Montava Phase E BDR - initial submittal
Responses to Staff Comments
August 17, 2022
September 03, 2021
Max Moss
Fort Collins, CO
RE: Montava Phase One, PDR210015
Please see the following summary of comments from City staff and outside reviewing
agencies for your submittal of Montava Phase One. If you have questions about any
comments, you may contact the individual commenter or direct your questions through yo ur
Development Review Coordinator, Tenae Beane via phone at 970-224-6119 or via email
at tbeane@fcgov.com.
Comment Summary:
Department: Development Review Coordinator
Contact: Tenae Beane, 970-224-6119, tbeane@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 08/24/2021
08/24/2021: I will be your primary point of contact throughout the development
review and permitting process. If you have any questions, need additional
meetings with the project reviewers, or need assistance throughout the process,
please let me know and I can assist you and your team. Please include me in all
email correspondence with other reviewers and keep me informed of any phone
conversations. Thank you!
Response: (BHA) In your absence we will be working with Todd Sullivan, Development Review
Coordinator.
Comment Number: 2 Comment Originated: 08/24/2021
08/24/2021: Some of the proposed uses are subject to a Basic Development
Review. The decision maker for your BDR project will be the Development
Review Manager and/or Director of Community Development and
Neighborhood Services. All documents submitted to the City in association with
2
your Basic Development Review project are available to the public through our
website. Formal public notice of your project is at the discretion of the
Development Review Manager, including a posted sign, mailing to surrounding
neighbors and/or published notice elsewhere.
Some of the proposed uses are subject to a Type 1 Review. The decision
maker for the type 1 project will be an Administrative Hea ring Officer at a public
hearing. For the hearing, we will formally notify surrounding property owners
within 800 feet (excluding public right-of-way and publicly owned open space).
As your Development Review Coordinator, I will assist with preparing the mailing and
coordinating the hearing date with your team.
A neighborhood meeting is not required for this development request, but it is
encouraged. See the comments listed under Planning for more details. Please
contact me to schedule a date, time and location for a meeting.
Response: (BHA) Consistent with the discussions with City staff regarding the staggering of
submittals for the areas covered by PDR 210015, Phase G, the associated infrastructure
improvements and the irrigation storage pond have already been submitted and are under review.
Pursuant to the PUD Master Plan and the Uses, Densities and Development Standards, the
proposed uses in this Phase E submittal trigger Basic Development Review, with this initial
submittal meeting the level of a PDP instead of a final plan. This allows our team to receive
comments from the City before finalizing construction plans. We have included the submittal
checklist provided to us for Phase E. We plan to have an informational meeting when appropriate
and will be working with Planning Services to get that scheduled. See Planning Services Comment
Number 1 below.
Comment Number: 3 Comment Originated: 08/24/2021
08/24/2021: INFORMATION:
Please follow the Electronic Submittal Requirements and File Naming
Standards found at https://www.fcgov.com/developmentreview/files/electronic
submittal requirements and file naming standards_v1_8 1 19.pdf?1566857888.
File names should begin with the file type, followed by the project information,
and round number. Example: UTILITY PLANS_PROJECT
NAME_PDP_Rd2.pdf
Response: We have followed the file naming standards on the City’s website.
Comment Number: 4 Comment Originated: 08/24/2021
08/24/2021: I will provide a Project Submittal Checklist to assist in your
submittal preparation. Please use the checklist in conjunction with the Submittal
Requirements located at:
http://www.fcgov.com/developmentreview/applications.php.
The checklist provided is specific to this Conceptual project; If there are any
significant changes to this project, please let me know so we can adjust the
checklist accordingly. I can send an updated copy of the Submittal Checklist to
ensure you are submitting the correct materials.
Response: We followed the submittal checklist you provided, with the changes agreed to, and
have provided a copy with this submittal. Thank you.
Comment Number: 5 Comment Originated: 08/24/2021
0.8/24/2021: As part of your submittal you will respond to the comments
provided in this letter. This letter is provided to you in Microsoft Word format.
Please use this document to insert responses to each comment for your
3
submittal, using a different font color. When replying to the comment letter
please be detailed in your responses, as all comments should be thoroughly
addressed. Provide reference to specific project plans or explanations of why
comments have not been addressed, when applicable.
Response: Responses are included with our submittal.
Comment Number: 6 Comment Originated: 08/24/2021
08/24/2021: The request will be subject to the Development Review Fee
Schedule: https://www.fcgov.com/developmentreview/fees.php.
I will provide estimated fees, which are due at time of project submittal for
formal review. This is an estimate of the initial fees to begin the development
review process based on your Conceptual Review Application. As noted in the
comments, there are additional fees required by other departments, and
additional fees at the time of building permit. The City of Fort Collins fee
schedule is subject to change – please confirm these estimates before
submitting. If you have any questions about fees, please reach out to me.
A convenience fee of 2% + $0.25 will be added to all credit card payments
under $2,500. A convenience fee of 2.75% will be added to all credit card
payments over $2,500.
Response: We have provided fees associated with Basic Development Review as advised by Todd
Sullivan per the Development Review Fee schedule effective January 1, 2022.
Comment Number: 7 Comment Originated: 08/24/2021
08/24/2021: Submittals are accepted any day of the week, with Wednesday at
noon being the cut-off for routing the same week. Upon initial submittal, your
project will be subject to a completeness review. Staff has until noon that Friday
to determine if the project contains all required checklist items and is sufficient
for a round of review. If complete, a formal Letter of Acceptance will be emailed
to you and the project would be officially routed for review, followed by a formal
meeting.
Response: Understood.
Comment Number: 8 Comment Originated: 08/24/2021
08/24/2021: INFORMATION:
Temporary Service Changes - City of Fort Collins Development Review
In order to continue providing thorough reviews and giving every project the
attention it deserves, the City of Fort Collins is implementing temporary
changes in how we serve our development customers. As you may be aware,
we are experiencing staff shortages in a number of key departments, which has
begun to impact the timeliness of our reviews. We recognize that development
and construction play a critical role in our community’s vibrancy and economic
recovery, and we have been exploring options for mitigating impacts to our
customers. As a result, we will be making some temporary service changes.
Beginning Monday May 10th one additional week of review time will be added
to all 1st and 2nd round submittals (increase from 3 weeks to 4 weeks).
Response: Understood.
Department: Planning Services
Contact: Jenny Axmacher, jaxmacher@fcgov.com
Topic: General
4
Comment Number: 1 Comment Originated: 08/24/2021
08/24/2021: OVERALL - OUTREACH AND ENGAGEMENT: Neighborhood
meetings are not required for these submittals, but community engagement is
recommended as part of the review process. Outreach should seek to
understand potential impacts to existing residents of the area, inform the
broader community, and engage with potential future residents. City staff
coordinates closely with applicants on public engagement efforts, and will
provide support to notify community members, facilitate inclusive participation,
and promote transparency. The Neighborhood Development Liaison is
available for consultation on engagement in the development review process.
Response: (BHA) Applicant will coordinate with Planning Services to schedule an informational
meeting when appropriate for the projects. We look forward to continuing outreach with the
community as the project develops over time.
Comment Number: 2 Comment Originated: 08/24/2021
08/24/2021: OVERALL - MEETINGS AND EVENTS: For the proposed
phases, staff recommends hosting (1) a virtual project update with general Q&A
and (2) at least one targeted event with the immediately adjacent
neighborhoods (Maple Hill and Storybook in particular). At this time,
Neighborhood Services continues to recommend virtual events to prevent
transmission of the highly contagious delta variant of COVID-19. These events
would not be required prior to submittal, but should occur prior to the second
round of submittal. Mailed notice would be required two weeks in advance of
any neighborhood meeting or event.
