Loading...
HomeMy WebLinkAboutGATEWAY AT HARMONY PUD, LOT 3, MAKEN II - AMENDED FINAL - 1-88J - CORRESPONDENCE - STAFF'S PROJECT COMMENTS - " 3 Comuty Planning and Environmen ervices T 1 , Current Planning - , . - • _ _ _ _ - Ci of Fort Collins - - • - "'„ - - - . DdceMber-20, 1996 • . • - - • Linda Ripley . • _ VF Ripley Associates 1113 Stoney Hill Drive Fort Collins, CO 80525 -- - Dear Linda: - _ Staff has reviewed the revisions for the Maken II PUD, Amended Preliminary and Final and offer the following comments: The Current Planning Department offers the following comments: a. The name of the PUD D should be changed. This is part of the Gateway at - - Harmony PUD and should be noted as such. b, The Business Service Uses point chart will be used to determine the appropriateness of the land use. I concur with your calculation of allowable points. c. Please provide information about any restrictions being placed on Window signage. This information should be included in the plan notes. d. The ownership signature block still references 1995. This should be changed to 1997. e. The signature block for the secretary of the Planning and Zoning Board references 1996. Since this will not be heard by the Board untilJanuary, at the earliest, this should be changed to 1997. • f. The Interim Design Standards and Guidelines for All Commercial Development requires that a "context diagram" be submitted for any commercial development. Please refer to the standards and guidelines document for what it should contain. 281 North „ . • - - College Avenue • P.O.Box 580 • Fort Collins,CO 80522-0580 • (970)221-6750 FAX(970)221-6378 • TDD(970)224-6002 Ak Site and Landscape Plans Notes on the site plan are identical to the notes on the landscape plan. These should be changed to reflect general notes related to • the site plan. -• Building_coverage is indicated as 11,685 square feet yet the traffic study was completed for a 6,800 square foot project. Please submit a revised study or justify that the current study is adequate. • Bike parking is indicated on the legend of both the site and • - landscape plan but is not shown on the plan. Please indicate where the bike parking will be located. • A sidewalk connection from walkway along College Avenue should be provided near the north end of the site as well as a connection from this site to the property to the north. This latter connection should be an extension of the walkway in front of the building. • .The walkway adjacent to the entry off of College Avenue should -"either 1) continue around the curb section to the parking lot or 2) cross the auto entr yway with a walkway to the landscape island then across the parking area to the building. Please indicate how _ potential pedestrian and automobile conflicts will be addressed. At a minimum, all pedestrian crossings of the parking area should be highlighted in someway to alert drivers of the possibility of pedestrians. • There is no walkway connection from the parking area on the west side of the building to the tenant entrances on the south and east sides. This connection should be provided so pedestrians are not forced into the parking/drive area. • The applicant should work with the property owner to the north to provide a walkway connection from their property to the applicant's property. A walkway should also be provided in the landscape island in the southwest corner of the applicant's property to provide. a pedestrian access to McDonald's. As before, all pedestrian crossings of the parking area should be highlighted in someway to alert drivers of the possibility of pedestrians. y= {Y c ' . _ ___ ..,„.., -2,..-_,,... -:.----,---.:- --,7--- ' ,,, . -''.'‘,‘..• '•r n :,''' :''':,??.....i'.I.. ,' ,,,:, ' ''',.,''.,-', .-.'' '';'---,f •'z'-:, '-t,' '''^-c,- '' ,'"-- ,'.ir, ,,-4,_ . ''..i'`',Iti;p.,1-7, --i','''' =--2--`7-r-v:.*-L'7,-.-----',:i-Z;=,-•• ,=--='.' •-,t~.4.4- .,. t,e-= -,:.'' =",:.--'-='-,--4--, ..: - :'-;='-' '•:;.---='-'i-L•',..-'z-_,tr.:,',-.17.4...".-t,„:„..„,,:', -..f.,-..--',"'--.77' ... • L-- n cn t - - --:-_-___„-----:-.----- •-' --;- :L-:Tiiily-one trash----.:,-:;-_--,------,_----i--..:---2-:-,------------.-'-;:.-.-_:,-x"-,-,-;,,,, -,----;ki-',,,---- .:,- nOrt.o.:- . • enclosure is snow he s. ite and landscape .plans. .:inconvenient for in the northwestv this away from nntonff the ee site. While it's pareefextrarebmleetioy maintain building, it seem ui. i g. - _:--7.,,-„-,.--,- - :--=:-_:-,...;•-7..,_ , ,•-•- -,_. , inconve tenant of the front portion of the b .I‘Sn An '-'':.'''''' 1-::--- '-'-';?-•--:--- ---, --,:-- -,? additional trash enclosure, properly screened, should be toward the front of the -. perhaps, one could - _- : -.