HomeMy WebLinkAboutGATEWAY TO HARMONY ROAD PUD - PRELIMINARY - 1-88B - SUBMITTAL DOCUMENTS - ROUND 1 - APPLICANT COMMUNICATION0
G
GEFROH HATTMAN INC.
ARCHITECTS/PLANNERS
CONSTRUCTION MANAGEMENT
135 West Swallow Road
Fort Collins. CO 80525
(303) 223-7335
SUBMISSION INFORMATION
PERTAINING TO THE P.U.D.
for the
GATEWAY AT HARMONY ROAD
LOCATED AT HARMONY ROAD AND COLLEGE AVENUE
PREPARED BY:
GEFROH HATTMAN INC.
145 West Swallow Road
Fort Collins, Colorado 80525
PREPARED FOR:
PAUL HEFFRON
Box 1345
Boulder, Colorado 80306
ail
GEFROH HATTMAN INC.
ARCHITECTS/PLANNERS
CONSTRUCTION MANAGEMENT
135 West Swallow Road
Fort Collins, CO 80525
December 2, 1988 (303) 223-7335
Ms. Linda Ripley
CITY OF FORT COLLINS
Planning & Development
Box 580
Fort Collins, CO 80522
RE: THE GATEWAY AT HARMONY ROAD
FORT COLLINS, COLORADO
Dear Linda:
This project is submitted as a Preliminary P.U.D. for Staff review and Planning
and Zoning action.
The Gateway is conceived as a mixed use business service and roadside commercial
project As South Fort Collins develops and businesses locate within the area,
food and gas services become a necessary element to achieve consumer satisfaction
and to reduce trips out of the area for those services. This P.U.D. is geared to
provide basic services in the ever expanding market along College Avenue. This
development at the intersection of Harmony and College is not intended to be a
neighborhood convenience center as defined in the recently developed guidelines
pending approval by City Council. The neighborhood convenience center criteria
is developed, as we understand, for those centers which develop adjacent to
residential neighborhoods. This project is located in an highly developed com-
mercial area with regional draw characteristics.
The P.U.D is submitted under the requirements set forth in the Land Development
Guidance System as they relate to Business Services and Auto -Related and Road-
side Commercial Uses. The Point Charts E and D are included for review and
documentation.
POINT EXPLANATIONS -- POINT CHART D AUTO -RELATED & ROADSIDE COMMERCIAL
A. Not at two arterials: The project is located at the intersection of College
Avenue, an arterial, and Harmony Road, an arterial. No points taken.
B. Part of planned center: The project is located contiguous to the Arbor Plaza
center and along College Avenue -- a major regional draw center.
C. On -non -arterial: Access to the project is gained from Mason and Kensington
which are full -turn movements.
D. Two accesses or more: The project is approximately six acres in size.
E. Mixed -use: The project contains two or more different uses.
F. Joint parking: As indicated, this project is an integral part of a much
larger regional draw retail center where off -site parking with direct
vehicular and pedestrian access occurs. Arbor Plaza to the south contains
parking area in excess of 10 spaces.
Ms. Linda Ripley
GATEWAY AT HARMONY ROAD
December 2, 1988
Page 2
G. Energy conservation: Although we do not claim any points for energy conserva-
tion, we fully intend to meet state and local energy standards in' -force.
H. Contiguity: All of the property is contiguous to existing urban development.
POINT EXPLANATIONS -- POINT CHART E, BUSINESS SERVICES.
A. Transit route: College Avenue is on a major transit route.
B. South College corridor: The project is within the defined College corridor.
No points taken.
C. Part of center: Reference criteria b, Point Chart D.
D. Two acres or more: Reference criteria d, Point Chart D.
E. Mixed -use: Reference criteria c, Point Chart D.
F. Joint parking: Reference criteria f, Point Chart D.
G. Energy conservation: Reference criteria g, Point Chart D.
H. Contiguity: Reference criteria h, Point Chart D.
LAND USE POLICIES
POLICY 3a. "The City shall promote maximum Utilization of the Land Within the City.''
