HomeMy WebLinkAboutBLOOM FILING ONE - PDP210014 - PLANS - PLANSLC
2 - LANE ARTERIAL
LC
LC
LC
LC
MINOR COLLECTOR
RESIDENTIAL LOCAL
CONNECTOR LOCAL
CONNECTOR LOCAL
GREENFIELDS DRIVE
INTERNATIONAL BLVD
SYKES DRIVEARIA WAY - SYKES DRIVE TO
DONELLA DRIVEDONELLA DRIVE
WHISPERWIND LANETOURMALINE PLACE
PARKLAND STREET
ARIA WAY - WHISPERWIND LANE TO
PARKLAND STREETPARKLAND STREET
BARNSTORMER STREET
ARIA WAY - PARKLAND STREET TO
SYKES DRIVE
ARIA WAY
CONQUEST STREETROSELYN STREET
FLOURISH LANECOMET STREET
CRUSADER STREET
LC
2.00%2.25%2.25%2.00%
PROPOSED PAVEMENTSECTION (TYP.)
PROPOSED BASECOURSE (TYP.)
11'11'
76' ROW
8'8'8'5'8'5'9'9'
50' -
6'6'
DELOZIER ROAD
MINOR COLLECTOR
2.5' VERTICALCURB & GUTTER (TYP.)
HARTFORD HOMES
BLOOM FILING ONE
FINAL DEVELOPMENT PLAN
AUGUST, 2022
A TRACT OF LAND LOCATED IN THE NORTHWEST AND WEST HALF OF THE SOUTHWEST QUARTER OF SECTION 9, TOWNSHIP 7 NORTH,
RANGE 68 WEST OF THE 6TH P.M., CITY OF FORT COLLINS, COUNTY OF LARIMER, STATE OF COLORADO.
FORT COLLINS, CO
Know what's
before you dig.
Planning. Architecture. Engineering.
GAS Xcel Energy Stephanie Rich (970) 225-7828
ELECTRIC City of Fort Collins Light and Power Tyler Siegmund (970) 416-2772
CABLE Xfinity Don Kapperman (970) 484-7166
TELECOM. Centurylink William Johnson (970) 377-6401
WATER ELCO Mike Scheid (970) 493-2044
WASTEWATER Boxelder Sanitation District Karen Reynolds (970) 498-0604
STORMWATER City of Fort Collins Utilities Wes Lamarque (970) 416-2418
UTILITY COMPANY CONTACT PHONE NUMBER
* ALL UTILITY LOCATIONS SHOWN ARE BASED ON MAPS PROVIDED BY THE APPROPRIATE UTILITY COMPANY AND FIELD SURFACE EVIDENCE AT THE TIME OF SURVEY AND IS TO BE CONSIDERED AN
APPROXIMATE LOCATION ONLY. IT IS THE CONTRACTOR'S RESPONSIBILITY TO FIELD VERIFY THE LOCATION OF ALL UTILITIES, PUBLIC OR PRIVATE, WHETHER SHOWN ON THE PLANS OR NOT,
PRIOR TO CONSTRUCTION. REPORT ANY DISCREPANCIES TO THE ENGINEEER PRIOR TO CONSTRUCTION.
SITES. TIMBERLINE RD.E. VINE DRIVE
INTERSTATE - 25DateCity Engineer,
Date
Date
Date
Date
Stormwater Utility,
Parks Planning and Development,
Traffic Operations,
Date
APPROVED:
APPROVED:
APPROVED:
CHECKED BY:
CHECKED BY:
CHECKED BY:
Water & Wastewater Utility,
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
Environmental Planner,
APPROVED SHEETS
APPROVED SHEETS
APPROVED SHEETS
APPROVED SHEETS
APPROVED SHEETS
APPROVED SHEETS
GENERAL MANAGER
REVIEWED BY:
DATE:
UTILITY PLAN REVIEWBOXELDER SANITATION DISTRICT
REVIEW DOES NOT CONSTITUTE "APPROVAL" OF PLANS. PLAN ENGINEER IS
RESPONSIBLE FOR ACCURACY AND COMPLETENESS.
REVIEW DOES NOT CONSTITUTE "APPROVAL" OF PLANS. PLAN ENGINEER IS RESPONSIBLE
FOR ACCURACY AND COMPLETENESS.
GENERAL MANAGER
REVIEWED BY:
DATE:
EAST LARIMER COUNTY WATER DISTRICTUTILITY PLAN REVIEW
-
-
-
-
-
-
-
-
-
-
-
-
-
-
STAMP
H:\Hartford Homes\CO Fort Collins HFH22 - Mulberry\0CIV\3-CD\FDP_F1\HFH022_C0.0_Cover Sheet.dwg - Matthew Kasch - 8/17/2022Init.# Issue / DescriptionDateFINAL DEVELOPMENT PLANS BLOOM FILING ONEFORT COLLINS, COTHESE PLANS ARE AN INSTRUMENT OF SERVICE
AND ARE THE PROPERTY OF GALLOWAY, AND MAY
NOT BE DUPLICATED, DISCLOSED, OR REPRODUCED
WITHOUT THE WRITTEN CONSENT OF GALLOWAY.
COPYRIGHTS AND INFRINGEMENTS WILL BE
ENFORCED AND PROSECUTED.
COPYRIGHT
GallowayUS.com
5265 Ronald Reagan Blvd., Suite 210
Johnstown, CO 80534
970.800.3300
PRELIMINARYNOT FOR BIDDINGNOT FOR CONSTRUCTIONDate:
Drawn By:
Project No:
Checked By:
08.17.2022
HFH000022
AGM
JEP
COVER SHEET
C0.0
CITY OF GREELEY
And Mulberry W and
Mulberry SF?
City of Fort Collins
Development Review Engineering
Sophie Buckingham, EI
Date:09/01/2022
E. EAST LARIMER COUNTY WATER DISTRICT GENERAL NOTES FOR CONSTRUCTION (Version: 11/22/2019)
The following information is condensed from the current "Standard Construction Specifications for Water Mains" (Specification) as adopted by the East Larimer County Water
District (‘ELCO’ or ‘District’) and is to be considered as such. In the event of any conflict the full District Specification document shall take precedence over these general
notes.
1. Standards and Specifications: Construction shall be per the District Specifications in effect at the start of construction. Material or equipment shall be
manufactured per the most recent version of applicable industry standards.
2. Locates: Contractor shall coordinate field locates of all existing utilities prior to commencement of any construction and as required notify all affected utility companies
prior to commencing construction. Cost of repairs to any utility damaged during District waterline installation shall be the responsibility of the Contractor.
3. Damage to Property: Contractor shall continuously maintain adequate protection
from damage of all public and private property through which the work is done and shall be fully responsible for all costs associated with damage to any and all public and
private
property.
4. Safety: Contractor shall comply with any and all requirements and regulations as set forth by any local, City, County, State or Federal agency having applicable authority.
5. Landscaping Adjacent to District Waterlines: No landscaping (bushes, shrubs, trees or other plantings) that has a mature height of over 3 feet (3-ft) shall be placed within
ten feet (10-ft) of any District waterline or appurtenance (distribution main, service line, fire hydrant, meter, etc.). Bushes or shrubs with a mature height of less than 3-ft
shall be placed a minimum 4-ft from any District waterline or appurtenance. The District shall have the right to remove any landscaping that violates this standard, at any
time such landscaping is discovered, and shall not be required to replace the removed landscaping.
6. Design Approval and Construction Start: No construction shall begin without prior design acceptance from ELCO. District shall be notified 48 hours in advance of starting
construction or testing to allow for scheduling.
7. Permits: Contractor is responsible for obtaining all permits which may be required. For any permitting where the District must apply for a permit the Contractor shall
coordinate, cover the cost and schedule the permit acquisition with the District.
8. Changes During Construction: No verbal authorization for field revision shall be given. All requests for such field revision shall be made in writing with the proposed
change indicated on a copy of the signed design drawings. Any field revision approved and installed shall also be accurately documented on the As-Built Drawings.
9.Materials of Construction:
a. Pipe: All water piping shall be Polyvinyl Chloride (PVC). All PVC piping 6-inch through 12-inch shall be DR 18 (pressure class 235 psi) and manufactured in
accordance with AWWA Standard C900, "Polyvinyl Chloride (PVC) Pressure Pipe, 4-inch through 12-inch, For Water Distribution". All PVC piping 14-inch through
24-inch shall be DR 18 (pressure class 235 psi) and manufactured in accordance with AWWA Standard C905, "Polyvinyl Chloride (PVC) Water Transmission Pipe,
Nominal Diameters 14-inch through 36". Pipe with a diameter greater than 24 inches shall be specified based on engineered design.
b. Tracer Wire: All water piping shall be installed with a twelve (12) gauge solid copper wire, plastic coated, six hundred (600) volt taped to top of pipe and surfaced
at each hydrant into a tracer wire box.
c. Pipe Joints: Pipe joints shall be made using an integral bell with an elastomeric gasket push-on type joint or using machined couplings of a sleeve type with rubber
ring gaskets and machined pipe ends to form a push-on type joint.
d. Materials and Installation: All materials installed shall be new and free of manufacturer defects. Any defective or damaged materials noted on the construction site
shall be so marked and removed from the site. Under no circumstances shall any PVC piping be installed utilizing mechanical equipment to seat the joints.
e. Pipe Fittings: All fittings shall be mechanical joint, ductile iron, manufactured in accordance with AWWA Standard C153. Fittings shall be furnished with a
cement-mortar lining of standard thickness class with a 250 psi pressure rating.
f. Gate Valves: Gate valves shall conform to AWWA Standard C509 with mechanical joint, 2" open left operating nut and resilient seat.
g. Butterfly Valves: Butterfly valves shall be used for all valves 12-inches and larger and conform to AWWA Standard C504 with mechanical joint, 2" open left operating
nut, resilient seat and shall be equipped with sand bonnet.
h. Fire Hydrants: Hydrants shall conform to AWWA Standard C502, 1" square open-right operating nut. Allowable manufacturers and models are Mueller Super
Centurion with epoxy coated shoe or American Flo Control Waterous Pacer WB67-250X with epoxy coated shoe. All fittings shall be swing assemblies with anchor
couplings.
i. Pipe, Valve and Fitting Wrap: All fittings, valves, fire hydrant shoes and plugs shall be poly-wrapped with 8-mil thick polyethylene plastic wrap, double layered, and
ends securely taped prior to backfill. All fitting bolts shall have zinc caps installed.