Response: (BHA) Agree, see response to Comment Number 1 above.
Comment Number: 3 Comment Originated: 08/24/2021
08/24/2021: OVERALL -ONLINE ENGAGEMENT: The City of Fort Collins has
developed a communication plan for Montava to promote transparency and
share information with the public throughout the review process. For this phase,
this will include web updates and email notification upon PDP submittal, prior to
any public hearings or neighborhood meetings, and upon decision. Social
media updates will also be utilized to promote public hearings and
neighborhood meetings. The City currently hosts a dedicated site for Montava
on OurCity , the City’s online public engagement platform. Close coordination
with City staff is recommended to provide accurate information, answer
development questions, and review feedback.
Response: (BHA) Agree, please let us know how we can support this outreach.
Comment Number: 4 Comment Originated: 08/24/2021
08/24/2021: OVERALL -INFRASTRUCTURE: Consider exploring a PDP
Infrastructure Plan to establish and implement the street network, utilities,
including proposed non-potable supply system, and drainage infrastructure for
all three phases prior to completing the reviews for the individual phases. See
comments from Engineering for additional details.
Response: (BHA) Infrastructure plans were submitted with Phase G and will continue to be updated
as required through reviews.
Comment Number: 5 Comment Originated: 08/24/2021
08/24/2021: OVERALL - INFRASTRUCTURE: The City’s regulations for
Compact Urban Growth (Land Use Code Section 3.7(C), Adequate Public
Facilities and (D) Level of Service) require that all public facilities and services
5
necessary to serve the development must be in place p rior to the issuance of
any building permits for the development. This includes the provision of
transportation, water, wastewater, storm drainage, fire and emergency services,
electrical power, and any other public facilities/services required to serve the
development. Water and wastewater systems must meet the requirements
established by the special districts that serve this area (ELCO and Boxelder). If
a future transition away from one of the utility providers is envisioned, please
provide details on the proposed logistics for this transition.
Response: (Max) Design of infrastructure including roads, storm drainage and utilities to support
Phase E are included with the submittal. This currently includes services from both ELCO and
Boxelder.
Montava has purchased water rights in ELCO to begin development of the project. Other water
rights are also contracted for and will be secured as needed. Montava continues to work on its
water court case for a more affordable long term water supply and will transition to that supply
when it is available for areas of the development not built in ELCO. This assumes ELCO does not
decide to work with us to expand its water supply portfolio as we have offered many times and
continue to offer.
Montava will utilize the sanitary services of Boxelder Sanitation either as a wholesale customer by
providing additional support services through the metro district, or as a direct customer as
Boxelder has continued to evaluate its rate structure and work with our development team in very
productive ways. Either way, our services for sewer will go through Boxelder. We are striving to
set up the most affordable solution long term that will enable the desired development of affordable
homes.
We will provide updates on any future plans for transition away from any provider as any confirmed
plans are approved.
Comment Number: 6 Comment Originated: 08/24/2021
08/24/2021: OVERALL - CONNECTIVITY: While the framework of public
streets appears to meet connectivity requirements, staff has concerns about the
availability of visitor/on street parking, delivery access/loading, the offset alleys
and green spaces, and lack of connectivity in between the major public street
connections. Is there a reason the alleys are offset and disconnected? The
concern with this approach is that it limits movement for all modes of
transportation. Offset streets are particularly challenging for pedestrians and
cyclists to cross safely. Consider a balanced approach between providing
unconventional geometries while still maintaining direct pedestrian/cyclist spine
way connections. Please also see comments from Traffic and Engineering
regarding street cross sections.
Response: (BHA) Based on these comments and subsequent discussions with staff about Phase G,
we have reduced the offset alleys to better address these concerns. Pedestrian connectivity is
provided throughout Phase E.
Comment Number: 7 Comment Originated: 08/24/2021
08/24/2021: OVERALL - TRAIL CROSSINGS: Are the two trail crossings at
Timberline/Mountain Vista and across Timberline still intended to be grade
separated?
Response: (BHA) Based on the continued discussions over the last year and requirements of the
6
ditch company, the No. 8 canal will be piped from Mountain Vista to Country Club Road, and
Timberline Road is being designed as a unique pedestrian and bicycle-focused road through the
Phase G, Phase E, Town Center and Community Park areas. The result is a trail underpass planned
at Mountain Vista Drive, and the bike-priority at-grade crossings north of this to Country Club
Road.
Comment Number: 8 Comment Originated: 08/24/2021
08/24/2021: OVERALL - The following comments provide references for
regulations that will apply as you prepare your complete submittal.
LANDSCAPING: Your formal submittal will require a landscape
plan that meets the requirements of Land Use Code Section 3.2.1 unless
modified as outlined in Section 7.2 of the “PUD Uses, Densities, and
Development Standards” document (e.g. modified standards for full tree
stocking, parking lot screening, foundation plantings). Some of the important
considerations when developing your landscape plan include:
Providing street trees spaced at 30 40 foot intervals
Parking lot perimeter and interior landscaping will be required.
Areas next to buildings with low visual interest should provide tree and
shrub plantings to screen these areas of low visual interest
Note that with the exception of the street tree spacing requirements that you
may group plantings together and average out the tree spacing to meet these
requirements.
Response: (BHA) Our landscape plans indicate street trees at 30-40 foot intervals. This
submittal of Phase E does not include any multi-family or commercial uses with parking lots but
we will consider this comment for future phases where this is applicable.
PARKING: You will need to meet requirements for parking, bicycle
parking, and general access/circulation as approved in Chapter 6 of the
PUD Uses, Densities, and Development Standards. Please refer to this section
when finalizing your site plan. Specific things to consider in addition to the number
and dimensions of parking spaces required include: the location of
accessible parking spaces, the location of visitor parking, inclusion of parking lot
islands and landscaping, bicycle and pedestrian safety and connectivity, and
parking lot screening.
Response: (DPZ) Montava is subject to the parking standards in the PUD Uses, Densities and
Development Standards. A parking analysis exhibit has been provided demonstrating
compliance for Phase E. In Phase E, all parking for detached and attached single family
homes are provided within the site with additional parking on-street. Overall, Phase E
provides parking excess of the applicable standard.
SITE AND BUILDING DESIGN: Staff recognizes that specific site
and architectural details for the residential buildings have not yet been
finalized. When you submit your formal application, the site layout and architecture of
the buildings will be reviewed as outlined in Chapters 5 and 9 of the PUD Uses,
Densities, and Development Standards document. Several standards from
the Land Use Code will also apply:
3.5.1(I) Outdoor Storage Areas/Mechanical Equipment
3.5.1(J) Operational/Physical Compatibility Standards
3.5.2(D) Relationship of Dwellings to Streets and Parking
3.5.2(D)(1) Orientation to a Connecting Walkway
3.5.2(D)(2) Street Facing Facades
7
Response: (DPZ) Montava is subject to the site and building standards in the PUD Uses,
Densities and Development Standards. The standards to not address architectural style which
is currently being developed. The Uses, Densities and Development Standards do address the
topics identified in this comment. These are applied on a per-lot basis. Housing will comply
with the standards of the PUD.
WASTE MANAGEMENT: Your submittal will need to include
information about trash and recycling on the site and how the waste
management system will function for both residents and haulers. Land Use
Code Section 3.2.5 outlines requirements for trash and recycling.
Response: (Max) Montava intends to negotiate a single provider of trash and recycling service
In line with City policies. A single provider will provide a more cost-effective solution for
residents as well as a more structured system throughout the entire community.
