HomeMy WebLinkAboutMONTAVA - PHASE E TOWN CENTER - BDR220003 - MONTAVA SUBMITTAL DOCUMENTS - ROUND 1 - SITE PLANSHEET INDEXSHEET 1COVER SHEET1.REFER TO FINAL UTILITY PLANS FOR EXACT LOCATIONS AND CONSTRUCTION INFORMATION FOR STORM DRAINAGE STRUCTURES, UTILITY MAINS AND SERVICES, PROPOSED TOPOGRAPHY, STREET IMPROVEMENTS.2.REFER TO THE SUBDIVISION PLAT AND UTILITY PLANS FOR EXACT LOCATIONS, AREAS AND DIMENSIONS OF ALL EASEMENTS, LOTS, TRACTS, STREETS, WALKS AND OTHER SURVEY INFORMATION.3.THE PROJECT SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE FINAL PLANS. AMENDMENTS TO THE PLANS MUST BE REVIEWED AND APPROVED BY THE CITY PRIOR TO THE IMPLEMENTATION OF ANY CHANGES TO THE PLANS.4.ALL ROOFTOP AND GROUND MOUNTED MECHANICAL EQUIPMENT MUST BE SCREENED FROM VIEW FROM ADJACENT PROPERTY AND PUBLIC STREETS. IN CASES WHERE BUILDING PARAPETS DO NOT ACCOMPLISH SUFFICIENT SCREENING,THEN FREE-STANDING SCREEN WALLS MATCHING THE PREDOMINANT COLOR OF THE BUILDING SHALL BE CONSTRUCTED. OTHER MINOR EQUIPMENT SUCH AS CONDUIT, METERS AND PLUMBING VENTS SHALL BE SCREENED OR PAINTEDTO MATCH SURROUNDING BUILDING SURFACES.5.ALL CONSTRUCTION WITH THIS DEVELOPMENT PLAN MUST BE COMPLETED IN ONE PHASE UNLESS A PHASING PLAN IS SHOWN WITH THESE PLANS.6.ALL EXTERIOR LIGHTING PROVIDED SHALL COMPLY WITH THE FOOT-CANDLE REQUIREMENTS IN SECTION 3.2.4 OF THE LAND USE CODE AND SHALL USE A CONCEALED, FULLY SHIELDED LIGHT SOURCE WITH SHARP CUT-OFF CAPABILITYSO AS TO MINIMIZE UP-LIGHT, SPILL LIGHT, GLARE AND UNNECESSARY DIFFUSION.7.SIGNAGE AND ADDRESSING ARE NOT PERMITTED WITH THIS PLANNING DOCUMENT AND MUST BE APPROVED BY SEPARATE CITY PERMIT PRIOR TO CONSTRUCTION. SIGNS MUST COMPLY WITH CITY SIGN CODE UNLESS A SPECIFICVARIANCE IS GRANTED BY THE CITY.8.FIRE HYDRANTS MUST MEET OR EXCEED POUDRE FIRE AUTHORITY STANDARDS. ALL BUILDINGS MUST PROVIDE AN APPROVED FIRE EXTINGUISHING SYSTEM.9.ALL BIKE RACKS PROVIDED MUST BE PERMANENTLY ANCHORED.10.ALL SIDEWALKS AND RAMPS MUST CONFORM TO CITY STANDARDS. ACCESSABLE RAMPS MUST BE PROVIDED AT ALL STREET AND DRIVE INTERSECTIONS AND AT ALL DESIGNATED ACCESSABLE PARKING SPACES. ACCESSABLE PARKINGSPACES MUST SLOPE NO MORE THAN 1:48 IN ANY DIRECTION. ALL ACCESSIBLE ROUTES MUST SLOPE NO MORE THAN 1:20 IN DIRECTION OF TRAVEL AND WITH NO MORE THAN 1:48 CROSS SLOPE.11.COMMON OPEN SPACE AREAS AND LANDSCAPING WITHIN RIGHT OF WAYS, STREET MEDIANS, AND TRAFFIC CIRCLES ADJACENT TO COMMON OPEN SPACE AREAS ARE REQUIRED TO BE MAINTAINED BY THE PROPERTY OWNER OF THECOMMON AREA. THE PROPERTY OWNER IS RESPONSIBLE FOR SNOW REMOVAL ON ALL ADJACENT STREET SIDEWALKS AND SIDEWALKS IN COMMON OPEN SPACE AREAS.12.DESIGN AND INSTALLATION OF ALL PARKWAY/TREE LAWN AND MEDIAN AREAS IN THE RIGHT-OF-WAY SHALL BE IN ACCORDANCE WITH CITY STANDARDS. UNLESS OTHERWISE AGREED TO BY THE CITY WITH THE FINAL PLANS, ALL ONGOINGMAINTENANCE OF SUCH AREAS IS THE RESPONSIBILITY OF THE OWNER/DEVELOPER.13.THE PROPERTY OWNER FOR EACH RESIDENTIAL LOT IS RESPONSIBLE FOR SNOW REMOVAL ON ALL STREET SIDEWALKS ADJACENT TO EACH RESIDENTIAL LOT.14.PRIVATE CONDITIONS, COVENANTS, AND RESTRICTIONS (CC&R'S), OR ANY OTHER PRIVATE RESTRICTIVE COVENANT IMPOSED ON LANDOWNERS WITHIN THE DEVELOPMENT, MAY NOT BE CREATED OR ENFORCED HAVING THE EFFECT OFPROHIBITING OR LIMITING THE INSTALLATION OF XERISCAPE LANDSCAPING, SOLAR/PHOTO-VOLTAIC COLLECTORS (IF MOUNTED FLUSH UPON ANY ESTABLISHED ROOF LINE), CLOTHES LINES (IF LOCATED IN BACK YARDS),ODORCONTROLLED COMPOST BINS, OR WHICH HAVE THE EFFECT OF REQUIRING THAT A PORTION OF ANY INDIVIDUAL LOT BE PLANTED IN TURF GRASS.15.ANY DAMAGED CURB, GUTTER AND SIDEWALK EXISTING PRIOR TO CONSTRUCTION, AS WELL AS STREETS, SIDEWALKS, CURBS AND GUTTERS, DESTROYED, DAMAGED OR REMOVED DUE TO CONSTRUCTION OF THIS PROJECT, SHALL BEREPLACED OR RESTORED TO CITY OF FORT COLLINS STANDARDS AT THE DEVELOPER'S EXPENSE PRIOR TO THE ACCEPTANCE OF COMPLETED IMPROVEMENTS AND/OR PRIOR TO THE ISSUANCE OF THE FIRST CERTIFICATE OFOCCUPANCY.16.FIRE LANE MARKING: A FIRE LANE MARKING PLAN MUST BE REVIEWED AND APPROVED BY THE FIRE OFFICIAL PRIOR TO THE ISSUANCE