visit due to existing stormwater flows. All of the grass was intact where the sheet flow begins, indicating that with the higher peak flow experienced under existing conditions, the velocity and associated hydraulic forces have not been sufficient to tear up the grass, · The flow is spread out over the level spreader outlet from Pond A, mimicking the existing condition sheet flow over the prairie grass, · Proposed condition peak discharges are less than existing conditions, so hydraulic forces for the highest energy events are reduced, lowering the chance of erosion. · The bedrock layer is about 0.5 ft below the vegetative soil layer, so any erosion that may develop, such as a headcut, would be arrested by the bedrock layer. Based on the above findings, we recommend a level spreader outlet at Pond A1 to minimize the erosion potential within the proposed outfall area. We recommend that the level spreader width be at least 15 ft, to mimic the existing channel conditions. The outlet velocity of a 15 ft level spreader (assuming the level spreader acts as a broad-crested weir) during a 100-year event is roughly 1.2 ft/s which is significantly less than the permissible velocity of the grass of 4 ft/s. This indicates that tearing of the grass is unlikely in the outfall location (Part 654 Stream Restoration Design National Engineering Handbook, 2007). To further reduce impacts by erosive forces, we recommend that riprap be installed downstream of the level spreader. Additionally, we recommend that the storage volume of the retention ponds is enough to reduce the flows out of Pond A1 to equal or less than the existing conditions 100-year flow rate of 39.5 cfs. References Part 654 Stream Restoration Design National Engineering Handbook (2007). Chapter 8. NRCS. 4,514 752.3 FCMaps This map is a user generated static output from the City of Fort Collins FCMaps Internet mapping site and is for reference only. Data layers that appear on this map may or may not be accurate, current, or otherwise reliable. City of Fort Collins - GIS 572.0 1: WGS_1984_Web_Mercator_Auxiliary_Sphere Feet572.00286.00 Notes Legend 3,430 FEMA Floodplain FEMA High Risk - Floodway FEMA High Risk - 100 Year FEMA Moderate Risk - 100 / 500 Year City Floodplains City High Risk - Floodway City High Risk - 100 Year City Moderate Risk - 100 Year City Limits National Flood Hazard Layer FIRMette 0 500 1,000 1,500 2,000250 Feet Ü SEE FIS REPORT FOR DETAILED LEGEND AND INDEX MAP FOR FIRM PANEL LAYOUT SPECIAL FLOOD HAZARD AREAS Without Base Flood Elevation (BFE) Zone A, V, A99 With BFE or DepthZone AE, AO, AH, VE, AR Regulatory Floodway 0.2% Annual Chance Flood Hazard, Areas of 1% annual chance flood with average depth less than one foot or with drainage areas of less than one square mileZone X Future Conditions 1% Annual Chance Flood HazardZone X Area with Reduced Flood Risk due to Levee. See Notes.Zone X Area with Flood Risk due to LeveeZone D NO SCREEN Area of Minimal Flood Hazard Zone X Area of Undetermined Flood HazardZone D Channel, Culvert, or Storm Sewer Levee, Dike, or Floodwall Cross Sections with 1% Annual Chance 17.5 Water Surface Elevation Coastal Transect Coastal Transect Baseline Profile Baseline Hydrographic Feature Base Flood Elevation Line (BFE) Effective LOMRs Limit of Study Jurisdiction Boundary Digital Data Available No Digital Data Available Unmapped This map complies with FEMA's standards for the use of digital flood maps if it is not void as described below. The basemap shown complies with FEMA's basemap accuracy standards The flood hazard information is derived directly from the authoritative NFHL web services provided by FEMA. This map was exported on 3/4/2021 at 3:31 PM and does not reflect changes or amendments subsequent to this date and time. The NFHL and effective information may change or become superseded by new data over time. This map image is void if the one or more of the following map elements do not appear: basemap imagery, flood zone labels, legend, scale bar, map creation date, community identifiers, FIRM panel number, and FIRM effective date. Map images for unmapped and unmodernized areas cannot be used for regulatory purposes. Legend OTHER AREAS OF FLOOD HAZARD OTHER AREAS GENERAL STRUCTURES OTHER FEATURES MAP PANELS 8 B 20.2 The pin displayed on the map is an approximate point selected by the user and does not represent an authoritative property location. 