SOLAR ENERGY: Will the residential buildings have solar
panels? If so, the standards in Land Use Code section 3.8.32 (Solar Energy
Systems) will apply.
Response: (Max) We support and will not preclude the use of solar panels on homes. As final
home designs progress, we will be able to identify where solar panels are feasible and will
follow the requirements of LUC 3.8.32.
Comment Number: 10 Comment Originated: 08/24/2021
08/24/2021: OVERALL INFORMATION: The subdivision to the west is
Storybook, not Storybrook. Please ensure that the correct name is used.
Response: (BHA) Understood; references, if any, have been changed to “Storybook.”
Comment Number: 11 Comment Originated: 08/24/2021
08/24/2021: FARM – PHASING: the plans for the farm in this PDR include
more phasing than shown in the prior PDR. Will separate approvals be pursued
for the phases? Please provide greater detail regarding the farm operations for
the initial phase so that Staff may confirm the correct review process
requirements.
Response: (BHA) Phase E does not include any of the farm area. We will confirm the applicable
review process with City staff prior to submittals that includes any of the farm area.
Comment Number: 12 Comment Originated: 08/24/2021
08/24/2021: FARM - URBAN AGRICULTURE: The standards in Land Use
Code section 3.8.31 for Urban Agriculture will apply (as vested in the PUD
Master Plan and Overlay). These standards are intended to ensure that
agricultural activities and residential uses can be successfully integrated.
Please refer to this section for information about setbacks for hoop houses and
compost piles, impact mitigation, food distribution, licensing, etc.
Response: (BHA) Phase E does not include any of the farm area. Future submittals that include
any of the farm area will address these considerations as applicable.
Comment Number: 13 Comment Originated: 08/24/2021
08/24/2021: FARM - FARM COMPOSTING: Are there plans for composting
facilities associated with the farm? If so, standards in Land Use Code
section 3.8.24 will apply. These standards require that composting facilities are
located at least 660 feet from residential uses. Composting facilities must also
treat and contain all run off on site. A nuisance condition control plan will be
required and must be approved by the Director.
Response: (BHA) Phase E does not include any of the farm area. Future submittals that include
any of the farm area will address these considerations as applicable.
8
Comment Number: 14 Comment Originated: 08/24/2021
08/24/2021: PHASE G - OPEN SPACE: The open space amenity was
previously labelled as a park and detention area. Is detention still proposed?
The area shown is about half the size of the park/green space identified in the
approved PUD. Please provide more detail about the plans for this open space
amenity area.
Response: (BHA) This comment is not applicable to Phase E; details are provided in the Phase G
submittal.
Comment Number: 15 Comment Originated: 08/24/2021
08/24/2021: PHASE G – OPEN SPACE: The southern pedway/open space
belt should make a deliberate connection directly into the Open Space Amenity
in G.
Response: (BHA) This comment is not applicable to Phase E; this comment is addressed in the
Phase G submittal.
Comment Number: 16 Comment Originated: 08/24/2021
08/24/2021: PHASE G – OPEN SPACE: Consider connecting and extending
the three northern pedway/open space areas to create a pedestrian spine.
Response: (BHA) This comment is not applicable to Phase E; this comment is addressed in the
Phase G submittal.
Comment Number: 17 Comment Originated: 08/24/2021
08/24/2021: PHASE G – OPENSPACE: Is the area labelled “Irrigation Water”
a second irrigation pond?
Response: (BHA) This comment is not applicable to Phase E; this comment is addressed in the
Phase G submittal.
Comment Number: 18 Comment Originated: 08/24/2021
08/24/2021: PHASE E – LIVE/WORK: What is the intention for the Livework /
Do-More units? Are customers anticipated to visit these units? How will street
access/parking/deliveries/loading be handled for these uses?
Response: (DPZ) The Live/Work DoMore units are anticipated to contain a dwelling unit on the top 2
floors with a 1-car garage and small “flex” space (200sf approximately) on the ground floor. Several
factors nearly guarantee that the flex space is used solely by the occupant of the dwelling unit: the
interconnectedness with the garage and stairs, and the small footprint of the space. It is possible
that the flex space serves as an extension of the upstairs dwelling, or a semi -separate home-office
or shop. Customers may visit these spaces, at a low volume.
Resident parking will be partially handled by the garage space and we will include the remaining
residential and commercial parking requirements from the flex space in the total parking
calculations. The remaining parking will be fulfilled by the shared parking in and around the block.
Aside from parking, additional street access and delivery/loading requirements are not anticipated
to be much higher than typical residential needs. All vehicular service will occur from the rear alley,
which is sized to accommodate fire trucks.
Comment Number: 19 Comment Originated: 08/24/2021
08/24/2021: PHASE E -MASSING: The placement of the northern-most
three-story townhome block appears to present a privacy concern for the
surrounding proposed SFDs. What is envisioned by surrounding a block of
three-story units by SFDs? How will privacy concerns be mitigated?
Response: (DPZ) SFD units are anticipated to focus the living/sleeping space towards the front of
the lots with a garage in the rear. The potential yards of the SFD units may be situated to the sides
9
of the lots or at the rear defined by the massing of the garage. Ple ase see the lot typical diagrams
as an example. The townhomes face on to the pedestrian way, with bedrooms towards the rear.
Views of any SFD yard space will be obscured by the placement of garages and fencing with the
alley space between.
Comment Number: 20 Comment Originated: 08/24/2021
08/24/2021: PHASE E – TEMPORARY USES: Will additional details on the
proposed temporary uses and structures be provided with the Phase E plans or
as a separate phase?
Response: (BHA) There are no temporary uses planned for Phase E.
Comment Number: 9 Comment Originated: 08/24/2021
OVERALL: ADDRESSING: For properties fronting on green space and
backing to alleys, how will unit addressing be handled?
Response: (DPZ) These units will be addressed from the front, pending coordination with life
safety. All pedestrian paths with lot frontages will be named from the pre -approved list. Should life
safety prefer addressing from the rear, additional alley names will be selected.
Department: Historic Preservation
Contact: Maren Bzdek, 970-221-6206, mbzdek@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 08/24/2021
08/24/2021: INFORMATION ONLY: The existing residence on parcel 6 has been cleared for future
demolition by a staff survey of structures that are more than 50 years old within
the Montava project boundary. No further historic review is required for that
residence.
Response: Thank you. The developer will follow standard procedures for demolition.
Department: Engineering Development Review
Contact: Marc Virata, 970-221-6567, mvirata@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 08/24/2021
08/24/2021: OVERALL -The PDR indicates that the improvements to the
Mountain Vista and Timberline intersection, along with the bridge to the east,
would be designed by the City. Additional discussion with City Engineering
should occur as this hasn't been committed to by the City at this time. The
proposed details of scope, timing, and funding would need to be discussed for
verification if this approach can be utilized. I'm aware of conversations
previously around the fall of 2019 where the timing of the bridge on Mountain
Vista was discussed and who leads and there appeared to be options where
either the City or the development managed this.
Response: (BHA) The Timberline Road/Mountain Vista Drive design has been preliminarily reviewed
by City Engineering; plans for formal review will accompany the Montava Phase G resubmittal on
August 24, 2022.
