HomeMy WebLinkAboutGATEWAY AT PROSPECT - BDR200010 - CORRESPONDENCE - OTHER JURISDICTIONSPR20-177 Greeley W & S Plan Review Comments – January 29, 2021
Gateway at Prospect
Section 16, T 7 N, R 68 W
Submittal 1 - General Comments
City of Greeley Pipeline and Easements:
Line No. 3 - 27” Steel Pipeline – 1952; Sufficient Width, Prescriptive Easement
Line No. 10 – 60” Steel Pipeline – 2006; Rec. No. 2006-0044720 – 40’ Easement
Greeley Transmission Line No. 3 was installed in 1952-53 without a dedicated easement in the current project area; as such, the City of Greeley has a prescriptive easement of sufficient
width for maintenance and repair of the line. As a part of this project, it would be beneficial to all parties to define an easement centered on the existing transmission line. This
easement should be defined by separate instrument and then be referred to on the plat and construction drawings. Until this easement is defined, drawings must refer to the prescriptive
easement as outlined in the comments for the plat and construction drawings.
PR20-177Greeley W & S Plan Review Comments – January 29, 2021
Gateway at Prospect
Section 16, T 7 N, R 68W
Submittal 1–Plat
City of Greeley Pipeline and Easements:
Line No. 3 - 27” Steel Pipeline – 1952; Sufficient Width, Prescriptive Easement
Line No. 10 – 60” Steel Pipeline – 2006; Rec. No. 2006-0044720 – 40’ Easement
Please include the following specific revisions, additions, clarifications in the plan sheets and resubmit to Greeley W&S for review:
Sheet
BY
TITLE
COG SIGN
COMMENTS/REVISIONS
1
Northern Engineering
Cover Sheet
Will review and sign after revisions made
Add City of Greeley signature block and general notes 1 - 4. See attachments in email.
2
Northern Engineering
No comment.
3
Northern Engineering
Willreview after revisions made
Add City of Greeley to “40’ Waterline Easement Rec No. 20060044720” label.
4
Northern Engineering
Will review after revisions made.
Add City of Greeley to “40’ Waterline Easement Rec No. 20060044720” label.
5 - 6
Northern Engineering
No comment.
7
Northern Engineering
Will review after revisions made.
Add the City of Greeley 27” transmission line (#3) with the “Centerline of Greeley 27” Water Pipeline (No. 3), Prescriptive Easement of Sufficient Width for a Right-of-Way for an Underground
water pipe.”easement label.
8
Northern Engineering
No comment.
PR20-177 Greeley W & S Plan Review Comments – January29, 2021
Gateway at Prospect
Section 16, T 7 N, R 68 W
Submittal 1 – CD
City of Greeley Pipeline and Easements:
Line No. 3 - 27” Steel Pipeline – 1952; Sufficient Width, Prescriptive Easement
Line No. 10 – 60” Steel Pipeline - 2006; Rec. No. 2006-0044720 – 40’ Easement
Please include the following specific revisions, additions, clarifications in the plan sheets and resubmit to Greeley W&S for review:
Sheet
BY
TITLE
COG SIGN
COMMENTS/REVISIONS
1
Northern Engineering
Cover Sheet
Will review and sign after revisions made
No comment.
2
Northern Engineering
No comment.
3
Northern Engineering
General & Construction Notes
Will review after revisions made
Add City of Greeley general notes 1 – 10. See attachment in email.
Response: No notes were provided previously. Please email separately and we will get them added to the plans
4
Northern Engineering
Overall Existing Conditions & Demolitions Plan
Will review after revisions made
Add City of Greeley to the two “40’ Waterline Easement Rec. No. 20060044720” labels.
Response: Updated
Add 60” to the “Existing City of Greeley Waterline” easement.
Response: Updated
5
Northern Engineering
Overall Existing Conditions & Demolition Plan
Will review after revisions made
Add “Centerline of Greeley 27” Water Pipeline (No. 3), Prescriptive Easement of Sufficient Width for a Right-of-Way for an Underground water pipe.”
Response: Updated
Add 27” to “Approximate Location Existing Waterline (City of Greeley)”.
Response: Updated
6
Northern Engineering
Overall Utility Plan
Will review after revisions made
Add City of Greeley to the two “40’ Waterline Easement Rec. No. 20060044720” labels.
Response: Updated
Add 60” to the “Existing City of Greeley Waterline” easement.
Response: Updated
Will the proposed non-potable line be encroaching or crossing the City of Greeley easement?
Response: There will be one crossing of the City of Greeley 60” waterline with the proposed non-potable water see resubmitted plans for more information.
7
Northern Engineering
Overall Utility Plan
Will review after revisions made
Add “Centerline of Greeley 27” Water Pipeline (No. 3), Prescriptive Easement of Sufficient Width for a Right-of-Way for an Underground water pipe.”
Response: Updated
Add 27” to “Approximate Location Existing Waterline (City of Greeley)”.
Response: Updated
Will need to see plan and profile sheets for the water, sanitary sewer, and stormwater lines, andthe trail that crosses the City of Greeley 27” transmission line.
Response: Plan & profile of all proposed utility crossings have been added. Cross Sections of the proposed trail crossing have been provided with the resubmittal.
8
Northern Engineering
No comment.
9
Northern Engineering
Grading Plan
Will review after revisions made
Add City of Greeley to the “40’ Waterline Easement Rec. No. 20060044720” label.
Add City of Greeley existing 60” waterline label.
10 - 11
Northern Engineering
No comment.
12
Northern Engineering
Grading Plan
Will review after revisions made
Add “Centerline of Greeley 27” Water Pipeline (No. 3), Prescriptive Easement of Sufficient Width for a Right-of-Way for an Underground water pipe.”
Response: Updated
Add 27” to “Approximate Location Existing Waterline (City of Greeley)”.
Response: Updated
13
Northern Engineering
No comment.
14
Northern Engineering
Street A Plan and Profile
Will review after revisions made
Add “Centerline of Greeley 27” Water Pipeline (No. 3), Prescriptive Easement of Sufficient Width for a Right-of-Way for an Underground water pipe.”
Response: Updated
Add 27” to “Existing City of Greeley Waterline”.
Response: Updated
Add the City of Greeley 27” transmission water pipeline into the profile.
Response: Updated
15 - 19
Northern Engineering
No comment.
20
Northern Engineering
Erosion Control Plan
Will review after revisions made
Add the City of Greeley 27” transmission line.
Response: Updated
21 – 22
Northern Engineering
No comment.
23 - 44
Ayres
No comment.