OF ANY CERTIFICATE OF OCCUPANCY. WHERE REQUIRED BY THE FIRE CODE OFFICIAL, APPROVEDSIGNS OR OTHER APPROVED NOTICES THAT INCLUDE THE WORDS NO PARKING FIRE LANE SHALL BE PROVIDED FOR FIRE APPARATUS ACCESS ROADS TO IDENTIFY SUCH ROADS OR PROHIBIT THE OBSTRUCTION THEREOF. THE MEANS BYWHICH FIRE LANES ARE DESIGNATED SHALL BE MAINTAINED IN A CLEAN AND LEGIBLE CONDITION AT ALL TIMES AD BE REPLACED OR REPAIRED WHEN NECESSARY TO PROVIDE ADEQUATE VISIBILITY.17.PREMISE IDENTIFICATION: AN ADDRESSING PLAN IS REQUIRED TO BE REVIEWED AND APPROVED BY THE CITY AND POUDRE FIRE AUTHORITY PRIOR TO THE ISSUANCE OF ANY CERTIFICATE OF OCCUPANCY. UNLESS THE PRIVATE DRIVE ISNAMED, MONUMENT SIGNAGE MAY BE REQUIRED TO ALLOW WAY-FINDING. ALL BUILDINGS SHALL HAVE ADDRESS NUMBERS, BUILDING NUMBERS OR APPROVED BUILDING IDENTIFICATION PLACED IN A POSITION THAT IS PLAINLY LEGIBLE,VISIBLE FROM THE STREET OR ROAD FRONTING THE PROPERTY, AND POSTED WITH A MINIMUM OF SIX-INCH NUMERALS ON A CONTRASTING BACKGROUND. WHERE ACCESS IS BY MEANS OF A PRIVATE ROAD AND THE BUILDING CANNOTBE VIEWED FROM THE PUBLIC WAY, A MONUMENT, POLE OR OTHER SIGN OR MEANS SHALL BE USED TO IDENTIFY THE STRUCTURE.SITE PLAN NOTES:NOT TO SCALECONTEXT MAPN TIMBERLINE RD
MOUNTAIN VISTA DRTURNBERRY RD
RICHARDS LAKE DRI-25E VINE DRLINDENMEIERLAKELONG PONDRESERVOIRSheet Number:Project Number:Project:
Client:1603 Oakridge Drive, Suite 100Fort Collins, CO 80525p. (970) 223-7577www.bhadesign.comLandscape ArchitectureUrban DesignMaster PlanningC:\USERS\ANDYPATTON\ONEDRIVE - BHADESIGN\DOCUMENTS\PROJECTS\MONTAVA PHASE ONE PDP\DRAWINGS\ACAD\BDR-PHASE E\DWG\1734-SITE_PHASE E.DWGPlot Date:8/17/2022 10:09 AM Plotted By: Andy PattonDate Created:8/17/2022
Produced by:Date:Revision:COVERDate:COVER SHEET
MONTAVA SUBDIVISION FILING NO. 2
HF2M | COLORADO
BASIC DEVELOPMENT REVIEW08/17/20221734STORYBOOKMAPLE HILLRICHARD'S LAKEWATERGLENTRAILHEADWATERFIELDPLANNING CERTIFICATE______________________________________________ APPROVED BY THE DIRECTOR OF COMMUNITY DEVELOPMENT AND NEIGHBORHOOD SERVICES OF THE CITY OF FORTCOLLINS, COLORADO ON THIS _____ DAY OF__________________, 20_____,Director SignatureOWNER'S CERTIFICATETHE UNDERSIGNED DOES/DO HEREBY CERTIFY THAT I/WE ARE THE LAWFUL OWNERS OF THE REAL PROPERTYDESCRIBED ON THIS SITE PLAN AND DO HEREBY CERTIFY THAT I/WE ACCEPT THE CONDITIONS AND RESTRICTIONSSET FORTH ON SAID SITE PLAN.______________________________________________ Owner (Signed)______________________________________________ DateTHE FOREGOING INSTRUMENT WAS ACKNOWLEDGED BEFORE ME THIS _____ DAY OF__________________ A.D., 20_____,BY________________________________________________(print name)AS ________________________________________________MY COMMISSION EXPIRES: ________________________________________________WITNESS MY HAND AND OFFICIAL SEAL.______________________________________________ Notary Public______________________________________________ AddressMONTAVA SUBDIVISION FILING NO. 2NOT TO SCALEVICINITY MAPSHEET S1 - S16SITE PLAN SHEETSSHEET L0 - L16LANDSCAPE PLAN SHEETSPHASE EPROJECTBOUNDARYSHEET M1TREE MITIGATION SHEETSPHASE EPROJECTBOUNDARYLAND USE DATA (PHASE E)RESIDENTIALPROPOSED LAND USET4: 3 STORIES, T5: 4 STORIES2,071,288 S.F. (47.55 ACRES)MAX. BUILDING HEIGHT PERMITTEDEXISTING ZONING GROSS SITE AREA LMN WITH PUD OVERLAY N/A (RESIDENTIAL USES)0 S.F. COMMERCIALESTIMATED FLOOR AREA FLOOR AREA RATIO NET SITE AREA PUBLIC ROW:432,215.76 S.F. (9.92 ACRES)MAX. BUILDING HEIGHT PROPOSED3 STORIES17.016 ACRESA PARCEL OF LAND SITUATED IN THE SOUTHEAST QUARTER OFSECTION 32, TOWNSHIP 8 NORTH, RANGE 68 WEST OF THE 6TH P.M.,COUNTY OF LARIMER, STATE OF COLORADOSHEET A1 - A5ARCHITECTURAL SHEETSPROGRESS SETNET SITE AREA / # OF UNITS14.46 DU / ACRES1.No neighborhood perimeter fencing is planned in Phase E. Height and location of private lotfencing is restricted based based on the Montava PUD Uses, Densities and DevelopmentStandards. Fencing locations and styles will be subject to HOA or Metro District review andapproval.NOTES:
Sheet Number:Project Number:Project:
Client:1603 Oakridge Drive, Suite 100Fort Collins, CO 80525p. (970) 223-7577www.bhadesign.comLandscape ArchitectureUrban DesignMaster PlanningC:\USERS\ANDYPATTON\ONEDRIVE - BHADESIGN\DOCUMENTS\PROJECTS\MONTAVA PHASE ONE PDP\DRAWINGS\ACAD\BDR-PHASE E\DWG\1734-SITE_PHASE E.DWGPlot Date:8/17/2022 8:46 AM Plotted By: Andy PattonDate Created:8/17/2022
Produced by:Date:Revision:S1Date:HOUSING DIAGRAM
MONTAVA SUBDIVISION FILING NO. 2
HF2M | COLORADO
PHASE E
BASIC DEVELOPMENT REVIEW08/17/20221734PROGRESS SET
Sheet Number:Project Number:Project:
Client:1603 Oakridge Drive, Suite 100Fort Collins, CO 80525p. (970) 223-7577www.bhadesign.comLandscape ArchitectureUrban DesignMaster PlanningC:\USERS\ANDYPATTON\ONEDRIVE - BHADESIGN\DOCUMENTS\PROJECTS\MONTAVA PHASE ONE PDP\DRAWINGS\ACAD\BDR-PHASE E\DWG\1734-SITE_PHASE E.DWGPlot Date:8/17/2022 8:46 AM Plotted By: Andy PattonDate Created:8/17/2022
Produced by:Date:Revision:S2Date:PARKING DIAGRAM
MONTAVA SUBDIVISION FILING NO. 2
HF2M | COLORADO
PHASE E
BASIC DEVELOPMENT REVIEW08/17/20221734PROGRESS SET
Sheet Number:Project Number:Project:
Client:1603 Oakridge Drive, Suite 100Fort Collins, CO 80525p. (970) 223-7577www.bhadesign.comLandscape ArchitectureUrban DesignMaster PlanningC:\USERS\ANDYPATTON\ONEDRIVE - BHADESIGN\DOCUMENTS\PROJECTS\MONTAVA PHASE ONE PDP\DRAWINGS\ACAD\BDR-PHASE E\DWG\1734-SITE_PHASE E.DWGPlot Date:8/17/2022 8:47 AM Plotted By: Andy PattonDate Created:8/17/2022
Produced by:Date:Revision:S3Date:TRANSECT DIAGRAM
MONTAVA SUBDIVISION FILING NO. 2
HF2M | COLORADO
PHASE E
BASIC DEVELOPMENT REVIEW08/17/20221734PROGRESS SETTHE USES REQUESTED IN PHASE E INCLUDE SINGLE FAMILY DETACHED, SINGLEFAMILY ATTACHED, TWO-FAMILY DWELLINGS, AND TOWNHOMES (MULTI-FAMILY UPTO 14 UNITS PER BUILDING). ALL OF THESE LAND USES ARE PERMITTED INTRANSECTS T4 AND T5 UNDER BASIC DEVELOPMENT REVIEW.
6'4'4'6'6'4'4'6'9'6'4'4'24'4'6'9'9'9'9'4'20'4'N TIMBERLINE ROAD(SEE TIMBERLINE ROADPLANTING PLANS FORLANDSCAPE THIS AREA)MOUNTAIN VISTA AVE.(SEE MOUNTAIN VISTA ROADPLANTING PLANS FORLANDSCAPE THIS AREA)66'
ROW
66'ROWEX. 50' ROW(MONTAVA FILING 1)EX. 54' UE(MONTAVA FILING 1)EX. 20' UEBK 1889 PG512 TO E.LARIMER CO. WATERDISTRICTEX. 60' ROW(MONTAVA FILING 1)TRACT I (FUTURE DEVELOPMENT)157271 SF3.61 ACMONTAVA DRN TIMBERLINE RD
MOUNTAIN VISTA AVEBIG TIMBER DRS00°33'32"E 2648.64'FUTURE TIMBERLINERD CONNECTION PASheet Number:Project Number:Project:
Client:1603 Oakridge Drive, Suite 100Fort Collins, CO 80525p. (970) 223-7577www.bhadesign.comLandscape ArchitectureUrban DesignMaster PlanningC:\USERS\ANDYPATTON\ONEDRIVE - BHADESIGN\DOCUMENTS\PROJECTS\MONTAVA PHASE ONE PDP\DRAWINGS\ACAD\BDR-PHASE E\DWG\1734-SITE_PHASE E.DWGPlot Date:8/17/2022 8:47 AM Plotted By: Andy PattonDate Created:8/17/2022
Produced by:Date:Revision:S4Date:SITE PLAN
MONTAVA SUBDIVISION FILING NO. 2
HF2M | COLORADO
PHASE E
BASIC DEVELOPMENT REVIEW08/17/20221734KEY MAP0N O R T H60'15'30'S C A L E : 1''= 3 0'S5S6S7S10PROGRESS SETS4S9S8S13S12S11S14S15S16LEGENDSITE BOUNDARYR.O.W.LOT LINEUTILITY EASEMENTSETBACK4" THICK STANDARD GRAY CONCRETECONCRETE PAVERSPLANTING AREABUILDING FRONTAGENOTES:REFER TO MONTAVA USES, DENSITIES,AND DEVELOPMENT STANDARDS SECTION5.5-1 FOR SETBACK DIMENSIONS
6'4'4'24'4'6'9'
3
6
'
6'
6'
6'
6'
N TIMBERLINE ROAD(SEE TIMBERLINE ROADPLANTING PLANS FORLANDSCAPE THIS AREA)12'20'20'60'
ROW
6
0
'
ROW
66'ROW
66'ROWTRACT D (FUTURE DEVELOPMENT)255347 SF5.86 ACLOT 121787SFLOT 131787SFLOT 101392SFLOT 141430SFLOT 113782SFLOT 91080SFLOT 7962SFLOT 8832SFLOT 15832SFLOT 221083SFLOT 16962SFLOT 181118SFLOT 191118SFLOT 20832SFLOT 21832SFLOT 141080SFLOT 17962SFLOT 41042SFLOT 71040SFLOT 53972SFLOT 131457SFLOT 111040SFLOT 81040SFLOT 11362SFLOT 91398SFLOT 61398SFLOT 101398SFLOT 121040SFLOT 21042SFLOT 31042SFTRACT E18601 SF0.43 ACTRACT D (FUTURE DEVELOPMENT)255347 SF5.86 ACMONTAVA DRFLINT HILL DRN TIMBERLINE RD
MOUNTAIN VISTA DRIVEE CO RD 50SQUARECOMPACTGREENS00°33'32"E 2648.64'FUTURE TIMBERLINERD CONNECTIONPASheet Number:Project Number:Project:
Client:1603 Oakridge Drive, Suite 100Fort Collins, CO 80525p. (970) 223-7577www.bhadesign.comLandscape ArchitectureUrban DesignMaster PlanningC:\USERS\ANDYPATTON\ONEDRIVE - BHADESIGN\DOCUMENTS\PROJECTS\MONTAVA PHASE ONE PDP\DRAWINGS\ACAD\BDR-PHASE E\DWG\1734-SITE_PHASE E.DWGPlot Date:8/17/2022 8:47 AM Plotted By: Andy PattonDate Created:8/17/2022
Produced by:Date:Revision:S5Date:SITE PLAN
MONTAVA SUBDIVISION FILING NO. 2
HF2M | COLORADO
PHASE E
BASIC DEVELOPMENT REVIEW08/17/202217340N O R T H60'15'30'S C A L E : 1''= 3 0'PROGRESS SETKEY MAPS5S6S7S10S4S9S8S13S12S11S14S15S16LEGENDSITE BOUNDARYR.O.W.LOT LINEUTILITY EASEMENTSETBACK4" THICK STANDARD GRAY CONCRETECONCRETE PAVERSPLANTING AREABUILDING FRONTAGENOTES:REFER TO MONTAVA USES, DENSITIES,AND DEVELOPMENT STANDARDS SECTION5.5-1 FOR SETBACK DIMENSIONS
36'6'6'6'6'6'4'28'4'6'1
2
'12'12'1
2
'12'12'2
6
'
-
6
"57'12'6'20'9'6'4'28'4'6'9'1
3
'
8'20'20'20'60'ROW
66'ROW66'ROW60'ROW
TRACT G (FUTURE DEVELOPMENT)16536 SF0.38 ACTRACT H (FUTUREDEVELOPMENT)15184 SF0.35 ACLOT 291040SFLOT 301170SFLOT 311170SFLOT 321040SFLOT 331170SFLOT 491696SFLOT 411330SFLOT 341368SFLOT 481326SFLOT 461170SFLOT 471172SFLOT 451040SFLOT 351040SFLOT 441040SFLOT 381326SFLOT 431322SFLOT 511767SFLOT 371170SFLOT 391696SFLOT 501330SFLOT 361170SFLOT 401330SFLOT 421706SFLOT 121787SFLOT 131787SFLOT 101392SFLOT 141430SFLOT 151430SFLOT 113782SFLOT 161592SFLOT 6962SFLOT 91080SFLOT 5832SFLOT 11083SFLOT 21118SFLOT 7962SFLOT 31118SFLOT 8832SFLOT 4832SFLOT 15832SFLOT 221083SFLOT 16962SFLOT 181118SFLOT 191118SFLOT 20832SFLOT 21832SFLOT 141080SFLOT 17962SFLOT 131457SFLOT 111040SFLOT 91398SFLOT 101398SFLOT 121040SFTRACT F63892 SF1.47 ACTRACT E18601 SF0.43 ACTRACT F63892 SF1.47 ACCOUNTRY CLUB RDMONTAVA DRFLINT HILL DRMONTAVA DRPAMOUNTAIN VISTA DRIVEE CO RD 50SQUARECOMPACTGREENS00°33'32"E 2648.64'FUTURE TIMBERLINERD CONNECTIONSheet Number:Project Number:Project:
Client:1603 Oakridge Drive, Suite 100Fort Collins, CO 80525p. (970) 223-7577www.bhadesign.comLandscape ArchitectureUrban DesignMaster PlanningC:\USERS\ANDYPATTON\ONEDRIVE - BHADESIGN\DOCUMENTS\PROJECTS\MONTAVA PHASE ONE PDP\DRAWINGS\ACAD\BDR-PHASE E\DWG\1734-SITE_PHASE E.DWGPlot Date:8/17/2022 8:47 AM Plotted By: Andy PattonDate Created:8/17/2022
Produced by:Date:Revision:S6Date:SITE PLAN
MONTAVA SUBDIVISION FILING NO. 2
HF2M | COLORADO
PHASE E
BASIC DEVELOPMENT REVIEW08/17/202217340N O R T H60'15'30'S C A L E : 1''= 3 0'PROGRESS SETLEGENDSITE BOUNDARYR.O.W.LOT LINEUTILITY EASEMENTSETBACK4" THICK STANDARD GRAY CONCRETECONCRETE PAVERSPLANTING AREABUILDING FRONTAGENOTES:REFER TO MONTAVA USES, DENSITIES,AND DEVELOPMENT STANDARDS SECTION5.5-1 FOR SETBACK DIMENSIONSKEY MAPS5S6S7S10S4S9S8S13S12S11S14S15S16
12'9'6'4'28'4'6'9'13'8'38'8'13'20'66'ROW80'ROW
EX. 20' UETRACT H (FUTUREDEVELOPMENT)15184 SF0.35 ACLOT 291040SFLOT 301170SFLOT 311170SFLOT 321040SFLOT 331170SFTRACT F63892 SF1.47 ACTRACT J (FUTURE DEVELOPMENT)363326 SF8.34 ACCOUNTRY CLUB RDMONTAVA DRMOUNTAIN VISTA DRIVEE CO RD 50SQUARECOMPACTGREENS00°33'32"E 2648.64'FUTURE TIMBERLINERD CONNECTIONPASheet Number:Project Number:Project:
Client:1603 Oakridge Drive, Suite 100Fort Collins, CO 80525p. (970) 223-7577www.bhadesign.comLandscape ArchitectureUrban DesignMaster PlanningC:\USERS\ANDYPATTON\ONEDRIVE - BHADESIGN\DOCUMENTS\PROJECTS\MONTAVA PHASE ONE PDP\DRAWINGS\ACAD\BDR-PHASE E\DWG\1734-SITE_PHASE E.DWGPlot Date:8/17/2022 8:48 AM Plotted By: Andy PattonDate Created:8/17/2022
Produced by:Date:Revision:S7Date:SITE PLAN
MONTAVA SUBDIVISION FILING NO. 2
HF2M | COLORADO
PHASE E
BASIC DEVELOPMENT REVIEW08/17/202217340N O R T H60'15'30'S C A L E : 1''= 3 0'PROGRESS SETKEY MAPS5S6S7S10S4S9S8S13S12S11S14S15S16LEGENDSITE BOUNDARYR.O.W.LOT LINEUTILITY EASEMENTSETBACK4" THICK STANDARD GRAY CONCRETECONCRETE PAVERSPLANTING AREABUILDING FRONTAGENOTES:REFER TO MONTAVA USES, DENSITIES,AND DEVELOPMENT STANDARDS SECTION5.5-1 FOR SETBACK DIMENSIONS
EX. 20' UETRACT J (FUTURE DEVELOPMENT)363326 SF8.34 ACMOUNTAIN VISTA DRIVEE CO RD 50N
T
I
M
B
E
R
L
I
N
E
R
O
A
D
SQUARECOMPACTGREENS00°33'32"E 2648.64'N TIMBERLINE ROAD(SEE TIMBERLINE ROADPLANTING PLANS FORLANDSCAPE THIS AREA)
N TIMBERLINE ROAD(SEE TIMBERLINE ROADPLANTING PLANS FORLANDSCAPE THIS AREA)MOUNTAIN VISTA AVE.
