HomeMy WebLinkAboutFORT COLLINS NISSAN-KIA - FDP220011 - SUBMITTAL DOCUMENTS - ROUND 2 - ELEVATIONSFIRST FLOOR
EL. = 100' - 0"
T.O. HIGH PARAPET
EL. = 139' - 0"
SECOND FLOOR
EL. = 120' - 0"
CLEAR GLAZING IN ALUMINUM FRAMES (ALL INTERIOR FRAMES
BOTH VERTICAL AND HORIZONTAL ARE CLEAR ANODIZED; ALL
EXTERIOR HORIZONTAL ARE CHARCOAL, ALL EXTERIOR
VERTICAL ARE BUTT GLAZED).
T.O. ENTRY ELEMENT
EL. = 120' - 3"
T.O PARAPET
(TOP)6'-3"14'-0" (BASE)EL. = 143' - 0"
MAIN ENTRY OVERHANG /
ARCHITECTURAL ELEMENT
W/ INTEGRATED RECESSED
CAN LIGHT FIXTURES
31'-0" (BASE)8'-3" (TOP)(TOP)11'-3"14'-0" (BASE)ADA AUTOMATIC DOOR
OPERATOR BUTTON
9
35'-3"37'-3"ACM-3
ACM-1
CF-1
ACM-3
CF-3 ACM-1
CF-1
ACM-3
ACM-3
CF-3 ACM-1
CF-1
ACM-3
SF-1
SF-1
FIRST FLOOR
EL. = 100' - 0"
T.O. HIGH PARAPET
EL. = 139' - 0"
T.O. ENTRY ELEMENT
EL. = 116' - 3"
T.O PARAPET
14'-0" (BASE)16'-3" (TOP)KNOX BOX
PER AHJ31'-0" (BASE)8'-3" (TOP)EL. = 143' - 0"
GAS METER
CF-1
ACM-3
ACM-1
CMU-1
MP-1
B-1 B-1
ACM-3
B-1
CF-3
CF-3
CF-1
ACM-3
ACM-3
206 East 4th Street, Loveland, Colorado 80537
SHEET ISSUANCE: DATE:
Plot Date:
Seal:
N O T F O R C O N S T R U C T I O N F O R R E F E R E N C E O N L Y
7/6/2022 12:24:37 PM
A1 FORT COLLINS NISSANDEALERSHIP DEVELOPMENT5811 S COLLEGE AVE, FORT COLLINS, CO 80525BUILDING
ELEVATIONS
21010
CONSTRUCTION DOCUMENTS
PLANNING SUBMISSION 10/06/2021
PLANNING SUBMISSION 01/19/2022
PLANNING SUBMISSION 07/06/2022
3/32" = 1'-0"A1
2 EXTERIOR PLANNING ELEVATION - EAST (COLLEGE AVENUE)
3/32" = 1'-0"A1
3 EXTERIOR PLANNING ELEVATION - NORTH
0'
SCALE:
8'16'
3/32" = 1'-0"
32'
EXTERIOR MATERIALS - PLANNING SUBMITTAL
KEYNOTE MATERIAL MANUFACTURER PRODUCT NAME COLOR NAME LOCATION
ACM-1 ALUMINUM COMPOSITE METAL MITSUBISHI PLASTICS APOLIC 4334BSX3.5 BSX SILVER METALLIC GENERAL FACADE - SITE
SIGNAGE
ACM-2 ALUMINUM COMPOSITE METAL MITSUBISHI PLASTICS APOLIC 734L927 (FEVE) VALFLON 10742 RED FACADE ENTRY - SITE SIGNAGE
ACM-3 ALUMINUM COMPOSITE METAL MITSUBISHI PLASTICS APOLIC 732L878 (FEVE) NSG NISSAN GRAY SERVICE DRIVE - GENERAL
FACADE - ENTRY
B-1 BOLLARDS ID METALCO PRE FINISHED BOLLARD STAINLESS STEEL SITE
CF-1 PRE-FINISHED METAL COPING CAP COLOR TO MATCH ACM-1 SEE EXTERIOR ELEVATIONS
CF-3 PRE-FINISHED METAL COPING CAP COLOR TO MATCH ACM-3 SEE EXTERIOR ELEVATIONS
CMU-1 CONCRETE MASONRY UNIT BRAMPTON BRICK PROFILE SERIES CONCRETE BLOCK ABSOLUTE BLACK QUARTZ SERVICE BAYS