10. Bedding: All pipe shall be bedded in 3/4" washed rock uniformly graded and compacted. Trench shall be excavated to a depth below established grade equal to
14 of pipe
diameter (min. 4"). Bell depressions shall be provided for all joints. In event that unstable trench conditions are encountered at pipeline grade 1-1/2" uniformly graded
washed rock shall be used for stabilization. Bedding material shall be placed and compacted under and around sides of the pipe per the pipe manufacturer’s installation
recommendations. Note maximum trench width detail.
11. Backfill: Backfill of acceptable material shall be placed in ‘lifts’ of uniform horizontal layers not to exceed 6-inches of compacted depth per lift. Minimum 18" of compacted
backfill above pipe must be in place before rolling mechanical equipment type compaction is to be used. Backfill shall be compacted to 95% of optimum density in
roadway areas or per road authority’s requirements, and 90% in fields or non-road locations. Backfill compaction testing frequency shall be at least one test per 100-lineal
feet of pipeline length and at varying depths and locations in accordance with the requirements of the applicable road authority or beginning 1.5-feet above top of pipe and
at 1-foot increments to grade.
12. Joint Restraint: All fittings, tees, plugs and fire hydrants shall be provided with anchor couplings and/or joint restraint in accordance with District Specifications or as
required per engineer’s design. Thrust blocks shall be used only as required per field conditions and as approved or directed by the District field inspector.
13. Concrete: All concrete construction, including thrust blocks, shall be completed utilizing Type 5 or equal cement only.
14. Asphalt Replacement: For asphalt pavement that is cut and has been in place less than two years (according to City or County Engineer's record), the cut shall be a
minimum of 20 feet in width and will be replaced to the specified depth by a paving machine.
15. Pipe Cover: A minimum cover of 4-1/2 feet of cover over top of pipe shall be maintained throughout the waterline and service line installation, particularly in areas of new
grading and drainage swales. Extra bury depth may be required to maintain minimum cover at drainage culvert crossings and/or fire hydrant runs. Maximum allowable
cover shall be 6 feet, unless specifically approved by the District.
16. Connection to Existing System: All connections to existing waterlines shall be completed at developer's expense by District personnel or the District's authorized
contractor with no exception.
17. Inspection: The District shall have the authority to assign an inspector who shall inspect, check and verify that any and all work, including all materials to be incorporated in
the work, excavation, bedding, backfill, testing and all construction methods and practices of the installed facilities is equal to or better than minimum construction
requirements as set forth in the District’s Specifications.
18. Testing: All lines shall be pressure tested, chlorinated and flushed by the Contractor in accordance with District Specifications and under the District's supervision. Upon
passing chlorination testing, bacteriological testing will be completed by a State certified water quality control laboratory. Copies of all passing test results, including soils
compaction in the area of water main construction, shall be provided to the District.
19. Preliminary Acceptance: Preliminary Acceptance shall be issued to the Owner when all project work is complete, tested and operational such that the infrastructure is
ready to be accepted by the District. Documentation required prior to issuance of Preliminary Acceptance includes but is not limited to chlorination test report,
bacteriological test report, hydrotest report, compaction testing report, verification of project costs, As-built drawings and Record Drawings. Following receipt, review and
acceptance by the District of these and other documents as may be required per project specifics, the District will issue Preliminary Acceptance.
20.Project As-Built and Record Drawing Requirements:
a. As-Built Drawings are compiled and maintained during construction by the Contractor and identify, in red ink, on-site changes to the original design. As-Built
Drawings shall be delivered to the District (electronically in PDF format or otherwise as requested by the District) for acceptance and to the project’s design engineer
for creation of Record Drawings.
21. Record Drawings are prepared by the project’s design engineer and shall accurately reflect any change made in the field which varies from the accepted construction
plans, as noted in the As-Built Drawings, including at a minimum, field dimensions and elevations, horizontal and vertical locations of underground utilities and
appurtenances. The Record Drawings shall be reviewed and accepted by the District prior to Preliminary Acceptance of the project. Record Drawings are to be delivered
to the District in electronic format as Adobe (PDF), AutoCAD and ArcView shape files (release version to be confirmed with District at time of submittal).
22. Warranty: The Owner shall warrant all work associated with the waterline installation including, but not limited to the materials, installation workmanship and surface
restoration for a period of two years from date of Preliminary Acceptance. During this warranty period the Owner shall repair any defects in the work and maintain the work
area. At the close of the two-year warranty period and upon satisfactory correction of any deficiencies noted, the District shall accept the constructed lines and
appurtenances as the sole property and responsibility of the District.
F. BOXELDER SANITATION DISTRICT CONSTRUCTION NOTES:
The following information is condensed from the current “Standard Construction Specification for Sewer Mains” as adopted by the Boxelder Sanitation District (District) and is to
be considered as such. In the event of any question the full document shall take precedence.
1. Existing Utility Locates: It shall be the responsibility of the Contractor to coordinate field locates of all existing utilities prior to commencement of any construction.
Contractor shall also notify all affected utility companies prior to commencing construction. In the event of damage to any existing utility, the contractor shall immediately
notify the owner of the utility involved and unless authorized in writing by the owner of the subject utility, shall not attempt to make repairs. The cost of repairs shall be the
responsibility of the Contractor.
2. District Owned Easement Pictures: Contractor to provide sequential digital pictures spaced at no more than 300 feet detailing conditions of the off-site Boxelder Owned
Easement Conditions and any structures that could be affected, to the District and the property owner prior to the start of any off-site work. These pictures shall include all
existing fence, ditches, ditch structures, out buildings, water troughs, trees and all other landscaping. Pictures are to be placed at no more than four (4) pictures on a 11x8
sheet of photo paper inserted into transparent sleeves and delivered with the drawings of record in a three (3) ring binder.
3. Protection of Property: Contractor shall continuously maintain adequate protection from damage of all public and private property through which the work is done.
4. Safety: All sewer main installation within the District shall be subject to current (Occupational Safety and Heath Association (OSHA) and the Colorado Safety Association,
(CSA) safety requirements. Contractor shall also comply with any and all requirements and regulations as set forth by City, County, State and Federal agencies having
applicable authority.
5. Start of Construction: No construction shall begin without prior design review of the District. The District shall be notified 48 hours in advance of starting construction or
testing to allow for scheduling.
6. Road Excavation Permits: In event that State, County or City road excavation permit(s) are required, the Contractor is responsible for obtaining all road permits which may
be required.
7. Other Permits: The Contractor shall be responsible for obtaining all permits required for construction.
8. Revisions: No verbal authorization for field revision shall be given. All requests for field revision shall be made in writing accompanied by proposed change indicated on
copy of the approved design drawings. Any field revision approved and installed shall also be accurately documented on the Drawings of Record.
9. Materials: Plastic Pipe -All gravity sanitary sewer piping shall be Polyvinyl Chloride (PVC) unless otherwise noted on the approved drawings. Pipe 15” and smaller shall
conform to ASTM D3034, Type PSM, and SDR 35. Pipe 18” and larger shall conform to ASTM F679. All fittings shall be (PVC) unless otherwise noted.
10. Pipe Cover: A minimum cover of 3-1/2 feet of cover shall be maintained throughout the sewer line and service line installation.
11. Bedding: All sewer main installation shall include bedding. Bedding shall be ¾” washed rock uniformly graded and compacted. Refer to force main desgin for force main
bedding requirements. Trench shall be excavated to a depth below established grade equal to ¼ of pipe diameter (min. 4”). Bell depressions shall be provided for all
joints. In event that unstable trench conditions are encountered at pipeline grade 1-1/2” uniformly graded washed rock shall be used for stabilization. Bedding material
shall be placed and compacted under and around sides of the pipe. Place bedding in such a manner as to provide solid, uniform bearing surface for full length of barrel.
Minimum 30” initial lift above pipe before other than hand compaction equipment is to be used. Note maximum trench width detail.
12. Backfill: Backfilling of trench shall be performed as soon as practical, subsequent to inspection and approval. Backfilling of acceptable material shall not be placed in lifts
of greater than one (1) foot. Backfill shall be compacted to 95% of optimum density in roadway and residential areas and 90% in all off-site easement areas unless
otherwise noted. Compaction testing of bedding and back fill shall be at least five tests per 1,000 feet and at varying depths and locations in accordance with the
requirements of the applicable authority or as required in project specific specifications.
13. Concrete: All concrete construction shall be completed utilizing 3,000 psi at twenty-eight (28) days or equal concrete.
14. Pavement or Other Repairs: In event that asphalt or concrete pavement, sidewalks, storm sewers, waterline or any other public or privately owned property is damaged or
requires reconstruction due to the work, repairs or replacement will be made in accordance with the requirements of the appropriate governing authority. Private property
will be returned to its original condition or as close to original condition as reasonably possible, unless otherwise noted on the drawings.
15. Service Taps on Existing Lines: All taps made on existing lines shall be completed at developer's expense by District personnel or the District's authorized contractor with
no exception.
16. Inspection: Construction shall conform to District Standards and Specifications or project specific specifications at all times. The District shall inspect the construction as
necessary and shall observe all line testing. The District shall have the authority to ascertain that all construction of facilities is equal to or better than minimum
construction requirements as set forth in
17. Testing: All lines shall be pressure tested and flushed by the Contractor in accordance with District Standards and Specifications and under the District's supervision.
Upon passing, copies of all passing test results including soils compaction in the area of sewer main construction shall be provided to the District.
18. Acceptance: Upon completion of all utility construction (sewer and other) and fulfillment of all District requirements, preliminary acceptance of new sewer system
improvements will occur in accordance with District's acceptance procedure.
19. Warranty: The Contractor shall warrant the materials, installation, workmanship and surface restoration for a period of two years from date of preliminary acceptance.
During this warranty period the Developer shall promptly repair any defects in the work and maintain the work area. At the close of the two-year warranty period the
District will make a field inspection. Upon satisfactory correction of any deficiencies noted the District would make final acceptance of the lines and work. The lines and the
appurtenances shall then become the sole property and responsibility of Boxelder Sanitation District.
20. Drawings of Record and Total Costs: Within 90 days of preliminary acceptance of the new facilities, the District shall be provided with acceptable Drawings of Record of
the complete system consisting of two sets of fill size reproduced prints, two sets of ½-size reproduced prints, one set of 6 mil double matted reproducible mylars and one
complete digital file equivalent (software and version to be confirmed at time of delivery). Written confirmation of the total cost of all sewer system improvements shall also
be submitted with the Drawings of Record.