Comment Number: 2 Comment Originated: 08/24/2021
08/24/2021: OVERALL - In general with the potential phasing of approvals for
entitlement and construction of the overall development, each phase is required
to improve their abutting street frontages to the roadway classification of the
abutting streets. With respect to Phases E and G, the frontages of Mountain
10
Vista Drive and Timberline Road are specified as a 2 lane arterial on the
Master Street Plan and would be built to the roadway classification. For Phase
E, Country Club Road appears to border the northern boundary and is classified
as a collector. The type of collector (major collector without parking vs. minor
collector with parking) should be explored in detail and considered in the overall
context of the overall development. For the Farm, Richards Lake Road and
Giddings Road are the abutting main streets and are both classified as minor
arterials.
Response: (TST) Please see the Traffic Impact Study for Montava Phase G & E prepared by
Kimley-Horn in June 2022 is submitted with this application.
Comment Number: 3 Comment Originated: 08/24/2021
08/24/2021: OVERALL - The non-arterial and collector streets are less
apparent with respect to their intended roadway classification and proposed
design. Is it the intention to identify these road cross-sections at this time? I'm
acknowledging that the PUD Master Plan did provide for variances to certain
roadway classifications which were then intended to be held for the right -of-way
width and road width. It would be helpful if perhaps these phases included a
labelling of the proposed roadway classifications and the proposed street cross
sections.
Response: (TST) The utility plans provided for Phase E have typical roadway sections are provided
and the respective classifications are noted.
Comment Number: 4 Comment Originated: 08/24/2021
08/24/2021: The traffic study required for the phase(s) will need to address how
the proposed phases will impact intersections and potentially identify level of
service concerns that could require off-site improvements to roadways beyond
the adjacent frontages and/or mitigation measures. It is presumed that further
conversations will be had once the initial work of the traffic study is provided and
reviewed.
Response: (Kimley-Horn) A copy of the Traffic Impact Study for Montava Phase G & E prepared by
Kimley-Horn in June 2022 is submitted with this application.
Comment Number: 5 Comment Originated: 08/24/2021
08/24/2021: OVERALL - A roundabout appears to be proposed at the
intersection of Timberline Road and Country Club Road, which wasn't identified
specifically in the PUD Master Plan and the corresponding Master Street Plan
update. Both Timberline Road and Country Club Road are considered streets
eligible for partial reimbursement for widening these streets beyond the local
width. The additional widening needed to implement a roundabout vs. a
conventional intersection would likely not be eligible for reimbursement. The
design for the roundabout would need to be reviewed and understood with how
it is intended to be built. Would it potentially be built as a complete roundabout
with three approach legs built in the first phase?
Response: (Kimley-Horn) (TST) As shown in the Montava Phase G & E Traffic Impact Study dated
June 2022, the development will construct three legs of the roundabout as discussed with the City.
Until future developments are constructed Country Club Road will not connect to the north leg of
the intersection. A roundabout is beneficial in this location to promote slower speeds for
pedestrian and bicycle comfort. We look forward to continuing the discussions on the design and
appropriate reimbursement eligibility.
Comment Number: 6 Comment Originated: 08/24/2021
08/24/2021: OVERALL - It may be of benefit to explore a PDP Infrastructure
11
Plan that establishes and implements the framework of streets (rights-of-way
and adjacent easement widths), utilities, and drainage infrastructure as a
backbone to these three phases. Currently it's a little difficult to ascertain how
these phases are to be built (whether together or separate) and an infrastructure
plan for these three phases could be an option. With the Farm phase being
disconnected and not abutting Phases E or G, does there need to be the
creation of "off-site" (but still internal to Montava) transportation improvements
that link the phases together? If not abutting roadway improvements to provide
sidewalk and bikelane facilities, would interim bike/pedestrian trail facilities be
of benefit to better facilitate non-vehicular movements through the site with this
initial phase?
Response: (BHA) Infrastructure plans were submitted with Phase G and will continue to be updated
as required through reviews.
Comment Number: 7 Comment Originated: 08/24/2021
08/24/2021: OVERALL - There seems to be a purposeful intent to not align
private drives function as alleys and create offsets across public streets from
them. The typical requirement is to align these vehicular movements, not create
offsets, and look to meet driveway separation requirements as a part of
LCUASS. The direct cross connectivity of movements across streets whether
for alleys or for pedestrian walkways is the assumed ideal and the introduction
of offsets would require a variance request for evaluation.
Response: (BHA) Based on these comments and discussions with staff regarding Phase G, we
have reduced the offset alleys to better address these concerns without the need for a variance.
Comment Number: 8 Comment Originated: 08/24/2021
08/24/2021: OVERALL - The termination of Timberline Road that would
ultimately be built (and any other temporary dead end public street in the
development) would require the construction of a 100 foot diameter temporary
turnaround.
Response: (TST) Temporary dead end public streets have a 100’ turnaround shown with this
submittal.
Comment Number: 9 Comment Originated: 08/24/2021
08/24/2021: OVERALL - Street turns where the intersection isn't a traditional
four-legged intersection, but a right turn movement in one direction would be
specified to be built with a "knuckle" as indicated in LCUASS detail 7-24.
Response: (TST) Knuckles have been designed at applicable locations per the LCUASS details.
Comment Number: 10 Comment Originated: 08/24/2021
08/24/2021: OVERALL - The soils report from EEC in 2017 does not appear to
have analyzed soil conditions for the portion of the overall development that is
west of Timberline Road's north-south alignment. Phase G will need to have a
soils report comprising its area for review under its PDP.
Response: (BHA) This comment is not applicable to Phase E, however, the preliminary report
Prepared in 2017 is provided with this submittal, with a more comprehensive preliminary report for
Phase E to be submitted with the response to the first round of review comments.
Comment Number: 11 Comment Originated: 08/24/2021
08/24/2021: OVERALL - The Larimer County Urban Area Street Standards has
been updated effective August 1, 2021. The current link to these standards can
be found here: https://www.larimer.org/urban-area-street-standards-2021 It is
noted and acknowledged that the PUD Master Plan had variances approved
12
pertaining to street cross sections and Y-intersections. The link should be used
as a basis for all other street standard requirements.
Response: (TST) Understood.
Department: Traffic Operation
Contact: Nicole Hahn, 970-221-6820, nhahn@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 08/24/2021
08/24/2021: OVERALL
The anticipated change in traffic volume will meet the threshold of requiring a
Traffic Impact Study. Based on section 4.2.2.B of the Larimer County Urban
Area Street Standards (LCUASS), a full Traffic Impact Study will be required.
We have scoped the study with your traffic engineer, and need clear phasing
associated with the traffic studies. It may make sense to complete separate
studies for the individual proposals.
Response: (Kimley-Horn) A copy of the Traffic Impact Study for Montava Phase G & E prepared by
Kimley-Horn in June 2022 is submitted with this application.
Comment Number: 2 Comment Originated: 08/24/2021
08/24/2021: OVERALL
Can you provide information on what the cross sections are proposed for each
of the roads? We would also like to better understand design philosophy as it
relates to site connectivity and some of the cul-de-sac arrangements, and off set
alleyways. These off sets can be problematic for site distance, and can cause
safety issues. We would like to see improved connectivity through the site for all
modes.
Response: (TST) (DPZ) Cross sections will be illustrated in the roadway drawings.
Phase E has some instances where the alley space may resemble a cul-de-sac, which provides
parking access for adjacent uses. These instances are generally loops in format. In some instances
the alley extends a short distance to service a few units. Those conditions are very short and do not
allow for continuation of the alley. Overall vehicular and non-vehicular circulation is clear and
consistent. Alley access was a design concern on our part, and we ensure tha t any of these
pedestrian path focused areas have 3 or more means of accessing streets, along a short distance
from any unit. No actual cul-de-sacs are planned, there are 2 street stubs which will be continued
in later phases. These occur close to alley entrances so that vehicular connectivity is maintained.