(SEE MOUNTAIN
VISTA
ROADPLANTING
PLANS
FORLANDSCAPE THIS AREA)
N TIMBERLINE ROAD(SEE TIMBERLINE ROADPLANTING PLANS FORLANDSCAPE THIS AREA)FUTURE TIMBERLINERD CONNECTION PASheet Number:Project Number:Project:
Client:1603 Oakridge Drive, Suite 100Fort Collins, CO 80525p. (970) 223-7577www.bhadesign.comLandscape ArchitectureUrban DesignMaster PlanningC:\USERS\ANDYPATTON\ONEDRIVE - BHADESIGN\DOCUMENTS\PROJECTS\MONTAVA PHASE ONE PDP\DRAWINGS\ACAD\BDR-PHASE E\DWG\1734-SITE_PHASE E.DWGPlot Date:8/17/2022 8:48 AM Plotted By: Andy PattonDate Created:8/17/2022
Produced by:Date:Revision:S8Date:SITE PLAN
MONTAVA SUBDIVISION FILING NO. 2
HF2M | COLORADO
PHASE E
BASIC DEVELOPMENT REVIEW08/17/202217340N O R T H60'15'30'S C A L E : 1''= 3 0'PROGRESS SETKEY MAPS5S6S7S10S4S9S8S13S12S11S14S15S16LEGENDSITE BOUNDARYR.O.W.LOT LINEUTILITY EASEMENTSETBACK4" THICK STANDARD GRAY CONCRETECONCRETE PAVERSPLANTING AREABUILDING FRONTAGENOTES:REFER TO MONTAVA USES, DENSITIES,AND DEVELOPMENT STANDARDS SECTION5.5-1 FOR SETBACK DIMENSIONS
1
3
'
8'
3
8
'
1
3
'
8'S00°33'32"E 2648.64'N TIMBERLINE ROAD(SEE TIMBERLINE ROADPLANTING PLANS FORLANDSCAPE THIS AREA)10'6'
6'24'3
5
'
-
6
"
6'
1
2
'
1
2
'8'6'
7'-6"6'12'6'12'12'6'6'12'12'17'-412"11'-512"12'
6
'
6'26'6'
6'10'10'1
3
'22'20'20'20'2
0
'20'20'20'20'20'20'1
9
'
-
1
0
"24'24'26'20'2
0
'
6'
1
5
'
1
5
'
1
3
'20'6'60'
ROW
60'ROW EX. 54' UEMONTAVA FILING 1EX. 66' ROWEX. 102' ROW20' EX. UEBK 1889 PG512TO E. LARIMER CO.WATER DISTRICTPUBLIC ACCESS EASEMENTPUBLIC ACCESS EASEMENT20' EX. UEBK 1889 PG512TO E. LARIMER CO.WATER DISTRICTLOT 452937SFLOT 654472SFLOT 645440SFLOT 394590SFLOT 404675SFLOT 263042SFLOT 272957SFLOT 282920SFLOT 242873SFLOT 252957SFLOT 131592SFLOT 12LOT 131787SFLOT 611397SFLOT 621462SFLOT 631579SFLOT 571360SFLOT 581040SFLOT 591040SFLOT 601397SFLOT 701040SFLOT 712284SFLOT 691397SFLOT 681397SFLOT 671040SFLOT 661462SFLOT 11750SFLOT 31593SFLOT 21430SFLOT 381750SFLOT 341430SFLOT 331788SFLOT 324907SFLOT 311788SFLOT 301430SFLOT 291750SFLOT 351801SFLOT 373314SFLOT 361891SFLOT 561359SFLOT 551040SFLOT 541040SFLOT 531506SFLOT 481594SFLOT 471040SFLOT 501040SFLOT 521593SFLOT 511040SFLOT 492013SFLOT 102005SFLOT 41593SFLOT 121592SFLOT 111430SFLOT 51821SFLOT 62075SFLOT 72074SFLOT 82074SFLOT 92074SFLOT 412975SFLOT 422890SFLOT 432890SFLOT 442805SFLOT 901587SFTRACT C (FUTURE DEVELOPMENT)61359 SF1.41 ACTRACT B81471 SF1.87 ACTRACT B81471 SF1.87 ACCOUNTRY CLUB RDLONGWOOD DRN TIMBERLINE RDPAMOUNTAIN VISTA DRIVEE CO RD 50N T
I
M
B
ER
L
I
N
E
R
O
A
D
SQUARECOMPACTGREENS00°33'32"E 2648.64'N TIMBERLINE ROAD(SEE TIMBERLINE ROADPLANTING PLANS FORLANDSCAPE THIS AREA)
N TIMBERLINE ROAD(SEE TIMBERLINE ROADPLANTING PLANS FOR
LANDSCAPE THIS AREA)MOUNTAIN VISTA
AVE.(SEE MOUNTAIN V
ISTA ROADPLANTING PLANS FORLANDSCAPE THIS AREA)
N TIMBERLINE ROAD(SEE TIMBERLINE ROADPLANTING PLANS FORLANDSCAPE THIS AREA)FUTURE TIMBERLINERD CONNECTIONSheet Number:Project Number:Project:
Client:1603 Oakridge Drive, Suite 100Fort Collins, CO 80525p. (970) 223-7577www.bhadesign.comLandscape ArchitectureUrban DesignMaster PlanningC:\USERS\ANDYPATTON\ONEDRIVE - BHADESIGN\DOCUMENTS\PROJECTS\MONTAVA PHASE ONE PDP\DRAWINGS\ACAD\BDR-PHASE E\DWG\1734-SITE_PHASE E.DWGPlot Date:8/17/2022 8:48 AM Plotted By: Andy PattonDate Created:8/17/2022
Produced by:Date:Revision:S9Date:SITE PLAN
MONTAVA SUBDIVISION FILING NO. 2
HF2M | COLORADO
PHASE E
BASIC DEVELOPMENT REVIEW08/17/202217340N O R T H60'15'30'S C A L E : 1''= 3 0'PROGRESS SETLEGENDSITE BOUNDARYR.O.W.LOT LINEUTILITY EASEMENTSETBACK4" THICK STANDARD GRAY CONCRETECONCRETE PAVERSPLANTING AREABUILDING FRONTAGENOTES:REFER TO MONTAVA USES, DENSITIES,AND DEVELOPMENT STANDARDS SECTION5.5-1 FOR SETBACK DIMENSIONSKEY MAPS5S6S7S10S4S9S8S13S12S11S14S15S16
13'8'38'13'8'SQUARECOMPACTGREEN8'
1
3
'
3
8
'
1
3
'
8'6'6'36'6'6'10'6'6'24'35'-6"6'12'12'8'6'26'6'6'10'10'13'22'20'20'20'20'20'19'-10"24'24'20'6'10'6'10'6'
6'
6'98'10'2
6
'20'1
3
'20'1
3
'
1
3
'
15'15'13'15'-10"6'10'12'16'20'2
0
'
20'
2
6
'
1
2
'20'12'6'
7
2
'
2
6
'
2
6
'
1
3
'
8'
3
8
'
2
6
'
8
0
'
ROW60'ROW60'ROW80'ROW