1:6,000 105°5'1"W 40°30'39"N 105°4'24"W 40°30'11"N Basemap: USGS National Map: Orthoimagery: Data refreshed October, 2020 REPORT COVER PAGE Geotechnical Engineering Report __________________________________________________________________________ Fort Collins Nissan and Kia Dealerships Fort Collins, Colorado April 7, 2021 Terracon Project No. 20215013 Prepared for: TCC Corporation Windsor, Colorado Prepared by: Terracon Consultants, Inc. Fort Collins, Colorado United States Department of Agriculture A product of the National Cooperative Soil Survey, a joint effort of the United States Department of Agriculture and other Federal agencies, State agencies including the Agricultural Experiment Stations, and local participants Custom Soil Resource Report for Larimer County Area, Colorado Nissan Dealership Natural Resources Conservation Service March 4, 2021 Soil Map The soil map section includes the soil map for the defined area of interest, a list of soil map units on the map and extent of each map unit, and cartographic symbols displayed on the map. Also presented are various metadata about data used to produce the map, and a description of each soil map unit. 8 9 Custom Soil Resource Report Soil Map 4483840448390044839604484020448408044841404484200448426044838404483900448396044840204484080448414044842004484260493130 493190 493250 493310 493370 493430 493490 493130 493190 493250 493310 493370 493430 493490 40° 30' 33'' N 105° 4' 52'' W40° 30' 33'' N105° 4' 36'' W40° 30' 17'' N 105° 4' 52'' W40° 30' 17'' N 105° 4' 36'' WN Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 13N WGS84 0 100 200 400 600 Feet 0 30 60 120 180 Meters Map Scale: 1:2,350 if printed on A portrait (8.5" x 11") sheet. Soil Map may not be valid at this scale. MAP LEGEND MAP INFORMATION Area of Interest (AOI) Area of Interest (AOI) Soils Soil Map Unit Polygons Soil Map Unit Lines Soil Map Unit Points Special Point Features Blowout Borrow Pit Clay Spot Closed Depression Gravel Pit Gravelly Spot Landfill Lava Flow Marsh or swamp Mine or Quarry Miscellaneous Water Perennial Water Rock Outcrop Saline Spot Sandy Spot Severely Eroded Spot Sinkhole Slide or Slip Sodic Spot Spoil Area Stony Spot Very Stony Spot Wet Spot Other Special Line Features Water Features Streams and Canals Transportation Rails Interstate Highways US Routes Major Roads Local Roads Background Aerial Photography The soil surveys that comprise your AOI were mapped at 1:24,000. Warning: Soil Map may not be valid at this scale. Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil line placement. The maps do not show the small areas of contrasting soils that could have been shown at a more detailed scale. Please rely on the bar scale on each map sheet for map measurements. Source of Map: Natural Resources Conservation Service Web Soil Survey URL: Coordinate System: Web Mercator (EPSG:3857) Maps from the Web Soil Survey are based on the Web Mercator projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the Albers equal-area conic projection, should be used if more accurate calculations of distance or area are required. This product is generated from the USDA-NRCS certified data as of the version date(s) listed below. Soil Survey Area: Larimer County Area, Colorado Survey Area Data: Version 15, Jun 9, 2020 Soil map units are labeled (as space allows) for map scales 1:50,000 or larger. Date(s) aerial images were photographed: Aug 11, 2018—Aug 12, 2018 The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident. Custom Soil Resource Report 10 Map Unit Legend Map Unit Symbol Map Unit Name Acres in AOI Percent of AOI 55 Kim loam, 5 to 9 percent slopes 0.3 1.6% 56 Kim-Thedalund loams, 3 to 15 percent slopes 5.8 36.2% 65 Midway clay loam, 5 to 25 percent slopes 2.1 13.0% 108 Thedalund loam, 3 to 9 percent slopes 7.9 49.2% Totals for Area of Interest 16.0 100.0% Map Unit Descriptions The map units delineated on the detailed soil maps in a soil survey represent the soils or miscellaneous areas in the survey area. The map unit descriptions, along with the maps, can be used to determine the composition and properties of a unit. A map unit delineation on a soil map represents an area dominated by one or more major kinds of soil or miscellaneous areas. A map unit is identified and named according to the taxonomic classification of the dominant soils. Within a taxonomic class there are precisely defined limits for the properties of the soils. On the landscape, however, the soils are natural phenomena, and they have the characteristic variability of all natural phenomena. Thus, the range of some observed properties may extend beyond the limits defined for a taxonomic class. Areas of soils of a single taxonomic class