G. CITY OF GREELEY DEVELOPMENT/CONSTRUCTION PLAN GENERAL NOTES:
1. All easements and rights-of-way crossing the City of Greeley easement are subject to the rights of said City of Greeley easement.
2. There shall be no permanent structures, concrete slabs, detention ponds, fences, walls, trees, or other landscaping or berms greater than 3 feet at mature growth, or other
obstructions within the City of Greeley easement. No cover shall be removed and/or added without written permission from City of Greeley Water Engineer.
3. There shall be no other utilities within the City of Greeley easement except at right angle crossings and unless previously approved by the City of Greeley Water & Sewer
Department. All plans shall be submitted during the design phase at least two weeks prior to construction and shall show potholed locations and elevations in plan and
profile view. Greeley Water & Sewer will issue appropriate crossing approval.
4. In the event that excavation is required for the City of Greeley water pipelines due to water pipeline repairs, replacement or other operations, the excavation will be
backfilled safely but surface restoration will not be done by/ or at the expense of the City of Greeley.
5. Greeley water pipeline locations are approximate, contact the transmission line technician at 970-371-3726, 72 hours in advance of any locate request or any construction
activities within the Greeley water pipeline easement.
6. There shall be no vibratory or heavy sheepsfoot compaction within 20 feet of the existing water transmission pipeline. Static compaction equipment shall be used.
7. Greeley pipelines must have a minimum of six (6) feet of cover at all locations to be used as a land bridge during any construction activities.
8. No cuts in grading are allowed within the transmission waterline easements unless sufficient cover exists and is reviewed / approved by the City of Greeley.
9. Greeley water line support at crossings shall be incorporated into the design if proposed utility crossing is below the water line using open trench construction.
10. Any irrigation lines and/or sprinkler systems located within Greeley easement requires contractor to provide Greeley a full set of landscaping & irrigation/sprinkler system
plans for review and approval. Plans to be provided a minimum of 2 weeks prior to construction. Valve boxes are not to be located within Greeley’s easement.
11. Any work to be done on City of Greeley waterline(s) shall conform to current City of Greeley specifications.
-
-
-
-
-
-
-
-
-
-
-
-
-
-
STAMP
H:\Hartford Homes\CO Fort Collins HFH22 - Mulberry\0CIV\3-CD\FDP_F1\HFH022_C0.0_Cover Sheet.dwg - Matthew Kasch - 8/17/2022Init.# Issue / DescriptionDateFINAL DEVELOPMENT PLANS BLOOM FILING ONEFORT COLLINS, COTHESE PLANS ARE AN INSTRUMENT OF SERVICE
AND ARE THE PROPERTY OF GALLOWAY, AND MAY
NOT BE DUPLICATED, DISCLOSED, OR REPRODUCED
WITHOUT THE WRITTEN CONSENT OF GALLOWAY.
COPYRIGHTS AND INFRINGEMENTS WILL BE
ENFORCED AND PROSECUTED.
COPYRIGHT
GallowayUS.com
5265 Ronald Reagan Blvd., Suite 210
Johnstown, CO 80534
970.800.3300
PRELIMINARYNOT FOR BIDDINGNOT FOR CONSTRUCTIONDate:
Drawn By:
Project No:
Checked By:
08.17.2022
HFH000022
AGM
JEP
GENERAL NOTES
C0.2
CITY OF GREELEY
MISSING
MISSING. IF THIS SHEET
IS NOT NEEDED,
PLEASE REMOVE IT
FROM THE INDEX.
City of Fort Collins
Development Review Engineering
Sophie Buckingham, EI
Date:09/01/2022
MM
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S
S
S
S
S
S
S
S
S
S
S
S
MM MM
BIPLANE STREET
COLEMAN STREET
SUPERCUB LANE
CONQUEST STREET
SYKES DRIVE
COMET STREET (B)
RELIANT STREET
CRUSADER STREET (B)FAIRCHILD STREETQUINBY STREETFAIRCHILD STREETDELOZIER ROADALLEY AALLEY A
QUINBY STREETALLEY B
LOT 3 LOT 4 LOT 5
LOT 27LOT 28LOT 29 LOT 25
LOT 7 LOT 8 LOT 9
LOT 23LOT 24
LOT 6
LOT 26
LOT 10 LOT 11 LOT 12 LOT 13 LOT 14
LOT 19
LOT 20LOT 21LOT 22
LOT 18
LOT 17
LOT 16
LOT 15
LOT 3 LOT 4 LOT 5 LOT 6 LOT 7
LOT 16LOT 17LOT 18LOT 19LOT 20 LOT 15 LOT 14 LOT 13
LOT 10LOT 9LOT 8 LOT 11
LOT 12
LOT 3 LOT 4 LOT 5 LOT 6
LOT 7LOT 8LOT 9LOT 10 LOT 3
LOT 2
LOT 4
LOT 5
LOT 6
LOT 7
LOT 8
LOT 1
LOT 3 LOT 14
LOT 4
LOT 5
LOT 6
LOT 13
LOT 12
LOT 11
LOT 10LOT 7
LOT 8 LOT 9
LOT 1 LOT 16
LOT 15LOT 2
LOT 6 LOT 7
LOT 10LOT 11
LOT 8
LOT 9 LOT 16
LOT 1 LOT 2 LOT 3 LOT 4 LOT 5 LOT 6 LOT 7
LOT 10LOT 11LOT 12LOT 13LOT 14LOT 15
LOT 6 LOT 7 LOT 8 LOT 7LOT 6LOT 5LOT 4LOT 3LOT 2LOT 1
LOT 9
LOT 8
LOT 8
LOT 6 LOT 7
LOT 10LOT 11
LOT 8
LOT 9 LOT 16
LOT 1 LOT 2 LOT 3 LOT 4 LOT 5 LOT 6 LOT 7
LOT 10LOT 11LOT 12LOT 13LOT 14LOT 15 LOT 9
LOT 8
LOT 14 LOT 13 LOT 12 LOT 11 LOT 19 LOT 18 LOT 17 LOT 16 LOT 15 LOT 14 LOT 13 LOT 12 LOT 11
LOT 8LOT 7LOT 6LOT 5LOT 4LOT 3LOT 2LOT 1LOT 10LOT 9LOT 8LOT 7LOT 6
LOT 10
LOT 9
LOT 2 LOT 3 LOT 4 LOT 5 LOT 6 LOT 7
LOT 10LOT 11LOT 12LOT 13LOT 14LOT 15LOT 13LOT 14LOT 15LOT 16LOT 17
LOT 7 LOT 8 LOT 9 LOT 10
LOT 9
LOT 8LOT 1
LOT 16
LOT 11
LOT 12
LOT 6
LOT 3 LOT 4 LOT 5 LOT 6
LOT 7LOT 8LOT 9LOT 10
TRACT XTRACT YTRACT WTRACT VTRACT Z
BLOCK 21
BLOCK 19
BLOCK 19 BLOCK 21
BLOCK 22
BLOCK 23BLOCK 17
BLOCK 16
BLOCK 23
BLOCK 22
BLOCK 24
BLOCK 14
BLOCK 24
BLOCK 26
BLOCK 28
BLOCK 30
BLOCK 26
BLOCK 25
BLOCK 28
BLOCK 27
BLOCK 30
BLOCK 29
BLOCK 32
CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE, OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
CALL UTILITY NOTIFICATION CENTER OF
COLORADO
Know what'sbelow.before you dig.Call
R
SCALE: 1"=150'
0 75 1505025
MATCHLINE-SEE SHEET C1.1
-
-
-
-
-
-
-
-
-
-
-
-
-
-
STAMP
H:\Hartford Homes\CO Fort Collins HFH22 - Mulberry\0CIV\3-CD\FDP_F1\HFH022_C1.0_Existing Conditions.dwg - Matthew Kasch - 8/17/2022Init.# Issue / DescriptionDateFINAL DEVELOPMENT PLANS BLOOM FILING ONEFORT COLLINS, COTHESE PLANS ARE AN INSTRUMENT OF SERVICE
AND ARE THE PROPERTY OF GALLOWAY, AND MAY
NOT BE DUPLICATED, DISCLOSED, OR REPRODUCED
WITHOUT THE WRITTEN CONSENT OF GALLOWAY.
COPYRIGHTS AND INFRINGEMENTS WILL BE
ENFORCED AND PROSECUTED.
COPYRIGHT
GallowayUS.com
5265 Ronald Reagan Blvd., Suite 210
Johnstown, CO 80534
970.800.3300
PRELIMINARYNOT FOR BIDDINGNOT FOR CONSTRUCTIONDate:
Drawn By:
Project No:
Checked By:
08.17.2022
HFH000022
KEYMAP
AGM
JEP
EXISTING CONDITIONS
C1.0
C1.0
C1.1
Should the existing
barricade be labeled
"to be removed"?
Should the existing
barricades be labeled
"to be removed"?
Should the existing
barricade be labeled
"to be removed"?
City of Fort Collins
Development Review Engineering
Sophie Buckingham, EI
Date:08/31/2022
50'?
Are the existing
ownership and lot
lines still correct?
ONLYONLYONLYYIELDONLYYIEL
DYIELDYIELD YIELDONLY
ONLY
YIELDONLY
CRUSADER STREET (B)
LOT 6 LOT 7 LOT 8 LOT 7LOT 6LOT 5LOT 4LOT 3LOT 2LOT 1 LOT 8
LOT 10LOT 11 LOT 9 LOT 16 LOT 10LOT 11LOT 12LOT 13LOT 14LOT 15 LOT 9
TRACT Z
BLOCK 30BLOCK 29
BLOCK 32
CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE, OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
CALL UTILITY NOTIFICATION CENTER OF
COLORADO
Know what'sbelow.before you dig.Call
R
SCALE: 1"=150'
0 75 1505025
MATCHLINE-SEE SHEET C1.0
-
-
-
-
-
-
-
-
-
-
-
-
-
-
STAMP
H:\Hartford Homes\CO Fort Collins HFH22 - Mulberry\0CIV\3-CD\FDP_F1\HFH022_C1.0_Existing Conditions.dwg - Matthew Kasch - 8/17/2022Init.# Issue / DescriptionDateFINAL DEVELOPMENT PLANS BLOOM FILING ONEFORT COLLINS, COTHESE PLANS ARE AN INSTRUMENT OF SERVICE
AND ARE THE PROPERTY OF GALLOWAY, AND MAY
NOT BE DUPLICATED, DISCLOSED, OR REPRODUCED
WITHOUT THE WRITTEN CONSENT OF GALLOWAY.
