Loading...
HomeMy WebLinkAboutMONTAVA - PHASE E TOWN CENTER - BDR220003 - MONTAVA SUBMITTAL DOCUMENTS - ROUND 1 - GEOTECHNICAL (SOILS) REPORTPRELIMINARY SUBSURFACE EXPLORATION REPORT 800 ACRE MIXED USE DEVELOPMENT SOUTH OF LCR 52 AND WEST OF ANHEUSER BUSCH FORT COLLINS, COLORADO EEC PROJECT NO. 1172058 Prepared for: Chase Merritt 1637 Pearl Street Suite 204 Boulder, Colorado 80302 Attn: Mr. Max Moss (max@chasemerritt.com) Prepared by: Earth Engineering Consultants, LLC 4396 Greenfield Drive Windsor, Colorado 80550 4396 GREENFIELD DRIVE W INDSOR, COLORADO 80550 (970) 545-3908 FAX (970) 663-0282 October 2, 2017 Chase Merritt 1637 Pearl Street Suite 204 Boulder, Colorado 80302 Attn: Mr. Max Moss (max@chasemerritt.com) Re: Preliminary Subsurface Exploration Report 800 Acre Mixed Use Development South of LCR 52 and West of Anheuser Busch Windsor, Colorado EEC Project No. 1172058 Mr. Moss: Enclosed, herewith, are the results of the preliminary subsurface exploration completed by Earth Engineering Consultants, LLC personnel for the referenced project. A total of thirty (30) preliminary soil borings were drilled from August 14 through 30, 2017, at the approximate locations as indicated on the enclosed Figure 1: Boring Location Diagram included with this report. The borings were extended to depths of approximately 25 to 40 feet below existing site grades. Individual boring logs, including groundwater observations, depth to bedrock, and results of laboratory testing are included as a part of the attached report. This exploration was completed in general accordance with our proposal dated June 26, 2017. In summary, the subsurface soils encountered in the preliminary test borings generally consisted of cohesive lean clay with varying amounts of sand subsoils. The cohesive soils were generally soft to very stiff and exhibited low to high swell potential at current moisture and density conditions. The lean clay subsoils were underlain by sand/gravel with varying amounts of silt soils at depths of approximately 7 to 39 feet. The sand/gravel subsoils extended to the depths explored, approximately 25 to 40 feet, or to the underlying bedrock. The sandstone/siltstone/claystone bedrock was encountered in seven (7) of the thirty (30) preliminary test borings at depths ranging from approximately 24 to 27 feet below existing site grades and Earth Engineering Consultants, LLC EEC Project No. 1172058 October 2, 2017 Page 2 extended to the depths explored. The bedrock formation was highly weathered and became more competent/harder with increased depth. Groundwater was observed in the majority of the preliminary test borings at depths ranging from approximately 2 to 36½ feet below existing site grades. Based on the materials observed within the preliminary boring locations and the anticipated foundation loads, we believe the proposed lightly to moderately loaded structures, either commercial/retail building and/or residential structures with possible basements, could be supported by conventional spread footings bearing on either suitable native subsoils or on a zone of engineered/controlled fill material placed and compacted as described within this report. Due to the variable depth to groundwater across the site, moderate to high swells at various locations, and occasional areas with lower bearing capacities, ground modifications may be necessary in these areas, as described within this report. Groundwater was encountered across the site within the majority of the preliminary borings at approximate depths of 2 to 36½ feet below existing site grades. If lower level construction or full-depth basements are being considered for the site, we would suggest that the lower level subgrade(s) be placed a minimum of 3 feet above the maximum anticipated rise in groundwater levels, or a combination exterior and interior perimeter drainage system(s) be installed. Foundations for slab-on-grade buildings should also be placed at least 3 feet above maximum groundwater levels or have proper drainage in areas with extremely shallow groundwater. Additional drainage system recommendations are provided within the text portion of this report. In general, it appears the in-situ site materials could be used for support of interior slab-on- grades, exterior flatwork, and site pavements; however, ground modification procedures such as over-excavation and replacement of existing fill materials as approved engineered fill and placement of an approved imported fill material may be required to reduce post-construction movement in some areas. Post-construction movement can be reduced but cannot be eliminated. Additionally, the cohesive subsoil materials may be subject to strength loss and instability when wetted. Close monitoring and evaluation during the construction phase should be performed to reduce post-construction movement. PRELIMINARY SUBSURFACE EXPLORATION REPORT 800 ACRE MIXED USE DEVELOPMENT SOUTH OF LCR 52 AND WEST OF ANHEUSER BUSCH FORT COLLINS, COLORADO EEC PROJECT NO. 1172058 October 2, 2017 INTRODUCTION The preliminary subsurface exploration for the proposed 800-acre mixed use development located southeast of Larimer County Road (LCR) 52 and LCR 50E in Fort Collins, Colorado has been completed. A total of thirty (30) soil borings were drilled from August 14 through 30, 2017 at the approximate locations as indicated on the enclosed Boring Location Diagrams included with this report. The thirty (30) preliminary soil borings were advanced to depths of approximately 25 to 40 feet below existing site grades across the proposed development property to obtain information on existing subsurface conditions. Individual boring logs and site diagrams indicating the approximate boring locations are included with this report. The 800-acre development property is located southeast of Larimer County Road (LCR) 52 and LCR 50E and generally extends east to the existing Budweiser property and Interstate 25 and south to LCR 50 and Canal Access Road in Fort Collins, Colorado. The property will be developed for residential, commercial, and industrial use, including utility and interior roadway infrastructure. Foundation loads for the proposed residential, commercial, and industrial structures are anticipated to be light to moderate with continuous wall loads less than 4 kips per lineal foot and individual column loads less than 250 kips. Floor loads are expected to be light. Those structures are expected to include slab-on-grade, below grade construction such as crawl spaces, garden-level and/or full- depth basements where applicable. We anticipate maximum cuts and fills on the order of 5 feet (+/-) will be completed to develop the site grades. Overall site development will include construction of interior roadway designed in general accordance with the Larimer County Urban Area Street Standards (LCUASS) Pavement Design Criteria. The purpose of this report is to describe the subsurface conditions encountered in the preliminary borings, analyze and evaluate the test data and provide preliminary geotechnical recommendations concerning site development including foundations, floor slabs, pavement sections and the possibility for an area underdrain system to support basement construction. Earth Engineering Consultants, LLC EEC Project No. 1172058 October 2, 2017 Page 2 EXPLORATION AND TESTING PROCEDURES The boring locations were established in the field by a representative of Earth Engineering Consultants, LLC (EEC) by pacing and estimating angles from identifiable site features. Those locations should be considered accurate only to the degree implied by the methods used to make the field measurements. Photographs of the site taken at the time of drilling are provided with this report. The borings were performed using either a truck-mounted CME-55 drill rig equipped with a hydraulic head employed in drilling and sampling operations. The boreholes were advanced using 4-inch nominal diameter continuous flight augers. Samples of the subsurface materials encountered were obtained using split-barrel and California barrel sampling procedures in general accordance with ASTM Specifications D1586 and D3550, respectively. In the split-barrel and California barrel sampling procedures, standard sampling spoons are driven into the ground by means of a 140-pound hammer falling a distance of 30 inches. The number of blows required to advance the samplers is recorded and is used to estimate the in-situ relative density of cohesionless soils and, to a lesser degree of accuracy, the consistency of cohesive soils and hardness of weathered bedrock. In the California barrel sampling procedure, relatively undisturbed samples are obtained in brass liners. All samples obtained in the field were sealed and returned to the laboratory for further examination, classification and testing. Laboratory moisture content tests were performed on each of the recovered samples. In addition, selected samples were tested for fines content and plasticity by washed sieve analysis and Atterberg limits tests. Swell/consolidation tests were completed on selected samples to evaluate the subgrade materials’ tendency to change volume with variation in moisture content and load. Several samples were obtained from borings for Hveem Stabilometer/R-Value (ASTM Specification D2844) testing analyses to determine the in-situ subgrade strength characteristics. The quantity of water soluble sulfates was determined on select samples to evaluate the risk of sulfate attack on site concrete. Results of the outlined tests are indicated on the attached boring logs and summary sheets. Earth Engineering Consultants, LLC EEC Project No. 1172058 October 2, 2017 Page 3 As a part of the testing program, all samples were examined in the laboratory and classified in general accordance with the attached General Notes and the Unified Soil Classification System, based on the sample's texture and plasticity. The estimated group symbol for the Unified Soil Classification System is shown on the boring logs and a brief description of that classification system is included with this report. Classification of the bedrock was based on visual and tactual observation of disturbed samples and auger cuttings. Coring and/or petrographic analysis may reveal other rock types. SITE AND SUBSURFACE CONDITIONS The 800-acre development is located southeast of LCR 52 and LCR 50E in Fort Collins, Colorado. The project site is generally undeveloped farmland with a few existing structures scattered throughout. Surface water drainage across the site is generally to the south and to the east. Estimated relief across the site from northwest to southeast is approximately 25 to 30 feet (±). An EEC field engineer was on-site during drilling to direct the drilling activities and evaluate the subsurface materials encountered. Field descriptions of the materials encountered were based on visual and tactual observation of disturbed samples and auger cuttings. The boring logs included with this report may contain modifications to the field logs based on results of laboratory testing and engineering evaluation. Based on results of field and laboratory evaluation, subsurface conditions can be generalized as follows. Sparse vegetation and topsoil were encountered at the surface of each boring. The topsoil and/or agricultural/vegetation layers were underlain by brown lean clay with varying amounts of sand subsoils. Some zones of clayey sand were encountered in a few of the borings. The lean clay subsoils were generally soft to very stiff, exhibited low to moderate plasticity and low to high swell potential at current moisture and density conditions. The lean clay subsoils were underlain by sand/gravel with varying amounts of silt soils at depths of approximately 7 to 39 feet. The sands/gravels extended to the depths explored, approximately 25 to 40 feet, or to the underlying bedrock formation in a few borings. Earth Engineering Consultants, LLC EEC Project No. 1172058 October 2, 2017 Page 4 The overburden soils were underlain by bedrock consisting of interbedded layers of sandstone, siltstone, and claystone. The sandstone/siltstone/claystone bedrock was encountered in seven (7) of the thirty (30) preliminary test borings at depths ranging from approximately 24 to 29 feet below existing site grades, was highly weathered and became more competent/harder with increased depth. The bedrock formation exhibited moderate swell potential at current moisture and density conditions. As presented herein, bedrock was encountered in borings B-4, B-6, B-19, B-20, B-24, B- 25 and B-30. The stratification boundaries indicated on the boring logs represent the approximate locations of changes in soil and rock types; in-situ, the transition of materials may be gradual and indistinct. GROUNDWATER OBSERVATIONS Observations were made while drilling and after the completion of drilling to detect the presence and level of groundwater. Groundwater was observed in the majority of the preliminary test borings at depths ranging from approximately 2 to 31 feet below existing site grades. Temporary field slotted piezometers were installed in fifteen (15) of the test borings at the time of drilling and subsequent groundwater measurements were taken on August 28 and September 8. At the time of the subsequent measurements, groundwater was observed at depths ranging from approximately 4½ to 33 feet and 6½ to 36½ feet, respectively. As presented herein, groundwater was not encountered to maximum depths of exploration in borings B-2 and B-8. The remaining fifteen (15) borings without piezometers were backfilled upon completion, and therefore subsequent groundwater measurements were not made. A diagram outlining approximate areas with relatively shallow groundwater measurements has been provided along with a groundwater contour map, (please refer to Figure Nos. 2 and 3), included in the appendix of this report. Groundwater