rarely, if ever, can be mapped without including areas of other taxonomic classes. Consequently, every map unit is made up of the soils or miscellaneous areas for which it is named and some minor components that belong to taxonomic classes other than those of the major soils. Most minor soils have properties similar to those of the dominant soil or soils in the map unit, and thus they do not affect use and management. These are called noncontrasting, or similar, components. They may or may not be mentioned in a particular map unit description. Other minor components, however, have properties and behavioral characteristics divergent enough to affect use or to require different management. These are called contrasting, or dissimilar, components. They generally are in small areas and could not be mapped separately because of the scale used. Some small areas of strongly contrasting soils or miscellaneous areas are identified by a special symbol on the maps. If included in the database for a given area, the contrasting minor components are identified in the map unit descriptions along with some characteristics of each. A few areas of minor components may not have been observed, and consequently they are not mentioned in the descriptions, especially where the pattern was so complex that it was impractical to make enough observations to identify all the soils and miscellaneous areas on the landscape. The presence of minor components in a map unit in no way diminishes the usefulness or accuracy of the data. The objective of mapping is not to delineate Custom Soil Resource Report 11 pure taxonomic classes but rather to separate the landscape into landforms or landform segments that have similar use and management requirements. The delineation of such segments on the map provides sufficient information for the development of resource plans. If intensive use of small areas is planned, however, onsite investigation is needed to define and locate the soils and miscellaneous areas. An identifying symbol precedes the map unit name in the map unit descriptions. Each description includes general facts about the unit and gives important soil properties and qualities. Soils that have profiles that are almost alike make up a soil series. Except for differences in texture of the surface layer, all the soils of a series have major horizons that are similar in composition, thickness, and arrangement. Soils of one series can differ in texture of the surface layer, slope, stoniness, salinity, degree of erosion, and other characteristics that affect their use. On the basis of such differences, a soil series is divided into soil phases. Most of the areas shown on the detailed soil maps are phases of soil series. The name of a soil phase commonly indicates a feature that affects use or management. For example, Alpha silt loam, 0 to 2 percent slopes, is a phase of the Alpha series. Some map units are made up of two or more major soils or miscellaneous areas. These map units are complexes, associations, or undifferentiated groups. A complex consists of two or more soils or miscellaneous areas in such an intricate pattern or in such small areas that they cannot be shown separately on the maps. The pattern and proportion of the soils or miscellaneous areas are somewhat similar in all areas. Alpha-Beta complex, 0 to 6 percent slopes, is an example. An association is made up of two or more geographically associated soils or miscellaneous areas that are shown as one unit on the maps. Because of present or anticipated uses of the map units in the survey area, it was not considered practical or necessary to map the soils or miscellaneous areas separately. The pattern and relative proportion of the soils or miscellaneous areas are somewhat similar. Alpha-Beta association, 0 to 2 percent slopes, is an example. An undifferentiated group is made up of two or more soils or miscellaneous areas that could be mapped individually but are mapped as one unit because similar interpretations can be made for use and management. The pattern and proportion of the soils or miscellaneous areas in a mapped area are not uniform. An area can be made up of only one of the major soils or miscellaneous areas, or it can be made up of all of them. Alpha and Beta soils, 0 to 2 percent slopes, is an example. Some surveys include miscellaneous areas. Such areas have little or no soil material and support little or no vegetation. Rock outcrop is an example. Custom Soil Resource Report 12 Larimer County Area, Colorado 55—Kim loam, 5 to 9 percent slopes Map Unit