August 24, 2022
Project Narrative
Sit and Stay Dog Bar - Project Development Plan
Design/Development Team
Property Owner/Developer: Patrick Duncan
Planner/Landscape Architect: Ripley Design
Architect: VFLA
Civil Engineer: Olsson
Zoning District
CS (Service Commercial)
Project Summary
Proposed Building Area: 19,065 sf
Proposed Parking: 92 spaces
Proposed Bike Parking: 10 spaces
Building Height: 2 stories (28’)
Project Site & History
The site is located at 1524 North College Avenue, Lot 3 of Country Club Corners Six Filing. The
project site is approximately 94,269 square feet or 2.16 acres and is currently vacant. The
property is bordered by a multi-tenant commercial building to the north, Firehouse car wash and
a vacant parcel to the west, and the Health District Family Clinic to the south. The primary
access to the proposed development will be from the existing private drive which intersects with
College Avenue between Burger King and First National Bank. Secondary points of access
would extend from Bristlecone Drive to the south and Willox Ln to the north.
A Concept Plan was submitted on April 29, 2021, followed by a Conceptual Review Meeting
held on May 28, 2021.
First round PDP documents were submitted on September 22, 2021.
MINIMAL RISK. PAINLESS PROCESS. BEAUTIFUL SPACES.
o: 970.224.5828 | w: ripleydesigninc.com
RIPLEY DESIGN, INC. | 419 Canyon Avenue, Suite 200 | Fort Collins, CO 80521
Proposed Land Use
The applicants are proposing to construct a two-level building with approximately 19,065 square
feet. Approximately 7,847 square feet of the building will be dedicated to a restaurant use (no
dogs beyond service animals will be permitted inside the restaurant). The remainder of the
building will be utilized for indoor dog kennels and an indoor dog park and office space.
An outdoor patio will be situated adjacent to the restaurant on the south and west sides of the
building. This patio will be allowed to be occupied by leashed dogs only. Beyond the patio is the
fenced-in dog park where dogs can roam freely. Within the dog park along the western property
boundary, there will be a small structure to include outdoor restaurants and bar service. A raised
stage with canopy will be located at the southwest corner of the property. The stage will be used
for additional seating within the dog park as well as for occasional events.
Site Design
The project site is situated between two private drives to the east and west. While a shared
parking agreement exists across the Country Club Corners subdivision, the project is proposing
to provide all necessary parking on-site. Along the western property boundary, an enhanced
sidewalk has been designed to provide a street-like drive feel by widening the sidewalk to 10’
and incorporating trees in walk-adjacent planting areas. The main access into the building will
come from the west side. There will also be an employee entrance on the east side of the
building, and to the south is an entrance that will be used for private events. Within the dog
park, surfacing will primarily consist of artificial turf. The turf areas will be irrigated to keep the
park clean and reduce odors.
Architectural Design
The architecture embodies the enthusiasm the project team has for bringing this highly
desirable product to northern Fort Collins. The building will consist of a two-story structure with
areas designated for a restaurant, overnight dog kennel, and indoor dog park use. Inspiration for
the building and materials has been drawn from the industrial character of surrounding
structures in the neighborhood with metal siding and muted tones. The mass of the building will
be broken up through articulations in the building façade, varying window patterns, and a
diversity of materials. Deep canopies at building entrances will enhance the character of the
building while also helping to increase visibility of the main visitor entrances.
Site Drainage and Stormwater Treatment
Detention will be provided to treat the required runoff volume difference between the 100-year
developed flow rate the 2-year historic release rate. The remaining detention volume will be
treated by underground vaults below the unleashed zones and the dog kennel play areas.
Domestic Utility Service
MINIMAL RISK. PAINLESS PROCESS. BEAUTIFUL SPACES.
o: 970.224.5828 | w: ripleydesigninc.com
RIPLEY DESIGN, INC. | 419 Canyon Avenue, Suite 200 | Fort Collins, CO 80521
Water and sanitary sewer services are to be provided by the City of Fort Collins. A sanitary main
is located along the east side of the property within the common drive aisle. Sanitary and grease
trap services will be provided from the east and stubbed through the adjacent site parking are. A
domestic water main is located along the west side of the property within the common drive
aisle. Fire service and domestic water service will be provided from the west. A meter vault will
be provided within landscape area to the northwest of the building.
Development Phasing Schedule
Construction is scheduled to begin spring 2023 and will be completed in a single phase.