measurements provided with this report are indicative of groundwater levels at the locations and at the time the borings/groundwater measurements were completed. In general, the groundwater piezometric flow is in the south direction. Perched and/or trapped water may be encountered in more permeable zones in the subgrade soils at times throughout the year. Perched water is commonly encountered in soils immediately overlying less permeable bedrock materials. Fluctuations in ground water levels and in the location and Earth Engineering Consultants, LLC EEC Project No. 1172058 October 2, 2017 Page 5 amount of perched water may occur over time depending on variations in hydrologic conditions, irrigation activities on surrounding properties and other conditions not apparent at the time of this report. SOIL/GEOLOGIC REVIEW The site geology presented in this report is based upon review of listed literature and maps, and previous experience with similar geologic conditions in this area. The locations of geologic features are approximate and should be considered accurate only to the degree implied by the methods used to identify those features. The surficial soils at the project site are described as eolian deposits (Pleistocene and Holocene) and valley fill deposits (Pleistocene and Holocene), the eolian deposits are described as fine grained sand, silt and clay and the valley fill deposits are described as arkosic gravel and sand deposit. The upper soil is overlying the Pierre Shale Formation (Upper Cretaceous), described as a claystone shale containing beds of sandstone and siltstone, as illustrated on the Geologic Map of the Lower Cache La Poudre River Basin, North-Central Colorado by Lloyd A. Hershey and Paul A. Schneider, Jr., 1972. No seismic faults are reported within approximately twenty-five miles of the site. The Colorado Geological Survey (CGS) reports potentially active faults at least 25 miles west-southwest of the project site. The Fort Collins/Wellington Anticline, a small fold set, is described in the literature immediately west of the project location. The axis of the fold is described as trending north- northwest with asymmetrical limbs. The bedrock strata nearest to the axis is described as dipping at approximately 10 to 15 degrees east-northeast. The dip of the bedrock strata lessens with increased distance from the axis. Earth Engineering Consultants, LLC EEC Project No. 1172058 October 2, 2017 Page 6 ANALYSIS AND RECOMMENDATIONS Swell/Consolidation Test Results Swell/consolidation testing is performed to evaluate the swell or collapse potential of soil or bedrock to assist in determining/evaluating foundation, floor slab and/or pavement design criteria. In the swell/consolidation test, relatively undisturbed samples obtained directly from the California barrel sampler are placed in a laboratory apparatus and inundated with water under a pre-established load. The swell-index is the resulting amount of swell or collapse under the initial loading condition expressed as a percent of the sample’s initial thickness. After the inundation period, additional incremental loads are applied to evaluate swell pressure and/or consolidation. As a part of our laboratory testing, we conducted twenty-nine (29) swell/consolidation tests on samples of the overburden cohesive subsoils and underlying claystone bedrock. The swell index values for the samples analyzed revealed low to high swell characteristics of approximately (+) 0.0 to (+) 7.6% for the overburden lean clays and approximately (+) 3.7% for the bedrock when inundated with water and pre-loaded at 150 psf and 500 psf. Results of the laboratory swell tests are indicated on the attached boring logs and the enclosed summary sheets. A diagram outlining approximate areas with swell indices higher than 3% has been included with this report as an indication of locations where swell mitigation should be considered, (please refer to Figure No. 4) in the appendix of this report The Colorado Association of Geotechnical Engineers (CAGE) uses the following information to provide uniformity in terminology between geotechnical engineers to provide a relative correlation risk performance to measured swell. “The representative percent swell values are not necessarily measured values; rather, they are a judgment of the swell of the soil and/or bedrock profile likely to influence slab performance.” Geotechnical engineers use this information to also evaluate the swell potential risks for foundation performance based on the risk categories. Earth Engineering Consultants, LLC EEC Project No. 1172058 October 2, 2017 Page 7 TABLE I: Recommended Representative Swell Potential Descriptions and Corresponding Slab Performance Risk Categories Slab Performance Risk Category Representative Percent Swell (500 psf Surcharge) Representative Percent Swell (1000 psf Surcharge) Low 0 to < 3 0 < 2 Moderate 3 to < 5 2 to < 4 High 5 to < 8 4 to < 6 Very High > 8 > 6 Based on the laboratory test results, the samples of overburden subsoils and the underlying bedrock formation analyzed ranged from low to high risk. General Considerations If lower level construction or full-depth basements are being considered for the site, we would suggest that the lower level subgrade(s) be placed a minimum of 3 feet above the maximum anticipated rise in groundwater levels, or a combination exterior and interior perimeter drainage system(s) be installed in areas with shallow groundwater, as shown on the attached diagram. Also, consideration could be given to 1) either designing and installing an area underdrain system to lower the groundwater levels provided a gravity discharge point can be established. If a gravity outlet/system cannot be designed another consideration would be to design and install a mechanical sump pump system to discharge the collected groundwater within the underdrain system, or 2) elevate/raise the site grades to establish the minimum suggested 3-foot separation to the maximum anticipated rise in groundwater. Foundations for buildings that are constructed slab-on-grade (no basement) should also be placed a minimum of 3 feet above the maximum anticipated rise in groundwater levels. During our subsurface exploration groundwater was found at depths as shallow as 2 feet in some areas, as shown on the attached diagram. Consideration should be given to the implementing a drainage or grading plan, as listed above, in these areas. Earth Engineering Consultants, LLC EEC Project No. 1172058 October 2, 2017 Page 8 Site Preparation All existing vegetation and/or topsoil should be removed from beneath site fills, roadways or building subgrade areas. Care should be taken to ensure that the foundations associated with any of the existing structures in the new building areas are completely removed. Stripping depths should be expected to vary, depending, in part, on past agricultural activities. In addition, any soft/loose native soils or any existing fill materials without documentation of controlled fill placement should be removed from improvement and/or new fill areas. After stripping and completing all cuts, any over excavation, and prior to placement of any fill, floor slabs or pavements, we recommend the exposed soils be scarified to a minimum depth of 9 inches, adjusted in moisture content and compacted to at least 95% of the material's maximum dry density as determined in accordance with ASTM Specification D698, the standard Proctor procedure. The moisture content of the scarified materials should be adjusted to be within a range of 2% of standard Proctor optimum moisture at the time of compaction. In general, fill materials required to develop the building areas or site pavement subgrades should consist of approved, low-volume change materials which are free from organic matter and debris. The near surface lean clay soils with low swell potential and/or the sand/gravel soils could be used as fill in these areas. The claystone bedrock should not be used for fill in site improvement areas. We recommend the fill soils be placed in loose lifts not to exceed 9 inches thick, adjusted in moisture content and compacted to at least 95% of the material’s maximum dry density as determined in accordance with the standard Proctor procedure. The moisture content of predominately clay soils should be adjusted to be within the range of ± 2% of optimum moisture content at the time of placement. Granular soil should be adjusted to a workable moisture content. Specific explorations should be completed for each building/individual residential lot to develop recommendations specific to the proposed structure and owner/builder and for specific pavement sections. Care should be taken after preparation of the subgrades to avoid disturbing the subgrade materials. Positive drainage should be developed away from structures and across and away from pavement Earth Engineering Consultants, LLC EEC Project No. 1172058 October 2, 2017 Page 9 edges to avoid wetting of subgrade materials. Subgrade materials allowed to become wetted subsequent to construction of the residences and/or pavements can result in unacceptable performance of those improvements. Areas of greater fills overlying areas with soft/compressible subsoils, especially within the deeper utility alignments, may experience settlement due to the soft/compressible subsoils below and within the zone of placed fill materials. Settlement on the order of 1-inch or more per each 10 feet of fill depth would be estimated. The rate of settlement will be dependent on the type of fill material placed and construction methods. Granular soils will consolidate essentially immediately upon placement of overlying loads. Cohesive soils will consolidate at a slower rate. Preloading and/or surcharging the fill areas could be considered to induce additional settlement in these areas prior to construction of improvements in or on the fills. Unless positive steps are taken to pre-consolidate the fill materials and/or underlying soft subgrades, special care will be needed for construction of improvements supported on or within these areas. Foundation Systems – General Considerations The cohesive subsoils will require particular attention in the design and construction to reduce the amount of movement due to moderate to high swell potential and in-situ soft/compressible characteristics in some areas. Groundwater was also encountered at relatively shallow depths in a few areas which will require special attention in the overall design and construction of the project. As previously mentioned consideration could be given to the installation of an area underdrain system. Conventional type spread footings bearing on native subsoils or engineered controlled fill material were evaluated for use on the site; however final subsurface explorations should be performed after building footprints and elevations have been better defined and actual design loads determined. Earth Engineering Consultants, LLC EEC Project No. 1172058 October 2, 2017 Page 10 Preliminary Spread Footing Foundation Recommendations We anticipate use of conventional footing foundations could be considered for lightly to moderately loaded structures at this site. We expect footing foundations would be supported either on the native soils or on newly placed and compacted fills. A few soft zones were observed in the near surface clay soils; therefore, care should be taken to see that foundations are not supported directly on soft materials. Mitigation for swelling of the lean clay should be expected in the general areas shown on the attached diagram and mitigation for soft subgrade soils should be expected in a few areas. In areas where the cohesive subsoils exhibited elevated moisture contents near and/or encroaching the groundwater levels and/or where relatively low SPT N-Blows/ft were recorded, indicating “soft soils” we would expect these soft zones could require particular attention/ground modification procedures to develop increased support capacity characteristics. We expect enhancing/stiffening of the subgrade/bearing soils could be accomplished by incorporating into the soft/compressible subsoils a layer granular rock (i.e., 1-½ inches minus crushed concrete aggregate) into the top 12 to 18 inches (+/-) of the subgrades as an initial means and method. Depending on the proximity to groundwater and/or severity of the soft soils, overexcavation and backfill with an approved imported structural fill material placed and compacted as outlined herein could also be considered. We suggest an over excavation and backfill procedure be considered in areas with moderate to high swell potential and/or soft/compressible subsoils to reduce the potential for post construction movement. Over excavation depths should be expected to vary across the site, based on builder/owner requirements and lot-specific conditions. After completing a site-specific/lot-specific geotechnical exploration study, a thorough “open-hole/foundation excavation” observation should be performed prior to foundation formwork placement to determine the extent of any over excavation and replacement procedure. Deeper over excavation depths may be necessary depending upon the observed subsoils at the time of the foundation excavation observation. In general, the over excavation area would extend 8 inches laterally beyond the building perimeter for every 12 inches of overexcavation depth. We anticipate backfill materials would consist of an approved imported granular structural fill material such as a CDOT Class 7 aggregate base course (ABC) either native and/or recycled concrete oriented and/or equivalent, which is placed in uniforms lifts, properly Earth Engineering Consultants, LLC EEC Project No. 1172058 October 2, 2017 Page 11 adjusted in moisture content and mechanically compacted to at least 95% of the material’s Standard Proctor Density (ASTM D698) results. For design