COPYRIGHTS AND INFRINGEMENTS WILL BE
ENFORCED AND PROSECUTED.
COPYRIGHT
GallowayUS.com
5265 Ronald Reagan Blvd., Suite 210
Johnstown, CO 80534
970.800.3300
PRELIMINARYNOT FOR BIDDINGNOT FOR CONSTRUCTIONDate:
Drawn By:
Project No:
Checked By:
08.17.2022
HFH000022
KEYMAP
AGM
JEP
EXISTING CONDITIONS
C1.1
C1.0
C1.1
CITY OF GREELEY
Are the existing
ownership and lot
lines still correct?
City of Fort Collins
Development Review Engineering
Sophie Buckingham, EI
Date:09/01/2022
FAIRCHILD STREETLOT 12 LOT 13 LOT 14
LOT 19
LOT 20
LOT 18
LOT 17
LOT 16
LOT 15
BLOCK 21 8''SS8''SSS
S
S
S
S
S
M
Know what's
before you dig.SCALE: 1"=40'
0 20 40MATCHLINE-SEE SHEET C2.2MATCHLINE-SEE SHEET C2.3
-
-
-
-
-
-
-
-
-
-
-
-
-
-
STAMP
H:\Hartford Homes\CO Fort Collins HFH22 - Mulberry\0CIV\3-CD\FDP_F1\HFH022_C2.1-C2.6_Horizontal Control.dwg - Nate Whitcomb - 8/17/2022Init.# Issue / DescriptionDateFINAL DEVELOPMENT PLANS BLOOM FILING ONEFORT COLLINS, COTHESE PLANS ARE AN INSTRUMENT OF SERVICE
AND ARE THE PROPERTY OF GALLOWAY, AND MAY
NOT BE DUPLICATED, DISCLOSED, OR REPRODUCED
WITHOUT THE WRITTEN CONSENT OF GALLOWAY.
COPYRIGHTS AND INFRINGEMENTS WILL BE
ENFORCED AND PROSECUTED.
COPYRIGHT
GallowayUS.com
5265 Ronald Reagan Blvd., Suite 210
Johnstown, CO 80534
970.800.3300
PRELIMINARYNOT FOR BIDDINGNOT FOR CONSTRUCTIONDate:
Drawn By:
Project No:
Checked By:
08.17.2022
HFH000022
KEYMAP
AGM
JEP
HORIZONTAL CONTROL PLAN
C2.1
What about existing sidewalk?
Please add legend
symbols for existing
and proposed
pedestrian ramps.
It would be helpful to have
a construction detail
referenced
Should there be a note indicating
that this barricade will be removed?
Why do these ramps
have different
symbols? Will they be
constructed differently?
If so, please specify
the construction detail
for each. Either way,
please add legend
symbols.
Isn't there existing sidewalk along here?
City of Fort Collins
Development Review Engineering
Sophie Buckingham, EI
Date:08/31/2022
FAIRCHILD STREETLOT 3
LOT 2
LOT 4
LOT 5
LOT 6
LOT 7
LOT 8
LOT 1
LOT 8LOT 7 LOT 9
LOT 6 LOT 7
LOT 10LOT 11 LOT 9
LOT 8
BLOCK 22
BLOCK 22
BLOCK 24
MATCHLINE-SEE SHEET C2.4MATCHLINE-SEE SHEET C2.6
MATCHLINE-SEE SHEET C2.1
-
-
-
-
-
-
-
-
-
-
-
-
-
-
STAMP
H:\Hartford Homes\CO Fort Collins HFH22 - Mulberry\0CIV\3-CD\FDP_F1\HFH022_C2.1-C2.6_Horizontal Control.dwg - Nate Whitcomb - 8/17/2022Init.# Issue / DescriptionDateFINAL DEVELOPMENT PLANS BLOOM FILING ONEFORT COLLINS, COTHESE PLANS ARE AN INSTRUMENT OF SERVICE
AND ARE THE PROPERTY OF GALLOWAY, AND MAY
NOT BE DUPLICATED, DISCLOSED, OR REPRODUCED
WITHOUT THE WRITTEN CONSENT OF GALLOWAY.
COPYRIGHTS AND INFRINGEMENTS WILL BE
ENFORCED AND PROSECUTED.
COPYRIGHT
GallowayUS.com
5265 Ronald Reagan Blvd., Suite 210
Johnstown, CO 80534
970.800.3300
PRELIMINARYNOT FOR BIDDINGNOT FOR CONSTRUCTIONDate:
Drawn By:
Project No:
Checked By:
08.17.2022
HFH000022
KEYMAP
AGM
JEP
HORIZONTAL CONTROL PLAN
C2.3Know what's
before you dig.SCALE: 1"=40'
0 20 40
Can this masking be
trimmed back so it
doesn't cover so
much other linework?
What is this?
Does it need
a legend
symbol?
Please ensure that these
lights are at least 2 feet
away from the edge of
the sidewalk/trail.
City of Fort Collins
Development Review Engineering
Sophie Buckingham, EI
Date:08/31/2022
MATCHLINE-SEE SHEET C2.5MATCHLINE-SEE SHEET C2.7
MATCHLINE-SEE SHEET C2.2
MATCHLINE-SEE SHEET C2.3-
-
-
-
-
-
-
-
-
-
-
-
-
-
STAMP
H:\Hartford Homes\CO Fort Collins HFH22 - Mulberry\0CIV\3-CD\FDP_F1\HFH022_C2.1-C2.6_Horizontal Control.dwg - Nate Whitcomb - 8/17/2022Init.# Issue / DescriptionDateFINAL DEVELOPMENT PLANS BLOOM FILING ONEFORT COLLINS, COTHESE PLANS ARE AN INSTRUMENT OF SERVICE
AND ARE THE PROPERTY OF GALLOWAY, AND MAY
NOT BE DUPLICATED, DISCLOSED, OR REPRODUCED
WITHOUT THE WRITTEN CONSENT OF GALLOWAY.
COPYRIGHTS AND INFRINGEMENTS WILL BE
ENFORCED AND PROSECUTED.
COPYRIGHT
GallowayUS.com
5265 Ronald Reagan Blvd., Suite 210
Johnstown, CO 80534
970.800.3300
PRELIMINARYNOT FOR BIDDINGNOT FOR CONSTRUCTIONDate:
Drawn By:
Project No:
Checked By:
08.17.2022
HFH000022
KEYMAP
AGM
JEP
HORIZONTAL CONTROL PLAN
C2.4Know what's
before you dig.SCALE: 1"=40'
0 20 40
What are these? Is a
legend symbol needed?
There should be a ramp here if
curb, gutter, and sidewalk are all
being constructed now.
R85.86'
City of Fort Collins
Development Review Engineering
John Gerwel, EI
08/26/2022 10:26:23 AM
City of Fort Collins
Development Review Engineering
Sophie Buckingham, EI
Date:08/30/2022
MATCHLINE-SEE SHEET C2.4MATCHLINE-SEE SHEET C2.8
-
-
-
-
-
-
-
-
-
-
-
-
-
-
STAMP
H:\Hartford Homes\CO Fort Collins HFH22 - Mulberry\0CIV\3-CD\FDP_F1\HFH022_C2.1-C2.6_Horizontal Control.dwg - Nate Whitcomb - 8/17/2022Init.# Issue / DescriptionDateFINAL DEVELOPMENT PLANS BLOOM FILING ONEFORT COLLINS, COTHESE PLANS ARE AN INSTRUMENT OF SERVICE
AND ARE THE PROPERTY OF GALLOWAY, AND MAY
NOT BE DUPLICATED, DISCLOSED, OR REPRODUCED
WITHOUT THE WRITTEN CONSENT OF GALLOWAY.
COPYRIGHTS AND INFRINGEMENTS WILL BE
ENFORCED AND PROSECUTED.
COPYRIGHT
GallowayUS.com
5265 Ronald Reagan Blvd., Suite 210
Johnstown, CO 80534
970.800.3300
PRELIMINARYNOT FOR BIDDINGNOT FOR CONSTRUCTIONDate:
Drawn By:
Project No:
Checked By:
08.17.2022
HFH000022
KEYMAP
AGM
JEP
HORIZONTAL CONTROL PLAN
C2.5Know what's
before you dig.SCALE: 1"=40'
0 20 40
Is the dashed line the easement boundary as
dedicated on the plat? Or is there an additional
5' drainage easement around the edge?
City of Fort Collins
Development Review Engineering
Sophie Buckingham, EI
Date:08/31/2022
DELOZIER ROADLOT 7
LOT 10
LOT 7
LOT 9
LOT 8
LOT 8
LOT 7
LOT 10 LOT 9
LOT 8
LOT 12 LOT 11
LOT 8LOT 7
LOT 10
LOT 9
BLOCK 26
BLOCK 28
BLOCK 30
MATCHLINE-SEE SHEET C2.7MATCHLINE-SEE SHEET C2.9
-
-
-
-
-
-
-
-
-
-
-
-
-
-
STAMP
H:\Hartford Homes\CO Fort Collins HFH22 - Mulberry\0CIV\3-CD\FDP_F1\HFH022_C2.1-C2.6_Horizontal Control.dwg - Nate Whitcomb - 8/17/2022Init.# Issue / DescriptionDateFINAL DEVELOPMENT PLANS BLOOM FILING ONEFORT COLLINS, COTHESE PLANS ARE AN INSTRUMENT OF SERVICE
AND ARE THE PROPERTY OF GALLOWAY, AND MAY
NOT BE DUPLICATED, DISCLOSED, OR REPRODUCED
WITHOUT THE WRITTEN CONSENT OF GALLOWAY.
COPYRIGHTS AND INFRINGEMENTS WILL BE
ENFORCED AND PROSECUTED.
COPYRIGHT
GallowayUS.com
5265 Ronald Reagan Blvd., Suite 210
Johnstown, CO 80534
970.800.3300
PRELIMINARYNOT FOR BIDDINGNOT FOR CONSTRUCTIONDate:
Drawn By:
Project No:
Checked By:
08.17.2022
HFH000022
KEYMAP
MATCHLINE-SEE SHEET C2.3
AGM
JEP
HORIZONTAL CONTROL PLAN
C2.6Know what's
before you dig.SCALE: 1"=40'
0 20 40
Why are these ramp symbols different?