-.. ...... . ." ''- -'-----'---:----:-:----- r•-:'•-7--'••considered building or, -- --- -- - '-lbcghe l located on the Jiffy Lube site for joint use. • s . ---h. Architectural Elevation _ 4 . _ •-- - -- _ - • Please label all elevations as north, south, east and west. . o Elevations on the southwest corner of the building do not appear to . _ match the building footprint shown o site thteae bundlaildnidnsg being angled _ ... . The elevations appear to show thech the ar of - f angled (is it an entrywaay?9)owdheigleretheebfboronteprr.int on the site and la - , - - ndscape plans show . ,...4... ` -- - -- ' - •" • -kdecorative horizontal band, in contrasting color to the gray, _ - - around the exterior of the buildingwouldenhancethe four building tofive feet elevations. We suggest it be located approximately ' - - - - - - - - from the ground. • The walls of the building should not be smooth masonry. At a • Minimum, the portion wallof thefab split -face bedregcrobruantd.,fa decorative band to addnd • recommended above should ouldbe - variety to the elevations. Materials and color should be similar to the Texaco/Jiffy Lube directly to the north. The north elevation is a significantexpadnesseon tuffsepaacere.a thatThisadd area • should be broken up in some way with design - relief and variety. . The roof should not be 3-tab or flatashingles.dnbrovide a sample o Pleasesper cut-sheet with profile" or"shadowline" shingles with revisions. ' . - - , ...,:. The ort,iFotp001::'offlprs the following comments: , - ....„ ....,--_,.....,„,-,- -.-----:--,•,•,..-- - - -__4' _L-,..,„--.---,-,,,--',•-:::::,-- .........fi-_---4•-•._,,.', '•-- - _ ';,--..,,,,-1.• - s ,, '..„-',''..-,--, ..-: ' , ,' .:...;', -7-'7';.-7-'-,-,..,'t•-;,-'-',----''':---'-'-:"-,:--., ''..-;.:-'-7;:-K-,22-'',„:';',"Z' . , '' ''`r.,2,.;-,-'_i-,..-7;:.'''',,,I.V.-•,,,,,,r1=1----•--- • • a Please add the following notes on the landscape plan: "All=landscape beds will be mulched with- "Existing trees will be pruned to City Forestry medium prune standards "; b Add 2 or 3 ornamental trees in the landscape zone between the parking lot and sidewalk to meet screening requirements. - 'Poudre.Fire-Authority offers the following comments: a. Building tenant spaces exceed 5,000 square feet and must be further _ reduced to meet local building code requirements. An alternative would be to fire sprinkler the entire structure: b If the building is equipped with a fire sprinkler system, a "Knox Box" is required. The Public Service Company requires that a location suitable.to Public Service Company requirements be provided at which to group 3 natural gas meters. The Zoning Department offers the following comments: a. There may be some conflict at the right-in-only at College Avenue with cars driving north from McDonalds to the proposed project. A "Do Not Enter" sign should be placed to avoid this while still allowing entrance to the site from College Avenue. b. ._-Please show building envelope dimensions. Building Inspection comments are attached. Please see the attached comments from the Advance Planning Department (return redlines with revisions). U S West offers the following comments: a. These plans do not show existing telephone cable in developer-provided conduit. The proposed utilities may conflict with the existing telephone cable. b.: Review of these plans should not be construed as a commitment that telephone facilities sufficient to serve this project are presently available. U S West will provide telephone service in accordance with the rates and tariffs on file with the Colorado Public Utilities Commission. x c The owner is responsible for provision of all conduit,lditchcrossings and street crossings for telephone facilities within the project :The owner also_ provides terminal room space (usually 8' X 4') and power for the= - p generallyContact the U S,West: enginee foeconduit specifications for the telephone entrance cable. d - Any relocation of existing telephone facilities requited by these-plans be paid for by the developer. -The water and Wastewater Department offers the following comments: a. Curb stops and meter pits must be located in landscaped areas. b. Include all City standard general notes and details. C. Include a copy of the plat. d. Show location of water and sewer mains and services on landscape plans. e.,: T Coordinate landscape with civil design and provide required landscape separations. f. Put grading and drainage on separate sheet. _g. The method shown for relocating existing fire hydrant will require water to be shut off for an extended period. It is suggested that existing fire hydrant be abandoned and reinstalled at an acceptable new location using a wet tap. h. See the landscape (attached)and utility plans for more comments (please return redline plans with revisions). Comments from the Engineering Department are attached. - This concludes staff comments at this time. Additional comments may be forthcoming as the various departments.and reviewing agencies continue to review this request. In order to stay on schedule for the January 27, 1997 Planning and Zoning Board hearing, please not the following deadlines: • Plan revisions (folded and not staples together) are due by noon on Wednesday, January 8, 1997. • P.M.T.'s, 10 prints and colored renderings are due by noon on Tuesday, January 21, 1997. - NOTE, No revisions'or supporting documents will beaccepfed after the revision date (18/97) w No revisions will be reviewed after this deadline If revisions are not received by:thisdate, the item will either go to the Planning and;,-Zoning Board with.a"staff r. recommendation based on the originally submitted documents or:the applicant-will have. the option of continuing the item to the next month's Meeting Should-you have any questions regarding these:comments, please contact me. Sincere) Y _ - - _ _ Robert;E Blanchard _ _ Current`Planning Director. cc: . Development Review Engineer -. Stormwater:.UtilitY file/Project Planner