of footing foundations bearing on approved native subsoils, (i.e., the native subsoils in which expansive and/or soft/compressible conditions are not encountered), or on properly placed and compacted fill materials as outlined above, maximum net allowable total load soil bearing pressures on the order of 1,500 to 2,500 psf could be considered depending upon the specific backfill material used. Footing foundations should maintain separation above maximum anticipated rise in groundwater elevation of at least 3 feet as indicated earlier. The net bearing pressure refers to the pressure at foundation bearing level in excess of the minimum surrounding overburden pressure. Total load would include full dead and live loads. Exterior foundations and foundations in unheated areas are typically located at least 30 inches below adjacent exterior grade to provide frost protection. Formed continuous footings would have minimum widths of 12 to 16 inches and isolated column foundations would have a minimum width of 24 to 30 inches. Trenched foundations could probably be used in the near surface soils. If used, trenched foundations would have a minimum width of 12 inches and formed continuous foundations a minimum width of 8 inches. Care should be taken to avoid placement of structures partly on native soils and partly on newly placed fill materials to avoid differential settlement. In these areas, mitigation approaches could include surcharging of the fill materials, overexcavation of the native soils or use of alternative foundations, such as drilled piers, along with structural floors. Mitigation approaches may vary between structures depending, in part, on the extent and depth of new fill placement. Specific approaches could be established at the time of exploration for the individual structures. Care should be taken on the site to fully document the horizontal and vertical extent of fill placement on the site, including benching the fill into native slopes. Preliminary Floor Slab/Exterior Flatwork Subgrades We recommend all existing vegetation/topsoil be removed from beneath the floor slab and exterior flatwork areas as outlined in the section titled Site Preparation. Due to the moderate to high swell Earth Engineering Consultants, LLC EEC Project No. 1172058 October 2, 2017 Page 12 potential in areas across the site, as shown on the attached diagram, an over excavation procedure should be considered in those areas. The over excavation should be expected to extend to depths of 2 to 3 feet, and should be done in accordance with the recommendations for foundation over excavations. After stripping and completing all cuts and any over excavation, and prior to placement of any flatwork concrete or fill, the exposed subgrades should be scarified, adjusted in moisture content and compacted. If the subgrades become dry and desiccated prior to floor slab construction, it may be necessary to rework the subgrades prior to floor slab placement. Fill soils required to develop the floor slab subgrades should consist of approved, low-volume change materials which are free from organic matter and debris. Those fill materials should be placed as previously described in the section Site Preparation and surcharged/preloaded and/or monitored as necessary to limit total and differential movement after construction of overlying improvements. Preliminary Basement Design and Construction Groundwater was encountered across the site within the preliminary soil borings at approximate depths of 2 to 36½ feet below existing site grades. If lower level construction for either garden-level or full-depth basements is being considered for the site, we would suggest that the lower level subgrade(s) be placed a minimum of 3 feet above maximum anticipated rise in groundwater levels, or a combination exterior and interior perimeter drainage system(s) be installed in areas with shallow groundwater as indicated on the attached diagram. Consideration could be given to 1) either designing and installing an area underdrain system to lower the groundwater levels provided a gravity discharge point can be established. If a gravity outlet/system cannot be designed another consideration would be to design and install a mechanical sump pump system to discharge the collected groundwater within the underdrain system, or 2) elevate/raise the site grades to establish the minimum required 3-foot separation to the maximum anticipated rise in groundwater EEC is available to assist in the underdrain design if requested. For each individual building with a garden level or full-depth basement located less than 3 feet above maximum groundwater levels, the dewatering system should, at a minimum, include an under- Earth Engineering Consultants, LLC EEC Project No. 1172058 October 2, 2017 Page 13 slab gravel drainage layer sloped to an interior perimeter drainage system. Considerations for the preliminary design of the combination exterior and interior perimeter drainage system are as follows: The under-slab drainage system should consist of a properly sized perforated pipe, embedded in free-draining gravel, placed in a trench at least 12 inches in width. The trench should be inset from the interior edge of the nearest foundation a minimum of 12 inches. In addition, the trench should be located such that an imaginary line extending downward at a 45-degree angle from the foundation does not intersect the nearest edge of the trench. Gravel should extend a minimum of 3 inches beneath the bottom of the pipe. The underslab drainage system should be sloped at a minimum 1/8 inch per foot to a suitable outlet, such as a sump and pump system. The underslab drainage layer should consist of a minimum 6-inch thickness of free-draining gravel meeting the specifications of ASTM C33, Size No. 57 or 67 or equivalent. Cross-connecting drainage pipes should be provided beneath the slab at minimum 15-foot intervals, and should discharge to the perimeter drainage system. Sizing of drainage pipe will be dependent upon groundwater flow into the dewatering system. Groundwater flow rates will fluctuate with permeability of the soils to be dewatered and the depth to which groundwater may rise in the future. Pump tests to determine groundwater flow rates are recommended in order to properly design the system. For preliminary design purposes, the drainage pipe, sump and pump system should be sized for a projected flow of 0.5 x 10-3 cubic feet per second (cfs) per lineal foot of drainage pipe. Additional recommendations can be provided upon request and should be presented in final subsurface exploration reports for each residential/commercial lot. The exterior drainage system should be constructed around the exterior perimeter of the lower level/below grade foundation system, and sloped at a minimum 1/8 inch per foot to a suitable outlet, such as a sump and pump system. The exterior drainage system should consist of a properly sized perforated pipe, embedded in free- draining gravel, placed in a trench at least 12 inches in width. Gravel should extend a minimum of 3 inches beneath the bottom of the pipe, and at least 2 feet above the bottom of the foundation wall. The system should be underlain with a polyethylene moisture barrier, sealed to the foundation walls, Earth Engineering Consultants, LLC EEC Project No. 1172058 October 2, 2017 Page 14 and extended at least to the edge of the backfill zone. The gravel should be covered with drainage fabric prior to placement of foundation backfill. Preliminary Pavement Subgrades The average swell index for the preliminary test borings is above the LCUASS pavement design standard maximum value of 2%. Therefore, a swell mitigation plan consisting of a 2 to 3 foot over excavation and replacement concept or fly ash treatment of the subgrades should be considered within roadway alignments in areas with swell indices above 2%. All existing vegetation and/or topsoil and any soft or loose materials should be removed from pavement areas. After stripping, completing all cuts, and any over excavation, and prior to placement of any fill or pavements, we recommend the exposed soils be scarified to a minimum depth of 9 inches, adjusted in moisture content and compacted to at least 95% of the material's maximum dry density as determined in accordance with ASTM Specification D698, the standard Proctor procedure. The moisture content of the scarified soils should be adjusted to be within the range of 2% of standard Proctor optimum moisture. Fill materials required to develop the pavement subgrades should consist of approved, low-volume change materials, free from organic matter and debris. The near surface lean clay and/or clayey sand soils could be used for fill in these areas. We recommend those fill soils be placed in loose lifts not to exceed 9 inches thick, adjusted in moisture content and compacted to at least 95% of the material's standard Proctor maximum dry density. Settlement in the fill areas should be expected as previously outlined with possible mitigation including surcharging or preloading. After completion of the pavement subgrades, care should be taken to prevent disturbance of those materials prior to placement of the overlying pavements. Soils which are disturbed by construction activities should be reworked in-place or, if necessary, removed and replaced prior to placement of overlying fill or pavements. Depending on final site grading and/or weather conditions at the time of pavement construction, stabilization of a portion of the site pavement subgrades may be required to develop suitable Earth Engineering Consultants, LLC EEC Project No. 1172058 October 2, 2017 Page 15 pavement subgrades. The site clayey soils could be subject to instability at higher moisture contents. Stabilization could also be considered as part of the pavement design, although prior to finalizing those sections, a stabilization mix design would be required. Preliminary Site Pavements Pavement sections are based on traffic volumes and subgrade strength characteristics. Based on the results of our laboratory testing, an R-value of 14 would be appropriate for design of the pavements supported on the subgrade soils. Suggested preliminary pavement sections for the local residential and minor collector roadways are provided below in Table II. Thicker pavement sections may be required for roadways classified as major collectors. A final pavement design thickness evaluation will be determined when a pavement design exploration is completed (after subgrades are developed to ± 6 inches of design and wet utilities installed in the roadways). The projected traffic may vary from the traffic assumed from the roadway classification based on a site-specific traffic study. TABLE II – PRELIMINARY PAVEMENT SECTIONS Local Residential Roadways Minor Collectors Roadways EDLA – assume local residential roadways Reliability Resilient Modulus PSI Loss – (Initial 4.5, Terminal 2.0 and 2.5 respectively) 10 75% 4060 2.5 25 85% 4060 2.2 Design Structure Number 2.49 3.01 Composite Section without Fly Ash – Alternative A Hot Mix Asphalt (HMA) Grading S (75) PG 58-28 Aggregate Base Course ABC – CDOT Class 5 or 6 Design Structure Number 4ʺ 7ʺ (2.53) 5ʺ 8ʺ (3.08) Composite Section with Fly Ash – Alternative B Hot Mix Asphalt (HMA) Grading S (75) PG 58-28 Aggregate Base Course ABC – CDOT Class 5 or 6 Fly Ash Treated Subgrade Design Structure Number 4ʺ 6 ʺ 12″ (3.02) 4ʺ 6ʺ 12ʺ (3.02) PCC (Non-reinforced) – placed on an approved subgrade 5-1/2″ 7″ Earth Engineering Consultants, LLC EEC Project No. 1172058 October 2, 2017 Page 16 Asphalt surfacing should consist of grading S-75 or SX-75 hot bituminous pavement with PG 64-22 or PG 58-28 binder in accordance with Town of Windsor requirements. Aggregate base should be consistent with CDOT requirements for Class 5 or Class 6 aggregate base. A suggested specification for stabilization of the subgrades with class C fly ash is included with this report. As previously mentioned a final subgrade investigation and pavement design should be performed in general accordance with the LCUASS Pavement Design Criteria prior to placement of any pavement sections, to determine the required pavement section after design configurations, roadway utilities have been installed and roadway have been prepared to “rough” subgrade elevations have been completed. Detention Ponds It is expected that various detention ponds may be designed/constructed throughout the site. Detention ponds are generally designed to collect surface water and/or roof runoff for the project as a temporary “holding basin” over time and eventually discharge the water into the storm sewer drainage system. Depending upon the final design depth of the detention ponds, and due to the potential for groundwater fluctuations to become elevated and enter the ponds, as well as the permeability characteristics of the on-site cohesive materials, consideration could be given to lining the pond bottom of the ponds with the on-site clay soils and/or approved imported cohesive soils, to prevent groundwater intrusion from entering the pond. Sand and gravel generally exhibit high soil percolation/permeability characteristics allowing for an increase in infiltration, not conducive for containing water. In general, the bottom of any unlined detention pond should be at least 3-feet above the maximum anticipate rise in groundwater. After site configurations and detention pond elevations have been more defined we can provide additional geotechnical exploration activities, laboratory testing and lining recommendations upon request. Underground Utility Systems All piping should be adequately bedded for proper load distribution. It is suggested that clean, graded gravel compacted to 70 percent of Relative Density ASTM D4253 be used as bedding. Where utilities are excavated below groundwater, temporary dewatering will be required during excavation, pipe Earth