HomeMy WebLinkAboutGATEWAY TO HARMONY ROAD PUD - PRELIMINARY - 1-88A - CORRESPONDENCE - STAFF'S PROJECT COMMENTSCITY OF FORT COLLINS
OFFICE OF DEVELOPMENT SERVICES, PLANNING DEPARTMENT
January 15, 1989
John Barnett
11 Old Town Square #200
Fort Collins, CO.
Dear Mr. Barnett,
The City Staff has completed its review of The Gateway at Harmony Road,
preliminary, and has the following comments:
1. I have included a copy of the State Highway Departments letter dated
January 12, 1988.
2. A subdivision plat is needed.
3. Please indicate building envelopes and show all dimensions, including
the distance of each envelope to the property lines. Canopies must be
within a building envelope.
4. Please indicate on the plan if the McDonalds will be a drive up. If it
does happen to be a drive -up please indicate the location of the menu
board and pick up window.
5. Please show motorcycle parking spaces.
6. The City Parks and Recreation Department will not maintain any lands-
caping in the public right of way. +Please place a note addressing this
on the site plan.
7. For the purpose of fire safety, dedicated access easements must be pro-
vided throughout the site.
8. Fire flow capability of 6" water line in the area is limited. Build-
ings must be designed and built to not exceed 1,250 GPM fire flow. Area
separation walls or fire sprinkler systems may be required.
v
'` 4'-w ri +s. r. a, •,'v''j'yy� ,A' �yiF
t Jt t 3 I 4:
r • �k � o{, +�sJ +s t`�+., � l I�,i,�, 16 �� �.,,1 � � r..:p a .-y, ,: -�'r r•, u� of ° � �s "' i '•d '�
�, +•it" y esy.f� fip. r —'Ll ! L f �4 � e° � f t i'�3 4 ���' � �.SC � ,P'.ia� ,r�A`«;R�.P?'
r
9. This property will be assessed $160.00 per acre for the Warren Lake
trunk sewer basin fee.
10. Large trees can not be planted in the water and/or sewer easements.
11. Please show existing plantings and indicate if they are to be preserved
or removed.
12. The final plat needs to dedicate 15 feet minimum width utility ease-
ments adjoining the west right of way line of College Ave and the north
right of way line of Harmony Road. Also, an 8 foot minimum width util-
ity easements adjoining the east right of way line of Mason Street and
the south right of way line of Kensington Drive.
13. The site appears to have four separate, distinct, unrelated activities.
To help mitigate this issue Staff suggests that the landscape through-
out the site be uniform and aid in tying the four sites together. Also
the pedestrian ways should also help tie the site together.
14. Please provide a separate preliminary grading and drainage plan.
15. The area shown on the site plan needs to extend beyond the property
lines of the proposal to include a survey of the area and uses within
150 feet of the proposal, exclusive of public right-of-way at the same
scale as the proposal. Please see # 25 on page 44 of the LDGS for
details.
16: Please address signage for the McDonalds, the proposed signage needs
to be placed on the site plan or the elevation plan.
.17. Staff has concerns over the circulation of the site, particularly the
McDonalds site and the site with the tire store and convenience store.
18. In phase 11 and Ill the building setbacks are too close to the street.
19. The McDonalds elevation plan:
Will the roof have lighting?
-The "M" below the windows need to be removed.
-The signs on the side of the building need to be removed.
-Please provide information on the materials and colors of the build-
ing.
-Will there be a playground facility?
20. Landscaping:
-The street trees along Harmony and Shields need to be upscaled to 3"
caliper.
All buildings need foundation plantings.
-Trash enclosures should have shrubbery around .them.
-The landscape setback along Harmony and College should be 30' with at
least 20' of "green" from back of the sidewalk.
-provide a berm and/or landscape screening along College and Harmony.
-The corner at College and Kensington Drive should include a larger
landscaped area.
What portion of the 32.9% of the open space is "green"?
2
•
21. Please provide elevation plans for the retail building in Phase 111.
22. What is the phasing of the streets/drives?
23. This is the last comment. and probably the most important! With the
information we have and the traffic study submitted the proposed site
design does not meet the State Access Control Plan and therefore Staff
can not support the proposed accesses on College and Harmony. Cues-
tions and additional site details in regard to access design have not
been addressed by Staff at this time.