Why is the stop sign
on the left side?
What are these? Please
add a legend symbol or a
clear label, and reference
a construction detail.
City of Fort Collins
Development Review Engineering
Sophie Buckingham, EI
Date:08/31/2022
1
1
1?
1?
MATCHLINE-SEE SHEET C2.6MATCHLINE-SEE SHEET C2.10
-
-
-
-
-
-
-
-
-
-
-
-
-
-
STAMP
H:\Hartford Homes\CO Fort Collins HFH22 - Mulberry\0CIV\3-CD\FDP_F1\HFH022_C2.1-C2.6_Horizontal Control.dwg - Nate Whitcomb - 8/17/2022Init.# Issue / DescriptionDateFINAL DEVELOPMENT PLANS BLOOM FILING ONEFORT COLLINS, COTHESE PLANS ARE AN INSTRUMENT OF SERVICE
AND ARE THE PROPERTY OF GALLOWAY, AND MAY
NOT BE DUPLICATED, DISCLOSED, OR REPRODUCED
WITHOUT THE WRITTEN CONSENT OF GALLOWAY.
COPYRIGHTS AND INFRINGEMENTS WILL BE
ENFORCED AND PROSECUTED.
COPYRIGHT
GallowayUS.com
5265 Ronald Reagan Blvd., Suite 210
Johnstown, CO 80534
970.800.3300
PRELIMINARYNOT FOR BIDDINGNOT FOR CONSTRUCTIONDate:
Drawn By:
Project No:
Checked By:
08.17.2022
HFH000022
KEYMAP
AGM
JEP
HORIZONTAL CONTROL PLAN
C2.7MATCHLINE-SEE SHEET C2.8MATCHLINE-SEE SHEET C2.4
Know what's
before you dig.SCALE: 1"=40'
0 20 40
Is this supposed to be a ramp?
If so, please update the
symbol and add a receiving
ramp on the opposite side of
the street. If not, please clarify
what it is using a note or a
legend symbol.
City of Fort Collins
Development Review Engineering
Sophie Buckingham, EI
Date:08/31/2022
1?
1?
1?
MATCHLINE-SEE SHEET C2.10MATCHLINE-SEE SHEET C2.6
MATCHLINE-SEE SHEET C2.12
KEYMAP
-
-
-
-
-
-
-
-
-
-
-
-
-
-
STAMP
H:\Hartford Homes\CO Fort Collins HFH22 - Mulberry\0CIV\3-CD\FDP_F1\HFH022_C2.1-C2.6_Horizontal Control.dwg - Nate Whitcomb - 8/17/2022Init.# Issue / DescriptionDateFINAL DEVELOPMENT PLANS BLOOM FILING ONEFORT COLLINS, COTHESE PLANS ARE AN INSTRUMENT OF SERVICE
AND ARE THE PROPERTY OF GALLOWAY, AND MAY
NOT BE DUPLICATED, DISCLOSED, OR REPRODUCED
WITHOUT THE WRITTEN CONSENT OF GALLOWAY.
COPYRIGHTS AND INFRINGEMENTS WILL BE
ENFORCED AND PROSECUTED.
COPYRIGHT
GallowayUS.com
5265 Ronald Reagan Blvd., Suite 210
Johnstown, CO 80534
970.800.3300
PRELIMINARYNOT FOR BIDDINGNOT FOR CONSTRUCTIONDate:
Drawn By:
Project No:
Checked By:
08.17.2022
HFH000022
AGM
JEP
HORIZONTAL CONTROL PLAN
C2.9Know what's
before you dig.SCALE: 1"=40'
0 20 40
Please add a legend symbol for
curb ramps, on every sheet where
there are curb ramps (proposed,
existing, and deferred).
Symbols are needed
for existing, proposed,
and deferred curb
ramps. If this is not
clear to the inspectors
during construction,
they will err on the side
of requiring all curb
ramps to be built now.
If these curb ramps are not
being built now, please clearly
indicate that the curb will be
depressed in the correct
locations for the ramps to be
installed later.
If these curb ramps are not
being built now, please
clearly indicate that the curb
will be depressed in the
correct locations for the
ramps to be installed later.
Should there be a note that
the existing barricade will
be removed?
City of Fort Collins
Development Review Engineering
Sophie Buckingham, EI
Date:08/31/2022
MATCHLINE-SEE SHEET C2.9MATCHLINE-SEE SHEET C2.7
MATCHLINE-SEE SHEET C2.13
KEYMAP
-
-
-
-
-
-
-
-
-
-
-
-
-
-
STAMP
H:\Hartford Homes\CO Fort Collins HFH22 - Mulberry\0CIV\3-CD\FDP_F1\HFH022_C2.1-C2.6_Horizontal Control.dwg - Nate Whitcomb - 8/17/2022Init.# Issue / DescriptionDateFINAL DEVELOPMENT PLANS BLOOM FILING ONEFORT COLLINS, COTHESE PLANS ARE AN INSTRUMENT OF SERVICE
AND ARE THE PROPERTY OF GALLOWAY, AND MAY
NOT BE DUPLICATED, DISCLOSED, OR REPRODUCED
WITHOUT THE WRITTEN CONSENT OF GALLOWAY.
COPYRIGHTS AND INFRINGEMENTS WILL BE
ENFORCED AND PROSECUTED.
COPYRIGHT
GallowayUS.com
5265 Ronald Reagan Blvd., Suite 210
Johnstown, CO 80534
970.800.3300
PRELIMINARYNOT FOR BIDDINGNOT FOR CONSTRUCTIONDate:
Drawn By:
Project No:
Checked By:
08.17.2022
HFH000022
AGM
JEP
HORIZONTAL CONTROL PLAN
C2.10MATCHLINE-SEE SHEET C2.11Know what's
before you dig.SCALE: 1"=40'
0 20 40
If this sidewalk, curb,
and gutter are being
built now, please install
a ramp here now.
If this sidewalk is being installed
now, please use the appropriate
hatching to indicate sidewalk,
but be clear if it is being built
per Peakview plans.City of Fort Collins
Development Review Engineering
John Gerwel, EI
08/26/2022 2:06:09 PM
City of Fort Collins
Development Review Engineering
Sophie Buckingham, EI
Date:08/30/2022
MATCHLINE-SEE SHEET C2.13MATCHLINE-SEE SHEET C2.9
MATCHLINE-SEE SHEET C2.14
-
-
-
-
-
-
-
-
-
-
-
-
-
-
STAMP
H:\Hartford Homes\CO Fort Collins HFH22 - Mulberry\0CIV\3-CD\FDP_F1\HFH022_C2.1-C2.6_Horizontal Control.dwg - Nate Whitcomb - 8/17/2022Init.# Issue / DescriptionDateFINAL DEVELOPMENT PLANS BLOOM FILING ONEFORT COLLINS, COTHESE PLANS ARE AN INSTRUMENT OF SERVICE
AND ARE THE PROPERTY OF GALLOWAY, AND MAY
NOT BE DUPLICATED, DISCLOSED, OR REPRODUCED
WITHOUT THE WRITTEN CONSENT OF GALLOWAY.
COPYRIGHTS AND INFRINGEMENTS WILL BE
ENFORCED AND PROSECUTED.
COPYRIGHT
GallowayUS.com
5265 Ronald Reagan Blvd., Suite 210
Johnstown, CO 80534
970.800.3300
PRELIMINARYNOT FOR BIDDINGNOT FOR CONSTRUCTIONDate:
Drawn By:
Project No:
Checked By:
08.17.2022
HFH000022
Know what's
before you dig.
SCALE: 1"=40'
0 20 40
KEYMAP
AGM
JEP
HORIZONTAL CONTROL PLAN
C2.12
CITY OF GREELEY
This appears to be a future
roadway centerline for Aria
extension. The alignment
and design for Aria south
of Donella is not being
approved with Filing One.
Please remove this line
south of where it intersects
with the Donella centerline.
DRIVEWAY LOCATION TO
BE DETERMINED AND BUILT
WITH FUTURE FILING
City of Fort Collins
Development Review Engineering
John Gerwel, EI
08/26/2022 9:43:37 AM
City of Fort Collins
Development Review Engineering
Sophie Buckingham, EI
Date:08/30/2022
If these curb ramps are not being built
now, please clearly indicate that the curb
will be depressed in the correct locations
for the ramps to be installed later.
Please indicate that a
ramp will be constructed
here, now or in the
future.
MATCHLINE-SEE SHEET C2.15
MATCHLINE-SEE SHEET C2.10
MATCHLINE-SEE SHEET C2.12-
-
-
-
-
-
-
-
-
-
-
-
-
-
STAMP
H:\Hartford Homes\CO Fort Collins HFH22 - Mulberry\0CIV\3-CD\FDP_F1\HFH022_C2.1-C2.6_Horizontal Control.dwg - Nate Whitcomb - 8/17/2022Init.# Issue / DescriptionDateFINAL DEVELOPMENT PLANS BLOOM FILING ONEFORT COLLINS, COTHESE PLANS ARE AN INSTRUMENT OF SERVICE
AND ARE THE PROPERTY OF GALLOWAY, AND MAY
NOT BE DUPLICATED, DISCLOSED, OR REPRODUCED
WITHOUT THE WRITTEN CONSENT OF GALLOWAY.
COPYRIGHTS AND INFRINGEMENTS WILL BE
ENFORCED AND PROSECUTED.
COPYRIGHT
GallowayUS.com
5265 Ronald Reagan Blvd., Suite 210
Johnstown, CO 80534
970.800.3300
PRELIMINARYNOT FOR BIDDINGNOT FOR CONSTRUCTIONDate:
Drawn By:
Project No:
Checked By:
08.17.2022
HFH000022
KEYMAP
AGM
JEP
HORIZONTAL CONTROL PLAN
C2.13Know what's
before you dig.SCALE: 1"=40'
0 20 40
Ramps needed here if
sidewalk, curb, and gutter
are being installed now
Sidewalk hatching?
City of Fort Collins
Development Review Engineering
John Gerwel, EI
08/26/2022 2:06:37 PM
City of Fort Collins
Development Review Engineering
Sophie Buckingham, EI
Date:08/30/2022
MATCHLINE-SEE SHEET C2.12
MATCHLINE-SEE SHEET C2.15-
-
-
-
-
-
-
-
-
-
-
-
-
-
STAMP
H:\Hartford Homes\CO Fort Collins HFH22 - Mulberry\0CIV\3-CD\FDP_F1\HFH022_C2.1-C2.6_Horizontal Control.dwg - Nate Whitcomb - 8/17/2022Init.# Issue / DescriptionDateFINAL DEVELOPMENT PLANS BLOOM FILING ONEFORT COLLINS, COTHESE PLANS ARE AN INSTRUMENT OF SERVICE
AND ARE THE PROPERTY OF GALLOWAY, AND MAY
NOT BE DUPLICATED, DISCLOSED, OR REPRODUCED
WITHOUT THE WRITTEN CONSENT OF GALLOWAY.
