HomeMy WebLinkAboutAMENDMENT TO LOT 11-A, DRAKE PARK PUD - PRELIMINARY & FINAL - 5-88 - CORRESPONDENCE - STAFF'S PROJECT COMMENTSCITY OF FORT COLLINS
OFFICE OF DEVELOPMENT SERVICES, PLANNING DEPARTMENT
January 27, 1988
Mr. Barry Cunningham
Drake Executive Plaza
2625 Redwing Road
Fort Collins, CO 80526
Dear Mr. Cunningham:
Staff has reviewed the Drake Office Park 2nd - Amended P.U.D., Pre-
liminary and Final, Case #5-88, and has the following comments:
1. Please submit legal description and site dal on 8-1/2" x 11"
sheets.
2. Submit a letter verifying that the names on the APO list are
current to within thirty day of the date you supplied them.
3. Submit a statement of planning objectives. Items to be addressed
are attached.
4. The title block for the site plan should read "Drake Park 2nd
-Amended P.U.D., Preliminary and Final".
5. The site plan needs to include a vicinity map.
6. Complete the "All Development Criteria Chart and Point Chart E".
Forms are attached.
7. Indicate a submittal date on the site plan.
8. Please provide the following information on the PUD site plan:
(a) Existing and estimated total floor area and ratio of floor area
to lot size, with a breakdown by land use.
SERVICES, PLANNING
0
(b) Existing and proposed coverage of buildings and structures,
including the following:
1. Percentage and square footage of building coverage.
2. Percentage and square footage of driveways and parking.
3. Percentage and square footage of landscaped area.
These can be figured on a net basis and the landscaped area can
include sidewalks.
9. Please state the total number of parking spaces provided on the
PUD site plan. I need to know the total number of parking spaces
existing and proposed for Drake Park.
10. Will any trees be removed as a result of this building expan-
sion?
11. Staff requests that the chain link fence enclosure be black
vinyl clad chain link fencing. What are the horizontal bands on
top of the chain link?
12. Remove the signature block for City Council. The Planning and
Zoning Board signature block is signed by the Secretary of the
Planning and zoning Board. In addition you need to provide an
owner's certification. A copy of the owner's certification is
attached. All the owners in Drake Park will need to sign.
13. A detailed landscape plan will be required when you apply for a
building permit.
14. Any relocation of existing utilities will be at the developer's
expense.
15. The easement vacation language needs to be more clear, indicat-
ing that the parking area remaining is a storm drainage ease-
ment.
16. Add this statement to the PUD site plan. "Maintenance of all on
site drainage facilities shall be the responsibility of the
property owner."
17. Depth of ponding in the modified parking area exceeds the maxi-
mum allowable 18 inches. A Variance Request must be stated on
the PUD site plan.
18. Where will water go if inlets plug?
19. Staff is skeptical of the proposed 0.1 foot asphalt berm
designed to increase detention. Will it hold up under traffic
and freeze thaw conditions?
i
•
20. Provide a more detailed look at the new building and its rela-
tionship to the existing storm drain.
21. Additional engineering comments are on the utility drawings.
This concludes Staff comments at this time. Please note the follow-
ing dates and let me know if there are any problems in meeting the
deadlines:
Plan revisions are due February 4, 1988.
PMT's, colored renderings, and 10 prints are due February 15, 1988.
Final mylars and documents are due February 18, 1988.
As always, please call if there are any questions or concerns.
Sincerely,
Linda Ripley
Project Planner
LR/bh
•
Wording for Owner's Certification Option
OWNER'S CERTIFICATION
The undersigned does/do hereby certify that I/we are the lawful owners of
real property described on this site plan and do hereby certify that I/we
accept the conditions and restrictions set forth on said site plan.
Owner (signed) date
Owner (signed)
date
%6 }
[1] Application form and filing fee.
[2] Legal description of the site.
[3] A list of the names and addresses of all owners of
record of real property within 500 feet of the
property lines of the parcel of land for which the
planned unit development is proposed, exclusive of
public right-of-way. This list shall be typed on
mailing labels.
[4] A statement of planning objectives, including:
[a] Statement of appropriate City Land Use Poli-
cies achieved by proposed plan.
[b] Statement of proposed ownership of public and
private open space areas. Applicants inten-
tions with regard to future ownership of all
or portions of the planned unit development.
[c] Estimate of number of employees for business,
commercial and industrial uses.
[d] Description of rationale behind the assump-
tions and choices made by the applicant.
[e] The applicant shall submit as evidence of
successful completion of the applicable
criteria, the completed documents pursuant to
these regulations for each proposed use. The
Planning Director may require, or the appli-
cant may choose to submit evidence that is
beyond what is required in that section. Any
variance from the criterion shall be described.
[f] Detailed description of how conflicts between
land uses are being avoided or mitigated.
[g] Statement of design methods to reduce energy
consumption including expected savings.
[5] A development schedule indicating the approximate
date when construction of the planned unit develop-
ment, or stages of the same, can be expected to
begin and be completed, including the proposed
phasing of construction of public improvements and
recreational and common space areas.