DP-1 DOOR PULL SOURCED BY GC CUSTOM ITEM POWDER COATED PC-3 RAL 3031 MATCH MAIN ENTRY - VEHICLE DELIVERY -
SERVICE WRITE UP
MP-1 CORRUGATED METAL PANEL BERRIDGE HC-16 PANEL (22 GA) FINISH TO MATCH P-5 SERVICE BAYS
P-5 PAINT SHERWIN WILLIAMS PRIMER: #E28W02600 PROMAR 200
LATEX PRIMER - PAINT: #A96W01251
DURATION - INTERIOR ACRYLIC LATEX
PAINT EGGSHELL FINISH
SW 7076 CYPERSPACE - COLOR TO
MATCH RAL 7024
ALL EXTERIOR BUILDING
SURFACES NOT COVERED W ACM
- INCLUDING DOORS
SF-1 CURTAIN WALL SYSTEM KAWNEER 1600UT SYSTEM 2 ULTRA THERMAL
CURTAIN WALL SYSTEM
GLASS: CLEAR 1" INFILL MULLIONS: PPG
UC70743 DURANAR GRAPHITE GRAY
(COLOR TO MATCH RAL 7024)
GENERAL EXTERIOR - FACADE -
SERVICE DRIVE
SF-2 FRAMELESS GLASS SYSTEM GLASS: CLEAR 1" , MULLIONS: CLEAR
ANODIZED ALUM
GENERAL EXTERIOR - FACADE -
SERVICE DRIVE
FIRST FLOOR
EL. = 100' - 0"
T.O. HIGH PARAPET
EL. = 139' - 0"
SECOND FLOOR
EL. = 120' - 0"EL. = 120' - 3"
T.O PARAPET
EL. = 134' - 0"
T.O. ENTRY ELEMENT
25'-0" (TOP)14'-0" (BASE)39'-0" (BASE)6'-3" (TOP)14'-0" (BASE)35'-0"ACM-3
ACM-3 B-1
B-1
ACM-1ACM-3
ACM-3
CF-3
ACM-1
CF-1
CF-1
SF-1
SF-1DOWN LIGHT FIXTURE
(SHIELDED)
FIRST FLOOR
EL. = 100' - 0"
T.O. HIGH PARAPET
EL. = 139' - 0"
FDC CONNECTION
PER AHJ
ELEC METER /
DISCONNECT
EL. = 120' - 3"
T.O PARAPET
EL. = 116' - 0"
T.O PARAPET16'-3" (TOP)14'-0" (BASE)(TOP)6'-3"14'-0" (BASE)ACM-3
ACM-3
CMU-1
ACM-1
CF-1
CMU-1
MTL DOWNSPOUT TO
MATCH ADJACENT
MTL DOWNSPOUT TO
MATCH ADJACENT
MTL MECH
SCREEN
MTL BUILDING ADDRESS NUMBERS
PER AHJ REQUIREMENTS
MTL OVERFLOW SCUPPER TO
MATCH ADJACENT CF-1
MP-1 ACM-3
CF-3
ACM-3
CF-3
DOWN LIGHT FIXTURE
(SHIELDED)
206 East 4th Street, Loveland, Colorado 80537
SHEET ISSUANCE: DATE:
Plot Date:
Seal:
N O T F O R C O N S T R U C T I O N F O R R E F E R E N C E O N L Y
7/6/2022 12:26:15 PM
A2 FORT COLLINS NISSANDEALERSHIP DEVELOPMENT5811 S COLLEGE AVE, FORT COLLINS, CO 80525BUILDING
ELEVATIONS
21010
CONSTRUCTION DOCUMENTS
PLANNING SUBMISSION 10/06/2021
PLANNING SUBMISSION 01/19/2022
90% CD PROGRESS SET 07/14/2022
3/32" = 1'-0"A2
2 EXTERIOR PLANNING ELEVATION - SOUTH
3/32" = 1'-0"A2
3 EXTERIOR PLANNING ELEVATION - WEST 0'
SCALE:
8'16'
3/32" = 1'-0"
32'
EXTERIOR MATERIALS - PLANNING SUBMITTAL
KEYNOTE MATERIAL MANUFACTURER PRODUCT NAME COLOR NAME LOCATION
