HomeMy WebLinkAboutGATEWAY AT PROSPECT - BDR200010 - CORRESPONDENCE - OTHER JURISDICTIONSPR20-177 Greeley W & S Plan Review Comments – January 29, 2021 Gateway at Prospect Section 16, T 7 N, R 68 W Submittal 1 - General Comments City of Greeley Pipeline and Easements: Line No. 3 - 27” Steel Pipeline – 1952; Sufficient Width, Prescriptive Easement Line No. 10 – 60” Steel Pipeline – 2006; Rec. No. 2006-0044720 – 40’ Easement Greeley Transmission Line No. 3 was installed in 1952-53 without a dedicated easement in the current project area; as such, the City of Greeley has a prescriptive easement of sufficient width for maintenance and repair of the line. As a part of this project, it would be beneficial to all parties to define an easement centered on the existing transmission line. This easement should be defined by separate instrument and then be referred to on the plat and construction drawings. Until this easement is defined, drawings must refer to the prescriptive easement as outlined in the comments for the plat and construction drawings. PR20-177Greeley W & S Plan Review Comments – January 29, 2021 Gateway at Prospect Section 16, T 7 N, R 68W Submittal 1–Plat City of Greeley Pipeline and Easements: Line No. 3 - 27” Steel Pipeline – 1952; Sufficient Width, Prescriptive Easement Line No. 10 – 60” Steel Pipeline – 2006; Rec. No. 2006-0044720 – 40’ Easement Please include the following specific revisions, additions, clarifications in the plan sheets and resubmit to Greeley W&S for review: Sheet BY TITLE COG SIGN COMMENTS/REVISIONS 1 Northern Engineering Cover Sheet Will review and sign after revisions made Add City of Greeley signature block and general notes 1 - 4. See attachments in email. 2 Northern Engineering No comment. 3 Northern Engineering Willreview after revisions made Add City of Greeley to “40’ Waterline Easement Rec No. 20060044720” label. 4 Northern Engineering Will review after revisions made. Add City of Greeley to “40’ Waterline Easement Rec No. 20060044720” label. 5 - 6 Northern Engineering No comment. 7 Northern Engineering Will review after revisions made. Add the City of Greeley 27” transmission line (#3) with the “Centerline of Greeley 27” Water Pipeline (No. 3), Prescriptive Easement of Sufficient Width for a Right-of-Way for an Underground water pipe.”easement label. 8 Northern Engineering No comment. PR20-177 Greeley W & S Plan Review Comments – January29, 2021 Gateway at Prospect Section 16, T 7 N, R 68 W Submittal 1 – CD City of Greeley Pipeline and Easements: Line No. 3 - 27” Steel Pipeline – 1952; Sufficient Width, Prescriptive Easement Line No. 10 – 60” Steel Pipeline - 2006; Rec. No. 2006-0044720 – 40’ Easement Please include the following specific revisions, additions, clarifications in the plan sheets and resubmit to Greeley W&S for review: Sheet BY TITLE COG SIGN COMMENTS/REVISIONS 1 Northern Engineering Cover Sheet Will review and sign after revisions made No comment. 2 Northern Engineering No comment. 3 Northern Engineering General & Construction Notes Will review after revisions made Add City of Greeley general notes 1 – 10. See attachment in email. Response: No notes were provided previously. Please email separately and we will get them added to the plans 4 Northern Engineering Overall Existing Conditions & Demolitions Plan Will review after revisions made Add City of Greeley to the two “40’ Waterline Easement Rec. No. 20060044720” labels. Response: Updated Add 60” to the “Existing City of Greeley Waterline” easement. Response: Updated 5 Northern Engineering Overall Existing Conditions & Demolition Plan Will review after revisions made Add “Centerline of Greeley 27” Water Pipeline (No. 3), Prescriptive Easement of Sufficient Width for a Right-of-Way for an Underground water pipe.” Response: Updated Add 27” to “Approximate Location Existing Waterline (City of Greeley)”. Response: Updated 6 Northern Engineering Overall Utility Plan Will review after revisions made Add City of Greeley to the two “40’ Waterline Easement Rec. No. 20060044720” labels. Response: Updated Add 60” to the “Existing City of Greeley Waterline” easement. Response: Updated Will the proposed non-potable line be encroaching or crossing the City of Greeley easement? Response: There will be one crossing of the City of Greeley 60” waterline with the proposed non-potable water see resubmitted plans for more information. 7 Northern Engineering Overall Utility Plan Will review after revisions made Add “Centerline of Greeley 27” Water Pipeline (No. 3), Prescriptive Easement of Sufficient Width for a Right-of-Way for an Underground water pipe.” Response: Updated Add 27” to “Approximate Location Existing Waterline (City of Greeley)”. Response: Updated Will need to see plan and profile sheets for the water, sanitary sewer, and stormwater lines, andthe trail that crosses the City of Greeley 27” transmission line. Response: Plan & profile of all proposed utility crossings have been added. Cross Sections of the proposed trail crossing have been provided with the resubmittal. 8 Northern Engineering No comment. 9 Northern Engineering Grading Plan Will review after revisions made Add City of Greeley to the “40’ Waterline Easement Rec. No. 20060044720” label. Add City of Greeley existing 60” waterline label. 10 - 11 Northern Engineering No comment. 12 Northern Engineering Grading Plan Will review after revisions made Add “Centerline of Greeley 27” Water Pipeline (No. 3), Prescriptive Easement of Sufficient Width for a Right-of-Way for an Underground water pipe.” Response: Updated Add 27” to “Approximate Location Existing Waterline (City of Greeley)”. Response: Updated 13 Northern Engineering No comment. 14 Northern Engineering Street A Plan and Profile Will review after revisions made Add “Centerline of Greeley 27” Water Pipeline (No. 3), Prescriptive Easement of Sufficient Width for a Right-of-Way for an Underground water pipe.” Response: Updated Add 27” to “Existing City of Greeley Waterline”. Response: Updated Add the City of Greeley 27” transmission water pipeline into the profile. Response: Updated 15 - 19 Northern Engineering No comment. 20 Northern Engineering Erosion Control Plan Will review after revisions made Add the City of Greeley 27” transmission line. Response: Updated 21 – 22 Northern Engineering No comment. 23 - 44 Ayres No comment.