Setting National map unit symbol: jpwz Elevation: 4,800 to 5,600 feet Mean annual precipitation: 13 to 15 inches Mean annual air temperature: 48 to 50 degrees F Frost-free period: 135 to 150 days Farmland classification: Farmland of local importance Map Unit Composition Kim and similar soils:85 percent Minor components:15 percent Estimates are based on observations, descriptions, and transects of the mapunit. Description of Kim Setting Landform:Fans Landform position (three-dimensional):Base slope, side slope Down-slope shape:Linear Across-slope shape:Linear Parent material:Mixed alluvium Typical profile H1 - 0 to 7 inches: loam H2 - 7 to 60 inches: loam, clay loam, sandy clay loam H2 - 7 to 60 inches: H2 - 7 to 60 inches: Properties and qualities Slope:5 to 9 percent Depth to restrictive feature:More than 80 inches Drainage class:Well drained Runoff class: Medium Capacity of the most limiting layer to transmit water (Ksat):Moderately high to high (0.60 to 2.00 in/hr) Depth to water table:More than 80 inches Frequency of flooding:None Frequency of ponding:None Calcium carbonate, maximum content:15 percent Maximum salinity:Nonsaline to slightly saline (0.0 to 4.0 mmhos/cm) Available water capacity:Very high (about 26.5 inches) Interpretive groups Land capability classification (irrigated): 4e Land capability classification (nonirrigated): 6e Hydrologic Soil Group: B Ecological site: R067XY002CO - Loamy Plains Hydric soil rating: No Custom Soil Resource Report 13 Minor Components Thedalund Percent of map unit:10 percent Hydric soil rating: No Stoneham Percent of map unit:5 percent Hydric soil rating: No 56—Kim-Thedalund loams, 3 to 15 percent slopes Map Unit Setting National map unit symbol: jpx0 Elevation: 4,800 to 5,600 feet Mean annual precipitation: 13 to 15 inches Mean annual air temperature: 48 to 50 degrees F Frost-free period: 135 to 150 days Farmland classification: Not prime farmland Map Unit Composition Kim and similar soils:45 percent Thedalund and similar soils:35 percent Minor components:20 percent Estimates are based on observations, descriptions, and transects of the mapunit. Description of Kim Setting Landform:Fans, valley sides Landform position (three-dimensional):Base slope, side slope Down-slope shape:Linear Across-slope shape:Linear Parent material:Mixed alluvium Typical profile H1 - 0 to 7 inches: loam H2 - 7 to 60 inches: loam, clay loam, sandy clay loam H2 - 7 to 60 inches: H2 - 7 to 60 inches: Properties and qualities Slope:3 to 7 percent Depth to restrictive feature:More than 80 inches Drainage class:Well drained Runoff class: Medium Capacity of the most limiting layer to transmit water (Ksat):Moderately high to high (0.60 to 2.00 in/hr) Depth to water table:More than 80 inches Frequency of flooding:None Custom Soil Resource Report 14 Frequency of ponding:None Calcium carbonate, maximum content:15 percent Maximum salinity:Nonsaline to slightly saline (0.0 to 4.0 mmhos/cm) Available water capacity:Very high (about 26.5 inches) Interpretive groups Land capability classification (irrigated): 3e Land capability classification (nonirrigated): 4e Hydrologic Soil Group: B Ecological site: R067XY002CO - Loamy Plains Hydric soil rating: No Description of Thedalund Setting Landform position (three-dimensional):Side slope Down-slope shape:Linear Across-slope shape:Linear Parent material:Material weathered from sandstone and shale Typical profile H1 - 0 to 4 inches: loam H2 - 4 to 33 inches: clay loam, loam, sandy clay loam H2 - 4 to 33 inches: weathered bedrock H2 - 4 to 33 inches: H3 - 33 to 37 inches: Properties and qualities Slope:7 to 15 percent Depth to restrictive feature:20 to 40 inches to paralithic bedrock Drainage class:Well drained Runoff class: Medium Capacity of the most limiting layer to transmit water (Ksat):Moderately low to high (0.06 to 2.00 in/hr) Depth to water table:More than 80 inches Frequency of flooding:None Frequency of ponding:None Calcium carbonate, maximum content:15 percent Maximum salinity:Nonsaline to moderately saline (0.0 to 8.0 mmhos/cm) Available water capacity:Very high (about 15.5 inches) Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 6e Hydrologic Soil Group: C Ecological site: R067XY002CO - Loamy Plains Hydric soil rating: No Minor Components Renohill Percent of map unit:10 percent Hydric soil rating: No Midway Percent of map unit:9 percent Hydric soil rating: No Custom Soil Resource Report 15 Aquic haplustolls Percent of map unit:1 percent Landform:Swales Hydric soil rating: Yes 65—Midway clay loam, 5 to 25 percent slopes Map Unit