HomeMy WebLinkAboutGATEWAY AT HARMONY ROAD PUD, 1ST FILING - PRELIMINARY & FINAL - 1-88F - CORRESPONDENCE - STAFF'S PROJECT COMMENTS • _ = CommunityPlanningand Environmental Services Planning Department City of Fort Collins May 20, 1993 Mr. Carr Bieker The Architects' Studio 117 East Mountain Avenue, Suite 200 Fort Collins, CO 80524 Dear Carr: The Planning Department has coordinated its interdepartmental review of Lot One of the Gateway. at Harmony Road (Jiffy Lube) , Amended Final P.U.D. The following comments are offered: 1. Staff is concerned about the lack of internal access back into the center. It was agreed at conceptual review that internal access to the interior lot along Jiffy Lube's south property line would not be necessary as long as the interior lot continued to have an opportunity to gain access to the north- south internal drive aisle that serves all lots. There remains a concern, however, that Jiffy Lube patrons do not have access to the north-south drive aisle. The only opportunity to recirculate back to the center is via the carwash. In order to circulate back into the center, customers will have to use Kensington or College Avenue. Please keep in mind that the Preliminary P.U.D. for Gateway at Harmony Road (February, 1989) indicated internal access between lots and received credit on the Auto Related and Roadside Commercial Point Chart for Joint Parking. Staff is willing to look at any number of proposals that provide access to the north-south internal drive aisle. One idea would be to add a 12 foot wide, one-way exit lane as an expanded carwash lane. Another idea would be to widen this lane to 20 feet and place half its width on the interior lot, with permission from the owner. Please investigate any reasonable alternative that meet the needs of Jiffy Lube and yet provides internal access to the balance of the center. 2. Staff is concerned about architectural compatibility with the overall P.U.D. As you are aware, Total Petroleum submitted an administrative change (February, 1993) to significantly vary from the approved materials and color established for the P.U.D. A copy of the letter to Wickham-Gustafson, architects for Total, denying the proposed architectural changes is available for your review. 281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (303) 221-6750 S 111 ti The guiding design objective for the P.U.D. is found in the following passage on the Preliminary P.U.D. (February 27, 1989) : "The Gateway at Harmony Road is to be designed as a specialty user center. The two major users, Amoco and McDonalds's, will share common color values but building forms will be specific to their corporate standards. Buildings - All exteriors will be gray tones and charcoal accented with colored aluminum door and window frames. Glass will be clear or tinted bronze. Roofs will be pitched and flat. The roof material will be gray tones." In addition, the developer's consultant is quoted in the minutes to this February 27, 1989 meeting as stating: "The architecture was governed by the corporate standards of McDonald's and Amoco, but the tenants have agreed to conform to basic grays.. _as well. as brick coloring." In considering the Jiffy Lube proposal, the areas of greatest deviation are with the exterior materials, color of the building, and the roof color. The P.U.D. is quite clear that the building material should be gray brick, not stucco. Also, the roof material should be a gray tone, not a terra cotta which is commonly a reddish-orange color. Staff is extremely reluctant to allow deviations from these design parameters. It is strongly suggested that modifications be made to make the building exterior, color, and roof comply with the character established for this P.U.D. Please modify Note Number Six accordingly. 3 . The utility plans show the sidewalk on College in the wrong location. This walk should be seven feet wide and detached from the back of curb by 8.5 feet. Also, the plans are not clear as to whether the right-of-way along College Avenue is to be dedicated since there appears to be two front property lines. 4. U.S. West reminds the developer of the obligation to provide all conduit and street crossings for telephone facilities within the project, and provide terminal room space, and power for the main terminal at the main building. The developer's vendor provides all facilities beyond the main terminal. Be sure to contact U.S. West for conduit specifications for the main telephone entrance cable. 5. Public Service Company reminds the applicant that the planting of trees must be coordinated so that no tree is within four feet of any underground natural gas line. . 2 6. Poudre Fire Authority requests that the fire sprinkler service line be indicated on the utility plans. 7. The developer's consulting engineer should contact the City's Stormwater Utility regarding stormwater quality enhancement features. Recently, there has been a water quality problem in the Mail Creek drainage affecting the water features of downstream property owners. As mentioned at conceptual review, a joint City-developer water quality project was envisioned at the time of Preliminary P.U.D. Please verify with the Stormwater Utility regarding the need to implement water quality features to treat the stormwater runoff from this site. 8. With a detached sidewalk, it is suggested that the deciduous shade trees be planted in the parkway strip between walk and curb. 9. Staff is concerned about the proximity of the cashier's kiosk to the intersection of College and Kensington and recommends that a shrub bed be added to the berm. This will provide additional height and help mitigate the tight setback. 10. At the same corner, the berm is flanked by a Radiant Crab on the Kensington frontage. This should be reflected on the College frontage with an additional Radiant Crab to promote symmetry on the corner. 11. Additional landscaping should be provided on the west side of the carwash to screen and soften the building. 12 . Additional shrub material should be added along the south property line to screen the headlights of cars parked at the four parking stalls. 