Engineering Consultants, LLC EEC Project No. 1172058 October 2, 2017 Page 17 placement and backfilling operations for proper construction. Utility trenches should be excavated on safe and stable slopes in accordance with OSHA regulations as further discussed herein. Backfill should consist of the on-site soils or approved imported materials. The pipe backfill should be compacted to a minimum of 95 percent of Standard Proctor Density ASTM D698. Water Soluble Sulfates – (SO4) The water soluble sulfate (SO4) testing of the on-site subgrade material collected during our subsurface exploration is provided in the following table below. Based on the reported sulfate contents test results, this report includes a recommendation for the CLASS or TYPE of cement for use for contact in association with the on-site subsoils. TABLE III - Water Soluble Sulfate Test Results Sample Location Description Soluble Sulfate Content (mg/kg) Soluble Sulfate Content (%) B-1, S-1, at 2’ Clayey Sand/Sandy Lean Clay (SC/CL) 5,600 0.56 B-5, S-1, at 2’ Lean Clay with Sand (CL) 880 0.09 B-5, S-3, at 9’ Lean Clay with Sand (CL) 880 0.09 B-11, S-1, at 4’ Sandy Lean Clay (CL) 14,600 1.46 B-18, S-1, at 4’ Lean Clay with Sand (CL) 14,800 1.48 B-21, S-1, at 4’ Lean Clay with Sand (CL) 12,200 1.22 B-25, S-2, at 4’ Sandy Lean Clay (CL) 13,200 1.32 B-29, S-1, at 4’ Lean Clay with Sand (CL) 7,930 0.79 Based on the results as presented in Table VI above, ACI 318, Section 4.2 indicates the site overburden soils have a severe risk of sulfate attack on Portland cement concrete. Therefore Class 2 or Type V cement should be used for concrete on and below site grade within the on-site overburden soils. Foundation concrete should be designed in accordance with the provisions of the ACI Design Manual, Section 318, Chapter 4. These results are being compared to the following table. Earth Engineering Consultants, LLC EEC Project No. 1172058 October 2, 2017 Page 18 TABLE IV Requirements to Protect Against Damage to Concrete by Sulfate Attack from External Sources of Sulfate Severity of Sulfate exposure Water-soluble sulfate (SO4) in dry soil, percent Water-cement ratio, maximum Cementitious material Requirements Class 0 0.00 to 0.10% 0.45 Class 0 Class 1 0.11 to 0.20% 0.45 Class 1 Class 2 0.21 to 2.00% 0.45 Class 2 Class 3 2.01 of greater 0.45 Class 3 Other Considerations and Recommendations Groundwater was observed at depths of approximately 2 to 36½ feet below present site grades. Excavations extending to the wetter soils could create difficulties for backfilling of the sewer trenches with drying of the subgrade soils required to use those materials as backfill. In general, the subgrade soils could be used as overlot fill and backfill soils although care will be necessary to maintain sufficient moisture to reduce potential for post-construction movement. Although evidence of fills or underground facilities such as septic tanks, cesspools, basements, and utilities was not observed during the site reconnaissance, such features could be encountered during construction. If unexpected fills or underground facilities are encountered, such features should be removed and the excavation thoroughly cleaned prior to backfill placement and/or construction. Excavations into the on-site soils will encounter a variety of conditions. Excavations into the clays and bedrock can be expected to stand on relatively steep temporary slopes during construction; however, caving soils may also be encountered especially in close proximity to the groundwater table, as well as in the sand/gravel zones below the overlying clay soils. Groundwater seepage should also be anticipated for utility excavations. Pumping from sumps may be utilized to control water within the excavations. Well points may be required for significant groundwater flow, or where excavations penetrate groundwater to a significant depth. The individual contractor(s) should be made responsible for designing and constructing stable, temporary excavations as required to maintain stability of both the excavation sides and bottom. All excavations should be sloped or shored in the interest of safety following local and federal regulations, including current OSHA excavation and trench safety standards. Earth Engineering Consultants, LLC EEC Project No. 1172058 October 2, 2017 Page 19 Positive drainage should be developed away from the structures and pavement areas with a minimum slope of 1 inch per foot for the first 10 feet away from the improvements in landscape areas. Care should be taken in planning of landscaping (if required) adjacent to the buildings to avoid features which would pond water adjacent to the foundations or stemwalls. Placement of plants which require irrigation systems or could result in fluctuations of the moisture content of the subgrade material should be avoided adjacent to site improvements. Irrigation systems should not be placed within 5 feet of the perimeter of the buildings and parking areas. Spray heads should be designed not to spray water on or immediately adjacent to the structures or site pavements. Roof drains should be designed to discharge at least 5 feet away from the structures and away from the pavement areas. GENERAL COMMENTS The analysis and recommendations presented in this report are based upon the data obtained from the soil borings performed at the indicated locations and from any other information discussed in this report. This report does not reflect any variations which may occur between borings or across the site. The nature and extent of such variations may not become evident until construction. If variations appear evident, it will be necessary to re-evaluate the recommendations of this report. Site specific explorations will be necessary for the proposed site buildings. It is recommended that the geotechnical engineer be retained to review the plans and specifications so that comments can be made regarding the interpretation and implementation of our geotechnical recommendations in the design and specifications. It is further recommended that the geotechnical engineer be retained for testing and observations during earthwork and foundation construction phases to help determine that the design requirements are fulfilled. This report has been prepared for the exclusive use of Chase Merritt for specific application to the project discussed and has been prepared in accordance with generally accepted geotechnical engineering practices. No warranty, express or implied, is made. In the event that any changes in the nature, design or location of the project as outlined in this report are planned, the conclusions and recommendations contained in this report shall not be considered valid unless the changes are Earth Engineering Consultants, LLC EEC Project No. 1172058 October 2, 2017 Page 20 reviewed and the conclusions of this report modified or verified in writing by the geotechnical engineer. Earth Engineering Consultants, LLC    DRILLING AND EXPLORATION DRILLING & SAMPLING SYMBOLS:  SS:  Split Spoon ‐ 13/8" I.D., 2" O.D., unless otherwise noted  PS:  Piston Sample  ST:  Thin‐Walled Tube ‐ 2" O.D., unless otherwise noted  WS:  Wash Sample    R:  Ring Barrel Sampler ‐ 2.42" I.D., 3" O.D. unless otherwise noted  PA:  Power Auger       FT:  Fish Tail Bit  HA:  Hand Auger       RB:  Rock Bit  DB:  Diamond Bit = 4", N, B     BS:  Bulk Sample  AS:  Auger Sample      PM:  Pressure Meter  HS:  Hollow Stem Auger      WB:  Wash Bore     Standard "N" Penetration:  Blows per foot of a 140 pound hammer falling 30 inches on a 2‐inch O.D. split spoon, except where noted.     WATER LEVEL MEASUREMENT SYMBOLS:  WL  :  Water Level      WS  :  While Sampling  WCI:  Wet Cave in      WD :  While Drilling  DCI:  Dry Cave in       BCR:  Before Casing Removal  AB  :  After Boring      ACR:  After Casting Removal    Water levels indicated on the boring logs are the levels measured in the borings at the time indicated.  In pervious soils, the indicated  levels may reflect the location of ground water.  In low permeability soils, the accurate determination of ground water levels is not  possible with only short term observations.    DESCRIPTIVE SOIL CLASSIFICATION    Soil Classification is based on the Unified Soil Classification  system and the ASTM Designations D‐2488.  Coarse Grained  Soils have move than 50% of their dry weight retained on a  #200 sieve; they are described as:  boulders, cobbles, gravel or  sand.  Fine Grained Soils have less than 50% of their dry weight  retained on a #200 sieve; they are described as :  clays, if they  are plastic, and silts if they are slightly plastic or non‐plastic.   Major constituents may be added as modifiers and minor  constituents may be added according to the relative  proportions based on grain size.  In addition to gradation,  coarse grained soils are defined on the basis of their relative in‐ place density and fine grained soils on the basis of their  consistency.  Example:  Lean clay with sand, trace gravel, stiff  (CL); silty sand, trace gravel, medium dense (SM).     CONSISTENCY OF FINE‐GRAINED SOILS  Unconfined Compressive  Strength, Qu, psf    Consistency             <      500    Very Soft     500 ‐   1,000    Soft  1,001 ‐   2,000    Medium  2,001 ‐   4,000    Stiff  4,001 ‐   8,000    Very Stiff  8,001 ‐ 16,000    Very Hard    RELATIVE DENSITY OF COARSE‐GRAINED SOILS:  N‐Blows/ft    Relative Density      0‐3    Very Loose      4‐9    Loose      10‐29    Medium Dense      30‐49    Dense      50‐80    Very Dense      80 +    Extremely Dense                            PHYSICAL PROPERTIES OF BEDROCK    DEGREE OF WEATHERING:   Slight Slight decomposition of parent material on  joints.  May be color change.     Moderate Some decomposition and color change  throughout.     High Rock highly decomposed, may be extremely  broken.     HARDNESS AND DEGREE OF CEMENTATION:    Limestone and Dolomite:  Hard Difficult to scratch with knife.    Moderately Can be scratched easily with knife.     Hard Cannot be scratched with fingernail.     Soft Can be scratched with fingernail.     Shale, Siltstone and Claystone:  Hard Can be scratched easily with knife, cannot be  scratched with fingernail.     Moderately Can be scratched with fingernail.  Hard     Soft Can be easily dented but not molded with  fingers.     Sandstone and Conglomerate:  Well Capable of scratching a knife blade.  Cemented     Cemented Can be scratched with knife.     Poorly Can be broken apart easily with fingers.  Cemented                                    Group Symbol Group Name Cu≥4 and 1<Cc≤3E GW Well-graded gravel F Cu<4 and/or 1>Cc>3E GP Poorly-graded gravel F Fines classify as ML or MH GM Silty gravel G,H Fines Classify as CL or CH GC Clayey Gravel F,G,H Cu≥6 and 1<Cc≤3E SW Well-graded sand I Cu<6 and/or 1>Cc>3E SP Poorly-graded sand I Fines classify as ML or MH SM Silty sand G,H,I Fines classify as CL or CH SC Clayey sand G,H,I inorganic PI>7 and plots on or above "A" Line CL Lean clay K,L,M PI<4 or plots below "A" Line ML Silt K,L,M organic Liquid Limit - oven dried Organic clay K,L,M,N Liquid Limit - not dried Organic silt K,L,M,O inorganic PI plots on or above "A" Line CH Fat clay K,L,M PI plots below "A" Line MH Elastic Silt K,L,M organic Liquid Limit - oven dried Organic clay K,L,M,P Liquid Limit - not dried Organic silt K,L,M,O Highly organic soils PT Peat (D30)2 D10 x D60 GW-GM well graded gravel with silt NPI≥4 and plots on or above "A" line. GW-GC well-graded gravel with clay OPI≤4 or plots below "A" line. GP-GM poorly-graded gravel with silt PPI plots on or above "A" line. GP-GC poorly-graded gravel with clay QPI plots below "A" line. SW-SM well-graded sand with silt SW-SC well-graded sand with clay SP-SM poorly graded sand with silt SP-SC poorly graded sand with clay Earth Engineering Consultants, LLC IIf soil contains >15% gravel, add "with gravel" to group name JIf Atterberg limits plots shaded area, soil is a CL- ML, Silty clay Unified Soil Classification System Soil Classification Criteria for Assigning Group Symbols and Group Names Using Laboratory Tests Sands 50% or more coarse fraction passes No. 4 sieve Fine-Grained Soils 50% or more passes the No. 200 sieve <0.75 OL Gravels with Fines more than 12% fines Clean Sands Less than 5% fines Sands with Fines more than 12% fines Clean Gravels Less than 5% fines Gravels more than 50% of coarse fraction retained on No. 4 sieve Coarse - Grained Soils more than 50% retained on No. 200 sieve CGravels with 5 to 12% fines required dual symbols: Kif soil contains 15 to 29% plus No. 200, add "with sand" or "with gravel", whichever is predominant. <0.75 OH Primarily organic matter, dark in color, and organic odor ABased on the material passing the 3-in. (75-mm) sieve ECu=D60/D10 Cc= HIf fines are organic, add "with organic fines" to group name LIf soil contains ≥ 30% plus No. 200 predominantly sand, add "sandy" to group name. MIf soil contains ≥30% plus No. 200 predominantly gravel, add "gravelly" to group name. DSands with 5 to 12% fines require dual symbols: BIf field sample contained cobbles or boulders, or both, add "with cobbles or boulders, or both" to group name.FIf soil contains ≥15% sand, add "with sand" to GIf fines classify as CL-ML, use dual symbol GC- CM, or SC-SM. Silts and Clays Liquid Limit less than 50 Silts and Clays Liquid Limit 50 or more 0 10 20 30 40 50 60 0 10 20 30 40 50 60 70 80 90 100 110PLASTICITY INDEX (PI) LIQUID LIMIT (LL) ML OR OL MH OR OH For Classification of fine-grained soils and fine-grained fraction of coarse-grained soils. Equation of "A"-line Horizontal at PI=4 to LL=25.5 then PI-0.73 (LL-20) Equation of "U"-line Vertical at LL=16 to PI-7, then PI=0.9 (LL-8) CL-ML 800 ACRES MIXED USE PROPERTY FORT COLLINS, COLORADO EEC PROJECT NO. 1172058 AUGUST 2017 800 ACRES MIXED USE PROPERTY FORT COLLINS, COLORADO EEC PROJECT NO. 1172058 AUGUST 2017 B-2B-3B-4B-8B-12B-20B-19B-18B-16B-15B-13B-5B-6B-7B-30B-28B-27B-29B-23B-24B-11B-171243B-21B-22B-26B-25B-1B-14B-9B-10Figure 