Revisions reflecting these comments are due by noon on Wednesday, January
27, 1988. Items that cannot be shown graphically or noted on the plans
should be addressed in writing.
PMT reductions of all plans, color renderings, and 10 full size copies of
all plans are due by Monday, February 8, 1988.
If you have any questions or would like to set up a meeting to discuss
these comments please call me at 221-6750.
Sincerely,
Debbie deBesche
City Planner
xc: Mike Herzig, Development Coordinator
Ji!-n Faulhaber Civil Engineer I
Joe Frank, Assistant Planning Director
3
DIVISION OF HIGHWAYS STATE, OF COLORADO
_ :: •� SSE O
P.O. Box 850 jj �� (� j I '/ � _-� �1 •. a ..,r' }; `s,
Greeley, Colorado 80632-0850
D ' _
(303) 353-1232
January 12, 1988 f Larimer Co., S.H. 287
The Gateway to Harmony
Road P.U.D.
NW of Harmony Rd. and 287
Ms. Linda Ripley
Planning Department
City of Ft. Collins
P.O. Box 580
Ft. Collins, CO 80522
Dear Ms. Ripley:
DOH File 45100
We have reviewed the Gateway to Harmony Rd. P.U.D./Access Study, and
we have the following comments:
1. Projected traffic on State Highway 287 indicates the need for a 140-foot
total right of way, 70 feet each side of the highway centerline.
Since the existing width along this property is 50 feet west of the
centerline, additional width to meet the projected need should be
protected by reservation or, preferably, dedication, as permitted
by City regulations.
2. Access to this property from S.H. 287 has been previously reviewed
in relation to the Kensington P.U.D. and the South College Properties
Master Plan. The only access to S.H. 287 which has been approved
to serve this P.U.D. is the Kensington Street access along the north
side of this property. Based on our review of the Access Study, we
cannot support the new proposed right-in/right-out access to S.H. 287.
The Kensington St. access was originally intended as a right-in/right-out
access only, based on the South College Properties Master Plan. However,
we are willing to consider a left -turn opportunity for northbound
vehicles only on S.H. 287, if left turns into this access are acceptable
to the City of Ft. Collins. A limited left -turn in and right-in/right-out
type of access design is the same as that which was approved for the
Mason St. connection to S.H. 287 located approximately 600 ft. south
of the Harmony Rd. intersection.
The above type of access design nullifies the need for a traffic signal
at Kensington St. since crossing movements of S.H. 287 are limited
to northbound left turns only. Vehicles making this turn could be
stored in a median left -turn lane if a double left -turn lane for the
heavy southbound to eastbound left turns at Harmony Road is provided.
This double left -turn lane should be in place on S.H. 287 prior to
installation of the left -turn lane for Kensington St. to allow for
optimum operation of the median for both intersections.
0
LINDA RIPLEY
January 12, 1988
Page Two
Construction of the Kensington St. access requires an Access Permit.
Application for this permit is made to the City. We agree with the
Access Study that a southbound right -turn deceleration lane should
be provided on S.H. 287 for this street. If the right of way is available,
it should be required as part of the Access Permit. If right of way is not
sufficient to add this lane, it should be constructed when the property
north of Kensington St. dedicates the necessary additional width.
3. The site plan for this development indicates that surface runoff flows
toward the highway drainage system. That system is for the protection
of the State Highway right of way and is not intended to accommodate
drainage from abutting properties beyond that which has historically
been accepted. Therefore, we ask that on -site detention of surface
runoff be provided so that the historical runoff rate will not be
exceededd due to this development.
4. The landscape plan shows landscaping within the State Highway right
of way. We allow such landscaping provided that it is maintained
by the adjacent private property owner, does not impair sight distance
at any highway access, does not present a safety hazard, and would
not unreasonably conflict with future highway expansion. New trees
are .normally not permitted since they can be difficult to relocate.
5. The site plan indicates that a connection to an existing 42-inch line
in the S.H. 287 right of way is to be made. This utility tap requires
a Utility Permit from this office.
Thank you for the opportunity to review this P.U.D. Please contact
Wally Jacobson at 350-2168 if you have arty questions.
Very truly yours,
ALBERT CHOTVACS
DISTRICT417GINEER /
J hn K. Crier
Disttict Planning/Environmental Manager
JKC:mbc(WJ)
cc: D. Yost
Area Foreman
File: Crier -Jacobson via Chotvacs