COPYRIGHTS AND INFRINGEMENTS WILL BE
ENFORCED AND PROSECUTED.
COPYRIGHT
GallowayUS.com
5265 Ronald Reagan Blvd., Suite 210
Johnstown, CO 80534
970.800.3300
PRELIMINARYNOT FOR BIDDINGNOT FOR CONSTRUCTIONDate:
Drawn By:
Project No:
Checked By:
08.17.2022
HFH000022
Know what's
before you dig.
SCALE: 1"=40'
0 20 40
KEYMAP
AGM
JEP
HORIZONTAL CONTROL PLAN
C2.14
CITY OF GREELEY
This appears to be a future
roadway centerline for Aria
extension. The alignment
and design for Aria south
of Donella is not being
approved with Filing One.
Please remove this line.
City of Fort Collins
Development Review Engineering
Sophie Buckingham, EI
Date:08/31/2022
MATCHLINE-SEE SHEET C2.16
MATCHLINE-SEE SHEET C2.13
MATCHLINE-SEE SHEET C2.14-
-
-
-
-
-
-
-
-
-
-
-
-
-
STAMP
H:\Hartford Homes\CO Fort Collins HFH22 - Mulberry\0CIV\3-CD\FDP_F1\HFH022_C2.1-C2.6_Horizontal Control.dwg - Nate Whitcomb - 8/17/2022Init.# Issue / DescriptionDateFINAL DEVELOPMENT PLANS BLOOM FILING ONEFORT COLLINS, COTHESE PLANS ARE AN INSTRUMENT OF SERVICE
AND ARE THE PROPERTY OF GALLOWAY, AND MAY
NOT BE DUPLICATED, DISCLOSED, OR REPRODUCED
WITHOUT THE WRITTEN CONSENT OF GALLOWAY.
COPYRIGHTS AND INFRINGEMENTS WILL BE
ENFORCED AND PROSECUTED.
COPYRIGHT
GallowayUS.com
5265 Ronald Reagan Blvd., Suite 210
Johnstown, CO 80534
970.800.3300
PRELIMINARYNOT FOR BIDDINGNOT FOR CONSTRUCTIONDate:
Drawn By:
Project No:
Checked By:
08.17.2022
HFH000022
KEYMAP
AGM
JEP
HORIZONTAL CONTROL PLAN
C2.15Know what's
before you dig.SCALE: 1"=40'
0 20 40
This appears to be a future
roadway centerline for Aria
extension. The alignment
and design for Aria south
of Donella is not being
approved with Filing One.
Please remove this line.
Sidewalk hatching?
Does this mean that
the eastern sidewalk
north of this line is
NOT per Peakview
plans?
City of Fort Collins
Development Review Engineering
John Gerwel, EI
08/26/2022 2:07:15 PM
City of Fort Collins
Development Review Engineering
Sophie Buckingham, EI
Date:08/30/2022
MATCHLINE-SEE SHEET C2.17MATCHLINE-SEE SHEET C2.15
-
-
-
-
-
-
-
-
-
-
-
-
-
-
STAMP
H:\Hartford Homes\CO Fort Collins HFH22 - Mulberry\0CIV\3-CD\FDP_F1\HFH022_C2.1-C2.6_Horizontal Control.dwg - Nate Whitcomb - 8/17/2022Init.# Issue / DescriptionDateFINAL DEVELOPMENT PLANS BLOOM FILING ONEFORT COLLINS, COTHESE PLANS ARE AN INSTRUMENT OF SERVICE
AND ARE THE PROPERTY OF GALLOWAY, AND MAY
NOT BE DUPLICATED, DISCLOSED, OR REPRODUCED
WITHOUT THE WRITTEN CONSENT OF GALLOWAY.
COPYRIGHTS AND INFRINGEMENTS WILL BE
ENFORCED AND PROSECUTED.
COPYRIGHT
GallowayUS.com
5265 Ronald Reagan Blvd., Suite 210
Johnstown, CO 80534
970.800.3300
PRELIMINARYNOT FOR BIDDINGNOT FOR CONSTRUCTIONDate:
Drawn By:
Project No:
Checked By:
08.17.2022
HFH000022
Know what's
before you dig.
SCALE: 1"=40'
0 20 40
KEYMAP
AGM
JEP
HORIZONTAL CONTROL PLAN
C2.16
CITY OF GREELEY
This appears to be a future
roadway centerline for Aria
extension. The alignment
and design for Aria south
of Donella is not being
approved with Filing One.
Please remove this line.
These access easements
need to be added to the plat
City of Fort Collins
Development Review Engineering
John Gerwel, EI
08/26/2022 12:46:07 PM
City of Fort Collins
Development Review Engineering
Sophie Buckingham, EI
Date:08/30/2022
MATCHLINE-SEE SHEET C3.1MATCHLINE-SEE SHEET C3.5
-
-
-
-
-
-
-
-
-
-
-
-
-
-
STAMP
H:\Hartford Homes\CO Fort Collins HFH22 - Mulberry\0CIV\3-CD\FDP_F1\HFH022_C3.1-C3.6_Overlot Grading.dwg - Nate Whitcomb - 8/17/2022Init.# Issue / DescriptionDateFINAL DEVELOPMENT PLANS BLOOM FILING ONEFORT COLLINS, COTHESE PLANS ARE AN INSTRUMENT OF SERVICE
AND ARE THE PROPERTY OF GALLOWAY, AND MAY
NOT BE DUPLICATED, DISCLOSED, OR REPRODUCED
WITHOUT THE WRITTEN CONSENT OF GALLOWAY.
COPYRIGHTS AND INFRINGEMENTS WILL BE
ENFORCED AND PROSECUTED.
COPYRIGHT
GallowayUS.com
5265 Ronald Reagan Blvd., Suite 210
Johnstown, CO 80534
970.800.3300
PRELIMINARYNOT FOR BIDDINGNOT FOR CONSTRUCTIONDate:
Drawn By:
Project No:
Checked By:
08.17.2022
HFH000022
KEYMAP
Know what's
before you dig.
AGM
JEP
OVERLOT GRADING
C3.2SCALE: 1"=40'
0 20 40
KEYMAP
MATCHLINE-SEE SHEET C3.3B/GBA/BA G
S
Please make sure to use the
"right-of-way" line type for this
line. It is very confusing that
this line looks so similar to the
Proposed Contour line type.
Please use a different line
type for right-of-way than
you used for easement.
City of Fort Collins
Development Review Engineering
Sophie Buckingham, EI
Date:08/31/2022
MATCHLINE-SEE SHEET C3.2MATCHLINE-SEE SHEET C3.6
-
-
-
-
-
-
-
-
-
-
-
-
-
-
STAMP
H:\Hartford Homes\CO Fort Collins HFH22 - Mulberry\0CIV\3-CD\FDP_F1\HFH022_C3.1-C3.6_Overlot Grading.dwg - Nate Whitcomb - 8/17/2022Init.# Issue / DescriptionDateFINAL DEVELOPMENT PLANS BLOOM FILING ONEFORT COLLINS, COTHESE PLANS ARE AN INSTRUMENT OF SERVICE
AND ARE THE PROPERTY OF GALLOWAY, AND MAY
NOT BE DUPLICATED, DISCLOSED, OR REPRODUCED
WITHOUT THE WRITTEN CONSENT OF GALLOWAY.
COPYRIGHTS AND INFRINGEMENTS WILL BE
ENFORCED AND PROSECUTED.
COPYRIGHT
GallowayUS.com
5265 Ronald Reagan Blvd., Suite 210
Johnstown, CO 80534
970.800.3300
PRELIMINARYNOT FOR BIDDINGNOT FOR CONSTRUCTIONDate:
Drawn By:
Project No:
Checked By:
08.17.2022
HFH000022
KEYMAP
Know what's
before you dig.
AGM
JEP
OVERLOT GRADING
C3.3SCALE: 1"=40'
0 20 40
KEYMAP
B/GBA/BA G
S
What is this line? If it is
important, please label
it. If it is not important,
please remove it.
City of Fort Collins
Development Review Engineering
Sophie Buckingham, EI
Date:08/31/2022
MATCHLINE-SEE SHEET C3.16
MATCHLINE-SEE SHEET C3.11
MATCHLINE-SEE SHEET C3.13-
-
-
-
-
-
-
-
-
-
-
-
-
-
STAMP
H:\Hartford Homes\CO Fort Collins HFH22 - Mulberry\0CIV\3-CD\FDP_F1\HFH022_C3.1-C3.6_Overlot Grading.dwg - Matthew Kasch - 8/17/2022Init.# Issue / DescriptionDateFINAL DEVELOPMENT PLANS BLOOM FILING ONEFORT COLLINS, COTHESE PLANS ARE AN INSTRUMENT OF SERVICE
AND ARE THE PROPERTY OF GALLOWAY, AND MAY
NOT BE DUPLICATED, DISCLOSED, OR REPRODUCED
WITHOUT THE WRITTEN CONSENT OF GALLOWAY.
COPYRIGHTS AND INFRINGEMENTS WILL BE
ENFORCED AND PROSECUTED.
COPYRIGHT
GallowayUS.com
5265 Ronald Reagan Blvd., Suite 210
Johnstown, CO 80534
970.800.3300
PRELIMINARYNOT FOR BIDDINGNOT FOR CONSTRUCTIONDate:
Drawn By:
Project No:
Checked By:
08.17.2022
HFH000022
KEYMAP
Know what's
before you dig.
AGM
JEP
OVERLOT GRADING
C3.14SCALE: 1"=40'
0 20 40
KEYMAP
B/GBA/BA G
S
Please label these contours
and any others that have not
been adequately labeled.