Ally alignment is consistent throughout Phase E with no significant offsets.
Comment Number: 3 Comment Originated: 08/24/2021
08/24/2021: OVERALL, PHASE G, PHASE E
We'll need to work with you on the intersection of Timberline and Mtn Vista. The
submittal noted that the bridge and intersection design will be by the City. I've
passed this information on to our engineering capital group. There is not
currently a design for this project in development with the city. The Traffic study
will give us more information about when improvements in this location will be
required.
Response: (BHA) The Timberline Road/Mountain Vista Drive design has been preliminarily reviewed
by City Engineering; plans for formal review will accompany the Montava Phase G resubmittal on
August 24, 2022.
Comment Number: 4 Comment Originated: 08/24/2021
08/24/2021: We have asked the design team for more information regarding
13
quantities for the roundabout report so we can move that conversation forward.
Response: (Kimley-Horn) A supplement to the Master Traffic Study Report is provided.
Department: Erosion Control
Contact: Jesse Schlam, 970-218-2932, jschlam@fcgov.com
Topic: Erosion Control
Comment Number: 1 Comment Originated: 08/24/2021
08/24/2021: Information Only: (Overall)
This project is located within the City's MS4 boundaries and is subject to the
erosion control requirements located in the Stormwater Design Criteria,
Chapter 2, Section 6.0. A copy of those requirements can be found at
www.fcgov.com/erosion
Information Only: (Overall)
Based upon the supplied materials, site disturbs more than 10,000 sq. ft. and/or
meets one of the other triggering criteria (sensitive area, steep slopes, or larger
common development) that would require Erosion and Sediment Control
Materials to be submitted.
For Final: (Separate for each of Phase G, E and Farm)
Please submit an Erosion Control Plans to meet City Criteria (FCDCM Ch 2
Section 6.1.3)
Please ensure that the Erosion Control Plans provided include a individual
sequence sheets in accordance with (FCDCM Ch 2 Section 6.1.3.2)
Please ensure that the Erosion Control Plans, Escrows, and Reports include
phasing requirements (FCDCM Ch 2 Section 6.1.3, 6.1.4, & 6.1.5)
For Final: (Separate for each of Phase G, E and Farm)
Please submit an Erosion Control Escrow / Security Calculation based upon the
accepted Erosion Control Plans to meet City Criteria. (FCDCM Ch 2 Section 6.1.5)
Response: (TST) Comment noted. The Phase E submittal includes preliminary drainage design
plans, but we understand this requirement at time of final.
For Final: (Separate for each of Phase G, E and Farm)
Please submit an Erosion Control Report to meet City Criteria. (FCDCM Ch 2
Section 6.1.4)
Response: (TST) Comment noted. The Phase E submittal includes preliminary drainage design
plans, but we understand this requirement at time of final.
Information Only: (Overall)
Based upon the area of disturbance or this project is part of a larger common
development, State permits for stormwater will be required since the site is over
an acre and should be pulled before Construction Activities begin.
Response: (TST) Comment noted. Appropriate permits will be obtained by the contractor and/or
owner as required.
Comment Number: 2 Comment Originated: 08/24/2021
08/24/2021: For Final: (Phase G)
The City Manager’s development review fee schedule under City Code 7.5 -2
was updated to include fees for Erosion Control and Stormwater Inspections.
14
As of January 1st, 2021, these fees will be collected on all projects for such
inspections.
The Erosion Control fees are based on; the number of lots, the total site
disturbance, the estimated number of years the project will be active and the
Stormwater Inspection Fees are based on the number of LID/WQ Features that
are designed for on this project.
Based on the proposed site construction associated with this project we are
assuming 401 lots, 34.97 acres of disturbance, 13 years from demo through
build out of construction and an additional 3 years till full vegetative stabilization
due to seeding. Which results in an Erosion Control Fee estimate of $23127.1.
Response: (TST) This fee will be calculated in conjunction with the Phase G submittal.
We could not make any assumptions at this time for the number of LID and WQ
features, each porous pavers will be $365.00, each bioretention/level spreaders
$315.00, each extended detention basins $250.00, and each underground
treatment will be $415.00. Stormwater LID/WQ Inspections to be $TBD.
Please note that as the plans and any subsequent review modifications of the
above-mentioned values change the fees may need to be mo dified. I have
provided a copy of the spreadsheet used to arrive at these estimates for you to
review.
Please respond to this comment with any changes to these assumed estimates
and why, so that we may have a final fee estimate ready for this proj ect. The fee
will need to be provided at the time of erosion control escrow.
For Final: (Phase E)
(Same as prior fee comment for phase G with a different fee estimate)
Based on the proposed site construction associated with this project we are
assuming 554 lots, 39.25 acres of disturbance, 8 years from demo through
build out of construction and an additional 3 years till full vegetative stabilization
due to seeding. Which results in an Erosion Control Fee estimate of
$22733.01.
Response: (TST) This fee will be calculated in conjunction with the Phase E approvals.
For Final: (Farm)
(Same as prior fee comment for phase G with a different fee estimate)
Based on the proposed site construction associated with this project we are
assuming 1 lots, 73.3 acres of disturbance, 2 years from demo through build out
of construction and an additional 5 years till full vegetative stabilization due to
seeding. Which results in an Erosion Control Fee estimate of $3595.25
Response: (TST) Comment noted; information regarding the farm phase will be provided with that
future submittal.
Comment Number: 3 Comment Originated: 08/24/2021
08/24/2021: For Final: (Farm Specific Comment)
This area will need some clear delineation for what the final condition will look
like with specified vegetation and landscaping versus the farm area. There will
need to be a clear description in the erosion control report describing how the
farm area will be considered stabilized and farmed condition during the entire
build out of the remaining areas of the farm. This open yard and storage bin
15
area leads me to believe this will be used for construction material storage
during the entire build out. If this area is to be used as a storage yard for the
other phases this area will need to be described and called out as such.
Response: (TST) Comment noted; stabilization for the farm will be identified in the submittal for
that phase.
Department: Stormwater Engineering
Contact: Wes Lamarque, 970-416-2418, wlamarque@fcgov.com
Topic: General
Comment Number: 4 Comment Originated: 08/24/2021
08/24/2021: OVERALL - Master plan and criteria compliance (site specific
comment):
The design of this site must conform to the drainage basin design of the
Boxelder/Cooper Slough Master Drainage Plan as well the Fort Collins
Stormwater Criteria Manual. The stormwater criteria manual can be found at
the following link:
https://www.fcgov.com/utilities/business/builders-and-developers/development-f
orms-guidelines-regulations/stormwater-criteria
Response: (TST) (M/M) Comment noted. Phase one, including this Phase E, is being designed to
closely conform to the selected alternatives identified in the Cooper Slough Master Drainage Plan
prepared by ICON, Engineering, Inc., as well as the approved Montava PUD Master Drainage Study,
prepared by Martin/Martin, Inc. Additionally, the Fort Collins Stormwater Criteria Manual is being
referenced as the primary guidance for design of the proposed drainage systems within each
individual site.
Comment Number: 5 Comment Originated: 08/24/2021
08/24/2021: OVERALL - Documentation requirements (site specific comment):
A drainage report and construction plans are required and must be prepared by
a Professional Engineer registered in the State of Colorado. The drainage
report must address the four-step process for selecting structural BMPs.
Response: (TST) A drainage report and construction plans are being provided for this Phase E.
