HomeMy WebLinkAboutPOWERHOUSE 2 - PDP220006 - SUBMITTAL DOCUMENTS - ROUND 3 - ELEVATIONS84' (approx.)84' (approx.)AUGUST 17, 2022
SOUTH ELEVATION
WEST ELEVATION
0 5 10 20 30
0 5 10 20 30
SCALE TOP OF PARAPETMECANICAL EQUIPMENT
SCREENING - MATERIAL #3
MECANICAL EQUIPMENT
SCREENING - MATERIAL #3
STAIR TOWER
MATERIAL #1 SUN SHADING
DEVICES
ARCHITECTURAL
METAL PANEL, PREFINISHED
MATERIAL #3
MASONRY VENEER-
MATERIAL #2
STONE VENEER -
MATERIAL #1
TOP OF PARAPETVERTICAL SUN SHADES-
PREFINISED METAL
ARCHITECTURAL METAL
PANEL, PREFINISHED -
MATERIAL #4
MATERIAL # 1 -
SANDSTONE VENEER
EDGE SAWN, SPLIT (CLEFT) FACE
MATERIAL PALETTE
MATERIAL # 2 -
BRICK VENEER
(COLOR TO BE SIMULAR TO
POWERHOUSE 1 BUILDING)
MATERIAL # 3 & 4
ARCHITECTURAL METAL PANELS
RIBBED & SMOOTH TEXTURED
PREFINISHED
COLOR MATERIAL # 3
COLOR MATERIAL # 4
The Neenan Company
3325 S. Timberline Rd.
Fort Collins, CO 80525
www.neenan.com
POWERHOUSE 2 CLIMATE SOLUTIONS CAMPUS FORT COLLINS, COLORADOSHEET NAME:EXTERIOR BUILDING ELEVATIONSBULDING MATERIALSISSUE DATE:
APRIL 13, 2022
REVISIONS:
SHT. #
1
OF
4
SCALE
RAMMED EARTH
RETAINING WALLS
@ RAIN GARDENS
METAL RAILING
@ PLAZAS (TYP.) 10'10'
10'STAIR/ ELEVATOR
TOWER
10'STAIR TOWERS & MECHANICAL
EQUIPMENT SCREENING 84' (approx.)84' (approx.)AUGUST 17, 2022
FOLDING
OVERHEAD
DOORS
MECANICAL EQUIPMENT
SCREENING - MATERIAL #3
MECANICAL EQUIPMENT
SCREENING - MATERIAL #3
STAIR TOWER
MATERIAL #1
ARCHITECTURAL
METAL PANEL, PREFINISHED
MATERIAL #3
MASONRY VENEER-
MATERIAL #2
STONE VENEER -
MATERIAL #1
ARCHITECTURAL METAL
PANEL, PREFINISHED -
MATERIAL #4 SECURED COVERED
BIKE PARKING - STANDING
SEAM METAL ROOF
NORTH ELEVATION
0 5 10 20 30
SCALE
EAST ELEVATION
0 5 10 20 30
SCALE
The Neenan Company
3325 S. Timberline Rd.
Fort Collins, CO 80525
www.neenan.com
POWERHOUSE 2 CLIMATE SOLUTIONS CAMPUS FORT COLLINS, COLORADOSHEET NAME:EXTERIOR BUILDING ELEVATIONSCOVERED PARKINGSOLAR CANOPYISSUE DATE:
APRIL 13, 2022
REVISIONS:
SHT. #
2
OF
4
COVERED PARKING SOLAR CANOPIES
GLU-LAM TIMBERS w/
STEEL REINFORCING
AS REQUIRED
SOLAR PANELS TOP OF PARAPETTOP OF PARAPETUTILITY COURT
SCREENING - MATERIAL #2
8' H. WALLTRASH ENCLOSURE -
MATERIAL #2 - 8' H. WALL
AERIAL PERSPECTIVE from NORTHWEST
AERIAL PERSPECTIVE from SOUTHWEST
SHADOW STUDY
AUGUST 17, 2022
The Neenan Company
3325 S. Timberline Rd.
Fort Collins, CO 80525
www.neenan.com
POWERHOUSE 2 CLIMATE SOLUTIONS CAMPUS FORT COLLINS, COLORADOSHEET NAME:AERIALPERSPECTIVESSHADOW STUDYISSUE DATE:
APRIL 13, 2022
REVISIONS:
SHT. #
3
OF
4COLLEGE AVE.VINE ST.JEROME ST. NORTH
THE SHADOW SHOWN REPRESENTS THE SHADOW
THE BUILDING WILL CAST ON THE WINTER
SOLSTICE (DEC. 21ST) @ 12:00 P.M.
THIS SHADOW WILL BE THE LONGEST SHADOW OF THE YEAR.
Perspective View from Southwest
PERSPECTIVE VIEW from SoutheastPERSPECTIVE VIEW from Northeast
AUGUST 17, 2022
The Neenan Company
3325 S. Timberline Rd.
Fort Collins, CO 80525
www.neenan.com
POWERHOUSE 2 CLIMATE SOLUTIONS CAMPUS FORT COLLINS, COLORADOSHEET NAME:BUILDINGPERSPECTIVESISSUE DATE:
APRIL 13, 2022
REVISIONS:
SHT. #
4
OF
4