March 11, 1988
Ms. Debbie DeBesche
City of Fort Collins
Planning Department
P.O. Box 580
Fort Collins, CO 80522
RE: The Gateway at Harmony Road
#01-7045
Dear Ms. DeBesche:
The following is in response to your comments as set forth in your letter of
January 15, 1988:
1. We are working on access with both the City and State.
2. A plat will be provided at final P.U.D.
3. See Site Plan.
4. See Site Plan.
5. See Site Plan notes.
6. See Site Plan notes.
7. We have shown public access easements on the preliminary site plan. If more
are necessary, please show us where to put them and we will provide them on
the final plan and plat.
8. We will keep this in mind for building designs.
9. We will inform the owners.
10. Noted.
11. There are no existing trees on the site.
12. See Site Plan.
13. See Site Plan and revised Master Plan.
14. See Site Plan.
15. See revised Site Plan.
16. See revised Site Plan and Elevations.
0
•
Ms. Debbie DeBesche
March 11, 1988
Page 2
17. See revised Master Plan and Site Plan.
18. See revised Site Plan.
19. a. The roof beams are not proposed to be lit.
b. The "M" logo below the windows is colored bronze on a bronze background
of the same material. It will be unobtrusive.
c. McDonald's wishes to keep this sign at this point.
d. See Elevations.
e. "Playland" will be located west of the building.
20. Tree sizes are usually established at final Site Plan.
21. See Elevations.
22. See revised Site Plan.
23. We are working with City and State Highway Department staff on this.
If you have any questions or would like any additional information, please let
me know.
Sincerely,
ZVFK ARCHITECTS/PLANNERS
Z
John L. Barnett, ASLA
JB:dh