1: Boring Location Diagram800-Acre Mixed Use DevelopmentFort Collins, ColoradoEEC Project Number: 1172058 Date: July 2017EARTH ENGINEERING CONSULTANTS, LLCApproximate BoringLocations1LegendSite Photos(Photos taken in approximatelocation, in direction of arrow) 50055005500049954985498049754970499049754970498 0 4975498549904995500050055005 4970Figure 2: Groundwater Contour Diagram800-Acre Mixed Use DevelopmentFort Collins, ColoradoEEC Project Number: 1172058 Date: September 2017EARTH ENGINEERING CONSULTANTS, LLCLegendApproximateGroundwater Contours B-2B-3B-4B-8B-12B-20B-19B-18B-16B-15B-13B-5B-6B-7B-30B-28B-27B-29B-23B-24B-11B-17B-21B-22B-2617.5'18.5'21.0'22.7'18.0'14.0'14.5'10.0'31.0'12.0'2.0'4.5'12.0'12.5'13.5'9.5'6.5'13.5'9.0'8.0'12.3'27.8'4.0'14.0'11.0'19.0'B-258.0'B-1B-14B-9B-10Figure 3: Depth to Groundwater Diagram800-Acre Mixed Use DevelopmentFort Collins, ColoradoEEC Project Number: 1172058 Date: September 2017EARTH ENGINEERING CONSULTANTS, LLCApproximate BoringLocationsLegendDepth toGroundwater 0-6 ftDepth toGroundwater 6-10 ftDepth toGroundwater 10+ ftNote: Approximate depths to groundwater. Variations may occur across the site. B-2B-3B-4B-8B-12B-20B-19B-18B-16B-15B-13B-5B-6B-7B-30B-28B-27B-29B-23B-24B-11B-17S1 @ 2'(+) 4.8%S1 @ 2'(+) 1.2%S1 @ 4'(+) 3.3%S3 @ 9'NoneS3 @ 9'NoneS1 @ 4'(+) 0.1%S1 @ 4'NoneS1 @ 4'(+) 3.3%S1 @ 2'(+) 4.1%S1 @ 2'(+) 7.6%S1 @ 4'NoneS3 @ 9'NoneS1 @ 2'(+) 4.4%B-21B-22S1 @ 2'(+) 2.4%S1 @ 4'(+) 1.1%S1 @ 2'(+) 0.3%S1 @ 2'(+) 4.3%B-26S1 @ 2'(+) 3.6%B-25B-1B-14S1 @ 4'(+) 1.7%S1 @ 4'(+) 0.4%B-9B-10S3 @ 9'(+) 0.8%S1 @ 2'(+) 2.4%Figure 4: Swell Diagram800-Acre Mixed Use DevelopmentFort Collins, ColoradoEEC Project Number: 1172058 Date: September 2017EARTH ENGINEERING CONSULTANTS, LLCApproximate BoringLocationsLegendSwell Indices 0-3%Swell Indices 3%+Note: Approximate swell-index values as measured in the laboratory. Variationsmay occur across the site. DATE: RIG TYPE: CME55 FOREMAN: DG AUGER TYPE: 4" CFA SPT HAMMER: AUTOMATIC SOIL DESCRIPTION D N QU MC DD -200 TYPE (FEET) (BLOWS/FT) (PSF) (%) (PCF) LL PI (%) PRESSURE % @ 500 PSF SPARSE VEGETATION _ _ 1 _ _ CLAYEY SAND / SANDY LEAN CLAY (SC / CL) 2 brown _ _ medium dense to very loose / stiff to very stiff to soft 3 with calcareous deposits _ _ with organics 4 _ _ CS 5 18 6500 6.9 93.7 31 19 49.4 1200 psf 1.7% _ _ 6 _ _ 7 _ _ 8 _ _ 9 _ _ SS 10 19 9000+ 9.9 _ _ 11 _ _ 12 _ _ 13 _ _ 14 brown / gray / rust _ _ CS 15 11 4000 17.5 108.0 _ _ 16 _ _ 17 _ _ 18 _ _ 19 _ _ SS 20 10 4000 18.4 _ _ 21 _ _ 22 _ _ 23 _ _ 24 _ _ CS 25 2 Continued on Sheet 2 of 2 _ _ Earth Engineering Consultants, LLC A-LIMITS SWELL SURFACE ELEV N/A CHECKED ON 8/28/2017 21.5' FINISH DATE 8/14/2017 CHECKED ON 9/8/2017 22.7' SHEET 1 OF 1 WATER DEPTH START DATE 8/14/2017 WHILE DRILLING 21.0' 800 ACRE MIXED USE DEVELOPMENT FORT COLLINS, COLORADO LOG OF BORING B-1PROJECT NO: 1172058 SEPTEMBER 2017 DATE: RIG TYPE: CME55 FOREMAN: DG AUGER TYPE: 4" CFA SPT HAMMER: AUTOMATIC SOIL DESCRIPTION D N QU MC DD -200 TYPE (FEET) (BLOWS/FT) (PSF) (%) (PCF) LL PI (%) PRESSURE % @ 500 PSF Continued from Sheet 1 of 2 26 _ _ 27 CLAYEY SAND / SANDY LEAN CLAY (SC / CL) _ _ brown 28 medium dense _ _ with calcareous deposits 29 with organics _ _ sand / gravel seams SS 30 23 -- 11.4 _ _ 31 _ _ 32 _ _ 33 _ _ 34 _ _ auger cuttings 35 15.1 _ _ 36 _ _ 37 _ _ 38 _ _ 39 SAND / GRAVEL (SP / GP) _ _ brown / gray / rust SS 40 9 -- 9.3 loose to medium dense _ _ BOTTOM OF BORING DEPTH 40.5' 41 _ _ 42 _ _ 43 _ _ 44 _ _ 45 _ _ 46 _ _ 47 _ _ 48 _ _ 49 _ _ 50 _ _ Earth Engineering Consultants, LLC A-LIMITS SWELL N/A 8/14/2017 CHECKED ON 9/8/2017 22.7' SURFACE ELEV CHECKED ON 8/28/2017 21.5' FINISH DATE SHEET 2 OF 2 WATER DEPTH START DATE 8/14/2017 WHILE DRILLING 21.0' 800 ACRE MIXED USE DEVELOPMENT FORT COLLINS, COLORADO LOG OF BORING B-1 SEPTEMBER 2017PROJECT NO: 1172058 DATE: RIG TYPE: CME55 FOREMAN: DG AUGER TYPE: 4" CFA SPT HAMMER: AUTOMATIC SOIL DESCRIPTION D N QU MC DD -200 TYPE (FEET) (BLOWS/FT) (PSF) (%) (PCF) LL PI (%) PRESSURE % @ 500 PSF SPARSE VEGETATION _ _ 1 _ _ SANDY LEAN CLAY (CL) 2 brown _ _ very stiff to hard CS 3 18 9000+ 9.1 103.4 with calcareous deposits _ _ 4 _ _ SS 5 23 9000+ 9.9 _ _ 6 _ _ 7 _ _ 8 _ _ 9 _ _ CS 10 18 9000+ 9.2 107.7 _ _ 11 _ _ 12 _ _ 13 _ _ 14 _ _ SS 15 21 9000+ 10.0 _ _ 16 _ _ 17 _ _ 18 _ _ 19 _ _ CS 20 23 9000+ 9.6 111.9 _ _ 21 _ _ 22 _ _ 23 _ _ 24 _ _ SS 25 13 9000+ 11.0 BOTTOM OF BORING DEPTH 25.5' _ _ Earth Engineering Consultants, LLC A-LIMITS SWELL SURFACE ELEV N/A 24 HOUR N/A FINISH DATE 8/14/2017 AFTER DRILLING N/A SHEET 1 OF 1 WATER DEPTH START DATE 8/14/2017 WHILE DRILLING None 800 ACRE MIXED USE DEVELOPMENT FORT COLLINS, COLORADO PROJECT NO: 1172058 LOG OF BORING B-2 SEPTEMBER 2017 DATE: RIG TYPE: CME55 FOREMAN: DG AUGER TYPE: 4" CFA SPT HAMMER: AUTOMATIC SOIL DESCRIPTION D N QU MC DD -200 TYPE (FEET) (BLOWS/FT) (PSF) (%) (PCF) LL PI (%) PRESSURE % @ 500 PSF VEGETATION & TOPSOIL _ _ 1 _ _ LEAN CLAY with SAND (CL) 2 brown _ _% @ 150 psf very stiff to stiff CS 3 24 9000+ 7.9 104.3 33 19 71 1400 psf 4.8% with calcareous deposits _ _ with organics 4 _ _ SS 5 18 9000+ 9.2 _ _ 6 _ _ 7 _ _ 8 _ _ 9 _ _ *SANDY LEAN CLAY (CL) Lens CS 10 13 9000+ 13.2 111.0 32 15 60.8 1400 psf 0.7% _ _ 11 _ _ 12 _ _ 13 _ _ 14 brown / gray / rust _ _ SS 15 13 5500 16.6 _ _ 16 _ _ 17 _ _ 18 _ _ 19 _ _ CS 20 11 3000 19.6 106.7 _ _ 21 _ _ 22 _ _ 23 _ _ 24 _ _ SS 25 20 4000 17.1 BOTTOM OF BORING DEPTH 25.5' _ _ Earth Engineering Consultants, LLC A-LIMITS SWELL SURFACE ELEV N/A CHECKED ON 8/28/2017 22.7' FINISH DATE 8/14/2017 CHECKED ON 9/8/2017 23.4' SHEET 1 OF 1 WATER DEPTH START DATE 8/14/2017 WHILE DRILLING 24.0' 800 ACRE MIXED USE DEVELOPMENT FORT COLLINS, COLORADO PROJECT NO: 1172058 LOG OF BORING B-3 SEPTEMBER 2017 DATE: RIG TYPE: CME55 FOREMAN: DG AUGER TYPE: 4" CFA SPT HAMMER: AUTOMATIC SOIL DESCRIPTION D N QU MC DD -200 TYPE (FEET) (BLOWS/FT) (PSF) (%) (PCF) LL PI (%) PRESSURE % @ 500 PSF _ _ 1 _ _ SANDY LEAN CLAY (CL) 2 brown _ _% @ 150 psf medium stiff to stiff CS 3 10 9000+ 13.7 113.0 30 23 54.3 1800 psf 1.2% _ _ 4 with calcareous deposits _ _ SS 5 6 6500 15.3 _ _ 6 _ _ 7 _ _ 8 _ _ 9 _ _ CS 10 15 7500 19.5 105.9 1400 psf 0.7% _ _ 11 _ _ 12 _ _ 13 _ _ 14 _ _ SS 15 8 5000 21.1 _ _ 16 _ _ 17 _ _ 18 _ _ SAND / GRAVEL (SP / GP) 19 brown _ _ very loose to medium dense CS 20 2 -- 11.8 114.2 _ _ 21 _ _ 22 _ _ 23 _ _ 24 _ _ SS 25 17 -- 0.2 Continued on Sheet 2 of 2 _ _ Earth Engineering Consultants, LLC A-LIMITS SWELL SURFACE ELEV N/A 24 HOUR N/A FINISH DATE 8/18/2017 AFTER DRILLING N/A SHEET 1 OF 1 WATER DEPTH START DATE 8/18/2017 WHILE DRILLING 17.5' 800 ACRE MIXED USE DEVELOPMENT FORT COLLINS, COLORADO PROJECT NO: 1172058 LOG OF BORING B-4 SEPTEMBER 2017 DATE: RIG TYPE: CME55 FOREMAN: DG AUGER TYPE: 4" CFA SPT HAMMER: AUTOMATIC SOIL DESCRIPTION D N QU MC DD -200 TYPE (FEET) (BLOWS/FT) (PSF) (%) (PCF) LL PI (%) PRESSURE % @ 500 PSF Continued from Sheet 1 of 2 26 _ _ 27 SAND / GRAVEL (SP / GP) _ _ brown 28 medium dense to dense _ _ 29 _ _ CLAYSTONE / SILTSTONE / SANDSTONE CS 30 33 9000+ 19.5 107.4 brown / gray / rust _ _ moderately hard to hard 31 _ _ 32 _ _ 33 _ _ gray 34 _ _ SS 35 50/4" 6000 19.8 _ _ 36 _ _ 37 _ _ 38 _ _ auger cuttings 39 28.0 _ _ 40 BOTTOM OF BORING DEPTH 40.0' _ _ 41 _ _ 42 _ _ 43 _ _ 44 _ _ 45 _ _ 46 _ _ 47 _ _ 48 _ _ 49 _ _ 50 _ _ Earth Engineering Consultants, LLC A-LIMITS SWELL N/A 8/18/2017 AFTER DRILLING N/A SURFACE ELEV 24 HOUR N/A FINISH DATE SHEET 2 OF 2 WATER DEPTH START DATE 8/18/2017 WHILE DRILLING 17.5' 800 ACRE MIXED USE DEVELOPMENT FORT COLLINS, COLORADO PROJECT NO: 1172058 LOG OF BORING B-4 SEPTEMBER 2017 DATE: RIG TYPE: CME55 FOREMAN: DG AUGER TYPE: 4" CFA SPT HAMMER: AUTOMATIC SOIL DESCRIPTION D N QU MC DD -200 TYPE (FEET) (BLOWS/FT) (PSF) (%) (PCF) LL PI (%) PRESSURE % @ 500 PSF VEGETATION & TOPSOIL _ _ 1 _ _ LEAN CLAY with SAND (CL) 2 gray / brown / rust _ _ soft to medium stiff CS 3 6 1500 26.6 94.8 with organics _ _ 4 gray / rust _ _ SS 5 2 -- 44.3 _ _ 6 _ _ 7 _ _ 8 _ _ 9 _ _ CS 10 6 1000 26.0 97.8 33 19 81.3 <500 psf none _ _ 11 _ _ 12 _ _ 13 _ _ 14 _ _ SS 15 7 1000 29.2 _ _ 16 _ _ 17 _ _ SILTY SAND / GRAVEL (SM / GM) 18 brown / rust / gray _ _ loose to medium dense 19 _ _ CS 20 15 _ _ 21 _ _ 22 _ _ 23 _ _ 24 intermittent clay seams _ _ SS 25 8 BOTTOM OF BORING DEPTH 25.5' _ _ Earth Engineering Consultants, LLC A-LIMITS SWELL SURFACE ELEV N/A CHECKED ON 8/28/2017 4.6' FINISH DATE 8/18/2017 CHECKED ON 9/8/2017 6.3' SHEET 1 OF 1 WATER DEPTH START DATE 8/18/2017 WHILE DRILLING 2.0' 800 ACRE MIXED USE DEVELOPMENT FORT COLLINS, COLORADO PROJECT NO: 1172058 LOG OF BORING B-5 SEPTEMBER 2017 DATE: RIG TYPE: CME55 FOREMAN: DG AUGER TYPE: 4" CFA SPT HAMMER: AUTOMATIC SOIL DESCRIPTION D N QU MC DD -200 TYPE (FEET) (BLOWS/FT) (PSF) (%) (PCF) LL PI (%) PRESSURE % @ 500 PSF _ _ 1 _ _ SANDY LEAN CLAY (CL) 2 gray / rust _ _ soft to medium stiff 3 _ _ 4 _ _ CS 5 4 1500 21.3 103.2 34 20 58.2 <500 psf none _ _ 6 _ _ 7 _ _ 8 _ _ 9 brown / rust / gray _ _ SS 10 14 1000 27.1 _ _ SILTY SAND / GRAVEL (SM / GM) 11 brown / rust / gray _ _ loose 12 _ _ 13 _ _ 14 _ _ CS 15 5 _ _ 16 _ _ 17 _ _ 18 _ _ 19 _ _ SS 20 8 -- 10.6 _ _ 21 _ _ 22 _ _ 23 _ _ 24 SANDSTONE / SILTSTONE / CLAYSTONE _ _ gray / brown / rust CS 25 37 3500 17.8 BOTTOM OF BORING DEPTH 25.0' _ _ Earth Engineering Consultants, LLC A-LIMITS SWELL SURFACE ELEV N/A 24 HOUR N/A FINISH DATE 8/18/2017 AFTER DRILLING N/A SHEET 1 OF 1 WATER DEPTH START DATE 8/18/2017 WHILE DRILLING 4.5' 800 ACRE MIXED USE DEVELOPMENT FORT COLLINS, COLORADO PROJECT NO: 1172058 LOG OF BORING B-6 SEPTEMBER 2017 DATE: RIG TYPE: CME55 FOREMAN: DG AUGER TYPE: 4" CFA SPT HAMMER: AUTOMATIC SOIL DESCRIPTION D N QU MC DD -200 TYPE (FEET) (BLOWS/FT) (PSF) (%) (PCF) LL PI (%) PRESSURE % @ 500 PSF VEGETATION & TOPSOIL _ _ 1 _ _ SANDY LEAN CLAY (CL) 2 brown _ _% @ 150 psf very stiff CS 3 27 9000+ 5.8 107.2 1600 psf 4.4% with calcareous deposits _ _ with organics 4 _ _ SS 5 17 -- 7.6 _ _ 6 _ _ 7 _ _ 8 _ _ 9 _ _ CS 10 21 9000+ 13.2 118.3 _ _ 11 _ _ 12 _ _ 13 _ _ 14 brown / rust / gray _ _ SS 15 10 4500 17.5 _ _ 16 _ _ 17 _ _ 18 _ _ 19 _ _ CS 20 24 4000 13.2 119.7 SAND / GRAVEL (SP / GP) _ _ brown / rust / gray 21 medium dense _ _ 22 _ _ 23 _ _ 24 _ _ SS 25 21 -- 8.0 BOTTOM OF BORING DEPTH 25.5' _ _ Earth Engineering Consultants, LLC A-LIMITS SWELL SURFACE ELEV N/A 24 HOUR N/A FINISH DATE 8/14/2017 AFTER DRILLING N/A SHEET 1 OF 1 WATER DEPTH START DATE 8/14/2017 WHILE DRILLING 18.0' 800 ACRE MIXED USE DEVELOPMENT FORT COLLINS, COLORADO PROJECT NO: 1172058 LOG OF BORING B-7 SEPTEMBER 2017 DATE: RIG TYPE: CME55 FOREMAN: DG AUGER TYPE: 4" CFA SPT HAMMER: AUTOMATIC SOIL DESCRIPTION D N QU MC DD -200 TYPE (FEET) (BLOWS/FT) (PSF) (%) (PCF) LL PI (%) PRESSURE % @ 500 PSF _ _ 1 _ _ SANDY LEAN CLAY (CL) 2 brown _ _ stiff to very stiff to medium stiff 3 _ _ 4 _ _ CS 5 24 9000+ 6.7 103.9 34 19 65.2 1800 psf 3.3% _ _ 6 _ _ 7 _ _ 8 _ _ 9 _ _ SS 10 11 9000+ 12.4 _ _ 11 _ _ 12 _ _ 13 _ _ 14 _ _ CS 15 14 9000+ 13.1 110.7 _ _ 16 _ _ 17 _ _ 18 _ _ 19 with calcareous deposits _ _ SS 20 14 7000 18.3 _ _ 21 _ _ 22 _ _ 23 _ _ 24 _ _ CS 25 7 3000 25.2 96.5 BOTTOM OF BORING DEPTH 25.0' _ _ Earth Engineering Consultants, LLC A-LIMITS SWELL SURFACE ELEV N/A CHECKED ON 8/28/2017 None FINISH DATE 8/14/2017 CHECKED ON 9/8/2017 None SHEET 1 OF 1 WATER DEPTH START DATE 8/14/2017 WHILE DRILLING None 800 ACRE MIXED USE DEVELOPMENT FORT COLLINS, COLORADO PROJECT NO: 1172058 LOG OF BORING B-8 SEPTEMBER 2017 DATE: RIG TYPE: CME55 FOREMAN: DG AUGER TYPE: 4" CFA SPT HAMMER: AUTOMATIC SOIL DESCRIPTION D N QU MC DD -200 TYPE (FEET) (BLOWS/FT) (PSF) (%) (PCF) LL PI (%) PRESSURE % @ 500 PSF _ _ 1 _ _ SANDY LEAN CLAY (CL) 2 brown _ _ very stiff to stiff CS 3 7 9000+ 14.2 112.8 _ _ 4 with calcareous deposits _ _ SS 5 6 7500 16.8 _ _ 6 _ _ 7 _ _ 8 _ _ 9 brown / rust _ _ CS 10 16 8500 20.2 104.3 1600 psf 0.8% _ _ 11 _ _ 12 _ _ 13 _ _ 14 _ _ SS 15 6 2000 26.4 _ _ 16 _ _ 17 _ _ 18 _ _ SAND / GRAVEL (SP / GP) 19 brown _ _ medium dense CS 20 19 -- 12.5 112.1 _ _ 21 _ _ 22 _ _ 23 _ _ 24 _ _ SS 25 31 -- 9.9 BOTTOM OF BORING DEPTH 25.5' _ _ Earth Engineering Consultants, LLC A-LIMITS SWELL SURFACE ELEV N/A 24 HOUR N/A FINISH DATE 8/18/2017 AFTER DRILLING N/A SHEET 1 OF 1 WATER DEPTH START DATE 8/18/2017 WHILE DRILLING 18.5' 800 ACRE MIXED USE DEVELOPMENT FORT COLLINS, COLORADO PROJECT NO: 1172058 LOG OF BORING B-9 SEPTEMBER 2017 DATE: RIG TYPE: CME55 FOREMAN: DG AUGER TYPE: 4" CFA SPT HAMMER: AUTOMATIC SOIL DESCRIPTION D N QU MC DD -200 TYPE (FEET) (BLOWS/FT) (PSF) (%) (PCF) LL PI (%) PRESSURE % @ 500 PSF SPARSE VEGETATION _ _ 1 _ _ SANDY LEAN CLAY (CL) 2 brown _ _% @ 150 psf very stiff to stiff CS 3 8 8500 16.4 107.5 2000 psf 2.4% with calcareous deposits _ _ 4 _ _ SS 5 7 8000 15.9 _ _ 6 _ _ 7 _ _ 8 _ _ 9 _ _ CS 10 11 9000+ 14.5 112.4 30 16 52.1 2000 psf 0.9% _ _ 11 _ _ 12 _ _ 13 _ _ 14 brown / tan / rust _ _ SS 15 9 3500 22.9 _ _ 16 _ _ 17 _ _ 18 _ _ 19 rust / brown / gray _ _ CS 20 10 -- 25.1 95.5 _ _ 21 _ _ SAND / GRAVEL (SP/ GP) 22 brown _ _ medium dense 23 _ _ 24 _ _ SS 25 13 -- 9.6 BOTTOM OF BORING DEPTH 25.5' _ _ Earth Engineering Consultants, LLC A-LIMITS SWELL SURFACE ELEV N/A CHECKED ON 8/28/2017 22.3' FINISH DATE 8/14/2017 CHECKED ON 9/8/2017 22.7' SHEET 1 OF 1 WATER DEPTH START DATE 8/14/2017 WHILE DRILLING 19.0' 800 ACRE MIXED USE DEVELOPMENT FORT COLLINS, COLORADO PROJECT NO: 1172058 LOG OF BORING B-10 SEPTEMBER 2017 DATE: RIG TYPE: CME55 FOREMAN: DG AUGER TYPE: 4" CFA SPT HAMMER: AUTOMATIC SOIL DESCRIPTION D N QU MC DD -200 TYPE (FEET) (BLOWS/FT) (PSF) (%) (PCF) LL PI (%) PRESSURE % @ 500 PSF SPARSE VEGETATION _ _ 1 _ _ SANDY LEAN CLAY (CL) 2 brown _ _ very stiff to stiff 3 _ _ 4 _ _ CS 5 11 7000 16.4 111.5 32 20 63.1 _ _ 6 _ _ 7 _ _ 8 _ _ 9 tan / gray / rust _ _ SS 10 8 4000 14.9 _ _ 11 _ _ 12 _ _ 13 _ _ 14 brown / rust / gray _ _ CS 15 9 2000 17.6 115.3 _ _ 16 _ _ SAND / GRAVEL (SP / GP) 17 brown / rust / gray _ _ medium dense 18 _ _ 19 _ _ SS 20 18 -- 23.0 _ _ 21 _ _ 22 _ _ 23 _ _ 24 _ _ CS 25 15 -- 27.6 108.9 BOTTOM OF BORING DEPTH 25.0' _ _ Earth Engineering Consultants, LLC A-LIMITS SWELL SURFACE ELEV N/A CHECKED ON 8/28/2017 14.0' FINISH DATE 8/14/2017 CHECKED ON 9/8/2017 14.8' SHEET 1 OF 1 WATER DEPTH START DATE 8/14/2017 WHILE DRILLING 15.0' 800 ACRE MIXED USE DEVELOPMENT FORT COLLINS, COLORADO PROJECT NO: 1172058 LOG OF BORING B-11 SEPTEMBER 2017 DATE: RIG TYPE: CME55 FOREMAN: DG AUGER TYPE: 4" CFA SPT HAMMER: AUTOMATIC SOIL DESCRIPTION D N QU MC DD -200 TYPE (FEET) (BLOWS/FT) (PSF) (%) (PCF) LL PI (%) PRESSURE % @ 500 PSF _ _ 1 _ _ SANDY LEAN CLAY (CL) 2 brown _ _ very stiff CS 3 8 6500 16.5 98.6 with calcareous deposits _ _ 4 _ _ SS 5 9 6000 15.3 _ _ 6 _ _ 7 _ _ 8 _ _ 9 brown / tan _ _ CS 10 4 6000 20.7 100.2 _ _ 11 _ _ 12 _ _ 13 _ _ 14 _ _ SS 15 9 6000 18.1 _ _ 16 _ _ 17 _ _ 18 _ _ 19 _ _ SAND / GRAVEL (SP / GP) CS 20 20 -- 10.1 132.6 brown / tan _ _ medium dense 21 with cobbles and clay seams _ _ 22 _ _ 23 _ _ 24 _ _ SS 25 10 -- 7.9 BOTTOM OF BORING DEPTH 25.5' _ _ Earth Engineering Consultants, LLC A-LIMITS SWELL SURFACE ELEV N/A CHECKED ON 8/28/2017 15.0' FINISH DATE 8/14/2017 CHECKED ON 9/8/2017 16.5' SHEET 1 OF 1 WATER DEPTH START DATE 8/14/2017 WHILE DRILLING 14.5' 800 ACRE MIXED USE DEVELOPMENT FORT COLLINS, COLORADO PROJECT NO: 1172058 LOG OF BORING B-12 SEPTEMBER 2017 DATE: RIG TYPE: CME55 FOREMAN: DG AUGER TYPE: 4" CFA SPT HAMMER: AUTOMATIC SOIL DESCRIPTION D N QU MC DD -200 TYPE (FEET) (BLOWS/FT) (PSF) (%) (PCF) LL PI (%) PRESSURE % @ 500 PSF VEGETATION & TOPSOIL _ _ 1 _ _ CLAYEY SAND (SC) 2 gray _ _ loose to very loose CS 3 8 4000 24.8 86.5 _ _ 4 _ _ SS 5 2 1000 36.2 _ _ 6 _ _ 7 _ _ 8 _ _ 9 _ _ SILTY SAND (SM) CS 10 6 -- 21.6 104.2 NL NP 30.3 <500 psf none brown / rust / gray _ _ loose to medium dense 11 _ _ 12 _ _ 13 _ _ 14 _ _ SS 15 12 1500 22.9 _ _ 16 _ _ SAND / GRAVEL (SP / GP) 17 rust / brown _ _ medium dense 18 _ _ 19 _ _ CS 20 22 1000 8.0 130.3 _ _ 21 _ _ 22 _ _ 23 _ _ 24 _ _ SS 25 10 -- 9.2 BOTTOM OF BORING DEPTH 25.5' _ _ Earth Engineering Consultants, LLC A-LIMITS SWELL SURFACE ELEV N/A 24 HOUR N/A FINISH DATE 8/14/2017 AFTER DRILLING N/A SHEET 1 OF 1 WATER DEPTH START DATE 8/14/2017 WHILE DRILLING 10.0' 800 ACRE MIXED USE DEVELOPMENT FORT COLLINS, COLORADO PROJECT NO: 1172058 LOG OF BORING B-13 SEPTEMBER 2017 DATE: RIG TYPE: CME55 FOREMAN: DG AUGER TYPE: 4" CFA SPT HAMMER: AUTOMATIC SOIL DESCRIPTION D N QU MC DD -200 TYPE (FEET) (BLOWS/FT) (PSF) (%) (PCF) LL PI (%) PRESSURE % @ 500 PSF _ _ 1 _ _ SANDY LEAN CLAY (CL) 2 brown _ _ very stiff to medium stiff 3 with calcareous deposits _ _ 4 _ _ CS 5 10 6000 15.1 107.4 36 19 51.8 1600 psf 0.4% _ _ 6 _ _ 7 _ _ 8 _ _ 9 _ _ SS 10 8 4500 18.3 _ _ 11 _ _ 12 _ _ 13 _ _ 14 _ _ CS 15 10 2500 18.6 110.0 _ _ 16 _ _ 17 _ _ 18 _ _ 19 brown / rust _ _ with intermittent silty sand lenses SS 20 14 1500 23.5 _ _ 21 _ _ 22 _ _ 23 _ _ 24 SAND / GRAVEL (SP / GP) _ _ brown / rust, loose, with intermittent clay seams CS 25 7 -- 10.4 117.6 BOTTOM OF BORING DEPTH 25.0' _ _ Earth Engineering Consultants, LLC A-LIMITS SWELL SURFACE ELEV N/A 24 HOUR 14.7' FINISH DATE 8/14/2017 CHECKED ON 9/8/2017 18.2' SHEET 1 OF 1 WATER DEPTH START DATE 8/14/2017 WHILE DRILLING 12.0' 800 ACRE MIXED USE DEVELOPMENT FORT COLLINS, COLORADO PROJECT NO: 1172058 LOG OF BORING B-14 SEPTEMBER 2017 DATE: RIG TYPE: CME55 FOREMAN: DG AUGER TYPE: 4" CFA SPT HAMMER: AUTOMATIC SOIL DESCRIPTION D N QU MC DD -200 TYPE (FEET) (BLOWS/FT) (PSF) (%) (PCF) LL PI (%) PRESSURE % @ 500 PSF VEGETATION & TOPSOIL _ _ 1 _ _ LEAN CLAY with SAND (CL) 2 brown _ _% @ 150 psf very stiff to medium stiff CS 3 30 9000+ 8.0 111.1 3500 psf 7.6% with calcareous deposits _ _ 4 _ _ SS 5 15 9000+ 7.6 _ _ 6 _ _ 7 _ _ 8 _ _ 9 _ _ CS 10 25 9000+ 9.4 109.0 40 25 81.2 3500 psf 4.4% _ _ 11 _ _ 12 _ _ 13 _ _ 14 _ _ SS 15 35 9000+ 10.9 _ _ 16 _ _ 17 _ _ 18 _ _ 19 _ _ * SANDY LEAN CLAY (CL) Lens CS 20 17 9000+ 15.2 113.4 24 11 67.9 1600 psf 0.7% _ _ 21 _ _ 22 _ _ 23 _ _ 24 _ _ SS 25 18 3000 18.7 Continued on Sheet 2 of 2 _ _ Earth Engineering Consultants, LLC A-LIMITS SWELL SURFACE ELEV N/A CHECKED ON 8/28/2017 33.0' FINISH DATE 8/18/2017 CHECKED ON 9/8/2017 36.5' SHEET 1 OF 1 WATER DEPTH START DATE 8/18/2017 WHILE DRILLING 31.0' 800 ACRE MIXED USE DEVELOPMENT FORT COLLINS, COLORADO PROJECT NO: 1172058 LOG OF BORING B-15 SEPTEMBER 2017 DATE: RIG TYPE: CME55 FOREMAN: DG AUGER TYPE: 4" CFA SPT HAMMER: AUTOMATIC SOIL DESCRIPTION D N QU MC DD -200 TYPE (FEET) (BLOWS/FT) (PSF) (%) (PCF) LL PI (%) PRESSURE % @ 500 PSF Continued from Sheet 1 of 2 26 _ _ 27 LEAN CLAY with SAND (CL) _ _ brown 28 very stiff to medium stiff _ _ with calcareous deposits 29 _ _ CS 30 14 7000 17.0 112.8 _ _ 31 _ _ 32 _ _ 33 _ _ 34 _ _ SS 35 18 2000 19.2 _ _ 36 SILTY SAND / GRAVEL (SM / GM) _ _ brown / gray / rust 37 medium dense _ _ 38 _ _ 39 _ _ CS 40 29 -- 4.0 128.1 BOTTOM OF BORING DEPTH 40.0' _ _ 41 _ _ 42 _ _ 43 _ _ 44 _ _ 45 _ _ 46 _ _ 47 _ _ 48 _ _ 49 _ _ 50 _ _ Earth Engineering Consultants, LLC A-LIMITS SWELL N/A 8/18/2017 CHECKED ON 9/8/2017 36.5' SURFACE ELEV CHECKED ON 8/28/2017 33.0' FINISH DATE SHEET 2 OF 2 WATER DEPTH START DATE 8/18/2017 WHILE DRILLING 31.0' 800 ACRE MIXED USE DEVELOPMENT FORT COLLINS, COLORADO PROJECT NO: 1172058 LOG OF BORING B-15 SEPTEMBER 2017 DATE: RIG TYPE: CME55 FOREMAN: DG AUGER TYPE: 4" CFA SPT HAMMER: AUTOMATIC SOIL DESCRIPTION D N QU MC DD -200 TYPE (FEET) (BLOWS/FT) (PSF) (%) (PCF) LL PI (%) PRESSURE % @ 500 PSF SPARSE VEGETATION _ _ 1 _ _ CLAYEY SAND (SC) 2 brown _ _ medium dense to loose 3 with calcareous deposits _ _ 4 _ _ CS 5 15 8000 15.5 112.3 25 11 43.8 800 psf 0.1% _ _ 6 _ _ 7 _ _ 8 _ _ 9 _ _ SS 10 4 -- 21.9 _ _ 11 _ _ 12 _ _ 13 _ _ 14 brown / rust _ _ CS 15 8 -- 21.0 112.7 _ _ 16 _ _ 17 _ _ 18 _ _ 19 _ _ brown / gray / rust SS 20 8 -- 19.2 _ _ 21 _ _ 22 _ _ SILTY SAND / GRAVEL (SM / GM) 23 brown / gray / rust _ _ medium dense 24 _ _ CS 25 17 -- 10.6 123.1 BOTTOM OF BORING DEPTH 25.0' _ _ Earth Engineering Consultants, LLC A-LIMITS SWELL SURFACE ELEV N/A 24 HOUR N/A FINISH DATE 8/18/2017 AFTER DRILLING N/A SHEET 1 OF 1 WATER DEPTH START DATE 8/18/2017 WHILE DRILLING 12.0' 800 ACRE MIXED USE DEVELOPMENT FORT COLLINS, COLORADO PROJECT NO: 1172058 LOG OF BORING B-16 SEPTEMBER 2017 DATE: RIG TYPE: CME55 FOREMAN: DG AUGER TYPE: 4" CFA SPT HAMMER: AUTOMATIC SOIL DESCRIPTION D N QU MC DD -200 TYPE (FEET) (BLOWS/FT) (PSF) (%) (PCF) LL PI (%) PRESSURE % @ 500 PSF SPARSE VEGETATION _ _ 1 _ _ SANDY LEAN CLAY (CL) 2 brown _ _ very stiff to medium stiff CS 3 13 8000 18.3 102.4 with calcareous deposits _ _ 4 _ _ SS 5 12 6000 19.1 _ _ 6 _ _ 7 _ _ 8 _ _ 9 _ _ CS 10 8 3500 34.2 95.6 _ _ 11 _ _ 12 _ _ 13 _ _ 14 brown / rust / gray _ _ SS 15 8 2000 19.6 _ _ 16 _ _ 17 _ _ 18 SILTY SAND / GRAVEL (SM / GM) _ _ brown / rust / gray 19 medium dense _ _ CS 20 17 -- 9.3 124.3 _ _ 21 _ _ 22 _ _ 23 _ _ 24 _ _ SS 25 20 -- 6.1 BOTTOM OF BORING DEPTH 25.5' _ _ Earth Engineering Consultants, LLC A-LIMITS SWELL SURFACE ELEV N/A CHECKED ON 8/28/2017 15.3' FINISH DATE 8/18/2017 CHECKED ON 9/8/2017 16.9' SHEET 1 OF 1 WATER DEPTH START DATE 8/18/2017 WHILE DRILLING 12.5' 800 ACRE MIXED USE DEVELOPMENT FORT COLLINS, COLORADO PROJECT NO: 1172058 LOG OF BORING B-17 SEPTEMBER 2017 DATE: RIG TYPE: CME55 FOREMAN: DG AUGER TYPE: 4" CFA SPT HAMMER: AUTOMATIC SOIL DESCRIPTION D N QU MC DD -200 TYPE (FEET) (BLOWS/FT) (PSF) (%) (PCF) LL PI (%) PRESSURE % @ 500 PSF SPARSE VEGETATION _ _ 1 _ _ SANDY LEAN CLAY (CL) 2 brown _ _ very stiff to stiff to medium stiff 3 with calcareous deposits _ _ 4 _ _ CS 5 12 9000+ 19.0 101.6 29 16 69.2 800 psf 0.3% _ _ 6 _ _ 7 _ _ 8 _ _ 9 _ _ SS 10 7 2500 22.7 _ _ 11 _ _ 12 _ _ 13 _ _ 14 _ _ CS 15 8 3500 19.9 108.0 _ _ 16 _ _ 17 _ _ SILTY SAND / GRAVEL (SM / GM) 18 brown _ _ medium dense 19 _ _ SS 20 15 -- 11.4 _ _ 21 _ _ 22 _ _ 23 _ _ 24 _ _ CS 25 22 -- 13.1 120.7 BOTTOM OF BORING DEPTH 25.0' _ _ Earth Engineering Consultants, LLC A-LIMITS SWELL SURFACE ELEV N/A 24 HOUR N/A FINISH DATE 8/25/2017 AFTER DRILLING N/A SHEET 1 OF 1 WATER DEPTH START DATE 8/25/2017 WHILE DRILLING 13.5' 800 ACRE MIXED USE DEVELOPMENT FORT COLLINS, COLORADO PROJECT NO: 1172058 LOG OF BORING B-18 SEPTEMBER 2017 DATE: RIG TYPE: CME55 FOREMAN: DG AUGER TYPE: 4" CFA SPT HAMMER: AUTOMATIC SOIL DESCRIPTION D N QU MC DD -200 TYPE (FEET) (BLOWS/FT) (PSF) (%) (PCF) LL PI (%) PRESSURE % @ 500 PSF SPARSE VEGETATION _ _ 1 _ _ SANDY LEAN CLAY (CL) 2 brown / red _ _ very stiff 3 with calcareous deposits _ _ 4 _ _ CS 5 10 6500 20.5 100.6 27 13 68 <500 psf none _ _ 6 _ _ 7 _ _ 8 _ _ 9 _ _ SAND / GRAVEL (SP / GP) SS 10 17 -- 5.4 brown / red _ _ medium dense 11 _ _ 12 _ _ 13 _ _ 14 _ _ CS 15 28 -- 10.2 127.7 NL NP 2 _ _ 16 _ _ 17 _ _ 18 _ _ 19 intermittent clay seams _ _ SS 20 14 -- 7.9 _ _ 21 _ _ 22 _ _ 23 _ _ 24 _ _ CS 25 23 -- 11.4 129.6 Continued on Sheet 2 of 2 _ _ Earth Engineering Consultants, LLC A-LIMITS SWELL SURFACE ELEV N/A 24 HOUR N/A FINISH DATE 8/28/2017 AFTER DRILLING N/A SHEET 1 OF 1 WATER DEPTH START DATE 8/25/2017 WHILE DRILLING 9.5' 800 ACRE MIXED USE DEVELOPMENT FORT COLLINS, COLORADO PROJECT NO: 1172058 LOG OF BORING B-19 SEPTEMBER 2017 DATE: RIG TYPE: CME55 FOREMAN: DG AUGER TYPE: 4" CFA SPT HAMMER: AUTOMATIC SOIL DESCRIPTION D N QU MC DD -200 TYPE (FEET) (BLOWS/FT) (PSF) (%) (PCF) LL PI (%) PRESSURE % @ 500 PSF Continued from Sheet 1 of 2 26 _ _ 27 SANDSTONE / SILTSTONE / CLAYSTONE _ _ brown / gray / rust 28 moderately hard to hard _ _ 29 _ _ SS 30 30 9000+ 22.8 _ _ 31 _ _ 32 _ _ 33 _ _ 34 _ _ CS 35 50/11" 9000+ 22.6 107.0 _ _ 36 _ _ 37 _ _ 38 _ _ 39 _ _ SS 40 41 7000 24.4 _ _ BOTTOM OF BORING DEPTH 40.5' 41 _ _ 42 _ _ 43 _ _ 44 _ _ 45 _ _ 46 _ _ 47 _ _ 48 _ _ 49 _ _ 50 _ _ Earth Engineering Consultants, LLC A-LIMITS SWELL N/A 8/28/2017 AFTER DRILLING N/A SURFACE ELEV 24 HOUR N/A FINISH DATE SHEET 2 OF 2 WATER DEPTH START DATE 8/25/2017 WHILE DRILLING 9.5' 800 ACRE MIXED USE DEVELOPMENT FORT COLLINS, COLORADO PROJECT NO: 1172058 LOG OF BORING B-19 SEPTEMBER 2017 DATE: RIG TYPE: CME55 FOREMAN: DG AUGER TYPE: 4" CFA SPT HAMMER: AUTOMATIC SOIL DESCRIPTION D N QU MC DD -200 TYPE (FEET) (BLOWS/FT) (PSF) (%) (PCF) LL PI (%) PRESSURE % @ 500 PSF SPARSE VEGETATION _ _ 1 _ _ SANDY LEAN CLAY (CL) 2 brown _ _ very stiff to stiff CS 3 10 5500 20.7 101.6 with calcareous deposits _ _ with gypsum crystals 4 _ _ SS 5 6 3000 21.8 _ _ 6 _ _ 7 _ _ 8 _ _ 9 _ _ SILT (ML) CS 10 8 1000 19.6 109.7 23 6 64.7 <500 psf none brown / rust _ _ soft 11 _ _ 12 _ _ 13 _ _ SAND / GRAVEL (SP / GP) 14 brown / rust _ _ loose to medium dense SS 15 8 -- 5.5 NL NP 3.4 _ _ 16 _ _ 17 _ _ 18 _ _ 19 _ _ CS 20 17 -- 10.2 118.1 _ _ 21 _ _ 22 _ _ 23 _ _ 24 SANDSTONE / SILTSTONE / CLAYSTONE _ _ brown / gray / rust, moderately hard SS 25 38 3500 17.3 BOTTOM OF BORING DEPTH 25.5' _ _ Earth Engineering Consultants, LLC A-LIMITS SWELL SURFACE ELEV N/A CHECKED ON 8/28/2017 10.7 FINISH DATE 8/25/2017 CHECKED ON 9/8/2017 12.0' SHEET 1 OF 1 WATER DEPTH START DATE 8/25/2017 WHILE DRILLING 9.5 800 ACRE MIXED USE DEVELOPMENT FORT COLLINS, COLORADO PROJECT NO: 1172058 LOG OF BORING B-20 SEPTEMBER 2017 DATE: RIG TYPE: CME55 FOREMAN: DG AUGER TYPE: 4" CFA SPT HAMMER: AUTOMATIC SOIL DESCRIPTION D N QU MC DD -200 TYPE (FEET) (BLOWS/FT) (PSF) (%) (PCF) LL PI (%) PRESSURE % @ 500 PSF SPARSE VEGETATION _ _ 1 _ _ LEAN CLAY with SAND (CL) 2 brown _ _% @ 150 psf very stiff to medium stiff CS 3 12 9000+ 16.1 110.0 34 22 83.2 2000 psf 2.4% with calcareous deposits _ _ 4 brown / red / gray _ _ with silty seams SS 5 9 2000 23.5 _ _ 6 _ _ 7 _ _ 8 _ _ 9 _ _ SAND / GRAVEL (SP / GP) CS 10 19 -- 8.2 124.6 brown / red / gray _ _ dense to medium dense 11 _ _ 12 _ _ 13 _ _ 14 _ _ SS 15 43 -- 6.5 _ _ 16 _ _ 17 _ _ 18 _ _ 19 _ _ CS 20 22 -- 8.6 134.4 _ _ 21 _ _ 22 _ _ 23 _ _ 24 _ _ auger cuttings 25 -- -- 10.1 BOTTOM OF BORING DEPTH 25.5' _ _ Earth Engineering Consultants, LLC A-LIMITS SWELL SURFACE ELEV N/A 24 HOUR N/A FINISH DATE 8/25/2017 AFTER DRILLING N/A SHEET 1 OF 1 WATER DEPTH START DATE 8/25/2017 WHILE DRILLING 9.0' 800 ACRE MIXED USE DEVELOPMENT FORT COLLINS, COLORADO PROJECT NO: 1172058 LOG OF BORING B-21 SEPTEMBER 2017 DATE: RIG TYPE: CME55 FOREMAN: DG AUGER TYPE: 4" CFA SPT HAMMER: AUTOMATIC SOIL DESCRIPTION D N QU MC DD -200 TYPE (FEET) (BLOWS/FT) (PSF) (%) (PCF) LL PI (%) PRESSURE % @ 500 PSF VEGETATION & TOPSOIL _ _ 1 _ _ SANDY LEAN CLAY (CL) 2 brown _ _ very stiff 3 with calcareous deposits _ _ 4 _ _% @ 150 psf CS 5 6 7000 16.4 97.0 1200 psf 1.1% _ _ 6 _ _ 7 _ _ 8 _ _ SAND / GRAVEL with SILT (SP - SM / GP - GM) 9 brown _ _ medium dense SS 10 23 -- 8.2 _ _ 11 _ _ 12 _ _ 13 _ _ 14 _ _ CS 15 15 -- 9.0 122.8 NL NP 9.2 _ _ 16 _ _ 17 _ _ 18 _ _ 19 _ _ SS 20 22 -- 9.9 _ _ 21 _ _ 22 _ _ 23 _ _ 24 _ _ CS 25 16 -- 6.8 148.4 BOTTOM OF BORING DEPTH 25.0' _ _ Earth Engineering Consultants, LLC A-LIMITS SWELL SURFACE ELEV N/A 24 HOUR N/A FINISH DATE 8/25/2017 AFTER DRILLING N/A SHEET 1 OF 1 WATER DEPTH START DATE 8/25/2017 WHILE DRILLING 8.0' 800 ACRE MIXED USE DEVELOPMENT FORT COLLINS, COLORADO PROJECT NO: 1172058 LOG OF BORING B-22 SEPTEMBER 2017 DATE: RIG TYPE: CME55 FOREMAN: DG AUGER TYPE: 4" CFA SPT HAMMER: AUTOMATIC SOIL DESCRIPTION D N QU MC DD -200 TYPE (FEET) (BLOWS/FT) (PSF) (%) (PCF) LL PI (%) PRESSURE % @ 500 PSF _ _ 1 _ _ SANDY LEAN CLAY (CL) 2 brown _ _ stiff CS 3 7 4000 12.7 100.1 with calcareous deposits _ _ 4 red / brown _ _ SS 5 6 2000 26.8 _ _ 6 _ _ 7 _ _ 8 _ _ 9 brown / gray / rust _ _ CS 10 8 3500 29.4 90.0 _ _ 11 _ _ 12 _ _ 13 _ _ SAND / GRAVEL (SP / GP) 14 brown / gray / rust _ _ medium dense to dense SS 15 23 -- 8.0 _ _ 16 _ _ 17 _ _ 18 _ _ 19 _ _ CS 20 32 -- 13.3 119.5 _ _ 21 _ _ 22 _ _ 23 _ _ 24 _ _ SS 25 17 -- 6.2 BOTTOM OF BORING DEPTH 25.5' _ _ Earth Engineering Consultants, LLC A-LIMITS SWELL SURFACE ELEV N/A 24 HOUR N/A FINISH DATE 8/28/2017 CHECKED ON 9/8/2017 12.3' SHEET 1 OF 1 WATER DEPTH START DATE 8/28/2017 WHILE DRILLING 13.0' 800 ACRE MIXED USE DEVELOPMENT FORT COLLINS, COLORADO PROJECT NO: 1172058 LOG OF BORING B-23 