Comment Number: 6 Comment Originated: 08/24/2021
08/24/2021: OVERALL - Stormwater outfall (site specific comment):
The stormwater outfall options for Phase One will vary as this phase consists of
sites that are in different locations. Drainage Infrastructure may need to be built
in areas not included in this phase as to provide an adequate drainage system
that meets all City Stormwater Criteria.
Response: (TST) Comment noted; stormwater outfalls will be analyzed and designed for each
individual phase.
Comment Number: 7 Comment Originated: 08/24/2021
08/24/2021: OVERALL - Detention requirements (site specific comment):
Onsite detention is required for the runoff volume difference between the
100-year developed inflow rate and the 2-year historic release rate. Please
note, the agreement with the ditch company may be less the City’s detention
standard.
Response: (TST) (M/M) Per the Cooper Slough Master Drainage Plan, prepared by ICON
Engineering, Inc., as well as the approved Montava PUD Master Drainage Study, prepared by
Martin/Martin, Inc., the portions of Montava tributary to Cooper Slough will include regional
detention that meets the discharge rates identified in those studies. For Phase E of Montava,
16
interim detention facilities are being provided that will attenuate discharges to the rates identified
in both master plans at the downstream discharge point from the Montava property.
Comment Number: 8 Comment Originated: 08/24/2021
08/24/2021: OVERALL - Detention drain times (standard comment):
Per Colorado Revised Statute §37-92-602 (8) that became effective August 5,
2015, criteria regarding detention drain time will apply to this project. As part of
the drainage design, the engineer will be required to show compliance with this
statute using a standard spreadsheet (available on request) that will need to be
included in the drainage report. Upon completion of the project, the engineer
will also be required to upload the approved spreadsheet onto the Statewide
Compliance Portal. This will apply to any volume-based stormwater storage,
including extended detention basins.
Response: (TST) Comment noted; detention pond drain times to be documented showing
compliance with CRS 37-92-602(8).
Comment Number: 9 Comment Originated: 08/24/2021
08/24/2021: OVERALL - Water Quality and Low Impact Development
requirements (standard comment):
All new or modified impervious areas require stormwater quality treatment. In
addition, the City requires the use of Low Impact Development (LID) methods to
treat stormwater quality on all new or redeveloping property, including sites
required to be brought into compliance with the Land Use Code. There are two
(2) categories of LID requirements; the development will need to meet one of
the two following options:
1. LID with Permeable Pavers: When using the permeable pavers option, 50%
of the new or modified impervious areas must be treated by LID methods . Of
the new or modified paved areas, 25% must be pervious.
2. LID - without Pavers: 75% of all new or modified impervious areas must be
treated by LID methods. This typically consists of a rain garden or bioretention
system, but other options are allowed.
The remainder of the water quality treatment can be accomplished ‘standard’ or
LID water quality methods. Accepted methods are described in the Fort Collins
Stormwater Criteria Manual (FCSCM), Chapter 7:
http://www.fcgov.com/utilities/business/builders-and-developers/development-fo
rms-guidelines-regulations/stormwater-criteria
Response: (TST) Comment noted; stormwater improvements are being designed per the LID
requirements above.
Comment Number: 10 Comment Originated: 08/24/2021
08/24/2021: OVERALL - Inspection and maintenance (standard comment):
There will be a final site inspection of the stormwater facilities when the project
is complete and the maintenance is handed over to an HOA or another
maintenance organization. Standard operating procedures (SOPs) for on-going
maintenance of all onsite drainage facilities will be included as part of the
Development Agreement. More information and links can be found at:
http://www.fcgov.com/utilities/what-we-do/stormwater/stormwater-quality/low-im
pact-development
Response: (TST) Comment noted; thank you.
Comment Number: 11 Comment Originated: 08/24/2021
17
08/24/2021: OVERALL - Fees (standard comment):
The 2020 city wide Stormwater development fee (PIF) is $9,447/acre of new
impervious area over 350 square feet and there is a $1,045/acre of site review
fee. No fee is charged for existing impervious area. These fees are to be paid
at the time each building permit is issued. Information on fees can be found at:
http://www.fcgov.com/utilities/business/builders-and-developers/plant-investmen
t-development-fees or contact our Utility Fee and Rate Specialists at (970)
416-4252 for questions on fees. There is also an erosion control escrow
required before the Development Construction permit is issued. The amount of
the escrow is determined by the design engineer, and is based on the site
disturbance area, cost of the measures, or a minimum amount in accordance
with the Fort Collins Stormwater Manual.
Response: (TST) Comment noted; thank you.
Comment Number: 12 Comment Originated: 08/24/2021
08/24/2021: OVERALL - Offsite Stormwater Flows (standard comment):
The development will need to account for any offsite flows from existing
upstream properties and safely convey these flows to the outfall location.
Response: (TST) Comment noted; offsite stormwater discharges are being accounted for as part of
the proposed development improvements for Phase E.
Department: Water-Wastewater Engineering
Contact: Wes Lamarque, 970-416-2418, wlamarque@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 08/24/2021
08/24/2021: Other service district (site specific comment):
This project site is located within the East Larimer County (ELCO) Water
District and the Boxelder Sanitation District for water and sewer service. Please
contact them for development requirements.
Response: (TST) Comment noted; we will coordinate with ELCO and Boxelder on specific
development requirements.
Comment Number: 2 Comment Originated: 08/24/2021
08/24/2021: Water conservation (standard comment):
The water conservation standards for landscape and irrigation will apply.
Information on these requirements can be found at:
http://www.fcgov.com/standards
Response: (BHA) Understood. This initial submittal for Phase E meets the level of a PDP rather than
submitting final plans initially to allow our team to receive comments from the city before finalizing
detailed information on planting and irrigation.
Department: PFA
Contact: Marcus Glasgow, 970-416-2869, marcus.glasgow@poudre-fire.org
Topic: General
Comment Number: 1 Comment Originated: 08/20/2021
08/20/2021:
FIRE LANES
Fire access is required to within 150 feet of all exterior portions of any building,
or facility ground floor as measured by anroved route around the perimeter.
18
For the purposes of this section, fire access cannot be measured from an
arterial road (Mountain Vista Dr and Timberline Rd). Any private alley, private
road, or private drive serving as a fire lane shall be dedicated as an Emergency
Access Easement (EAE) and be designed to standard fire lane specifications
noted in comment 2. In addition, aerial apparatus access requirements are
triggered for buildings in excess of 30' in height.
Phase E appears to have some buildings that might be out of access due to the
majority of the building being located along the Pedways. If buildings are out of
access, Pedways may need to be improved to meet fire lane standards.
Response: (TST) Understood.
Comment Number: 2 Comment Originated: 08/20/2021
08/20/2021:
FIRE LANE SPECIFICATIONS
Please provide documentation for the note stating an 18 foot wide alley was
approved by the Fire Chief. Fire lanes are required to meet the specification
found below and any alternative methods must be submitted for approval.
A fire lane plan shall be submitted for approval prior to installation. In addition to
the design criteria already contained in relevant standards and policies, any
new fire lane must meet the following general requirements:
-Fire lanes established on private property shall be dedicated by plat or
separate document as an Emergency Access Easement.
-Maintain the required 20 foot minimum unobstructed width & 14 foot minimum
overhead clearance. Where road widths exceed 20 feet in width, the full width
shall be dedicated unless otherwise approved by the AHJ.
-Additional fire lane requirements are triggered for buildings greater than 30' in
height. Refer to Appendix D105 of the International Fire Code.
-Be designed as a flat, hard, all-weather driving surface capable of supporting
40 tons.
-Dead-end fire access roads in excess of 150 feet in length shall be provided
with an approved turnaround area for fire apparatus.