Setting National map unit symbol: jpxb Elevation: 4,800 to 5,800 feet Mean annual precipitation: 13 to 15 inches Mean annual air temperature: 48 to 50 degrees F Frost-free period: 135 to 150 days Farmland classification: Not prime farmland Map Unit Composition Midway and similar soils:90 percent Minor components:10 percent Estimates are based on observations, descriptions, and transects of the mapunit. Description of Midway Setting Landform position (three-dimensional):Side slope Down-slope shape:Linear Across-slope shape:Linear Parent material:Material weathered from shale Typical profile H1 - 0 to 4 inches: clay loam H2 - 4 to 19 inches: clay, clay loam, silty clay loam H2 - 4 to 19 inches: weathered bedrock H2 - 4 to 19 inches: H3 - 19 to 23 inches: Properties and qualities Slope:5 to 25 percent Depth to restrictive feature:6 to 20 inches to paralithic bedrock Drainage class:Well drained Runoff class: Very high Capacity of the most limiting layer to transmit water (Ksat):Moderately low to moderately high (0.06 to 0.20 in/hr) Depth to water table:More than 80 inches Frequency of flooding:None Frequency of ponding:None Calcium carbonate, maximum content:15 percent Gypsum, maximum content:15 percent Maximum salinity:Very slightly saline to moderately saline (2.0 to 8.0 mmhos/cm) Sodium adsorption ratio, maximum:15.0 Custom Soil Resource Report 16 Available water capacity:Moderate (about 7.9 inches) Interpretive groups Land capability classification (irrigated): 6e Land capability classification (nonirrigated): 6e Hydrologic Soil Group: D Ecological site: R067BY045CO - Shaly Plains Hydric soil rating: No Minor Components Renohill Percent of map unit:10 percent Hydric soil rating: No 108—Thedalund loam, 3 to 9 percent slopes Map Unit Setting National map unit symbol: jpv1 Elevation: 4,800 to 5,600 feet Mean annual precipitation: 13 to 15 inches Mean annual air temperature: 48 to 50 degrees F Frost-free period: 135 to 150 days Farmland classification: Not prime farmland Map Unit Composition Thedalund and similar soils:90 percent Minor components:10 percent Estimates are based on observations, descriptions, and transects of the mapunit. Description of Thedalund Setting Landform position (three-dimensional):Side slope Down-slope shape:Linear Across-slope shape:Linear Parent material:Material weathered from sandstone and shale Typical profile H1 - 0 to 6 inches: loam H2 - 6 to 37 inches: clay loam, loam, sandy clay loam H2 - 6 to 37 inches: weathered bedrock H2 - 6 to 37 inches: H3 - 37 to 41 inches: Properties and qualities Slope:3 to 9 percent Depth to restrictive feature:20 to 40 inches to paralithic bedrock Drainage class:Well drained Runoff class: Medium Custom Soil Resource Report 17 Capacity of the most limiting layer to transmit water (Ksat):Moderately low to high (0.06 to 2.00 in/hr) Depth to water table:More than 80 inches Frequency of flooding:None Frequency of ponding:None Calcium carbonate, maximum content:15 percent Maximum salinity:Nonsaline to moderately saline (0.0 to 8.0 mmhos/cm) Available water capacity:Very high (about 16.8 inches) Interpretive groups Land capability classification (irrigated): 4e Land capability classification (nonirrigated): 6e Hydrologic Soil Group: C Ecological site: R067XY002CO - Loamy Plains Hydric soil rating: No Minor Components Kim Percent of map unit:6 percent Hydric soil rating: No Renohill Percent of map unit:4 percent Hydric soil rating: No Custom Soil Resource Report 18 A PPENDIX D D RAINAGE E XHIBITS COLLEGE AVE (HWY 287)VENUS AVESKYVIEW SUBDIVISIONZONED RLOS13.27EX12.12EX21.70EX30.41EX40.38EX57.97FOSSIL CREEKS COLLEGE AVER.O.W BOUNDARYEXISTING WETLANDSOS26.22EX66.44EROSION BUFFER LIMITS (TYP)LANG GULCHEXISTING 12" CULVERTPATH:0'150'300'SCALE: 1" = 150'75'C:\UNITED CIVIL DROPBOX\PROJECTS\U21004 - NISSAN DEALERSHIP\CADD\ET\EXISTING DRAINAGE MAP.DWG EXISTING DRAINAGE MAPDRAWING NAME:SHEET SIZE: 11 x 17 FORT COLLINS NISSANEXISTING DRAINAGE MAPDATE:April 24, 2022PREPARED FOR:TCC CORPORATIONJOB NUMBER:U21004NOTE:THIS EXHIBIT WAS PREPARED FOR INFORMATION ONLY AND THE ENGINEER PREPARING THESE PLANS WILL NOT BE RESPONSIBLE FOR UNAUTHORIZED USE OF THEM.SHEETOF11NORTH19 OLD TOWN SQUARE #238 | FORT COLLINS, CO 80524 | (970) 530-4044 | www.unitedcivil.comUNITED CIVILDesign GroupEXISTING MAJOR CONTOUREXISTING MINOR CONTOURXX.XXBASIN DESIGNATIONEXISTING BASINEXISTING BASIN LINELEGENDBASIN AREA (ACRE) COLLEGE AVE (HWY 287)VENUS AVESKYVIEW SUBDIVISIONZONED RL FOSSIL CREEKPROPOSEDBUILDINGBIO.POND A2BIO. POND A3UNDERGROUND WATER QUALITY& DETENTION POND