�e
l�
ACTIVITY: Business Service Uses
DEFINITION
Those activities which are predominantly retail, office, and service
uses which would not qualify as or be a part of a neighborhood or
community/regional shopping center. Uses include: retail shops;
offices; personal service shops; financial institutions; hotels/
motels; medical clinics; health clubs; membership clubs; standard and
fast-food restaurants; hospitals; mortuaries; indoor theatres; retail
laundry and dry cleaning outlets; limited indoor recreation uses;
small animal veterinary clinics; printing and newspaper offices;
neighborhood convenience center; and, other uses which are of the same
general character.
CRITERIA, Each of the following applicable criteria must be
answered "yes" and implemented within the development
plan.
Yes No NA
1. Does the project gain its primary vehicular access a
from a street other than. South College Avenue?
2. DOES THE PROJECT EARN AT LEAST 50% OF THE MAXIMUM
POINTS AS CALCULATED ON "POINT CHART E" FOR THE
FOLLOWING CRITERIA:
a. Is the activity contiguous to an existing transit route (not
applicable for uses of less than 25,000 sq. ft. GLA or with
less than 25 employees) or located in the Central Business
District?
b. Is the project located outside of the "South College Avenue
Corridor"?
c. Is the project contiguous to and functionally a part of a
neighborhood or community/regional shopping center, an office
or industrial park, located in the Central Business Dis-
trict or in the case of a single user, employ or will employ a
total of more than 100 full-time employees during a single
8-hour shift?
d. Is the project on at least two acres of land or located in the
Central Business District?
-22-
conthuEw
If
7
e- Does the project contain two or more significant uses (such
as retail, office, residential, hotel/motel, and recreation)?
f. Is there direct vehicular and pedestrian access between
on -site parking areas and adjacent existing or future off -site
parking areas which contain more than ten (10) spaces?
g. Does the activity reduce non-renewable energy usage, through
the application of alternative energy systems, use of existing
buildings, and through committed energy conservation measures
beyond that normally required by City Code?
h. Is the project located with at least 1/6th of its property
boundary contiguous to existing urban development?
i. If the site contains a building or place in which a historic
event occurred, which has special public value because of
notable architecture, or is of cultural significance, does
the project fulfill the following criteria:
i. Prevent creation of influences adverse to its preserva-
tion;
ii. Assure that new structures and uses will be in keeping
with the character of the building or place. Imitation
of period styles should be avoided; and
iii. Propose adaptive use of the building or place that will
lead to its continuance, conservation, and improvement
in an appropriate manner while respecting the integrity
of the neighborhood.
-23-
BUSINESS
SERVICE USES
is
POINT CHART E
For All Critera
Applicable Criteric Only
` Criterion
Is The
Criterion
Applicable
Yes No
I II III I`✓
Circle
The
Correct
Score
Yes VW' No
Multiplier
Points
Earned
1Y11
'
Vcximum
rcN, ccc'e
Points
I a. Transit route
I
X
2
0
2
b. S. College corridor
X
I
X
2
0
4
8
c. Part of center
X
X
2
0
3
6
d. Two acres or more
X
X
2
0
3
6
e. Mixed -use
X
X
2101
3
6
f. Joint parking
1
2
0
3
g. Energy conservation
X
1
2
0
4
8
h. Contiguity
X
X
2
0
5
10
i. Historic preservation
1
2
0
2
j.
1
2101
k.
1
2101
I.
1
21
0
VW — Very Well Done Totals
Percentage Earned of Maximum Applicable Points VNI=V11
7- -24-
PROJECT NUMBER: �TE:
ALL DEVELOPMENT: NUMBERED CRITERIA CHART
ALL CRITERIA
APPLICABLE CRITERIA ONLY
Will the criterion
is the criterion applicable' be sat shear
CRITERION Q,e�,,��°�.�� Yes No If no, please explain
NO
NEIGHBORHOOD COMPATABIUTY
1. Social Compatibility
2. Neighborhood Character
3. Land Use Conflicts
>:
4. Adverse Traffic Impact
PLANS AND POLICIES
5, Comprehensive Pion
PUBLIC FACILITIES & SAFETY
6. Street Capacity
7. Utility Capacity
8. Design Standards
9. Emergency Access
10. Security Lighting
11, Water Hazards
RESOURCE PROTECTION
12. Soils & Slope Hazard
13. Significant Vegetation
14. Wildlife Habitat
15. Historical Landmark
16. Mineral Deposit
17. Eco-Sensitive Areas
18. Agricultural Lands
..........
ENVIRONMENTAL STANDARDS
19. Air Quaiity
20. Water Quality
21. Noise
22. Glare & Heat41.
23. Vibrations
24. Exterior Lighting
25. Sewage & Wastes
...........:.
SITE DESIGN
26. Community Organization
27, Site Organization
28. Natural Features
29. Energy Conservation
;
30. Privacy
31. Open Space Arrangement
32. Building Height
33. Vehicular Movement
34. Vehicular Design
35. Parking
36. Active Recreational Areas
37. Private Outdoor Areas
F>
38. Pedestrian Convenience
39. Pedestrian Conflicts
40. Landscaping/Open Areas
41. Landscaping/Buildings
42. Landscaping/Screening
:.
43. Public Access
44. Signs
-12-