HomeMy WebLinkAboutAMENDMENT TO LOT 11-A, DRAKE PARK PUD - PRELIMINARY & FINAL - 5-88 - CORRESPONDENCE - CORRESPONDENCE-CONCEPTUAL REVIEWCITY OF FORT COLLINS
OFFICE OF DEVELOPMENT SERVICES, PLANNING DEPARTMENT
January 12, 1988
Barry Cunningham
c/o Drake Executive Plaza
2625 Redwing Rd.
Fort Collins, CO 80526
Dear Sir,
For your information, attached is a copy of the Staff's comments concerning
Drake Professional Park, which were presented before the Conceptual Review
Team on January 4, 1987.
The comments are offered informally by Staff to assist you in preparing the
detailed components of the project application. Modifications and
additions to these comments may be made at the time of formal review of
this project.
If you should have any questions regarding these comments or the next steps
in the review process, please feel free to call me at 221-6750.
Sinc ely,
Linda Rip ey
Senior Planner
Attachment
LR/bh
xc: Tom Peterson, Director of Planning
Mike Herzig, Development Coordinator
Project Planner
File
Kr'
� <.R. --
OF FICE OF DEVELOPMENT ' 300 LaPorte Ave. • P.O. Box 580 • Fort Collins, Colorado 80522 • (303) 221-6750
SERVICES, PLANNING
C0114CEPUTUAL REVIEW STAFF COMMENTS
MEETING DATE: January 4, 1988
ITEM: Drake Professional Park
APPLICANT: Barry Cunningham, Drake Executive Plaza, 2625 Redwing Road,
Suite 210, Fort Collins, CO 80526
LAND USE DATA: Request for approval of a 16,000 SF expansion of Building
number 11, also known as Creekside One.
1. Water and sewer utilities are located in the drive to the north of this
building. Providing additional service should be no problem. (Water and
Sewer)
2. There is an existing overhead power line located north of Building num-
ber 11. The City cautions the developer to be aware of this line and avoid
it during construction. The applicant is requested to fill out a Commercial
One form to assess additional power requirements in order to determine what
charges there might be for providing additional electrical service. (Light
and Power)
3. Fire access appears to be adequate.(Fire)
4. The applicant is requested to meet with the Building Inspection Depart-
ment to ascertain what effect the proposed expansion has on Building Code
requirements.(Building Inspection)
5. A storm drainage report will be required. The report needs to address
current storm water requirements, displaced detention and where the pro-
posed building's foundation will be in relation to the existing storm
drain. (Storm Drainage)
6. Check to see if there are any utility easements on the property proposed
to be covered by the building expansion. If there are any they would have
to be vacated.(Engineering)
7. Define the new building envelope on the plan.(Zoning)
8. A landscape plan showing foundation plantings for the expanded building
will be required.