-Dead-end roads shall not exceed 660 feet in length without providing for a
second point of access. Dead-end access roads in excess of 1320 feet in
length require a third point of access. Dead-end access roads in excess of
2640 feet in length require a fourth point of access.
-The required turning radii of a fire apparatus access road shall be a minimum
of 25 feet inside and 50 feet outside. Turning radii shall be detailed on
submitted plans.
-Dedicated fire lanes are required to connect to the Public Way unless
otherwise approved by the AHJ.
-Fire lane to be identified by red curb and/or signage, and maintained
unobstructed at all times.
-Fire lane sign locations or red curbing should be labeled and detailed on final
plans. Refer to LCUASS detail #1418 & #1419 fo r sign type, placement, and
spacing. Appropriate directional arrows required on all signs.
- In remote rural applications, fire lane standards may be modified with the
approval of the fire marshal; examples might include reduction in road width or
road surface.
International Fire Code 503.2.3, 503.2.4, 503.2.5, 503.3, 503.4 and Appendix
D; FCLUC 3.6.2(B)2006 and Local Amendments.
19
Response: (TST) Understood.
Comment Number: 3 Comment Originated: 08/20/2021
08/20/2021:
STRUCTURES EXCEEDING 30 FEET IN HEIGHT
- IFC Appendix D105: In order to accommodate the access requirements for
aerial fire apparatus (ladder trucks), required fire lanes shall be 26 foot wide
minimum on at least one long side of the building. At least one of th e required
access routes meeting this condition shall be located within a minimum of 15
feet and a maximum of 30 feet from the building, and shall be positioned
parallel to one entire side of the building or as otherwise approved by the fire
code official.
Response: (TST) Comment noted; there are no buildings in excess of 30 feet in height proposed in
Phase E. Any multi-family housing will be in a future development phase and submittal.
Comment Number: 4 Comment Originated: 08/20/2021
08/20/2021:
MULTIPLE-FAMILY RESIDENTIAL DEVELOPMENTS
- IFC D106.2: Multiple-family residential projects having more than 200 dwelling
units shall be provided with two separate and approved fire apparatus access
roads regardless of whether they are equipped with an approved automatic
sprinkler system.
Response: (TST) There is no multi-family residential proposed in Phase E. Any multi-family housing
will be in a future development phase and submittal.
Comment Number: 5 Comment Originated: 08/20/2021
08/20/2021: ALLEY LOADED UNITS
There is a reasonable expectation that emergency services personnel can
quickly arrive at the primary door to the residence. This is usually the main
egress door. Plans containing alley loaded lots present an added obstacle for
access. Alley loaded units shall be provided with a main egress door to the
rear (alley) side of the structure or if main egress door faces onto a greenbelt or
other landscape feature, they shall be provided with an approved sidewalk
connecting to the alley so as to provide direct and efficient access to any
individual unit. Future plans should include all walkways to the main egress door.
Response: (TST) Pathways are shown with this submittal.
Comment Number: 6 Comment Originated: 08/20/2021
08/20/2021:
RESIDENTIAL HYDRANT REQUIREMENTS
- IFC 507.5 and PFA Policy: Within the Urban Growth Area, hydrants to provide
1,000 gpm at 20 psi residual pressure, spaced not further than 400 feet to the
building, on 800-foot centers thereafter.
Response: (TST) Water loops and hydrant spacing per the requirement above has been provided.
Comment Number: 7 Comment Originated: 08/20/2021
08/20/2021:
COMMERCIAL/MULTIFAMILY HYDRANT REQUIREMENTS
- IFC 507.5 and PFA Policy: Hydrants to provide 1,500 gpm at 20 psi residual
pressure, spaced not further than 300 feet to the building, on 600 -foot centers
thereafter (EXCEPTION: In buildings equipped with standpipe s ystems, a
hydrant is required within 100' of the Fire Department Connection).
Response: (TST) There is no multi-family residential proposed in Phase E. Any multi-family housing
will be in a future development phase and submittal.
20
Department: Light And Power
Contact: Austin Kreager, 970-224-6152, akreager@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 08/24/2021
08/24/2021: OVERALL:
Light and Power will serve the proposed development. Generally, Light and
Power has electric facilities surrounding the proposed project limits. Electric
facilities exist along Richards Lake Rd, Giddings Rd, and Mountain Vista Dr.
Response: (TST) Comment noted.
Comment Number: 2 Comment Originated: 08/24/2021
08/24/2021: OVERALL:
Electric capacity fees, development fees, building site charges and any system
modification charges necessary to feed the site will apply to this develop ment.
Please contact me to discuss Light and Power fees or visit the following
website for additional information related to fees:
http://www.fcgov.com/utilities/business/builders-and-developers/plant-investmen
t-development-fees
Response: (TST) Comment noted; thank you.
Comment Number: 3 Comment Originated: 08/24/2021
08/24/2021: OVERALL:
During utility infrastructure design, please provide adequate space along the
public roads and private drives to ensure proper utility installation and to meet
minimum utility spacing requirements. 10ft minimum separation is needed
between all water, sewer, storm water, and irrigation main lines. Light and
Power has a 3ft minimum separation requirement from all other utility
lines/infrastructure with the exception of telecom facilities
Utility coordination meetings are available and recommended early in the
Project Development Plan process to assist in utility infrastructure design and to
ensure proper separation requirements are being met for providers.
Response: (TST) Utility layouts are included with this submittal. We are planning to meet and
discuss the layout further after first round comments are received.
Comment Number: 4 Comment Originated: 08/24/2021
08/24/2021: PHASE E AND G:
Transformer locations will need to be coordinated with Light & Power.
Transformers must be placed within 10 ft of a drivable surface for installation
and maintenance purposes. The transformer must also have a front clearance of
10 ft and side/rear clearance of 3 ft minimum. When located close to a building,
please provide required separation from building openings as defined in
Figures ESS4 - ESS7 within the Electric Service Standards. Please show all
proposed transformer locations on the Utility Plans for your PDP submittal.
Response: (TST) We are planning to coordinate transformer locations after first round comments
are received.
Comment Number: 5 Comment Originated: 08/24/2021
08/24/2021: OVERALL:
Streetlight placement along public roads will need to be coordinated with Light
21
& Power. Shade trees are required to maintain 40 feet of separation and
ornamental trees are required to maintain 15 feet of separation from
streetlights. A link to the City of Fort Collins street lighting requirements can be
found below:
http://www.larimer.org/engineering/GMARdStds/Ch15_04_01_2007.pdf
Light and Power does not light public and/or private alleys or private drives. All
required lighting along private drives is private.
Response: (TST) Comment noted.
Comment Number: 6 Comment Originated: 08/24/2021
08/24/2021: OVERALL:
Any existing electric infrastructure that needs to be relocated as part of this
project will be at the expense of the developer. Please coordinate relocations
with Light and Power Engineering.
Response: (TST) Comment noted.
Comment Number: 7 Comment Originated: 08/24/2021
08/24/2021: OVERALL:
Any existing and/or proposed Light and Power electric facilities that are within
the limits of the project must be located within a utility easement or right of way.
Response: (TST) Noted.
Comment Number: 8 Comment Originated: 08/24/2021
08/24/2021: OVERALL:
All utility easements and crossing permits (railroad, ditch, flood plain etc.)
needed to serve this development will need to be obtained by the developer.
Response: (TST) Comment noted.
