Loading...
HomeMy WebLinkAboutGATEWAY AT HARMONY ROAD PUD, 2ND FILING - FINAL - 1-88D - CORRESPONDENCE - OTHER JURISDICTIONS0 • • DIVISION OF HIGHWAYS STATE OF COLORADO P.O. Box 850 y� Greeley, Colorado 80632-0850 rN CC` (303) 353-1232 �; ( , S - --= `" a V - .. C____•.J February 14, 1989 Larimer Co., S.H. 287 The Gateway at Harmony Rd. P.U.D. , lst and 2nd Filings NW of Harmony Rd. and 287 Mr. Joe Frank DOH File 45100 Planning Department City of Ft. Collins P.O. Box 580 Ft. Collins, CO 80522 Dear Mr. Frank: We have reviewed the Gateway at Harmony Rd., lst and 2nd Final Filings, and we have the following comments. This P.U.D. has been reviewed by this office on several occasions dating back to January 1988. Our comments have addressed a number of issues involving S.H. 287, including: additional highway right of way, access to S.H. 287, surface runoff control, landscaping along S.H. 287, and new utility line connections. More recently this P.U.D. has been discussed in relation to the Draft South College Access Control Plan. Since the lst and 2nd Filing plans do not address surface runoff, landscaping, or utilities, we will limit the following comments to the access and right of way issues. Our District Engineer, Douglas Rames, has re-evaluated the proposed right -in -only access to this P.U.D. based on a 1/30/89 memorandum by Matt Delich. Due to this analysis and his concern about potential left -turn conflicts on Kensington St. without the requested access, he is now willing to allow it as shown on the Final P.U.D. plans with certain conditions. These conditions are as follows: 1. A raised median shall be constructed between Kensington St. and Harmony Rd. to physically prevent left -turn movements. 2. This median shall allow for double southbound left -turn lanes at Harmony Rd. and a northbound left -turn lane at Kensington St. 3. A southbound right -turn deceleration lane shall be provided for Kensington St., then continue to the Harmony Rd. intersection. In addition to the above conditions we are requesting that -the necessary right of way for the ultimate long-range highway width and detailed design plans be provided. Additional right of way to achieve the 75- or 76-foot width identified by Matt Delich should be dedicated. Construction quality r-ns for all widening along S.H. 287 should be prepared to fully identify • • JOE FRANK February 14, 1989 Page Two how the access -related improvements will be accomplished. This is especially important at Harmony Rd. due to the existing signal poles, curb and gutter, and guardrail which will be affected by this highway widening and the transition south of the intersection. These plans will be required for an Access Permit to be approved by this office. We look forward to continued coordination with the City on this project and the South College Access Control Plan. As noted in our 2/8/89 letter to Mike Davis, we hope to meet with the City to achieve a mutually acceptable plan. Please contact me at 350-2168 if you have any questions. Very truly yours, DOUGLAS RAMES DISTRICT ENGINEER /Cz �. u�' /S. �"'� Wallace R. yacobson Development Planning/Access Coordinator WJ:mbc cc: D. Yost Eric Bracke, Ft. Collins Transp. File: Jacobson via Crier