SEPTEMBER 2017 DATE: RIG TYPE: CME55 FOREMAN: DG AUGER TYPE: 4" CFA SPT HAMMER: AUTOMATIC SOIL DESCRIPTION D N QU MC DD -200 TYPE (FEET) (BLOWS/FT) (PSF) (%) (PCF) LL PI (%) PRESSURE % @ 500 PSF SPARSE VEGETATION _ _ 1 _ _ SANDY LEAN CLAY (CL) 2 brown _ _ medium stiff 3 with calcareous deposits _ _ 4 _ _ CS 5 6 4000 25.5 89.6 _ _ 6 _ _ 7 _ _ 8 _ _ 9 gray / brown / rust _ _ SS 10 7 2500 31.4 _ _ 11 _ _ 12 _ _ 13 _ _ CLAYEY SAND (SC) 14 gray / brown / rust _ _ loose to medium dense CS 15 10 -- 8.7 _ _ 16 _ _ 17 _ _ 18 _ _ 19 with gray silty lcay seams _ _ SS 20 9 -- 19.3 26 10 44.1 _ _ 21 _ _ 22 _ _ 23 _ _ 24 _ _ CS 25 18 -- 9.0 107.9 _ _ Earth Engineering Consultants, LLC A-LIMITS SWELL SURFACE ELEV N/A 24 HOUR N/A FINISH DATE 8/28/2017 AFTER DRILLING N/A SHEET 1 OF 1 WATER DEPTH START DATE 8/28/2017 WHILE DRILLING 11.0' 800 ACRE MIXED USE DEVELOPMENT FORT COLLINS, COLORADO PROJECT NO: 1172058 LOG OF BORING B-24 SEPTEMBER 2017 DATE: RIG TYPE: CME55 FOREMAN: DG AUGER TYPE: 4" CFA SPT HAMMER: AUTOMATIC SOIL DESCRIPTION D N QU MC DD -200 TYPE (FEET) (BLOWS/FT) (PSF) (%) (PCF) LL PI (%) PRESSURE % @ 500 PSF Continued from Sheet 1 of 2 26 _ _ 27 _ _ CLAYSTONE 28 gray / rust _ _ highly weathered to moderately hard to hard 29 _ _ CS 30 12 3000 29.5 91.5 _ _ 31 _ _ 32 _ _ 33 _ _ 34 _ _ SS 35 28 9000+ 20.8 _ _ 36 _ _ 37 _ _ 38 _ _ 39 _ _ CS 40 50/6" 9000+ 17.2 114.6 46 27 58.9 6500 psf 3.7% BOTTOM OF BORING DEPTH 40.5' _ _ 41 _ _ 42 _ _ 43 _ _ 44 _ _ 45 _ _ 46 _ _ 47 _ _ 48 _ _ 49 _ _ 50 _ _ Earth Engineering Consultants, LLC A-LIMITS SWELL N/A 8/28/2017 AFTER DRILLING N/A SURFACE ELEV 24 HOUR N/A FINISH DATE SHEET 2 OF 2 WATER DEPTH START DATE 8/28/2017 WHILE DRILLING 11.0' 800 ACRE MIXED USE DEVELOPMENT FORT COLLINS, COLORADO PROJECT NO: 1172058 LOG OF BORING B-24 SEPTEMBER 2017 DATE: RIG TYPE: CME55 FOREMAN: DG AUGER TYPE: 4" CFA SPT HAMMER: AUTOMATIC SOIL DESCRIPTION D N QU MC DD -200 TYPE (FEET) (BLOWS/FT) (PSF) (%) (PCF) LL PI (%) PRESSURE % @ 500 PSF _ _ 1 _ _ SANDY LEAN CLAY (CL) 2 brown / red _ _% @ 150 psf very stiff CS 3 19 9000+ 17.6 99.2 3500 psf 4.3% with calcareous deposits _ _ with gypsum crystals 4 _ _ SS 5 11 9000+ 21.0 _ _ 6 _ _ 7 _ _ 8 _ _ SAND / GRAVEL (SP / GP) 9 brown / red _ _ medium dense CS 10 26 -- 10.7 124.6 _ _ 11 _ _ 12 _ _ 13 _ _ 14 intermittent silty clay seams _ _ SS 15 19 -- 23.9 _ _ 16 _ _ 17 _ _ 18 _ _ 19 _ _ CS 20 24 -- 12.7 110.6 _ _ 21 _ _ 22 _ _ 23 _ _ 24 SILTSTONE / SANDSTONE at 25' _ _ gray / rust SS 25 27 2000 11.0 BOTTOM OF BORING DEPTH 25.5' _ _ Earth Engineering Consultants, LLC A-LIMITS SWELL SURFACE ELEV N/A 24 HOUR N/A FINISH DATE 8/28/2017 AFTER DRILLING N/A SHEET 1 OF 1 WATER DEPTH START DATE 8/28/2017 WHILE DRILLING 8.0' 800 ACRE MIXED USE DEVELOPMENT FORT COLLINS, COLORADO PROJECT NO: 1172058 LOG OF BORING B-25 SEPTEMBER 2017 DATE: RIG TYPE: CME55 FOREMAN: DG AUGER TYPE: 4" CFA SPT HAMMER: AUTOMATIC SOIL DESCRIPTION D N QU MC DD -200 TYPE (FEET) (BLOWS/FT) (PSF) (%) (PCF) LL PI (%) PRESSURE % @ 500 PSF ALFALFA _ _ 1 _ _ LEAN CLAY with SAND (CL) 2 brown _ _% @ 150 psf very stiff CS 3 19 6000 9.6 101.5 37 10 81.3 1600 psf 3.6% _ _ 4 _ _ SS 5 19 9000+ 8.6 _ _ 6 _ _ 7 _ _ 8 _ _ 9 _ _ CS 10 15 9000+ 16.7 109.1 39 22 78.6 2000 psf 1.5% _ _ 11 _ _ 12 _ _ 13 _ _ SILTY SAND / GRAVEL (SM / GM) 14 brown _ _ medium dense SS 15 19 -- 8.1 _ _ 16 _ _ 17 _ _ 18 _ _ 19 _ _ CS 20 24 -- 8.6 129.7 _ _ 21 _ _ 22 _ _ 23 _ _ 24 _ _ SS 25 13 -- 4.1 BOTTOM OF BORING DEPTH 25.5' _ _ Earth Engineering Consultants, LLC A-LIMITS SWELL SURFACE ELEV N/A 24 HOUR N/A FINISH DATE 8/30/2017 CHECKED ON 9/8/2017 15.2' SHEET 1 OF 1 WATER DEPTH START DATE 8/30/2017 WHILE DRILLING 14.0' 800 ACRE MIXED USE DEVELOPMENT FORT COLLINS, COLORADO PROJECT NO: 1172058 LOG OF BORING B-26 SEPTEMBER 2017 DATE: RIG TYPE: CME55 FOREMAN: DG AUGER TYPE: 4" CFA SPT HAMMER: AUTOMATIC SOIL DESCRIPTION D N QU MC DD -200 TYPE (FEET) (BLOWS/FT) (PSF) (%) (PCF) LL PI (%) PRESSURE % @ 500 PSF ALFALFA _ _ 1 _ _ SANDY LEAN CLAY (CL) 2 brown _ _ very stiff 3 with calcareous deposits _ _ with organics 4 _ _ CS 5 21 5500 10.1 91.1 _ _ 6 _ _ 7 _ _ 8 _ _ 9 with gypsum crystals _ _ SS 10 11 8500 13.2 _ _ 11 _ _ 12 _ _ 13 _ _ SAND / GRAVEL (SP / GP) 14 brown _ _ medium dense to dense CS 15 24 -- 13.1 107.6 _ _ 16 _ _ 17 _ _ 18 _ _ 19 _ _ SS 20 27 -- 6.0 _ _ 21 _ _ 22 _ _ 23 _ _ 24 _ _ CS 25 35 -- 9.4 132.5 BOTTOM OF BORING DEPTH 25.0' _ _ Earth Engineering Consultants, LLC A-LIMITS SWELL SURFACE ELEV N/A 24 HOUR N/A FINISH DATE 8/30/2017 AFTER DRILLING N/A SHEET 1 OF 1 WATER DEPTH START DATE 8/30/2017 WHILE DRILLING 14.0' 800 ACRE MIXED USE DEVELOPMENT FORT COLLINS, COLORADO PROJECT NO: 1172058 LOG OF BORING B-27 SEPTEMBER 2017 DATE: RIG TYPE: CME55 FOREMAN: DG AUGER TYPE: 4" CFA SPT HAMMER: AUTOMATIC SOIL DESCRIPTION D N QU MC DD -200 TYPE (FEET) (BLOWS/FT) (PSF) (%) (PCF) LL PI (%) PRESSURE % @ 500 PSF ALFALFA _ _ 1 _ _ SANDY LEAN CLAY (CL) 2 brown _ _% @ 150 psf very stiff CS 3 20 9000+ 9.1 96.3 1200 psf 4.1% _ _ 4 with organics _ _ SS 5 12 4000 8.3 _ _ 6 _ _ 7 _ _ 8 _ _ 9 _ _ CS 10 20 9000+ 11.7 98.8 _ _ 11 _ _ 12 _ _ 13 _ _ 14 _ _ SS 15 17 9000+ 14.8 _ _ 16 _ _ 17 _ _ 18 _ _ 19 _ _ CS 20 16 7000 19.6 103.8 _ _ 21 _ _ 22 _ _ 23 _ _ 24 with gravel _ _ SS 25 9 4000 18.6 Continued on Sheet 2 of 2 _ _ Earth Engineering Consultants, LLC A-LIMITS SWELL SURFACE ELEV N/A 24 HOUR N/A FINISH DATE 8/30/2017 CHECKED ON 9/8/2017 27.8 SHEET 1 OF 1 WATER DEPTH START DATE 8/30/2017 WHILE DRILLING 30.5' 800 ACRE MIXED USE DEVELOPMENT FORT COLLINS, COLORADO PROJECT NO: 1172058 LOG OF BORING B-28 SEPTEMBER 2017 DATE: RIG TYPE: CME55 FOREMAN: DG AUGER TYPE: 4" CFA SPT HAMMER: AUTOMATIC SOIL DESCRIPTION D N QU MC DD -200 TYPE (FEET) (BLOWS/FT) (PSF) (%) (PCF) LL PI (%) PRESSURE % @ 500 PSF Continued from Sheet 1 of 2 26 _ _ 27 SANDY LEAN CLAY (CL) _ _ brown 28 very stiff _ _ 29 _ _ CS 30 9 4000 21.3 106.6 _ _ 31 _ _ 32 _ _ 33 _ _ 34 _ _ SS 35 10 1000 21.1 _ _ 36 _ _ 37 _ _ 38 _ _ 39 SILTY SAND (SM) _ _ brown, very loose CS 40 1 -- 17.0 BOTTOM OF BORING DEPTH 40.0' _ _ 41 _ _ 42 _ _ 43 _ _ 44 _ _ 45 _ _ 46 _ _ 47 _ _ 48 _ _ 49 _ _ 50 _ _ Earth Engineering Consultants, LLC A-LIMITS SWELL N/A 8/30/2017 CHECKED ON 9/8/2017 27.8 SURFACE ELEV 24 HOUR N/A FINISH DATE SHEET 2 OF 2 WATER DEPTH START DATE 8/30/2017 WHILE DRILLING 30.5' 800 ACRE MIXED USE DEVELOPMENT FORT COLLINS, COLORADO PROJECT NO: 1172058 LOG OF BORING B-28 SEPTEMBER 2017 DATE: RIG TYPE: CME55 FOREMAN: DG AUGER TYPE: 4" CFA SPT HAMMER: AUTOMATIC SOIL DESCRIPTION D N QU MC DD -200 TYPE (FEET) (BLOWS/FT) (PSF) (%) (PCF) LL PI (%) PRESSURE % @ 500 PSF ALFALFA _ _ 1 _ _ LEAN CLAY with SAND (CL) 2 brown _ _ very stiff 3 with calcareous deposits _ _ 4 _ _ CS 5 19 9000+ 12.5 103.4 35 20 73.8 3500 psf 3.3% _ _ 6 _ _ 7 _ _ 8 _ _ 9 _ _ brown / rust / gray SS 10 9 4000 21.4 _ _ 11 _ _ 12 _ _ 13 _ _ 14 _ _ SILTY SAND / GRAVEL (SM / GM) SS 15 20 -- 17.7 brown _ _ medium dense 16 _ _ 17 _ _ 18 _ _ 19 _ _ SS 20 27 -- 8.6 _ _ 21 _ _ 22 _ _ 23 _ _ 24 intermittent clay seams _ _ CS 25 11 -- 17.7 BOTTOM OF BORING DEPTH 25.0' _ _ Earth Engineering Consultants, LLC A-LIMITS SWELL SURFACE ELEV N/A 24 HOUR N/A FINISH DATE 8/30/2017 AFTER DRILLING N/A SHEET 1 OF 1 WATER DEPTH START DATE 8/30/2017 WHILE DRILLING 13.5' 800 ACRE MIXED USE DEVELOPMENT FORT COLLINS, COLORADO PROJECT NO: 1172058 LOG OF BORING B-29 SEPTEMBER 2017 DATE: RIG TYPE: CME55 FOREMAN: DG AUGER TYPE: 4" CFA SPT HAMMER: AUTOMATIC SOIL DESCRIPTION D N QU MC DD -200 TYPE (FEET) (BLOWS/FT) (PSF) (%) (PCF) LL PI (%) PRESSURE % @ 500 PSF ALFALFA _ _ 1 _ _ SANDY LEAN CLAY (CL) 2 gray _ _ stiff to medium stiff CS 3 4 4000 26.7 90.9 with calcareous deposits _ _ 4 gray / rust _ _ SS 5 2 1000 37.0 _ _ 6 _ _ 7 _ _ SAND / GRAVEL (SP / GP) 8 gray / rust _ _ medium dense to loose 9 _ _ CS 10 14 -- 12.0 112.1 _ _ 11 _ _ 12 _ _ 13 _ _ 14 _ _ SS 15 9 -- 8.3 NL NP 5.2 _ _ 16 _ _ 17 _ _ 18 _ _ 19 intermittent clay seams _ _ CS 20 6 -- 10.9 _ _ 21 _ _ 22 _ _ CLAYSTONE / SILTSTONE / SANDSTONE 23 gray _ _ 24 _ _ SS 25 50/7" 8500 17.2 BOTTOM OF BORING DEPTH 25.5' _ _ Earth Engineering Consultants, LLC A-LIMITS SWELL SURFACE ELEV N/A 24 HOUR N/A FINISH DATE 8/30/2017 CHECKED ON 9/8/2017 7.7' SHEET 1 OF 1 WATER DEPTH START DATE 8/30/2017 WHILE DRILLING 6.5' 800 ACRE MIXED USE DEVELOPMENT FORT COLLINS, COLORADO PROJECT NO: 1172058 LOG OF BORING B-30 SEPTEMBER 2017 Project: Location: Project #: Date: 800 Acre Mixed Use Development Fort Collins, Colorado 1172058 Sep-17 Beginning Moisture: 6.9% Dry Density: 99.9 pcf Ending Moisture: 23.3% Swell Pressure: 1200 psf % Swell @ 500: 1.7% Sample Location: Boring 1, Sample 1, Depth 4' Liquid Limit: 31 Plasticity Index: 19 % Passing #200: 49.4% SWELL / CONSOLIDATION TEST RESULTS Material Description: Brown Clayey Sand / Sandy Lean Clay (SC / CL) -10.0 -8.0 -6.0 -4.0 -2.0 0.0 2.0 4.0 6.0 8.0 10.0 0.01 0.1 1 10Percent MovementLoad (TSF)SwellConsolidatioWater Added Project: Location: Project #: Date: 800 Acre Mixed Use Development Fort Collins, Colorado 1172058 Sep-17 Beginning Moisture: 7.9% Dry Density: 102.8 pcf Ending Moisture: 20.8% Swell Pressure: 1400 psf % Swell @ 150: 4.8% Sample Location: Boring 3, Sample 1, Depth 2' Liquid Limit: 33 Plasticity Index: 19 % Passing #200: 71.0% SWELL / CONSOLIDATION TEST RESULTS Material Description: Brown Lean Clay with Sand (CL) -10.0 -8.0 -6.0 -4.0 -2.0 0.0 2.0 4.0 6.0 8.0 10.0 0.01 0.1 1 10Percent MovementLoad (TSF)SwellConsolidatioWater Added Project: Location: Project #: Date: SWELL / CONSOLIDATION TEST RESULTS Material Description: Brown Sandy Lean Clay (CL) Sample Location: Boring 3, Sample 3, Depth 9' Liquid Limit: 32 Plasticity Index: 15 % Passing #200: 60.8% Beginning Moisture: 13.2% Dry Density: 117.9 pcf Ending Moisture: 16.9% Swell Pressure: 1400 psf % Swell @ 500: 0.7% 800 Acre Mixed Use Development Fort Collins, Colorado 1172058 Sep-17 -10.0 -8.0 -6.0 -4.0 -2.0 0.0 2.0 4.0 6.0 8.0 10.0 0.01 0.1 1 10Percent MovementLoad (TSF)SwellConsolidatioWater Added Project: Location: Project #: Date: 800 Acre Mixed Use Development Fort Collins, Colorado 1172058 Sep-17 Beginning Moisture: 13.7% Dry Density: 119.5 pcf Ending Moisture: 15.0% Swell Pressure: 1800 psf % Swell @ 150: 1.2% Sample Location: Boring 4, Sample 1, Depth 2' Liquid Limit: 30 Plasticity Index: 23 % Passing #200: 54.3% SWELL / CONSOLIDATION TEST RESULTS Material Description: Brown Sandy Lean Clay (CL) -10.0 -8.0 -6.0 -4.0 -2.0 0.0 2.0 4.0 6.0 8.0 10.0 0.01 0.1 1 10Percent MovementLoad (TSF)SwellConsolidatioWater Added Project: Location: Project #: Date: 800 Acre Mixed Use Development Fort Collins, Colorado 1172058 Sep-17 Beginning Moisture: 19.5% Dry Density: 107.4 pcf Ending Moisture: 19.1% Swell Pressure: 1400 psf % Swell @ 500: 0.7% Sample Location: Boring 4, Sample 3, Depth 9' Liquid Limit: - - Plasticity Index: - - % Passing #200: - - SWELL / CONSOLIDATION TEST RESULTS Material Description: Brown Sandy Lean Clay (CL) -10.0 -8.0 -6.0 -4.0 -2.0 0.0 2.0 4.0 6.0 8.0 10.0 0.01 0.1 1 10Percent MovementLoad (TSF)SwellConsolidatioWater Added Project: Location: Project #: Date: 800 Acre Mixed Use Development Fort Collins, Colorado 1172058 Sep-17 Beginning Moisture: 26.0% Dry Density: 107 pcf Ending Moisture: 25.2% Swell Pressure: <500 psf % Swell @ 500: None Sample Location: Boring 5, Sample 3, Depth 9' Liquid Limit: 33 Plasticity Index: 19 % Passing #200: 81.3% SWELL / CONSOLIDATION TEST RESULTS Material Description: Gray / Brown / Rust Lean Clay with Sand (CL) -10.0 -8.0 -6.0 -4.0 -2.0 0.0 2.0 4.0 6.0 8.0 10.0 0.01 0.1 1 10Percent MovementLoad (TSF)SwellConsolidatioWater Added Project: Location: Project #: Date: 800 Acre Mixed Use Development Fort Collins, Colorado 1172058 Sep-17 Beginning Moisture: 21.3% Dry Density: 106.5 pcf Ending Moisture: 22.3% Swell Pressure: <500 psf % Swell @ 500: None Sample Location: Boring 6, Sample 1, Depth 4' Liquid Limit: 34 Plasticity Index: 20 % Passing #200: 58.2% SWELL / CONSOLIDATION TEST RESULTS Material Description: Gray / Rust Sandy Lean Clay (CL) -10.0 -8.0 -6.0 -4.0 -2.0 0.0 2.0 4.0 6.0 8.0 10.0 0.01 0.1 1 10Percent MovementLoad (TSF)SwellConsolidatioWater Added Project: Location: Project #: Date: 800 Acre Mixed Use Development Fort Collins, Colorado 1172058 Sep-17 Beginning Moisture: 5.8% Dry Density: 112.1 pcf Ending Moisture: 19.9% Swell Pressure: 1600 psf % Swell @ 150: 4.4% Sample Location: Boring 7, Sample 1, Depth 2' Liquid Limit: - - Plasticity Index: - - % Passing #200: - - SWELL / CONSOLIDATION TEST RESULTS Material Description: Brown Sandy Lean Clay (CL) -10.0 -8.0 -6.0 -4.0 -2.0 0.0 2.0 4.0 6.0 8.0 10.0 0.01 0.1 1 10Percent MovementLoad (TSF)SwellConsolidatioWater Added Project: Location: Project #: Date: 800 Acre Mixed Use Development Fort Collins, Colorado 1172058 Sep-17 Beginning Moisture: 6.7% Dry Density: 107.9 pcf Ending Moisture: 23.5% Swell Pressure: 1800 psf % Swell @ 500: 3.3% Sample Location: Boring 8, Sample 1, Depth 4' Liquid Limit: 34 Plasticity Index: 19 % Passing #200: 65.2% SWELL / CONSOLIDATION TEST RESULTS Material Description: Brown Sandy Lean Clay (CL) -10.0 -8.0 -6.0 -4.0 -2.0 0.0 2.0 4.0 6.0 8.0 10.0 0.01 0.1 1 10Percent MovementLoad (TSF)SwellConsolidatioWater Added Project: Location: Project #: Date: 800 Acre Mixed Use Development Fort Collins, Colorado 1172058 Sep-17 Beginning Moisture: 20.2% Dry Density: 107.2 pcf Ending Moisture: 18.0% Swell Pressure: 1600 psf % Swell @ 500: 0.8% Sample Location: Boring 9, Sample 3, Depth 9' Liquid Limit: - - Plasticity Index: - - % Passing #200: - - SWELL / CONSOLIDATION TEST RESULTS Material Description: Brown Sandy Lean Clay (CL) -10.0 -8.0 -6.0 -4.0 -2.0 0.0 2.0 4.0 6.0 8.0 10.0 0.01 0.1 1 10Percent MovementLoad (TSF)SwellConsolidatioWater Added Project: Location: Project #: Date: 800 Acre Mixed Use Development Fort Collins, Colorado 1172058 Sep-17 Beginning Moisture: 16.4% Dry Density: 107.4 pcf Ending Moisture: 19.0% Swell Pressure: 2000 psf % Swell @ 150: 2.4% Sample Location: Boring 10, Sample 1, Depth 2' Liquid