LOT 274403SFLOT 284403SFLOT 741595SFLOT 762540SFLOT 881750SFLOT 294843SFLOT 412540SFLOT 422684SFLOT 431711SFLOT 441276SFLOT 451653SFLOT 461595SFLOT 471276SFLOT 481276SFLOT 491595SFLOT 501653SFLOT 511276SFLOT 521711SFLOT 592540SFLOT 601936SFLOT 612684SFLOT 621711SFLOT 641276SFLOT 631276SFLOT 651653SFLOT 661653SFLOT 671276SFLOT 681653SFLOT 691653SFLOT 701276SFLOT 711276SFLOT 721711SFLOT 731653SFLOT 752684SFLOT 771847SFLOT 781430SFLOT 791885SFLOT 843516SFLOT 853459SFLOT 861796SFLOT 871430SFLOT 923212SFLOT 933080SFLOT 943080SFLOT 953080SFLOT 963080SFLOT 973080SFLOT 983080SFLOT 993212SFLOT 1002684SFLOT 1022540SFLOT 913124SFLOT 903080SFLOT 893068SFLOT 1011936SFLOT 11197SFLOT 21008SFLOT 31008SFLOT 41355SFLOT 51355SFLOT 452937SFLOT 654472SFLOT 645440SFLOT 394590SFLOT 404675SFLOT 263042SFLOT 222873SFLOT 272957SFLOT 282920SFLOT 212835SFLOT 232873SFLOT 242873SFLOT 252957SFLOT 151430SFLOT 161787SFLOT 171787SFLOT 131592SFLOT 181430SFLOT 191430SFLOT 201755SFLOT 141430SFLOT 231430SFLOT 221430SFLOT 241755SFLOT 381750SFLOT 341430SFLOT 331788SFLOT 324907SFLOT 311788SFLOT 301430SFLOT 291750SFLOT 351801SFLOT 561359SFLOT 551040SFLOT 541040SFLOT 531506SFLOT 481594SFLOT 471040SFLOT 501040SFLOT 521593SFLOT 511040SFLOT 492013SFLOT 121592SFLOT 412975SFLOT 422890SFLOT 432890SFLOT 442805SFLOT 901587SFTRACT A145153 SF3.33 ACTRACT B81471 SF1.87 ACTRACT B81471 SF1.87 ACTRACT A145153 SF3.33 ACGODWINK
DRCOUNTRY CLUB RDLONGWOOD
DRCOUNTRY CLUB RDMOUNTAIN VISTA DRIVEE CO RD 50N T
I
M
B
ER
L
I
N
E
R
O
A
D
SQUARECOMPACTGREENS00°33'32"E 2648.64'N TIMBERLINE ROAD(SEE TIMBERLINE ROADPLANTING PLANS FORLANDSCAPE THIS AREA)
N TIMBERLINE ROAD(SEE TIMBERLINE ROADPLANTING PLANS FORLANDSCAPE THIS AREA)MOUNTAIN VISTA AVE.
(SEE MOUNTAIN
VISTA
ROADPLANTING
PLANS
FORLANDSCAPE THIS AREA)
N TIMBERLINE ROAD(SEE TIMBERLINE ROAD
PLANTING PLANS FORLANDSCAPE THIS AREA)FUTURE TIMBERLINERD CONNECTION PASheet Number:Project Number:Project:
Client:1603 Oakridge Drive, Suite 100Fort Collins, CO 80525p. (970) 223-7577www.bhadesign.comLandscape ArchitectureUrban DesignMaster PlanningC:\USERS\ANDYPATTON\ONEDRIVE - BHADESIGN\DOCUMENTS\PROJECTS\MONTAVA PHASE ONE PDP\DRAWINGS\ACAD\BDR-PHASE E\DWG\1734-SITE_PHASE E.DWGPlot Date:8/17/2022 8:48 AM Plotted By: Andy PattonDate Created:8/17/2022
Produced by:Date:Revision:S10Date:SITE PLAN
MONTAVA SUBDIVISION FILING NO. 2
HF2M | COLORADO
PHASE E
BASIC DEVELOPMENT REVIEW08/17/202217340N O R T H60'15'30'S C A L E : 1''= 3 0'PROGRESS SETKEY MAPS5S6S7S10S4S9S8S13S12S11S14S15S16LEGENDSITE BOUNDARYR.O.W.LOT LINEUTILITY EASEMENTSETBACK4" THICK STANDARD GRAY CONCRETECONCRETE PAVERSPLANTING AREABUILDING FRONTAGENOTES:REFER TO MONTAVA USES, DENSITIES,AND DEVELOPMENT STANDARDS SECTION5.5-1 FOR SETBACK DIMENSIONS
SQUARECOMPACTGREEN13'8'6'10'6'6'6'98'10'26'20'13'20'13'6'72'26'26'
2
6
'20'6'6'6'6'6'28'13'8'38'22'20'22'20'80'ROW60'ROWEX. 20' UELOT 201008SFLOT 181008SFLOT 224784SFLOT 234400SFLOT 254843SFLOT 264402SFLOT 244840SFLOT 451653SFLOT 461595SFLOT 471276SFLOT 481276SFLOT 491595SFLOT 501653SFLOT 511276SFLOT 521711SFLOT 531653SFLOT 541276SFLOT 551595SFLOT 562684SFLOT 571936SFLOT 582540SFLOT 592540SFLOT 601936SFLOT 612684SFLOT 621711SFLOT 641276SFLOT 631276SFLOT 651653SFLOT 661653SFLOT 671276SFLOT 681653SFLOT 691653SFLOT 701276SFLOT 81355SFLOT 161406SFLOT 711276SFLOT 721711SFLOT 953080SFLOT 963080SFLOT 973080SFLOT 983080SFLOT 993212SFLOT 1002684SFLOT 1022540SFLOT 171406SFLOT 1011936SFLOT 11197SFLOT 21008SFLOT 31008SFLOT 41355SFLOT 51355SFLOT 61008SFLOT 71355SFLOT 111197SFLOT 91008SFLOT 101008SFLOT 121197SFLOT 131008SFLOT 141008SFLOT 151008SFLOT 211520SFLOT 191008SFLOT 271326SFLOT 281326SFLOT 291040SFLOT 30LOT 251340SFLOT 261040SFLOT 231430SFLOT 221430SFLOT 241755SFTRACT A145153 SF3.33 ACTRACT F63892 SF1.47 ACTRACT A145153 SF3.33 ACTRACT A145153 SF3.33 ACTRACT A145153 SF3.33 ACTRACT J (FUTURE DEVELOPMENT)363326 SF8.34 ACGODWINK DRCOUNTRY CLUB RDCOUNTRY CLUB RDMOUNTAIN VISTA DRIVEE CO RD 50N
T
I
M
B
E
R
L
I
N
E
R
O
A
D
SQUARECOMPACTGREENS00°33'32"E 2648.64'N TIMBERLINE ROAD(SEE TIMBERLINE ROADPLANTING PLANS FORLANDSCAPE THIS AREA)
N TIMBERLINE ROAD(SEE TIMBERLINE ROADPLANTING PLANS FORLANDSCAPE THIS AREA)MOUNTAIN VISTA AVE.