C1PROPOSEDBUILDINGBASINSA2, A4-A5, A7-A16BASINSC3-C6BASINSB2-B7LANG GULCHEXISTINGSCHOOL POND A1BASINSA1, A3, A6, B1BASINSC1-C2UNDERGROUND WATERQUALITY POND C2PATH:0'150'300'SCALE: 1" = 150'75'C:\UNITED CIVIL DROPBOX\PROJECTS\U21004 - NISSAN DEALERSHIP\CADD\ET\LID MAP.DWG LID MAPDRAWING NAME:SHEET SIZE: 11 x 17 FORT COLLINS NISSANLID & BMP TREATMENT MAPDATE:June 13, 2022PREPARED FOR:TCC CORPORATIONJOB NUMBER:U21004NOTE:THIS EXHIBIT WAS PREPARED FOR INFORMATION ONLY AND THE ENGINEER PREPARING THESE PLANS WILL NOT BE RESPONSIBLE FOR UNAUTHORIZED USE OF THEM.SHEETOF11NORTH19 OLD TOWN SQUARE #238 | FORT COLLINS, CO 80524 | (970) 530-4044 | www.unitedcivil.comUNITED CIVILDesign GroupPROPOSED MAJOR CONTOURPROPOSED MINOR CONTOUR BASIN BOUNDARYLEGENDBIORETENTION TREATMENTUNDERGROUND CHAMBERSTREATMENTEXTENDED DETENTIONTREATMENT SMOKEYSTREETCOLLEGE AVE (HWY 287) VENUS AVE DETENTION POND A1BIORETENTIONPOND A2NISSAN DEALERSHIP BUILDINGP U B L I C ROWDETENTIONPOND A1FOSSIL CREEKA8.31B3.50C4.11D0.45FLOODPLAIN CROSS SECTION #31323100-YEAR FLOOD ELEVATION -4952.2 (NGVD 29)4955.4 (NAVD 88)LANG GULCHNATURALHABITATBUFFER ZONE72' ROWPROPOSEDSTORM (TYP.)POND A1 OUTLET STRUCTUREUNDERGROUNDWQ & DETENTION(POND C1)REROUTED IRRIGATION LINE(LOUDON DITCH CO.)72' ROWE2.08BUENODRIVESKYVIEW SUBDIVISIONZONED RLSILVERTHORNE LLCZONED MMNRISING SUNMINOR SUBZONED CGSSTM INVESTMENTS LLCZONED CGREDTAIL PONDS NATURAL AREAZONED POLBNSF RAILWAY KIA DEALERSHIP BUILDINGEXISTINGBUILDINGROCK OUTCROPPING LIMITSOS13.27FOSSIL CREEKFLOODPLAIN/FLOODWAYFOSSIL CREEKFLOODPLAIN/FLOODWAYEROSION BUFFER LIMITSEXISTING WETLANDSEXISTING WETLANDSFLOODPLAIN C R O S S S E C T I O N # 1 5 9 9 100 - Y E A R F L O O D E L E V A T I O N - 4 9 8 3 . 4 ( N G V D 2 9 ) 4 9 8 6 . 6 ( N A V D 8 8 ) FLOODPLAIN CROSS SECTION #2000100-YEAR FLOOD ELEVATION -4983.4 (NGVD 29)4986.6 (NAVD 88)LOT 23LOT 24LOT 25LOT 26LOT 27LOT 28LOT 31LOT 29LOT 32LOT 1LOT 2LOT 30MILKY WAYMARS DRIVE MERCURY DRIVE #5822 #5828 #5834 #200#206#214#218#201#5836 #5835 #5817 EXISTING#224#230#234#5836 LOT 1BLOCK 1LOT 2BLOCK 1LOT 1BLOCK 2TRACT ATRACT BTRACT CTRACT DFLOODPLAIN CROSS SECTION #31957100-YEAR FLOOD ELEVATION -4956.0 (NGVD 29)4959.2 (NAVD 88)OS26.36FOSSIL CREEK TRAIL CULVERTEXISTING Q100 = 31.7 CFSPROPOSED Q100 = 23.7 CFSEXISTING Q10 = 12.4 CFSPROPOSED Q10 = 9.6 CFSEXISTING Q2 = 7.3 CFSPROPOSED Q2 = 5.8 CFSWETLANDS RESTORATION AREA0.070 ACRES AT BOTTOM OF PONDBIORETENTIONPOND A3EROSION BUFFER LIMITSFLOODPLAIN CROSS SECTION # 3 2 3 3 1 100-YEAR FLOOD E L E V A T I O N - 4958.4 (NG V D 2 9 ) 4961. 6 ( N A V D 8 8 ) FLOODPLAIN CROSS SECTION #32498100-YEAR FLOOD ELEVATION -4958.6 (NGVD 29)4961.8 (NAVD 88)FLOODPLAIN CROSS SECTION #1145100-YEAR FLOOD ELEVATION -4983.4 (NGVD 29)4986.6 (NAVD 88)FLOODPLAIN CROSS SECTION #2304100-YEAR FLOOD ELEVATION -4983.4 (NGVD 29)4986.6 (NAVD 88) TURF REINFORCEMENT MATTINGUNDERGROUNDWQ (POND C2)PROPOSED STORM SEWER (TYP.)DP4DP3DP1DPEDP2LANG GULCH OUTFALLPOND A1 RELEASE = 2.67 CFSDPD30' DRAINAGE EASEMENTFFE=5020.00FFE=5022.25U210041" = 80'1" = N/ANORTH 9/13/2022 4:25:42 PMC:\UNITED CIVIL DROPBOX\PROJECTS\U21004 - NISSAN DEALERSHIP\CADD\CP\C6.00 - OVERALL DRAINAGE PLAN.DWGC6.00 - OVERALL DRAINAGE PLAN###### OVERALL DRAINAGE PLAN080'160'SCALE: 1" = 80'40'PREPARED FOR:JOB NUMBERSHEET NUMBERSHEETSOFDATE SUBMITTED:VERTICAL:HORIZONTAL:SCALEPRELIMINARYP L A N SNOT FOR CONSTRUCTIONPROJ. MGR:DRAWING NAME:PATH:DESIGNER:DATE:TIME: The engineer preparing these plans will not be responsible for, or liable for, unauthorized changes to or uses of these plans. All changes to the plans must be in writing and must be approved by the preparer of these plans. NO.BY DATE CAUTIONREVISIONS:CIVIL ENGINEERING & CONSULTINGUNITED CIVILDesign Group19 OLD TOWN SQUARE #238FORT COLLINS, CO 80524(970) 530-4044www.unitedcivil.comTCC CORPORATION FORT COLLINS NISSAN-KIA 9/14/2022U21004 PROPOSED MAJOR CONTOURPROPOSED MINOR CONTOURLEGENDEXISTING MAJOR CONTOUREXISTING MINOR CONTOUREXISTING PROPERTY BOUNDARYRIGHT OF WAYXX.XXBASIN DESIGNATIONBASIN AREA (ACRE)PROPOSED BASINPROPOSED BASIN LINE1.REFER TO SHEETS C6.01-C6.02 FOR DETAILED DRAINAGE PLANS.2.THE TOP OF FOUNDATION ELEVATIONS SHOWN ARE THE MINIMUMELEVATIONS REQUIRED FOR PROTECTION FROM THE 100-YEARSTORM. MINIMUM FINISHED FLOOR ELEVATIONS ABOVE THE100-YEAR WATER SURFACE IN STREETS, CHANNELS, DITCHES,SWALES, OR OTHER DRAINAGE FACILITIES, AS ILLUSTRATED BY AMASTER GRADING PLAN ARE TO BE SHOWN.NOTES1.THE DEVELOPER SHALL OBTAIN A FLOODPLAIN USE PERMIT FROMTHE CITY OF FORT COLLINS AND PAY ALL APPLICABLEFLOODPLAIN USE PERMIT FEES PRIOR TO COMMENCING ANYCONSTRUCTION