EXPLANATION: The property is situated on the west side of College Avenue, an im-
portant N-S arterial street, and is contiguous with its boundaries to existing urban
development.
POLICY 21. "All levels of commercial development, including convenience...shop-
ping which have significant negative transportation impacts on South College Avenue
will be discouraged from gaining their primary access from College Avenue."
EXPLANATION: While the project contains a limited right -in only from College, the
primary access is from Mason and Kensington.
POLICY 22. "Preferential consideration shall be given to urban development pro-
posals which are contiguous to existing development within the City limits."
EXPLANATION: The project enjoying contiguity with existing urban development sup-
ports this policy. By its location the project takes advantage of existing urban
level services, utilities and facilities, including police and fire protection,
water, sewer, electricity, gas, telephone and cable TV. It will be served by ur-
ban level streets with curb gutter and sidewalks.
POLICY 26. "Availability of existing services shall be used as a criteria in de-
termining the location of higher intensity areas in the City."
EXPLANATION: The property is served by existing gas, water, electricity, telephone,
sanitary and storm drainage facilities.
POLICY 49. "The City's Land Use Policies Plan shall be directed toward minimizing
the use of private automobiles and toward alleviating and mitigating the air
quality impacts of concentrated use of automobiles."
EXPLANATION: The project, located on a major transit route allows for but trans-
portation. The services provided in the P.U.D. are intended to service employees
within the work area as well as transit pass -through -uses.
0 •
Ms. Linda Ripley
GATEWAY AT HARMONY ROAD
December 2, 1988
Page 3
PROJECT DESCRIPTION
The project located at the intersection of Harmony and College provides the oppor-
tunity to plan an important land area within an overall P.U.D. The uses are con-
sistent with those found along College Avenue which are geared to serve users that
travel along the major regional draw area of College Avenue.
College Avenue has long been recognized as the major retail and employment area
within Fort Collins. With the exception of widening a portion of College Avenue,
all of the major street improvements have been completed for this property. A
limited "right -in" only access cut occurs on College Avenue providing access to
McDonald's and the standard restaurant. The primary access points occur on Mason
Street and Kensington Drive. The uses on site consist of a McDonald's fast food
restuarant with exposure on three sides -- College, Harmony, and Mason. Generous
setbacks ranging from 45' along Harmony Road, 85' at the intersection of Harmony
and College and a minimum of 50' along College occur surrounding McDonald's.
This green space will be planted with street trees and smaller decorative shrubs
and will have berms at key areas. The building is set back approximately 210, from
College Avenue and approximately 70' from Harmony and approximately 140' from
Mason. Signage proposed is standard and typical of the McDonald's Corporation as
is a requirement for proper marketing especially given the fact that the building
is set back over 210 feet from the intersection.
The other known use at this preliminary stage is the Amoco Gas Station with an
automatic Car Wash Bay located at the intersection of College and Kensington.
This facility gets its access from Kensington Drive. The station will have four
stations with the intention of expanding to six stations. The canopy covers the
fill areas and the food shop portion of the use. The car wash allows for entrance
from the gas service area and exits on to the adjacent off -site private drive.
Signage is standard and typical of this franchized use.
The standard restaurant located central to the project achieves access from College
through the limited access and from Mason and Kensington. The user is unknown at
this time. A Final P.U.D. will not be submitted unti a user is located.
Retail/Service Buildings a and b, totaling 11,800 square feet are intended to serve
as support type uses, as are indicated in both submitted point charts. Users
are not known at this time. The Final Submission will better define uses and time
frame for actual development. It is intended that both the McDonald's store, the
Amoco Station will become First Phases to the project.
Respectfully,
GEFROH HATTMAN INC.
James�A. Gefroh
Presi ent
enc.