Limit: - - Plasticity Index: - - % Passing #200: - - SWELL / CONSOLIDATION TEST RESULTS Material Description: Brown Sandy Lean Clay (CL) -10.0 -8.0 -6.0 -4.0 -2.0 0.0 2.0 4.0 6.0 8.0 10.0 0.01 0.1 1 10Percent MovementLoad (TSF)SwellConsolidatioWater Added Project: Location: Project #: Date: 800 Acre Mixed Use Development Fort Collins, Colorado 1172058 Sep-17 Beginning Moisture: 14.5% Dry Density: 116.3 pcf Ending Moisture: 16.4% Swell Pressure: 2000 psf % Swell @ 500: 0.9% Sample Location: Boring 10, Sample 3, Depth 9' Liquid Limit: 30 Plasticity Index: 16 % Passing #200: 52.1% SWELL / CONSOLIDATION TEST RESULTS Material Description: Brown Sandy Lean Clay (CL) -10.0 -8.0 -6.0 -4.0 -2.0 0.0 2.0 4.0 6.0 8.0 10.0 0.01 0.1 1 10Percent MovementLoad (TSF)SwellConsolidatioWater Added Project: Location: Project #: Date: SWELL / CONSOLIDATION TEST RESULTS Material Description: Brown / Rust / Gray Silty Sand (SM) Sample Location: Boring 13, Sample 3, Depth 9' Liquid Limit: 25 Plasticity Index: NP % Passing #200: 30.3% Beginning Moisture: 21.6% Dry Density: 109.8 pcf Ending Moisture: 20.2% Swell Pressure: <500 psf % Swell @ 500: None 800 Acre Mixed Use Development Fort Collins, Colorado 1172058 Sep-17 -10.0 -8.0 -6.0 -4.0 -2.0 0.0 2.0 4.0 6.0 8.0 10.0 0.01 0.1 1 10Percent MovementLoad (TSF)SwellConsolidatioWater Added Project: Location: Project #: Date: SWELL / CONSOLIDATION TEST RESULTS Material Description: Brown Sandy Lean Clay (CL) Sample Location: Boring 14, Sample 1, Depth 4' Liquid Limit: 36 Plasticity Index: 19 % Passing #200: 51.8% Beginning Moisture: 15.1% Dry Density: 116.5 pcf Ending Moisture: 18.5% Swell Pressure: 1600 psf % Swell @ 500: 0.4% 800 Acre Mixed Use Development Fort Collins, Colorado 1172058 Sep-17 -10.0 -8.0 -6.0 -4.0 -2.0 0.0 2.0 4.0 6.0 8.0 10.0 0.01 0.1 1 10Percent MovementLoad (TSF)SwellConsolidatioWater Added Project: Location: Project #: Date: SWELL / CONSOLIDATION TEST RESULTS Material Description: Brown Sandy Lean Clay (CL) Sample Location: Boring 15, Sample 1, Depth 2' Liquid Limit: - - Plasticity Index: - - % Passing #200: - - Beginning Moisture: 8.0% Dry Density: 118.8 pcf Ending Moisture: 18.9% Swell Pressure: 3500 psf % Swell @ 150: 7.6% 800 Acre Mixed Use Development Fort Collins, Colorado 1172058 Sep-17 -10.0 -8.0 -6.0 -4.0 -2.0 0.0 2.0 4.0 6.0 8.0 10.0 0.01 0.1 1 10Percent MovementLoad (TSF)SwellConsolidatioWater Added Project: Location: Project #: Date: SWELL / CONSOLIDATION TEST RESULTS Material Description: Brown Lean Clay with Sand (CL) Sample Location: Boring 15, Sample 3, Depth 9' Liquid Limit: 40 Plasticity Index: 25 % Passing #200: 81.2% Beginning Moisture: 9.4% Dry Density: 109 pcf Ending Moisture: 21.3% Swell Pressure: 3500 psf % Swell @ 500: 4.4% 800 Acre Mixed Use Development Fort Collins, Colorado 1172058 Sep-17 -10.0 -8.0 -6.0 -4.0 -2.0 0.0 2.0 4.0 6.0 8.0 10.0 0.01 0.1 1 10Percent MovementLoad (TSF)SwellConsolidatioWater Added Project: Location: Project #: Date: SWELL / CONSOLIDATION TEST RESULTS Material Description: Brown Lean Clay with Sand (CL) Sample Location: Boring 15, Sample 5, Depth 19' Liquid Limit: 24 Plasticity Index: 11 % Passing #200: 67.9% Beginning Moisture: 15.2% Dry Density: 116.6 pcf Ending Moisture: 17.4% Swell Pressure: 1600 psf % Swell @ 500: 0.7% 800 Acre Mixed Use Development Fort Collins, Colorado 1172058 Sep-17 -10.0 -8.0 -6.0 -4.0 -2.0 0.0 2.0 4.0 6.0 8.0 10.0 0.01 0.1 1 10Percent MovementLoad (TSF)SwellConsolidatioWater Added Project: Location: Project #: Date: SWELL / CONSOLIDATION TEST RESULTS Material Description: Brown Clayey Sand (SC) Sample Location: Boring 16, Sample 1, Depth 4' Liquid Limit: 25 Plasticity Index: 11 % Passing #200: 43.8% Beginning Moisture: 15.5% Dry Density: 117.2 pcf Ending Moisture: 16.5% Swell Pressure: 800 psf % Swell @ 500: 0.1% 800 Acre Mixed Use Development Fort Collins, Colorado 1172058 Sep-17 -10.0 -8.0 -6.0 -4.0 -2.0 0.0 2.0 4.0 6.0 8.0 10.0 0.01 0.1 1 10Percent MovementLoad (TSF)SwellConsolidatioWater Added Project: Location: Project #: Date: SWELL / CONSOLIDATION TEST RESULTS Material Description: Brown / Rust Clayey Sand (SC) Sample Location: Boring 16, Sample 3, Depth 14' Liquid Limit: - - Plasticity Index: - - % Passing #200: - - Beginning Moisture: 21.0% Dry Density: 109.8 pcf Ending Moisture: 19.2% Swell Pressure: <500 psf % Swell @ 500: None 800 Acre Mixed Use Development Fort Collins, Colorado 1172058 Sep-17 -10.0 -8.0 -6.0 -4.0 -2.0 0.0 2.0 4.0 6.0 8.0 10.0 0.01 0.1 1 10Percent MovementLoad (TSF)SwellConsolidatioWater Added Project: Location: Project #: Date: SWELL / CONSOLIDATION TEST RESULTS Material Description: Brown Lean Clay with Sand (CL) Sample Location: Boring 18, Sample 1, Depth 4' Liquid Limit: 29 Plasticity Index: 16 % Passing #200: 69.2% Beginning Moisture: 19.6% Dry Density: 102.2 pcf Ending Moisture: 20.3% Swell Pressure: 800 psf % Swell @ 500: 0.3% 800 Acre Mixed Use Development Fort Collins, Colorado 1172058 Sep-17 -10.0 -8.0 -6.0 -4.0 -2.0 0.0 2.0 4.0 6.0 8.0 10.0 0.01 0.1 1 10Percent MovementLoad (TSF)SwellConsolidatioWater Added Project: Location: Project #: Date: SWELL / CONSOLIDATION TEST RESULTS Material Description: Brown / Red Lean Clay with Sand (CL) Sample Location: Boring 19, Sample 1, Depth 4' Liquid Limit: 27 Plasticity Index: 13 % Passing #200: 68.0% Beginning Moisture: 20.4% Dry Density: 103.3 pcf Ending Moisture: 22.8% Swell Pressure: <500 psf % Swell @ 500: None 800 Acre Mixed Use Development Fort Collins, Colorado 1172058 Sep-17 -10.0 -8.0 -6.0 -4.0 -2.0 0.0 2.0 4.0 6.0 8.0 10.0 0.01 0.1 1 10Percent MovementLoad (TSF)SwellConsolidatioWater Added Project: Location: Project #: Date: SWELL / CONSOLIDATION TEST RESULTS Material Description: Brown / Rust Silt (ML) Sample Location: Boring 20, Sample 3, Depth 9' Liquid Limit: 23 Plasticity Index: 6 % Passing #200: 64.7% Beginning Moisture: 19.6% Dry Density: 110.7 pcf Ending Moisture: 15.7% Swell Pressure: <500 psf % Swell @ 500: None 800 Acre Mixed Use Development Fort Collins, Colorado 1172058 Sep-17 -10.0 -8.0 -6.0 -4.0 -2.0 0.0 2.0 4.0 6.0 8.0 10.0 0.01 0.1 1 10Percent MovementLoad (TSF)SwellConsolidatioWater Added Project: Location: Project #: Date: SWELL / CONSOLIDATION TEST RESULTS Material Description: Brown Lean Clay with Sand (CL) Sample Location: Boring 21, Sample 1, Depth 2' Liquid Limit: 34 Plasticity Index: 22 % Passing #200: 83.2% Beginning Moisture: 16.1% Dry Density: 110 pcf Ending Moisture: 18.7% Swell Pressure: 2000 psf % Swell @ 150: 2.4% 800 Acre Mixed Use Development Fort Collins, Colorado 1172058 Sep-17 -10.0 -8.0 -6.0 -4.0 -2.0 0.0 2.0 4.0 6.0 8.0 10.0 0.01 0.1 1 10Percent MovementLoad (TSF)SwellConsolidatioWater Added Project: Location: Project #: Date: SWELL / CONSOLIDATION TEST RESULTS Material Description: Brown Sandy Lean Clay (CL) Sample Location: Boring 22, Sample 1, Depth 4' Liquid Limit: - - Plasticity Index: - - % Passing #200: - - Beginning Moisture: 16.4% Dry Density: 112.8 pcf Ending Moisture: 15.0% Swell Pressure: 1200 psf % Swell @ 150: 1.1% 800 Acre Mixed Use Development Fort Collins, Colorado 1172058 Sep-17 -10.0 -8.0 -6.0 -4.0 -2.0 0.0 2.0 4.0 6.0 8.0 10.0 0.01 0.1 1 10Percent MovementLoad (TSF)SwellConsolidatioWater Added Project: Location: Project #: Date: SWELL / CONSOLIDATION TEST RESULTS Material Description: Gray / Rust Claystone Sample Location: Boring 24, Sample 8, Depth 39' Liquid Limit: 46 Plasticity Index: 27 % Passing #200: 58.9% Beginning Moisture: 17.2% Dry Density: 115.2 pcf Ending Moisture: 18.9% Swell Pressure: 6500 psf % Swell @ 500: 3.7% 800 Acre Mixed Use Development Fort Collins, Colorado 1172058 Sep-17 -10.0 -8.0 -6.0 -4.0 -2.0 0.0 2.0 4.0 6.0 8.0 10.0 0.01 0.1 1 10Percent MovementLoad (TSF)SwellConsolidatioWater Added Project: Location: Project #: Date: SWELL / CONSOLIDATION TEST RESULTS Material Description: Brown / Red Sandy Lean Clay (CL) Sample Location: Boring 25, Sample 1, Depth 2' Liquid Limit: - - Plasticity Index: - - % Passing #200: - - Beginning Moisture: 17.6% Dry Density: 110 pcf Ending Moisture: 22.4% Swell Pressure: 3500 psf % Swell @ 150: 4.3% 800 Acre Mixed Use Development Fort Collins, Colorado 1172058 Sep-17 -10.0 -8.0 -6.0 -4.0 -2.0 0.0 2.0 4.0 6.0 8.0 10.0 0.01 0.1 1 10Percent MovementLoad (TSF)SwellConsolidatioWater Added Project: Location: Project #: Date: SWELL / CONSOLIDATION TEST RESULTS Material Description: Brown Lean Clay with Sand (CL) Sample Location: Boring 26, Sample 1, Depth 2' Liquid Limit: 37 Plasticity Index: 10 % Passing #200: 81.3% Beginning Moisture: 9.6% Dry Density: 104.5 pcf Ending Moisture: 29.4% Swell Pressure: 1600 psf % Swell @ 150: 3.6% 800 Acre Mixed Use Development Fort Collins, Colorado 1172058 Sep-17 -10.0 -8.0 -6.0 -4.0 -2.0 0.0 2.0 4.0 6.0 8.0 10.0 0.01 0.1 1 10Percent MovementLoad (TSF)SwellConsolidatioWater Added Project: Location: Project #: Date: SWELL / CONSOLIDATION TEST RESULTS Material Description: Brown Lean Clay with Sand (CL) Sample Location: Boring 26, Sample 3, Depth 9' Liquid Limit: 39 Plasticity Index: 22 % Passing #200: 78.6% Beginning Moisture: 16.7% Dry Density: 106.9 pcf Ending Moisture: 19.3% Swell Pressure: 2000 psf % Swell @ 500: 1.5% 800 Acre Mixed Use Development Fort Collins, Colorado 1172058 Sep-17 -10.0 -8.0 -6.0 -4.0 -2.0 0.0 2.0 4.0 6.0 8.0 10.0 0.01 0.1 1 10Percent MovementLoad (TSF)SwellConsolidatioWater Added Project: Location: Project #: Date: SWELL / CONSOLIDATION TEST RESULTS Material Description: Brown Sandy Lean Clay (CL) Sample Location: Boring 28, Sample 1, Depth 2' Liquid Limit: - - Plasticity Index: - - % Passing #200: - - Beginning Moisture: 9.1% Dry Density: 100 pcf Ending Moisture: 25.0% Swell Pressure: 1200 psf % Swell @ 150: 4.1% 800 Acre Mixed Use Development Fort Collins, Colorado 1172058 Sep-17 -10.0 -8.0 -6.0 -4.0 -2.0 0.0 2.0 4.0 6.0 8.0 10.0 0.01 0.1 1 10Percent MovementLoad (TSF)SwellConsolidatioWater Added Project: Location: Project #: Date: SWELL / CONSOLIDATION TEST RESULTS Material Description: Brown Lean Clay with Sand (CL) Sample Location: Boring 29, Sample 1, Depth 4' Liquid Limit: 35 Plasticity Index: 20 % Passing #200: 73.8% Beginning Moisture: 12.5% Dry Density: 111.6 pcf Ending Moisture: 18.6% Swell Pressure: 3500 psf % Swell @ 500: 3.3% 800 Acre Mixed Use Development Fort Collins, Colorado 1172058 Sep-17 -10.0 -8.0 -6.0 -4.0 -2.0 0.0 2.0 4.0 6.0 8.0 10.0 0.01 0.1 1 10Percent MovementLoad (TSF)SwellConsolidatioWater Added PROJECT: 800 Acre Retail Development PROJECT NO. 1172058 LOCATION:DATE Sep-17 MATERIAL DESCRIPTION: Sandy Lean Clay (CL) SAMPLE LOCATION: LIQUID LIMIT:34 PLASTICITY INDEX:20 %PASSING #200:63.2 R-VALUE LABORATORY TEST RESULTS TEST SPECIMEN NO. 1 23 COMPACTION PRESSURE (PSI)125 150 175 DENSITY (PCF)108.8 112.9 111.1 MOISTURE CONTENT (%)17.6 17.4 16.5 EXPANSION PRESSURE (PSI)0.00 0.00 0.00 HORIZONTAL PRESSURE @ 160 PSI 128 125 124 SAMPLE HEIGHT (INCHES)2.56 2.55 2.55 EXUDATION PRESSURE (PSI)261.2 362.6 462.9 UNCORRECTED R-VALUE 12.6 14.6 15.4 CORRECTED R-VALUE 12.9 14.6 15.4 R-VALUE @ 300 PSI EXUDATION PRESSURE = 14 RESILIENT MODULUS, PSI = 4,060 Composite Sample Boring B-2 Upper 2' RESISTANCE R-VALUE & EXPANSION PRESSURE OF COMPACTED SOIL - ASTM D2844 Fort Collins, Colorado 0 10 20 30 40 50 60 70 80 90 100 0 50 100 150 200 250 300 350 400 450 500 550 600R-ValueExudation Pressure, PSF PROJECT: 800 Acre Retail Development PROJECT NO. 1172058 LOCATION:DATE Sep-17 MATERIAL DESCRIPTION: Sandy Lean Clay (CL) SAMPLE LOCATION: LIQUID LIMIT: PLASTICITY INDEX: %PASSING #200:58.9 R-VALUE LABORATORY TEST RESULTS TEST SPECIMEN NO. 1 23 COMPACTION PRESSURE (PSI)250 225 200 DENSITY (PCF)115.7 113.7 114.5 MOISTURE CONTENT (%)15.5 16.2 17.1 EXPANSION PRESSURE (PSI)0.00 0.00 0.00 HORIZONTAL PRESSURE @ 160 PSI 111 110 116 SAMPLE HEIGHT (INCHES)2.54 2.55 2.56 EXUDATION PRESSURE (PSI)530.5 389.9 263.6 UNCORRECTED R-VALUE 25.9 25.6 20.8 CORRECTED R-VALUE 25.9 25.6 21.3 R-VALUE @ 300 PSI EXUDATION PRESSURE = 25 RESILIENT MODULUS, PSI = 5,816 Composite Sample Boring B-4 Upper 2' RESISTANCE R-VALUE & EXPANSION PRESSURE OF COMPACTED SOIL - ASTM D2844 Fort Collins, Colorado 0 10 20 30 40 50 60 70 80 90 100 0 50 100 150 200 250 300 350 400 450 500 550 600R-ValueExudation Pressure, PSF PROJECT: 800 Acre Retail Development PROJECT NO. 1172058 LOCATION:DATE Sep-17 MATERIAL DESCRIPTION: Sandy Lean Clay (CL) SAMPLE LOCATION: LIQUID LIMIT:33 PLASTICITY INDEX:20 %PASSING #200:56.0 R-VALUE LABORATORY TEST RESULTS TEST SPECIMEN NO. 1 23 COMPACTION PRESSURE (PSI)175 150 125 DENSITY (PCF)111.6 112.8 111.7 MOISTURE CONTENT (%)17.0 17.6 18.2 EXPANSION PRESSURE (PSI)0.00 0.00 0.00 HORIZONTAL PRESSURE @ 160 PSI 123 125 130 SAMPLE HEIGHT (INCHES)2.54 2.45 2.48 EXUDATION PRESSURE (PSI)425.0 340.1 263.4 UNCORRECTED R-VALUE 17.8 15.8 13.0 CORRECTED R-VALUE 17.8 15.8 13.0 R-VALUE @ 300 PSI EXUDATION PRESSURE = 15 RESILIENT MODULUS, PSI = 4,195 Composite Sample Boring B-15 Upper 2' RESISTANCE R-VALUE & EXPANSION PRESSURE OF COMPACTED SOIL - ASTM D2844 Fort Collins, Colorado 0 10 20 30 40 50 60 70 80 90 100 0 50 100 150 200 250 300 350 400 450 500 550 600R-ValueExudation Pressure, PSF PROJECT: 800 Acre Retail Development PROJECT NO. 1172058 LOCATION:DATE Sep-17 MATERIAL DESCRIPTION: Lean Clay with Sand (CL) SAMPLE LOCATION: LIQUID LIMIT:---PLASTICITY INDEX:---%PASSING #200:73.3 R-VALUE LABORATORY TEST RESULTS TEST SPECIMEN NO. 1 23 COMPACTION PRESSURE (PSI)250 225 200 DENSITY (PCF)117.1 115.2 111.3 MOISTURE CONTENT (%)14.2 15.4 15.9 EXPANSION PRESSURE (PSI)0.00 0.00 0.00 HORIZONTAL PRESSURE @ 160 PSI 101 115 123 SAMPLE HEIGHT (INCHES)2.50 2.55 2.50 EXUDATION PRESSURE (PSI)660.7 426.1 262.7 UNCORRECTED R-VALUE 30.0 22.0 16.9 CORRECTED R-VALUE 30.0 22.0 16.9 R-VALUE @ 300 PSI EXUDATION PRESSURE = 18 RESILIENT MODULUS, PSI = 4,627 Composite Sample Boring B-23 Upper 2' RESISTANCE R-VALUE & EXPANSION PRESSURE OF COMPACTED SOIL - ASTM D2844 Fort Collins, Colorado 0 10 20 30 40 50 60 70 80 90 100 0 50 100 150 200 250 300 350 400 450 500 550 600R-ValueExudation Pressure, PSF