(SEE MOUNTAIN
VISTA
ROADPLANTING
PLANS
FORLANDSCAPE THIS AREA)
N TIMBERLINE ROAD(SEE TIMBERLINE ROADPLANTING PLANS FORLANDSCAPE THIS AREA)FUTURE TIMBERLINERD CONNECTION PASheet Number:Project Number:Project:
Client:1603 Oakridge Drive, Suite 100Fort Collins, CO 80525p. (970) 223-7577www.bhadesign.comLandscape ArchitectureUrban DesignMaster PlanningC:\USERS\ANDYPATTON\ONEDRIVE - BHADESIGN\DOCUMENTS\PROJECTS\MONTAVA PHASE ONE PDP\DRAWINGS\ACAD\BDR-PHASE E\DWG\1734-SITE_PHASE E.DWGPlot Date:8/17/2022 8:49 AM Plotted By: Andy PattonDate Created:8/17/2022
Produced by:Date:Revision:S11Date:SITE PLAN
MONTAVA SUBDIVISION FILING NO. 2
HF2M | COLORADO
PHASE E
BASIC DEVELOPMENT REVIEW08/17/202217340N O R T H60'15'30'S C A L E : 1''= 3 0'PROGRESS SETKEY MAPS5S6S7S10S4S9S8S13S12S11S14S15S16LEGENDSITE BOUNDARYR.O.W.LOT LINEUTILITY EASEMENTSETBACK4" THICK STANDARD GRAY CONCRETECONCRETE PAVERSPLANTING AREABUILDING FRONTAGENOTES:REFER TO MONTAVA USES, DENSITIES,AND DEVELOPMENT STANDARDS SECTION5.5-1 FOR SETBACK DIMENSIONS
20'EX. 20' UETRACT J (FUTURE DEVELOPMENT)363326 SF8.34 ACMOUNTAIN VISTA DRIVEE CO RD 50FUTURE TIMBERLINERD CONNECTION PASheet Number:Project Number:Project:
Client:1603 Oakridge Drive, Suite 100Fort Collins, CO 80525p. (970) 223-7577www.bhadesign.comLandscape ArchitectureUrban DesignMaster PlanningC:\USERS\ANDYPATTON\ONEDRIVE - BHADESIGN\DOCUMENTS\PROJECTS\MONTAVA PHASE ONE PDP\DRAWINGS\ACAD\BDR-PHASE E\DWG\1734-SITE_PHASE E.DWGPlot Date:8/17/2022 8:49 AM Plotted By: Andy PattonDate Created:8/17/2022
Produced by:Date:Revision:S12Date:SITE PLAN
MONTAVA SUBDIVISION FILING NO. 2
HF2M | COLORADO
PHASE E
BASIC DEVELOPMENT REVIEW08/17/202217340N O R T H60'15'30'S C A L E : 1''= 3 0'PROGRESS SETKEY MAPS5S6S7S10S4S9S8S13S12S11S14S15S16LEGENDSITE BOUNDARYR.O.W.LOT LINEUTILITY EASEMENTSETBACK4" THICK STANDARD GRAY CONCRETECONCRETE PAVERSPLANTING AREABUILDING FRONTAGENOTES:REFER TO MONTAVA USES, DENSITIES,AND DEVELOPMENT STANDARDS SECTION5.5-1 FOR SETBACK DIMENSIONS
N
T
IMB
ER
L
IN
E
ROAD
1
3
'
8'
3
8
'
8'6'12'1
7
'
-
4
1
2"
1
1
'
-
5
1
2"
1
2
'22'1
9
'
-
1
0
"
1
5
'
1
5
'
1
3
'
15'-10"6'1
0
'12'16'20'8'6'6'15'15'8'
1
0
'6'13'13'8
0
'
ROWEX. 102' ROW8
0
'
ROW20' EX. UEBK 1889 PG512TO E. LARIMER CO.WATER DISTRICTLOT 881750SFLOT 821430SFLOT 831788SFLOT 843516SFLOT 853459SFLOT 861796SFLOT 871430SFLOT 282920SFLOT 381750SFLOT 341430SFLOT 331788SFLOT 324907SFLOT 311788SFLOT 301430SFLOT 291750SFLOT 351801SFLOT 373314SFLOT 361891SFTRACT B81471 SF1.87 ACCOUNTRY CLUB RDN
T
IMBER
L
INE
RDFUTURE TIMBERLINERD CONNECTIONMOUNTAIN VISTA DRIVEE CO RD 50S00°33'32"E 2648.64'FUTURE TIMBERLINERD CONNECTION PASheet Number:Project Number:Project:
Client:1603 Oakridge Drive, Suite 100Fort Collins, CO 80525p. (970) 223-7577www.bhadesign.comLandscape ArchitectureUrban DesignMaster PlanningC:\USERS\ANDYPATTON\ONEDRIVE - BHADESIGN\DOCUMENTS\PROJECTS\MONTAVA PHASE ONE PDP\DRAWINGS\ACAD\BDR-PHASE E\DWG\1734-SITE_PHASE E.DWGPlot Date:8/17/2022 8:49 AM Plotted By: Andy PattonDate Created:8/17/2022
Produced by:Date:Revision:S13Date:SITE PLAN
MONTAVA SUBDIVISION FILING NO. 2
HF2M | COLORADO
PHASE E
BASIC DEVELOPMENT REVIEW08/17/202217340N O R T H60'15'30'S C A L E : 1''= 3 0'PROGRESS SETKEY MAPS5S6S7S10S4S9S8S13S12S11S14S15S16LEGENDSITE BOUNDARYR.O.W.LOT LINEUTILITY EASEMENTSETBACK4" THICK STANDARD GRAY CONCRETECONCRETE PAVERSPLANTING AREABUILDING FRONTAGENOTES:REFER TO MONTAVA USES, DENSITIES,AND DEVELOPMENT STANDARDS SECTION5.5-1 FOR SETBACK DIMENSIONS
N TIMBERLINE ROAD13'8'38'13'8'SQUARECOMPACTGREEN22'10'6'10'6'
6'
15'15'13'15'-10"16'20'20'20'26'
1
2
'20'12'6'
6'15'15'8'
2
6
'
2
6
'
2
6
'
6'13'13'22'38'38'13'13'8'13'8'13'6'80'ROW80'ROW