ACM-1 ALUMINUM COMPOSITE METAL MITSUBISHI PLASTICS APOLIC 4334BSX3.5 BSX SILVER METALLIC GENERAL FACADE - SITE
SIGNAGE
ACM-2 ALUMINUM COMPOSITE METAL MITSUBISHI PLASTICS APOLIC 734L927 (FEVE) VALFLON 10742 RED FACADE ENTRY - SITE SIGNAGE
ACM-3 ALUMINUM COMPOSITE METAL MITSUBISHI PLASTICS APOLIC 732L878 (FEVE) NSG NISSAN GRAY SERVICE DRIVE - GENERAL
FACADE - ENTRY
B-1 BOLLARDS ID METALCO PRE FINISHED BOLLARD STAINLESS STEEL SITE
CF-1 PRE-FINISHED METAL COPING CAP COLOR TO MATCH ACM-1 SEE EXTERIOR ELEVATIONS
CF-3 PRE-FINISHED METAL COPING CAP COLOR TO MATCH ACM-3 SEE EXTERIOR ELEVATIONS
CMU-1 CONCRETE MASONRY UNIT BRAMPTON BRICK PROFILE SERIES CONCRETE BLOCK ABSOLUTE BLACK QUARTZ SERVICE BAYS
DP-1 DOOR PULL SOURCED BY GC CUSTOM ITEM POWDER COATED PC-3 RAL 3031 MATCH MAIN ENTRY - VEHICLE DELIVERY -
SERVICE WRITE UP
MP-1 CORRUGATED METAL PANEL BERRIDGE HC-16 PANEL (22 GA) FINISH TO MATCH P-5 SERVICE BAYS
P-5 PAINT SHERWIN WILLIAMS PRIMER: #E28W02600 PROMAR 200
LATEX PRIMER - PAINT: #A96W01251
DURATION - INTERIOR ACRYLIC LATEX
PAINT EGGSHELL FINISH
SW 7076 CYPERSPACE - COLOR TO
MATCH RAL 7024
ALL EXTERIOR BUILDING
SURFACES NOT COVERED W ACM
- INCLUDING DOORS
SF-1 CURTAIN WALL SYSTEM KAWNEER 1600UT SYSTEM 2 ULTRA THERMAL
CURTAIN WALL SYSTEM
GLASS: CLEAR 1" INFILL MULLIONS: PPG
UC70743 DURANAR GRAPHITE GRAY
(COLOR TO MATCH RAL 7024)
GENERAL EXTERIOR - FACADE -
SERVICE DRIVE
SF-2 FRAMELESS GLASS SYSTEM GLASS: CLEAR 1" , MULLIONS: CLEAR
ANODIZED ALUM
GENERAL EXTERIOR - FACADE -
SERVICE DRIVE
206 East 4th Street, Loveland, Colorado 80537
SHEET ISSUANCE: DATE:
Plot Date:
Seal:
N O T F O R C O N S T R U C T I O N F O R R E F E R E N C E O N L Y
7/6/2022 12:43:51 PM
A3 FORT COLLINS NISSANDEALERSHIP DEVELOPMENT5811 S COLLEGE AVE, FORT COLLINS, CO 80525EXTERIOR 3D
PERSPECTIVES
21010
CONSTRUCTION DOCUMENTS
PLANNING SUBMISSION 10/06/2021
PLANNING SUBMISSION 01/19/2022
PLANNING SUBMISSION 07/06/2022
A3
1 PLANNING PERSPECTIVE - SOUTHWEST AERIAL
A3
2 PLANNING PERSPECTIVE - NORTHEAST AERIAL
A3
3 PLANNING PERSPECTIVE - NORTHWEST
A3
4 PLANNING PERSPECTIVE - SOUTHWEST
A3
5 PLANNING PERSPECTIVE - SOUTHEAST
A3
6 PLANNING PERSPECTIVE - NORTHEAST
FIRST FLOOR
EL. = 100' - 0"
T.O. HIGH PARAPET
EL. = 139' - 0"
SECOND FLOOR
EL. = 118' - 0"
SF-1 EIFS-1
ACM-2
CF-3
EIFS-1
CF-1
EIFS-1
MAIN ENTRY OVERHANG /