City of Fort Collins
Development Review Engineering
Sophie Buckingham, EI
Date:08/31/2022
MATCHLINE-SEE SHEET C3.18MATCHLINE-SEE SHEET C3.15-
-
-
-
-
-
-
-
-
-
-
-
-
-
STAMP
H:\Hartford Homes\CO Fort Collins HFH22 - Mulberry\0CIV\3-CD\FDP_F1\HFH022_C3.1-C3.6_Overlot Grading.dwg - Matthew Kasch - 8/17/2022Init.# Issue / DescriptionDateFINAL DEVELOPMENT PLANS BLOOM FILING ONEFORT COLLINS, COTHESE PLANS ARE AN INSTRUMENT OF SERVICE
AND ARE THE PROPERTY OF GALLOWAY, AND MAY
NOT BE DUPLICATED, DISCLOSED, OR REPRODUCED
WITHOUT THE WRITTEN CONSENT OF GALLOWAY.
COPYRIGHTS AND INFRINGEMENTS WILL BE
ENFORCED AND PROSECUTED.
COPYRIGHT
GallowayUS.com
5265 Ronald Reagan Blvd., Suite 210
Johnstown, CO 80534
970.800.3300
PRELIMINARYNOT FOR BIDDINGNOT FOR CONSTRUCTIONDate:
Drawn By:
Project No:
Checked By:
08.17.2022
HFH000022
KEYMAP
Know what's
before you dig.
AGM
JEP
OVERLOT GRADING
C3.16SCALE: 1"=40'
0 20 40
KEYMAP
B/GBA/BA G
S
MATCHLINE-SEE SHEET C3.14
Please label these contours
and any others that have
not been labeled yet.
Why were the labels
taken off these
contours? Please add
back the labels.
What is this linework?
Please compare the legend to the linework
on this sheet and resolve any descprency
and omission
Contour elevations are not adequately
labeled. Elevations need to be clearly
labeled or easily surmised for every
contour shown in the utility plans.
Is this accurate? It
looks like the road
drops a foot in the
horizontal span of 0
to 3 feet
2'-8"
City of Fort Collins
Development Review Engineering
John Gerwel, EI
08/26/2022 3:25:46 PM
Where are the
grading tie-ins?
Different linetypes
City of Fort Collins
Development Review Engineering
Sophie Buckingham, EI
Date:08/31/2022
MATCHLINE-SEE SHEET C3.15
-
-
-
-
-
-
-
-
-
-
-
-
-
-
STAMP
H:\Hartford Homes\CO Fort Collins HFH22 - Mulberry\0CIV\3-CD\FDP_F1\HFH022_C3.1-C3.6_Overlot Grading.dwg - Matthew Kasch - 8/17/2022Init.# Issue / DescriptionDateFINAL DEVELOPMENT PLANS BLOOM FILING ONEFORT COLLINS, COTHESE PLANS ARE AN INSTRUMENT OF SERVICE
AND ARE THE PROPERTY OF GALLOWAY, AND MAY
NOT BE DUPLICATED, DISCLOSED, OR REPRODUCED
WITHOUT THE WRITTEN CONSENT OF GALLOWAY.
COPYRIGHTS AND INFRINGEMENTS WILL BE
ENFORCED AND PROSECUTED.
COPYRIGHT
GallowayUS.com
5265 Ronald Reagan Blvd., Suite 210
Johnstown, CO 80534
970.800.3300
PRELIMINARYNOT FOR BIDDINGNOT FOR CONSTRUCTIONDate:
Drawn By:
Project No:
Checked By:
08.17.2022
HFH000022MATCHLINE-SEE SHEET C3.18KEYMAP
Know what's
before you dig.
AGM
JEP
OVERLOT GRADING
C3.17
SCALE: 1"=40'
0 20 40
KEYMAP
B/GBA/BA G
S
CITY OF GREELEY
Need elevation
contour labels
City of Fort Collins
Development Review Engineering
John Gerwel, EI
08/29/2022 10:07:34 AM
MATCHLINE-SEE SHEET C3.16
-
-
-
-
-
-
-
-
-
-
-
-
-
-
STAMP
H:\Hartford Homes\CO Fort Collins HFH22 - Mulberry\0CIV\3-CD\FDP_F1\HFH022_C3.1-C3.6_Overlot Grading.dwg - Matthew Kasch - 8/17/2022Init.# Issue / DescriptionDateFINAL DEVELOPMENT PLANS BLOOM FILING ONEFORT COLLINS, COTHESE PLANS ARE AN INSTRUMENT OF SERVICE
AND ARE THE PROPERTY OF GALLOWAY, AND MAY
NOT BE DUPLICATED, DISCLOSED, OR REPRODUCED
WITHOUT THE WRITTEN CONSENT OF GALLOWAY.
COPYRIGHTS AND INFRINGEMENTS WILL BE
ENFORCED AND PROSECUTED.
COPYRIGHT
GallowayUS.com
5265 Ronald Reagan Blvd., Suite 210
Johnstown, CO 80534
970.800.3300
PRELIMINARYNOT FOR BIDDINGNOT FOR CONSTRUCTIONDate:
Drawn By:
Project No:
Checked By:
08.17.2022
HFH000022MATCHLINE-SEE SHEET C3.19KEYMAP
Know what's
before you dig.
AGM
JEP
OVERLOT GRADING
C3.18
SCALE: 1"=40'
0 20 40
KEYMAP
B/GBA/BA G
S
MATCHLINE-SEE SHEET C3.17CITY OF GREELEY
PLEASE LABEL ALL CONTOURS ON THIS SHEET THAT HAVE NOT ALREADY BEEN LABELED
OR ARE NOT EASY TO FIGURE OUT
Contour elevations are not adequately
labeled. Elevations need to be clearly
labeled or easily surmised for every
contour shown in the utility plans.
Grade not tied in to existing
This is one spot on this
sheet where elevations
cannot be determined
City of Fort Collins
Development Review Engineering
John Gerwel, EI
08/26/2022 3:25:41 PM
City of Fort Collins
Development Review Engineering
Sophie Buckingham, EI
Date:08/31/2022
MATCHLINE-SEE SHEET C3.18-
-
-
-
-
-
-
-
-
-
-
-
-
-
STAMP
H:\Hartford Homes\CO Fort Collins HFH22 - Mulberry\0CIV\3-CD\FDP_F1\HFH022_C3.1-C3.6_Overlot Grading.dwg - Matthew Kasch - 8/17/2022Init.# Issue / DescriptionDateFINAL DEVELOPMENT PLANS BLOOM FILING ONEFORT COLLINS, COTHESE PLANS ARE AN INSTRUMENT OF SERVICE
AND ARE THE PROPERTY OF GALLOWAY, AND MAY
NOT BE DUPLICATED, DISCLOSED, OR REPRODUCED
WITHOUT THE WRITTEN CONSENT OF GALLOWAY.
COPYRIGHTS AND INFRINGEMENTS WILL BE
ENFORCED AND PROSECUTED.
COPYRIGHT
GallowayUS.com
5265 Ronald Reagan Blvd., Suite 210
Johnstown, CO 80534
970.800.3300
PRELIMINARYNOT FOR BIDDINGNOT FOR CONSTRUCTIONDate:
Drawn By:
Project No:
Checked By:
08.17.2022
HFH000022
KEYMAP
Know what's
before you dig.
AGM
JEP
OVERLOT GRADING
C3.19
SCALE: 1"=40'
0 20 40
KEYMAP
B/GBA/BA G
S
CITY OF GREELEY
Contour elevations are not adequately
labeled. Elevations need to be clearly
labeled or easily surmised for every
contour shown in the utility plans. There is
not a single elevation label on this grading
sheet.
City of Fort Collins
Development Review Engineering
John Gerwel, EI
08/26/2022 3:27:01 PM
City of Fort Collins
Development Review Engineering
Sophie Buckingham, EI
Date:08/31/2022
S
S
W
W WW
W
W
W
W
W
WW
W
W
W
W
W
W
G
G G
GGG
G
G
G
G
G
GGGG
W
WW
S
S
W
G G G G
G G
G
G
G
G
GGG G
G G
GGG GGGGGGGW
S
SSSSSWWWWWWWWS
S
S
S
S
S
S
S
S
S
S
SWWSSSS
SS
W W
S S
S S
S S
W
W
S
S
S
S
W
W
W
W
W
S S
S
S
S
G GW
W
S
VA
U
L
T
VAULT
V
A
U
L
T
VAULTVAULT
VAULTFAIRCHILD STREETLOT 12 LOT 13 LOT 14
LOT 19
LOT 20
LOT 18
LOT 17
LOT 16
LOT 15
BLOCK 21 8''SS8''SSS
S
S
S
S
S
M
Know what's
before you dig.MATCHLINE-SEE SHEET C4.2MATCHLINE-SEE SHEET C4.3
-
-
-
-
-
-
-
-
-
-
-
-
-
-
STAMP
H:\Hartford Homes\CO Fort Collins HFH22 - Mulberry\0CIV\3-CD\FDP_F1\HFH022_C4.1-C4.6_Utility Plans.dwg - Jared Licht - 8/17/2022Init.# Issue / DescriptionDateFINAL DEVELOPMENT PLANS BLOOM FILING ONEFORT COLLINS, COTHESE PLANS ARE AN INSTRUMENT OF SERVICE
AND ARE THE PROPERTY OF GALLOWAY, AND MAY
NOT BE DUPLICATED, DISCLOSED, OR REPRODUCED
WITHOUT THE WRITTEN CONSENT OF GALLOWAY.
COPYRIGHTS AND INFRINGEMENTS WILL BE
ENFORCED AND PROSECUTED.
COPYRIGHT
GallowayUS.com
5265 Ronald Reagan Blvd., Suite 210
Johnstown, CO 80534
970.800.3300
PRELIMINARYNOT FOR BIDDINGNOT FOR CONSTRUCTIONDate:
Drawn By:
Project No:
Checked By:
08.17.2022
HFH000022
KEYMAP
AGM
JEP
UTILITY PLAN
C4.1
SCALE: 1"=40'
0 20 40
Please add a note to this sheet stating
that at the time of City approval of these
plans, the railroad has not yet given
permission for this water line to cross
railroad right-of-way. The note should also
state that City approval of these plans
does not constitute approval of any work
within railroad right-of-way. Please call out
this section of water line as not to be
constructed before permission has been
given by the railroad.
