Loading...
HomeMy WebLinkAboutRUDOLPH FARMS INFRASTRUCTURE PROJECT - FDP220010 - SUBMITTAL DOCUMENTS - ROUND 2 - EROSION CONTROL LETTER/REPORTProject:Disturbed Acres:114.60 EROSION CONTROL BMPs Units Estimated Quantity Unit Price Total Price each 11 $250.00 $2,750.00 L.F.15948 $1.10 $17,542.80 each 6 $90.00 $540.00 each 50 $125.00 $6,250.00 each 3 $1,700.00 $5,100.00 Outlet Protection each 5 $900.00 $4,500.00 Erosion Control Blanket S.Y.1370 $4.10 $5,617.00 each 1 $1,250.00 $1,250.00 Stabilized Staging Area S.Y.5898 $4.75 $28,015.50 acre 98.6 $800.00 $78,880.00 Sub-Total:$150,445.30 1.5 x Sub-Total:$225,667.95 Amount of security:$225,667.95 Total Acres x Price/acre:$91,680.00 $800.00 Sub-Total:$91,680.00 1.5 x Sub-Total:$137,520.00 Amount to Re-seed:$137,520.00 Minimum escrow amount:$3,000.00 Erosion Control Escrow:$225,667.95 Fields in yellow should be amended for this project. Vegetate Landscaped Areas Vehicle Tracking Control Pads Concrete Washout Area Erosion and Sediment Control Escrow/Security Calculation for The City of Fort Collins BMP Amount Inlet Protection Rock Socks Reseeding Amount Miniumum Escrow Amount Rudolph Farm Unit Price of Seeding per acre: “The amount of the security must be based on one and one-half times the estimate of the cost to install the approved measures, or one and one-half times the cost to re-vegetate the disturbed land to dry land grasses based upon unit cost determined by the City's Annual Revegetation and Stabilization Bid, whichever is greater. In no instance, will the amount of security be less than one thousand five hundred dollars ($1,500) for residential development or three thousand dollars ($3,000) for commercial development” Silt Fence Straw Wattles Final Escrow Amount 8/31/2022 11:07 AM P:\1896-001\Drainage\Reports\SWMP Report\1896-001_Rudolph Farm-EC_Escrow