ARCHITECTURAL ELEMENT 12'-0" (TOP)27'-0" (BASE)(TOP)6'-0" (BASE)13'-6"FIRST FLOOR
EL. = 100' - 0"
T.O. HIGH PARAPET
EL. = 139' - 0"
ACM-2
CMU-1B-1 EIFS-1SF-1
EIFS-1
CF-3
CF-1
SF-2
EL. = 119' - 6"
FDC CONNECTION PER AHJ27'-0" (BASE)12'-0" (TOP)(BASE)6'-0"25'-3" (TOP)DOWN LIGHT FIXTURE
(SHIELDED)
206 East 4th Street, Loveland, Colorado 80537
SHEET ISSUANCE: DATE:
Plot Date:
Seal:
N O T F O R C O N S T R U C T I O N F O R R E F E R E N C E O N L Y
7/6/2022 12:50:10 PM
A1 FORT COLLINS KIADEALERSHIP DEVELOPMENTSOUTH COLLEGE, FORT COLLINS, COBUILDING
ELEVATIONS
21041
DESIGN DEVELOPMENT
3/32" = 1'-0"A1
2 EXTERIOR PLANNING ELEVATION - EAST (COLLEGE AVENUE)
3/32" = 1'-0"A1
3 EXTERIOR PLANNING ELEVATION - NORTH
0'
SCALE:
8'16'
3/32" = 1'-0"
32'
EXTERIOR MATERIALS - PLANNING SUBMISSION
KEYNOTE MATERIAL MANUFACTURER PRODUCT NAME COLOR NAME LOCATION
ACM-1 ALUMINUM COMPOSITE METAL ALPOLIC ALPOLIC / FR TOB BLACK GENERAL FACADE - SITE
SIGNAGE
ACM-2 ALUMINUM COMPOSITE METAL ALPOLIC ALPOLIC / FR BSX SILVER METALLIC SERVICE DRIVE - GENERAL
FACADE - ENTRY
B-1 BOLLARDS ID METALCO DIX BOLLARD STAINLESS STEEL
CF-1 PRE-FINISHED METAL COPING CAP COLOR TO MATCH ACM-1 SEE EXTERIOR ELEVATIONS
CF-3 PRE-FINISHED METAL COPING CAP COLOR TO MATCH ACM-3 SEE EXTERIOR ELEVATIONS
CMU-1 CONCRETE MASONRY UNIT BRAMPTON BRICK PROFILE SERIES CONCRETE BLOCK ABSOLUTE BLACK QUARTZ SITE
EIFS-1 STUCCO
MP-1 CORRUGATED METAL PANEL FINISH TO MATCH P-5 SERVICE BAYS
SF-1 CURTAIN WALL SYSTEM KAWNEER 1600UT SYSTEM 2 ULTRA THERMAL
CURTAIN WALL SYSTEM
GLASS: CLEAR 1" INFILL - MULLIONS: PPG
UC70743 DURANAR GRAPHITE GRAY
(MATCH RAL 7024)
GENERAL EXTERIOR - FACADE -
SERVICE DRIVE
SF-2 STOREFRONT SYSTEM KAWNEER 451T SERIES THERMALLY BROKEN
FRAMES
GLASS: CLEAR 1" , MULLIONS: CLEAR
ANODIZED ALUM
GENERAL EXTERIOR - FACADE -
SERVICE DRIVE
PLANNING SUBMISSION 10/06/2021
PLANNING SUBMISSION 01/19/2022
PLANNING SUBMISSION 04/13/2022
PLANNING SUBMISSION 07/06/2022
FIRST FLOOR
EL. = 100' - 0"
T.O. HIGH PARAPET
EL. = 139' - 0"
SECOND FLOOR
EL. = 118' - 0"
CF-1
EIFS-1
ACM-1
B-1 SF-2 SF-1 SF-1B-1B-1
CF-3
EIFS-1
CF-1
CMU-125'-3" (TOP)(BASE)6'-0"EIFS-1 12'-0" (TOP)27'-0" (BASE)DOWN LIGHT FIXTURE
(SHIELDED)
FIRST FLOOR
EL. = 100' - 0"
T.O. HIGH PARAPET
EL. = 139' - 0"
CF-1
EIFS-1
B-1 B-1 25'-3" (TOP)(BASE)6'-0"CMU-1
ELEC METER / DISCONNECT