ACTIVITY (BUILDING OF STRUCTURES, GRADING,FILL, DETENTION PONDS, BIKE PATHS, PARKING LOTS, UTILITIES,LANDSCAPED AREAS, FLOOD CONTROL CHANNELS, ETC.) WITHINTHE FOSSIL CREEK FLOODPLAIN/FLOODWAY AND EROSIONBUFFER LIMITS. ALL ACTIVITIES WITHIN THE FLOODPLAIN ANDEROSION BUFFER ARE SUBJECT TO THE REQUIREMENTS OFCHAPTER 10 OF THE FORT COLLINS MUNICIPAL CODE.2.CONSTRUCTION OF NEW STRUCTURES, HARD SURFACE PATHS,WALKWAYS, DRIVEWAYS, WALLS, AND PARKING AREAS ISPROHIBITED IN THE FLOODWAY UNLESS NO-RISE CONDITIONS AREMET, PER SECTION 10-45 OF CITY CODE. ANY CONSTRUCTIONACTIVITIES IN THE REGULATORY FLOODWAY MUST ALSO INCLUDEA NO-RISE CERTIFICATION PREPARED BY A PROFESSIONALENGINEER LICENSED IN COLORADO.3.STORAGE OF EQUIPMENT AND MATERIALS (TEMPORARY ORPERMANENT) IS NOT ALLOWED IN THE FLOODWAY.4.ANY ITEMS IN THE FLOODWAY THAT CAN FLOAT SUCH AS BIKERACKS, PICNIC TABLES, ETC. MUST BE ANCHORED.5.A STABILITY STUDY MAY BE REQUIRED FOR WORK WITHIN THEEROSION BUFFER.6.THE NATURAL HABITAT BUFFER ZONE IS INTENDED TO BEMAINTAINED IN A NATIVE LANDSCAPE. PLEASE SEE SECTION 3.4.1OF THE LAND USE CODE FOR ALLOWABLE USES WITHIN THENATURAL HABITAT BUFFER ZONE.FLOODPLAIN NOTESDESIGN / CONCENTRATION POINTFLOW DIRECTIONDP1C6.009165 COLLEGE AVE (HWY 287)FOSSIL CREEK TRA IL FOSSIL CREEKFLOODPLAIN/FLOODWAYEROSION BUFFER LIMITSEXISTING WETLANDSPROPERTY BOUNDARYV E N U S A V E NU EA50.400.891.00A110.310.790.99A130.940.951.00B40.380.891.00B60.220.680.85B70.300.790.98C10.610.841.00C20.900.650.81C3.20.640.921.00C60.040.951.00E12.120.790.99DPB4DPB5DPB6DPB7DPA13DPC6DPC3.1DPC2DPC1DPE1FLOODPLAIN CROSS SECTION #31323100-YEAR FLOOD ELEVATION -4952.2 (NGVD 29)4955.4 (NAVD 88)FLOODPLAIN CROSS SECTION #31957100-YEAR FLOOD ELEVATION -4956.0 (NGVD 29)4959.2 (NAVD 88)TRACT CTRACT DLOT 1BLOCK 2LOT 1BLOCK 1OS26.360.250.31FOSSIL CREEK TRAIL CULVERTEXISTING Q100 = 31.74 CFSPROPOSED Q100 = 23.74 CFSEXISTING Q10 = 12.4 CFSPROPOSED Q10 = 9.6 CFSEXISTING Q2 = 7.3 CFSPROPOSED Q2 = 5.8 CFSAAUNDERGROUNDPOND C1FOSSIL CREEK UNDERGROUND WATERQUALITY TREATMENT POND C2(SEE DRAINAGE REPORT)NISSAN DEALERSHIPBUILDINGDP4DP3FFE=5020.00DPC5C50.200.881.00C40.650.881.00DPC45.55 LP10.97 LP96.07 LP96.10 LP16.42 LP14.09 LP1 9 . 0 2 H P SEE DRAINAGE REPORTC3.10.930.911.00DPC3.21" = 40'1" = N/A9/13/2022 4:28:19 PMC:\UNITED CIVIL DROPBOX\PROJECTS\U21004 - NISSAN DEALERSHIP\CADD\CP\C6.0X - DETAILED DRAINAGE PLANS.DWGC6.0X - DETAILED DRAINAGE PLANS####C6.0191DETAILED DRAINAGE PLAN - NORTH PREPARED FOR:JOB NUMBERSHEET NUMBERSHEETSOFDATE SUBMITTED:VERTICAL:HORIZONTAL:SCALEPRELIMINARYP L A N SNOT FOR CONSTRUCTIONPROJ. MGR:DRAWING NAME:PATH:DESIGNER:DATE:TIME: The engineer preparing these plans will not be responsible for, or liable for, unauthorized changes to or uses of these plans. All changes to the plans must be in writing and must be approved by the preparer of these plans. NO.BY DATE CAUTIONREVISIONS:CIVIL ENGINEERING & CONSULTINGUNITED CIVILDesign Group19 OLD TOWN SQUARE #238FORT COLLINS, CO 80524(970) 530-4044www.unitedcivil.comTCC CORPORATION FORT COLLINS NISSAN-KIA 9/14/2022U2100466X.XXX.XXXX.XXBASIN DESIGNATIONBASIN AREA (ACRE)2 - YR RUNOFF COEFF.100 - YR RUNOFF COEFF.DESIGN / CONCENTRATION POINTFLOW DIRECTIONDPD1LEGENDCOLLEGE AVE (HWY 287)VENUS AVENUEMILKY WAYNKEYMAP1.REFER TO SHEET C6.00 FOR THE OVERALL DRAINAGE PLAN.2.THE TOP OF FOUNDATION ELEVATIONS SHOWN ARE THE MINIMUMELEVATIONS REQUIRED FOR PROTECTION FROM THE 100-YEARSTORM. MINIMUM FINISHED FLOOR ELEVATIONS ABOVE THE100-YEAR WATER SURFACE IN STREETS, CHANNELS, DITCHES,SWALES, OR OTHER DRAINAGE FACILITIES, AS ILLUSTRATED BY AMASTER GRADING PLAN ARE TO BE SHOWN.NOTES1.THE DEVELOPER SHALL OBTAIN A FLOODPLAIN USE PERMIT FROMTHE CITY OF FORT COLLINS AND PAY ALL APPLICABLEFLOODPLAIN USE PERMIT FEES PRIOR TO COMMENCING ANYCONSTRUCTION ACTIVITY (BUILDING OF STRUCTURES, GRADING,FILL, DETENTION PONDS, BIKE PATHS, PARKING LOTS, UTILITIES,LANDSCAPED AREAS, FLOOD CONTROL CHANNELS, ETC.) WITHINTHE FOSSIL CREEK FLOODPLAIN/FLOODWAY AND EROSIONBUFFER LIMITS. ALL ACTIVITIES WITHIN THE FLOODPLAIN ANDEROSION BUFFER ARE SUBJECT TO THE REQUIREMENTS OFCHAPTER 10 OF THE FORT COLLINS MUNICIPAL CODE.2.CONSTRUCTION OF NEW STRUCTURES, HARD SURFACE PATHS,WALKWAYS, DRIVEWAYS, WALLS, AND PARKING AREAS ISPROHIBITED IN THE FLOODWAY UNLESS NO-RISE CONDITIONS AREMET, PER SECTION 10-45 OF CITY CODE. ANY CONSTRUCTIONACTIVITIES IN THE REGULATORY FLOODWAY MUST ALSO INCLUDEA NO-RISE CERTIFICATION PREPARED BY A PROFESSIONALENGINEER LICENSED IN COLORADO.3.STORAGE OF EQUIPMENT AND MATERIALS (TEMPORARY ORPERMANENT) IS NOT ALLOWED IN THE FLOODWAY.4.ANY