City of Fort Collins
Development Review Engineering
Sophie Buckingham, EI
Date:09/01/2022
W
S S
SS S S
SSSSSSS
S
S
S
S
SWWWWWW
W WW
W W W W W W
WWWWWWWW
W
W
W
W
W
W
W
W
W
W
G G G G G G GGS S S S S SS
SS
S
S
SS
S
W
W
W
WWW
W
W
W
S
S S S S S S
SSSSSSSWS S
WWWWS
WWWWWWS SSS S S SSS
W W W WWW W W W W SSWWWSWWSWS SSS
WWWWWWWWWWWWSWWWG
G G G G
G
G
G
G
G G G G G G
GGGGG G G G G G G
GGGGG GGGGGGGGGS S
S SSS WWS
S
W
W
S
S
WWS
S
S
S
S
S
S
S
S
S
S WWS
S
S
S S
S S
G GGW WW SS
S
VAULTVAULTVAULT
VAULT
VAULT
VAULT VAULTVAULTVAULTVAULT VAULT
VAULT
VAULT
VAULT
VAULT
VAULTFAIRCHILD STREETLOT 3
LOT 2
LOT 4
LOT 5
LOT 6
LOT 7
LOT 8
LOT 1
LOT 8LOT 7 LOT 9
LOT 6 LOT 7
LOT 10LOT 11 LOT 9
LOT 8
BLOCK 22
BLOCK 22
BLOCK 24 MATCHLINE-SEE SHEET C4.4MATCHLINE-SEE SHEET C4.6
MATCHLINE-SEE SHEET C4.1
-
-
-
-
-
-
-
-
-
-
-
-
-
-
STAMP
H:\Hartford Homes\CO Fort Collins HFH22 - Mulberry\0CIV\3-CD\FDP_F1\HFH022_C4.1-C4.6_Utility Plans.dwg - Jared Licht - 8/17/2022Init.# Issue / DescriptionDateFINAL DEVELOPMENT PLANS BLOOM FILING ONEFORT COLLINS, COTHESE PLANS ARE AN INSTRUMENT OF SERVICE
AND ARE THE PROPERTY OF GALLOWAY, AND MAY
NOT BE DUPLICATED, DISCLOSED, OR REPRODUCED
WITHOUT THE WRITTEN CONSENT OF GALLOWAY.
COPYRIGHTS AND INFRINGEMENTS WILL BE
ENFORCED AND PROSECUTED.
COPYRIGHT
GallowayUS.com
5265 Ronald Reagan Blvd., Suite 210
Johnstown, CO 80534
970.800.3300
PRELIMINARYNOT FOR BIDDINGNOT FOR CONSTRUCTIONDate:
Drawn By:
Project No:
Checked By:
08.17.2022
HFH000022
KEYMAP
AGM
JEP
UTILITY PLAN
C4.3Know what's
before you dig.SCALE: 1"=40'
0 20 40
Does this gas line
connect across the
street?
The gas layout provided by
Xcel does not show this
jog. Please confirm with
Xcel that the alignment is
acceptable to them.
This section of gas line
needs to be within a
utility easement. Please
use the standard 9-foot
utility easement here
and include easement
changes on the plat.
City of Fort Collins
Development Review Engineering
Sophie Buckingham, EI
Date:08/31/2022
W W
S
S
S SS
W
W
WWWW
G G G G
G
G
G G
S
SS
W F
VAULT
VAUL
T MATCHLINE-SEE SHEET C4.5MATCHLINE-SEE SHEET C4.7
MATCHLINE-SEE SHEET C4.2
MATCHLINE-SEE SHEET C4.3-
-
-
-
-
-
-
-
-
-
-
-
-
-
STAMP
H:\Hartford Homes\CO Fort Collins HFH22 - Mulberry\0CIV\3-CD\FDP_F1\HFH022_C4.1-C4.6_Utility Plans.dwg - Jared Licht - 8/17/2022Init.# Issue / DescriptionDateFINAL DEVELOPMENT PLANS BLOOM FILING ONEFORT COLLINS, COTHESE PLANS ARE AN INSTRUMENT OF SERVICE
AND ARE THE PROPERTY OF GALLOWAY, AND MAY
NOT BE DUPLICATED, DISCLOSED, OR REPRODUCED
WITHOUT THE WRITTEN CONSENT OF GALLOWAY.
COPYRIGHTS AND INFRINGEMENTS WILL BE
ENFORCED AND PROSECUTED.
COPYRIGHT
GallowayUS.com
5265 Ronald Reagan Blvd., Suite 210
Johnstown, CO 80534
970.800.3300
PRELIMINARYNOT FOR BIDDINGNOT FOR CONSTRUCTIONDate:
Drawn By:
Project No:
Checked By:
08.17.2022
HFH000022
KEYMAP
AGM
JEP
UTILITY PLAN
C4.4Know what's
before you dig.SCALE: 1"=40'
0 20 40
What is this? It was not on this sheet
previously. If it is important, please label
it. If it is not important, please remove it.
Please add a note to this sheet stating
that at the time of City approval of these
plans, the railroad has not yet given
permission for this irrigation line, water
line, or electric line to cross railroad
right-of-way. The note should also state
that City approval of these plans does not
constitute approval of any work within
railroad right-of-way. Please call out this
section of irrigation line, water line, and
electric line as not to be constructed
before permission has been given by the
railroad.
City of Fort Collins
Development Review Engineering
Sophie Buckingham, EI
Date:09/01/2022
S S
S
S S S
W W W W W W
S SSSSSSSSS S S
WWWWWWWWWWWWW F
W F
W
F
SS
WWS VAULTVAULT
VAULT
VAUL
T
MATCHLINE-SEE SHEET C4.6MATCHLINE-SEE SHEET C4.10
-
-
-
-
-
-
-
-
-
-
-
-
-
-
STAMP
H:\Hartford Homes\CO Fort Collins HFH22 - Mulberry\0CIV\3-CD\FDP_F1\HFH022_C4.1-C4.6_Utility Plans.dwg - Jared Licht - 8/17/2022Init.# Issue / DescriptionDateFINAL DEVELOPMENT PLANS BLOOM FILING ONEFORT COLLINS, COTHESE PLANS ARE AN INSTRUMENT OF SERVICE
AND ARE THE PROPERTY OF GALLOWAY, AND MAY
NOT BE DUPLICATED, DISCLOSED, OR REPRODUCED
WITHOUT THE WRITTEN CONSENT OF GALLOWAY.
COPYRIGHTS AND INFRINGEMENTS WILL BE
ENFORCED AND PROSECUTED.
COPYRIGHT
GallowayUS.com
5265 Ronald Reagan Blvd., Suite 210
Johnstown, CO 80534
970.800.3300
PRELIMINARYNOT FOR BIDDINGNOT FOR CONSTRUCTIONDate:
Drawn By:
Project No:
Checked By:
08.17.2022
HFH000022
KEYMAP
AGM
JEP
UTILITY PLAN
C4.7
MATCHLINE-SEE SHEET C4.4
MATCHLINE-SEE SHEET C4.8Know what's
before you dig.SCALE: 1"=40'
0 20 40
This is railroad right-of-way,
not public access and trail
easement.
City of Fort Collins
Development Review Engineering
Sophie Buckingham, EI
Date:09/01/2022
MATCHLINE-SEE SHEET C4.10MATCHLINE-SEE SHEET C4.8
-
-
-
-
-
-
-
-
-
-
-
-
-
-
STAMP
H:\Hartford Homes\CO Fort Collins HFH22 - Mulberry\0CIV\3-CD\FDP_F1\HFH022_C4.1-C4.6_Utility Plans.dwg - Jared Licht - 8/17/2022Init.# Issue / DescriptionDateFINAL DEVELOPMENT PLANS BLOOM FILING ONEFORT COLLINS, COTHESE PLANS ARE AN INSTRUMENT OF SERVICE
AND ARE THE PROPERTY OF GALLOWAY, AND MAY
NOT BE DUPLICATED, DISCLOSED, OR REPRODUCED
WITHOUT THE WRITTEN CONSENT OF GALLOWAY.
COPYRIGHTS AND INFRINGEMENTS WILL BE
ENFORCED AND PROSECUTED.
COPYRIGHT
GallowayUS.com
5265 Ronald Reagan Blvd., Suite 210
Johnstown, CO 80534
970.800.3300
PRELIMINARYNOT FOR BIDDINGNOT FOR CONSTRUCTIONDate:
Drawn By:
Project No:
Checked By:
08.17.2022
HFH000022
Know what's
before you dig.SCALE: 1"=40'
0 20 40
KEYMAP
AGM
JEP
UTILITY PLAN
C4.11
Please add a note to this sheet stating
that at the time of City approval of these
plans, the railroad has not yet given
permission for this storm line to cross
railroad right-of-way. The note should also
state that City approval of these plans
does not constitute approval of any work
within railroad right-of-way. Please call out
this section of storm line as not to be
constructed before permission has been
given by the railroad.
City of Fort Collins
Development Review Engineering
Sophie Buckingham, EI
Date:09/01/2022
These sanitary lines are
both existing. Why do
the lines look different?
MATCHLINE-SEE SHEET C4.15
MATCHLINE-SEE SHEET C4.10
MATCHLINE-SEE SHEET C4.12-
-
-
-
-
-
-
-
-
-
-
-
-
-
STAMP
H:\Hartford Homes\CO Fort Collins HFH22 - Mulberry\0CIV\3-CD\FDP_F1\HFH022_C4.1-C4.6_Utility Plans.dwg - Jared Licht - 8/17/2022Init.# Issue / DescriptionDateFINAL DEVELOPMENT PLANS BLOOM FILING ONEFORT COLLINS, COTHESE PLANS ARE AN INSTRUMENT OF SERVICE
AND ARE THE PROPERTY OF GALLOWAY, AND MAY
NOT BE DUPLICATED, DISCLOSED, OR REPRODUCED
WITHOUT THE WRITTEN CONSENT OF GALLOWAY.
COPYRIGHTS AND INFRINGEMENTS WILL BE
ENFORCED AND PROSECUTED.
COPYRIGHT
GallowayUS.com
5265 Ronald Reagan Blvd., Suite 210
Johnstown, CO 80534
970.800.3300
PRELIMINARYNOT FOR BIDDINGNOT FOR CONSTRUCTIONDate:
Drawn By:
Project No:
Checked By:
08.17.2022
HFH000022
KEYMAP
AGM
JEP
UTILITY PLAN
C4.13Know what's
before you dig.SCALE: 1"=40'
0 20 40
Repeat comment from previous round: separation
between hydrant and electric line?
Pond G is
overlapping with utility
easement
City of Fort Collins
Development Review Engineering
John Gerwel, EI
08/25/2022 4:57:16 PM
City of Fort Collins
Development Review Engineering
Sophie Buckingham, EI
Date:08/31/2022