13 . Staff is concerned about protecting the existing cottonwoods south of the site. Please add the following notes to the landscape plan: A. "There are existing trees on the adjacent lot that are to be preserved. Existing trees to be saved should be marked with prominent identification. Where tree trunks are apt to be damaged, they should be protected with metal posts and snow .fence." B. "Heavy equipment should not be allowed to compact over the soil over the root zone of existing trees. " C. "Avoid cutting surface roots wherever possible. Sidewalks and paving levels should be contoured sufficiently to avoid such cutting. " 3 411 D. "If there are to be any root cuts, such cuts should be done rapidly. Smooth flush cuts should be made. Backfill before the roots have a chance to dry out and water tree immediately. " 14. Please add the following standard notes to the landscape plan: A. "A free (no charge) permit must be obtained from the City Forester before any trees or shrubs as noted on this landscape plan are planted, pruned, or removed on the public right-of-way." B. "All landscaping must be installed or secured with an irrevocable letter of credit, escrow, or performance bond for 125% of the valuation as indicated on this plan prior to issuance of a Certificate of Occupancy." C. "All plant material shall comply with current AAH Standards for Number One material nursery stock. Plants to meet or exceed sizes specified. " 15. Please be aware that the P.U.D. is the final document on which all sign permits are issued. Therefore, it will be necessary to specify the dimensions and letter type of all proposed signs. 16. The location of the free-standing monument sign is in the public right-of-way. This should be pulled back so it is on private property. 17. On the east elevation of the main building, please specify that "Jiffy Lube" is to be an individual letter sign, and specify the sign height. 18. On the south elevation of the main building, Staff recommends that this logo be removed. At six feet in height, it is out of scale and proportion with the building and other signage on the property. Further, the investment in this sign will soon be minimized as the Austrian Pines mature and the interior lot develops, thus blocking sight lines. 19. Please clarify that the canopy signage applies to the eastern most canopy only, and that the western canopy shall remain free of signs and logos. 20. The original P.U.D. specified a free-standing monument sign with a cabinet height of 5'6" whereas the proposed sign measures six feet in height. The proposed sign should be reduced accordingly. 4 411 • 21. Staff is concerned about the propensity of these types of uses to hang temporary signs advertising the latest brand of motor , oil used in the lubrication operation. The Sign Code allows temporary banners and pennants by permit (no charge) for 20 days out of the year. In order to minimize the use of temporary signage yet still allow banners and pennants as per the Sign Code, please add the following note to the P.U.D. : "As a condition of this P.U.D. , there shall be no painted window signs, or other temporary window signage allowed. As per the Sign Code, Section 29-601, temporary banners and pennants may be allowed. " 22 . Please add the standard signage notes to the P.U.D. : A. "All signage on this P.U.D. shall comply with Sign Code. " B. All signage on this P.U.D. is restricted to the number, type, location, and size as specifically noted on this P.U.D. Any changes or deviations shall be reviewed, in advance, by the City of Fort Collins by the Administrative Review procedure, including, at the Planning Director's discretion, referral to the Planning and Zoning Board. " C. "Onsite directional signage shall contain no reference to advertising, logo, trademark, symbol, or other commercial message, and shall not exceed four square feet." 23 . The elevations should specify that the gas canopy columns should be gray in color. 24. The elevations should specify the building materials, color, and roof color, as discussed in earlier comments, for all three buildings. 25. Staff is concerned about lighting and the potential for illumination to spill offsite onto other properties or cause a problem of glare for drivers. For this reason, the P.U.D. should specify that all under canopy lighting shall be fully recessed into the canopy ceiling. Under canopy lighting shall reveal only one flush surface, and not protrude in a three dimensional fashion. 26. The P.U.D. should specify the number and location of security light poles. Every effort should be made to match the existing type and height of the security lights on the McDonald's property. If cutsheets are available, please supply copies. In order to reduce offsite light spillage and glare, please add the following note to the P.U.D. : 5 • 1 "Exterior lighting (both building-mounted and pole- mounted) shall feature down directional, sharp cut-off luminaries." 27 . Please amend Notes Number Four and Seven. A combined note should read as follows: "The trash enclosure will be mounted on concrete. It shall be constructed to match the building's exterior in materials and color. The gate shall be a solid screen. Minimum height - five feet. " 28. The transformer appears to be in the middle of a patio area. Has any consideration been given to screen or landscape this piece of equipment? 29. Has any consideration been given to employees who may choose to ride a bike to work? Are any bike racks planned? Please indicate the bicycle parking arrangement. 30. Please add directional arrows to the site plan to indicate the flow of traffic through the lubrication facility. 31. Will there be a coin-operated machine at the carwash entry? If so, please indicate. 32 . It is an absolute requirement of the Auto Related and Roadside Commercial Point Chart that there be no outside storage. Please add the following note to the P.U.D. : "There shall be no repair, painting, or body work activities, including storage of refuse and vehicular parts or containers of new or used lubricants, outside an enclosed structure." 33 . Please label the site plan and landscape plan as sheets one of two and two of two. 34. Please label Mason Street and McDonald's. This concludes Staff comments at this time. In order to stay on schedule for the June 28, 1993 Planning and Zoning Board meeting, please note the following deadlines: Plan revisions are due June 9, 1993. P.M.T. 's, 10 prints, colored renderings are due June 21, 1993. Final documents will not be filed until all plans and documents are in final form including the Utility Plans, Development Agreement, Site and Landscape Covenants, and P.U.D. sheets. If these _ 6 4 III 1 documents are not in final form, the Planning and Zoning Board is authorized to grant a two month condition of approval to allow recording of final documents. As always, please call to discuss these comments or to set up a meeting to discuss these comments in detail. Sincerely:74;-1(6. u. r41144 Ted Shepard Senior Planner xc: Sherry Albertson-Clark, Chief Planner Kerrie Ashbeck, Civil Engineer 7