ITEMS IN THE FLOODWAY THAT CAN FLOAT SUCH AS BIKERACKS, PICNIC TABLES, ETC. MUST BE ANCHORED.5.A STABILITY STUDY MAY BE REQUIRED FOR WORK WITHIN THEEROSION BUFFER.6.THE NATURAL HABITAT BUFFER ZONE IS INTENDED TO BEMAINTAINED IN A NATIVE LANDSCAPE. PLEASE SEE SECTION 3.4.1OF THE LAND USE CODE FOR ALLOWABLE USES WITHIN THENATURAL HABITAT BUFFER ZONE.FLOODPLAIN NOTES90.30PROPOSED SPOT ELEVATION LP = LOW POINT HP = HIGH POINT3.13EXISTING GRADEPROPOSED MAJOR CONTOURPROPOSED MINOR CONTOUREXISTING MAJOR CONTOUREXISTING MINOR CONTOUREXISTING PROPERTY BOUNDARYRIGHT OF WAY BIORETENTION POND A2DETENTION POND A1BIORETENTIONVENUS AVENUECOLLEGE AVE (HWY 287)MILKY WAYMARS DRIVE #5822 EXISTING #5828 EXISTING #5834 EXISTING #200EXISTING#206EXISTING#214EXISTING#218EXISTING#201EXISTING#5836EXISTING#5835EXISTING #5817EXISTING#224EXISTING#230EXISTINGLOT 1RISING SONMANORSUBDIVISIONA10.950.250.31A20.570.250.31A30.490.760.95A40.600.690.86A50.400.891.00A60.200.710.88A70.390.851.00A80.110.951.00A90.140.951.00A100.680.780.98A110.310.790.99A120.560.811.00A130.940.951.00A140.440.790.99A150.860.881.00A160.770.951.00B10.460.250.31B31.100.740.93B50.540.851.00B60.220.680.85B70.300.790.98OS13.270.550.69D10.490.720.90DPA1DPA2DPB1DPB3DPB4DPB5DPB6DPB7DPA5DPA7DPA13DPD1DPA14DPA15DPA9DPA10DPA11DPA12DPA6DP1DPA8DPA4POND A3LOT 2BLOCK 1TRACT ATRACT BLOT 1BLOCK 2DETENTIONPOND A1B20.480.250.31KIA DEALERSHIPBUILDINGDP2WSEL = 5010.00WQ WSEL = 5010.00WQ WSEL = 5007.40WSEL = 5010.00FFE=5022.2514.09 LP11.08 LP15.11 HP11.81 LP13.94 LP14.90 LP18.00 LP1 8 . 2 0 L P 18.15 LP19.02 HP18.75 LP20.43 LP20.49 LP21.33 LP21.21 HP20.53 LP21.63 HP21.79 HP19.32 HP20.44 HP5.12 LP2.40 LP9.00 LP15.54 LP21.30 HP1" = 40'1" = N/A9/13/2022 4:28:54 PMC:\UNITED CIVIL DROPBOX\PROJECTS\U21004 - NISSAN DEALERSHIP\CADD\CP\C6.0X - DETAILED DRAINAGE PLANS.DWGC6.0X - DETAILED DRAINAGE PLANS####C6.0291DETAILED DRAINAGE PLAN - SOUTH PREPARED FOR:JOB NUMBERSHEET NUMBERSHEETSOFDATE SUBMITTED:VERTICAL:HORIZONTAL:SCALEPRELIMINARYP L A N SNOT FOR CONSTRUCTIONPROJ. MGR:DRAWING NAME:PATH:DESIGNER:DATE:TIME: The engineer preparing these plans will not be responsible for, or liable for, unauthorized changes to or uses of these plans. All changes to the plans must be in writing and must be approved by the preparer of these plans. NO.BY DATE CAUTIONREVISIONS:CIVIL ENGINEERING & CONSULTINGUNITED CIVILDesign Group19 OLD TOWN SQUARE #238FORT COLLINS, CO 80524(970) 530-4044www.unitedcivil.comTCC CORPORATION FORT COLLINS NISSAN-KIA 9/14/2022U2100467X.XXX.XXXX.XXBASIN DESIGNATIONBASIN AREA (ACRE)2 - YR RUNOFF COEFF.100 - YR RUNOFF COEFF.DESIGN / CONCENTRATION POINTFLOW DIRECTIONDPD1LEGENDCOLLEGE AVE (HWY 287)VENUS AVENUEMILKY WAYNKEYMAP1.REFER TO SHEET C6.00 FOR THE OVERALL DRAINAGE PLAN.2.THE TOP OF FOUNDATION ELEVATIONS SHOWN ARE THE MINIMUMELEVATIONS REQUIRED FOR PROTECTION FROM THE 100-YEARSTORM. MINIMUM FINISHED FLOOR ELEVATIONS ABOVE THE100-YEAR WATER SURFACE IN STREETS, CHANNELS, DITCHES,SWALES, OR OTHER DRAINAGE FACILITIES, AS ILLUSTRATED BY AMASTER GRADING PLAN ARE TO BE SHOWN.NOTES1.THE DEVELOPER SHALL OBTAIN A FLOODPLAIN USE PERMIT FROMTHE CITY OF FORT COLLINS AND PAY ALL APPLICABLEFLOODPLAIN USE PERMIT FEES PRIOR TO COMMENCING ANYCONSTRUCTION ACTIVITY (BUILDING OF STRUCTURES, GRADING,FILL, DETENTION PONDS, BIKE PATHS, PARKING LOTS, UTILITIES,LANDSCAPED AREAS, FLOOD CONTROL CHANNELS, ETC.) WITHINTHE FOSSIL CREEK FLOODPLAIN/FLOODWAY AND EROSIONBUFFER LIMITS. ALL ACTIVITIES WITHIN THE FLOODPLAIN ANDEROSION BUFFER ARE SUBJECT TO THE REQUIREMENTS OFCHAPTER 10 OF THE FORT COLLINS MUNICIPAL CODE.2.CONSTRUCTION OF NEW STRUCTURES, HARD SURFACE PATHS,WALKWAYS, DRIVEWAYS, WALLS, AND PARKING AREAS ISPROHIBITED IN THE FLOODWAY UNLESS NO-RISE CONDITIONS AREMET, PER SECTION 10-45 OF CITY CODE. ANY CONSTRUCTIONACTIVITIES IN THE REGULATORY FLOODWAY MUST ALSO INCLUDEA NO-RISE CERTIFICATION PREPARED BY A PROFESSIONALENGINEER LICENSED IN COLORADO.3.STORAGE OF EQUIPMENT AND MATERIALS (TEMPORARY ORPERMANENT) IS NOT ALLOWED IN THE FLOODWAY.4.ANY ITEMS IN THE FLOODWAY THAT CAN FLOAT SUCH AS BIKERACKS, PICNIC TABLES, ETC. MUST BE ANCHORED.5.A STABILITY STUDY MAY BE REQUIRED FOR WORK WITHIN THEEROSION BUFFER.6.THE NATURAL HABITAT BUFFER ZONE IS INTENDED TO BEMAINTAINED IN A NATIVE LANDSCAPE. PLEASE SEE SECTION 3.4.1OF THE LAND USE CODE FOR ALLOWABLE USES WITHIN THENATURAL HABITAT BUFFER ZONE.FLOODPLAIN NOTES90.30PROPOSED SPOT ELEVATION LP = LOW POINT HP = HIGH POINT3.13EXISTING GRADEPROPOSED MAJOR CONTOURPROPOSED MINOR CONTOUREXISTING MAJOR CONTOUREXISTING MINOR CONTOUREXISTING PROPERTY BOUNDARYRIGHT OF WAY