DOWN LIGHT FIXTURE
(SHIELDED)
206 East 4th Street, Loveland, Colorado 80537
SHEET ISSUANCE: DATE:
Plot Date:
Seal:
N O T F O R C O N S T R U C T I O N F O R R E F E R E N C E O N L Y
7/6/2022 12:51:53 PM
A2 FORT COLLINS KIADEALERSHIP DEVELOPMENTSOUTH COLLEGE, FORT COLLINS, COBUILDING
ELEVATIONS
21041
DESIGN DEVELOPMENT
3/32" = 1'-0"A2
2 EXTERIOR PLANNING ELEVATION - SOUTH
3/32" = 1'-0"A2
3 EXTERIOR PLANNING ELEVATION - WEST
0'
SCALE:
8'16'
3/32" = 1'-0"
32'
EXTERIOR MATERIALS - PLANNING SUBMISSION
KEYNOTE MATERIAL MANUFACTURER PRODUCT NAME COLOR NAME LOCATION
ACM-1 ALUMINUM COMPOSITE METAL ALPOLIC ALPOLIC / FR TOB BLACK GENERAL FACADE - SITE
SIGNAGE
ACM-2 ALUMINUM COMPOSITE METAL ALPOLIC ALPOLIC / FR BSX SILVER METALLIC SERVICE DRIVE - GENERAL
FACADE - ENTRY
B-1 BOLLARDS ID METALCO DIX BOLLARD STAINLESS STEEL
CF-1 PRE-FINISHED METAL COPING CAP COLOR TO MATCH ACM-1 SEE EXTERIOR ELEVATIONS
CF-3 PRE-FINISHED METAL COPING CAP COLOR TO MATCH ACM-3 SEE EXTERIOR ELEVATIONS
CMU-1 CONCRETE MASONRY UNIT BRAMPTON BRICK PROFILE SERIES CONCRETE BLOCK ABSOLUTE BLACK QUARTZ SITE
EIFS-1 STUCCO
MP-1 CORRUGATED METAL PANEL FINISH TO MATCH P-5 SERVICE BAYS
SF-1 CURTAIN WALL SYSTEM KAWNEER 1600UT SYSTEM 2 ULTRA THERMAL
CURTAIN WALL SYSTEM
GLASS: CLEAR 1" INFILL - MULLIONS: PPG
UC70743 DURANAR GRAPHITE GRAY
(MATCH RAL 7024)
GENERAL EXTERIOR - FACADE -
SERVICE DRIVE
SF-2 STOREFRONT SYSTEM KAWNEER 451T SERIES THERMALLY BROKEN
FRAMES
GLASS: CLEAR 1" , MULLIONS: CLEAR
ANODIZED ALUM
GENERAL EXTERIOR - FACADE -
SERVICE DRIVE
PLANNING SUBMISSION 10/06/2021
PLANNING SUBMISSION 01/19/2022
PLANNING SUBMISSION 04/13/2022
PLANNING SUBMISSION 07/06/2022
206 East 4th Street, Loveland, Colorado 80537
SHEET ISSUANCE: DATE:
Plot Date:
Seal:
N O T F O R C O N S T R U C T I O N F O R R E F E R E N C E O N L Y
7/6/2022 12:53:05 PM
A3 FORT COLLINS KIADEALERSHIP DEVELOPMENTSOUTH COLLEGE, FORT COLLINS, COEXTERIOR 3D
PERSPECTIVES
21041
DESIGN DEVELOPMENT
A3
1 PLANNING PERSPECTIVE - NORTHEAST
A3
2 PLANNING PERSPECTIVE - SOUTHWEST AERIAL
A3
3 PLANNING PERSPECTIVE - NORTHEAST AERIAL
A3
4 PLANNING PERSPECTIVE - NORTHWEST
A3
5 PLANNING PERSPECTIVE - SOUTHWEST
A3
6 PLANNING PERSPECTIVE - SOUTHEAST
PLANNING SUBMISSION 10/06/2021
PLANNING SUBMISSION 01/19/2022
PLANNING SUBMISSION 04/13/2022
PLANNING SUBMISSION 07/06/2022