LOT 284403SFLOT 741595SFLOT 762540SFLOT 881750SFLOT 294843SFLOT 304489SFLOT 314400SFLOT 324400SFLOT 334400SFLOT 344840SFLOT 352816SFLOT 361936SFLOT 372816SFLOT 382728SFLOT 391936SFLOT 402672SFLOT 412540SFLOT 422684SFLOT 431711SFLOT 441276SFLOT 451653SFLOT 461595SFLOT 471276SFLOT 481276SFLOT 491595SFLOT 501653SFLOT 511276SFLOT 691653SFLOT 701276SFLOT 711276SFLOT 721711SFLOT 731653SFLOT 752684SFLOT 771847SFLOT 781430SFLOT 791885SFLOT 811430SFLOT 821430SFLOT 831788SFLOT 843516SFLOT 853459SFLOT 861796SFLOT 871430SFLOT 923212SFLOT 913124SFLOT 903080SFLOT 893068SFLOT 802501SFLOT 324907SFLOT 311788SFLOT 301430SFLOT 291750SFTRACT B81471 SF1.87 ACTRACT A145153 SF3.33 ACTRACT A145153 SF3.33 ACCOUNTRY CLUB RDMOUNTAIN VISTA DRIVEE CO RD 50S00°33'32"E 2648.64'FUTURE TIMBERLINERD CONNECTION PASheet Number:Project Number:Project:
Client:1603 Oakridge Drive, Suite 100Fort Collins, CO 80525p. (970) 223-7577www.bhadesign.comLandscape ArchitectureUrban DesignMaster PlanningC:\USERS\ANDYPATTON\ONEDRIVE - BHADESIGN\DOCUMENTS\PROJECTS\MONTAVA PHASE ONE PDP\DRAWINGS\ACAD\BDR-PHASE E\DWG\1734-SITE_PHASE E.DWGPlot Date:8/17/2022 8:49 AM Plotted By: Andy PattonDate Created:8/17/2022
Produced by:Date:Revision:S14Date:SITE PLAN
MONTAVA SUBDIVISION FILING NO. 2
HF2M | COLORADO
PHASE E
BASIC DEVELOPMENT REVIEW08/17/202217340N O R T H60'15'30'S C A L E : 1''= 3 0'PROGRESS SETKEY MAPS5S6S7S10S4S9S8S13S12S11S14S15S16LEGENDSITE BOUNDARYR.O.W.LOT LINEUTILITY EASEMENTSETBACK4" THICK STANDARD GRAY CONCRETECONCRETE PAVERSPLANTING AREABUILDING FRONTAGENOTES:REFER TO MONTAVA USES, DENSITIES,AND DEVELOPMENT STANDARDS SECTION5.5-1 FOR SETBACK DIMENSIONS
LOT 23LOT 254843SFLOT 264402SFLOT 274403SFLOT 284403SFLOT 244840SFLOT 491595SFLOT 501653SFLOT 511276SFLOT 521711SFTRACT A145153 SF3.33 ACMOUNTAIN VISTA DRIVEE CO RD 50S00°33'32"E 2648.64'FUTURE TIMBERLINERD CONNECTION PASheet Number:Project Number:Project:
Client:1603 Oakridge Drive, Suite 100Fort Collins, CO 80525p. (970) 223-7577www.bhadesign.comLandscape ArchitectureUrban DesignMaster PlanningC:\USERS\ANDYPATTON\ONEDRIVE - BHADESIGN\DOCUMENTS\PROJECTS\MONTAVA PHASE ONE PDP\DRAWINGS\ACAD\BDR-PHASE E\DWG\1734-SITE_PHASE E.DWGPlot Date:8/17/2022 8:50 AM Plotted By: Andy PattonDate Created:8/17/2022
Produced by:Date:Revision:S15Date:SITE PLAN
MONTAVA SUBDIVISION FILING NO. 2
HF2M | COLORADO
PHASE E
BASIC DEVELOPMENT REVIEW08/17/20221734PROGRESS SET0N O R T H60'15'30'S C A L E : 1''= 3 0'KEY MAPS5S6S7S10S4S9S8S13S12S11S14S15S16LEGENDSITE BOUNDARYR.O.W.LOT LINEUTILITY EASEMENTSETBACK4" THICK STANDARD GRAY CONCRETECONCRETE PAVERSPLANTING AREABUILDING FRONTAGENOTES:REFER TO MONTAVA USES, DENSITIES,AND DEVELOPMENT STANDARDS SECTION5.5-1 FOR SETBACK DIMENSIONS
FUTURE TIMBERLINERD CONNECTIONMOUNTAIN VISTA DRIVEE CO RD 50S00°33'32"E 2648.64'FUTURE TIMBERLINERD CONNECTION PAPROGRESS SETSheet Number:Project Number:Project:
Client:1603 Oakridge Drive, Suite 100Fort Collins, CO 80525p. (970) 223-7577www.bhadesign.comLandscape ArchitectureUrban DesignMaster PlanningC:\USERS\ANDYPATTON\ONEDRIVE - BHADESIGN\DOCUMENTS\PROJECTS\MONTAVA PHASE ONE PDP\DRAWINGS\ACAD\BDR-PHASE E\DWG\1734-SITE_PHASE E.DWGPlot Date:8/17/2022 8:50 AM Plotted By: Andy PattonDate Created:8/17/2022
Produced by:Date:Revision:S16Date:SITE PLAN
MONTAVA SUBDIVISION FILING NO. 2
HF2M | COLORADO
PHASE E
BASIC DEVELOPMENT REVIEW08/17/202217340N O R T H60'15'30'S C A L E : 1''= 3 0'KEY MAPS5S6S7S10S4S9S8S13S12S11S14S15S16LEGENDSITE BOUNDARYR.O.W.LOT LINEUTILITY EASEMENTSETBACK4" THICK STANDARD GRAY CONCRETECONCRETE PAVERSPLANTING AREABUILDING FRONTAGENOTES:REFER TO MONTAVA USES, DENSITIES,AND DEVELOPMENT STANDARDS SECTION5.5-1 FOR SETBACK DIMENSIONS