Comment Number: 9 Comment Originated: 08/24/2021
08/24/2021: OVERALL:
Electric meter locations will need to be coordinated with Light and Power
Engineering. Each residential unit will need to be individually metered. For
multifamily and single family attached products, please gang the electric meters
on one side of the building, opposite of the gas meters. All residential units
larger than a duplex and/or 200 amps is considered a customer owned service,
therefore the owner is responsible to provide and maintain the electrical service
from the transformer to the meter(s). There are proposed changes to code to
consider all buildings other than single family detached homes to be customer
owned electric services to the meter.
Response: (TST) Individual meters and ganged electric/gas meters have been shown in the typical
utility layouts for review.
Comment Number: 10 Comment Originated: 08/24/2021
08/24/2021: OVERALL:
For additional information on our renewal energy programs please visit the
website below or contact John Phelan (jphelan@fcgov.com)
https://www.fcgov.com/utilities/residential/renewables/
Response: (TST) Thank you. Comment noted.
Comment Number: 11 Comment Originated: 08/24/2021
08/24/2021: OVERALL:
The City of Fort Collins now offers gig-speed fiber internet, video and phone
22
service. Contact John Stark with Fort Collins Connexion at 970 -207-7890 or
jstark@fcgov.com for commercial grade account support, RFPs and bulk agreements.
Response: (BHA) It is the developer’s intent to include Connexion in Montava. As we receive
comments from city staff on these preliminary plans, we will also reach out to the Connexion
representatives separately if appropriate.
Comment Number: 12 Comment Originated: 08/24/2021
08/24/2021: OVERALL:
Thank you for showing the proposed utility infrastructure for alleyways. There are
a few small issues with this proposal that we look forward to working through
with you once more detail is available.
Response: (TST) Thank you. CAD files can be provided to assist in the review. Please reach out
if that would be beneficial and of interest.
Department: Environmental Planning
Contact: Scott Benton, (970)416-4290, sbenton@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 08/24/2021
08/24/2021: OVERALL: Please provide documentation of sufficient water
rights that will support the water supply of the irrigation ponds.
Response: (Max) The non-potable irrigation system in Montava will be built on a foundation of
adjudicated potable wells that exist on the property and that provide many times more water than
needed to irrigate. The overall irrigation needs for Montava are 600 -700 AF per year when
completed, and the wells are currently providing by themselves over 2,000 AF per year.
Additionally, Montava will be using a water system that has proven impactful called Aqua4D. This
system enables the ground water to be more usable for the plants. Lastly, the irrigation supply will
be augmented by WSSC water and NPIC irrigation water blending to the degree necessary to
support healthy landscape over the long term. These water rights are owned or contracted for,
and plans are being developed that enable the distribution of the water into the irrigation ponds.
Comment Number: 2 Comment Originated: 08/24/2021
08/24/2021: OVERALL: As stated on the PUD Master Plan, a more detailed
Ecological Characterization Study (ECS) is required within the project area, as
it is within 500 feet of LUC defined natural habitats and features (irrigation
canal, jurisdictional and non-jurisdictional wetlands). Please note the buffer zone
standards range from 50-100ft for these features. The ECS should address all
items (a)-(l) of LUC 3.4.1(D)(1) available for view online. In addition, ensure that
the study identifies feature(s) size, the "top of bank" of the ditch, the edge(s) of
wetlands, and whether jurisdictional wetlands may be impacted by the proposed
project. Namely, the No. 8 ditch and any wetlands within located within Phases
E, G, and the Farm should be delineated. If prairie dogs are onsite or within
500ft, the ECS should specifically address the presence of active prairie dogs
including estimate of number of individuals and entire size of the colony within
the project area. The ECS should address all items (a) (l) of LUC 3.4.1(D)(1)
available for view online and include prairie dog mitigation options.
The ECS is due a minimum of 10 working days prior to PDP submittal.
Response: (BHA) The ECS has previously been submitted for review.
Comment Number: 3 Comment Originated: 08/24/2021
08/24/2021: OVERALL: Please note that the City requires mitigation of all
23
wetlands, whether or not they are considered jurisdictional by the US Army
Corps of Engineers.
Response: (BHA) Understood. Planned wetland mitigation areas will be indicated in the Phase G
plans resubmittal scheduled for August 24th.
Comment Number: 4 Comment Originated: 08/24/2021
08/24/2021: OVERALL: Information from the ECS informs design of a "natural
habitat buffer zone" or "NHBZ". Thus, the ECS should explore the relationship
of the proposed impacts to natural features to the overall mitigation plan as
outlined in the ODP and PUD. Will impacts proposed in this PDR be mitigated
by these phases of development or in subsequent phases?
Response: (BHA) Based on our discussions, portions of the feature (No. 8 ditch) indicated with a
50’ buffer on the PUD Master Plan is now required to be piped by the ditch company. Although that
physical feature will no longer exist, we are indicating the locations a nd total sf of the various
natural features that have been incorporated throughout the plan. The detailed calculations for
these are included with the Phase G resubmittal scheduled for August 24th, but the Phase E plan
indicates these areas preliminarily as well.
Comment Number: 5 Comment Originated: 08/24/2021
08/24/2021: OVERALL: Please clarify what parts of the No. 8 ditch will be
piped and which will be raised/widened as per the PUD Master Plan as part of
Phase E, G, and the Farm. Either approach will require a letter from the ditch
company indicating approval of these changes.
Response: (BHA) Following discussions with the ditch company, the No. 8 ditch will be piped from
Mountain Vista to Country Club Road. The detailed plans for the piped sections will be included
with the Phase G resubmittal scheduled for August 24th.
Comment Number: 6 Comment Originated: 08/24/2021
08/24/2021: OVERALL: Contact the assigned Development Review
Coordinator (DRC) prior to submittal if trees will be impacted. A review of trees
shall be conducted by City Environmental staff to determine the status of
existing trees and any mitigation requirements that could result from the
proposed development. The site visit can be conducted in tandem with
Forestry’s site visit. Please contact assigned Development Review Coordinator
directly at 970-221-6689 or email DRCoord@fcgov.com to schedule a tree
inventory site visit. Please plan for at least two weeks to get an onsite meeting
scheduled, especially during April - October.
Response: (BHA) There are only a handful of trees within the Phase E area associated with the
existing residence outbuildings. A site assessment was conducted with the Forestry staff on
August 8, and mitigation plans are included in the submittal.
Comment Number: 7 Comment Originated: 08/24/2021
08/24/2021: OVERALL: Please note the oil well disclosure requirements for
Plats. Plats for any property within 1,000-ft of existing oil wells must include a
note informing future property owners that lots are in close proximity to an
existing oil and gas location. For residential developments requiring a
declaration pursuant to the Colorado Common Interest Ownership Act, a
statement shall be included in such declaration specifying the lots within such
residential development upon which dwellings may be constructed that are
within 1,000-ft of an oil and gas location. The approved plat for such residential
development shall be attached to the recorded declaration. Where no such
declaration is required, the property owner shall record a statement on the
property where the dwelling is located indicating that such property is located
24
within one thousand feet of an oil and gas location.
Response: (TST) The Phase E plan does not fall within 1,000 feet of any wells, so we have not
included this note on the plat. However, we will include these requirements on future plats if
applicable.
Comment Number: 8 Comment Originated: 08/24/2021
08/24/2021: FARM: Overflow parking is potentially allowable in the oil and gas
buffer near the farm but a number of outstanding questions need to be
answered to determine definitively. What is the proposed surfacing for the
overflow parking? Will the ground require excavation to add gravel? Will the
overlflow parking require any grading? Likely requirements include maintaining
25-feet of open space around the actual well with signage and fencing (or
similar) indicating no trespass in that central area.
Response: (BHA) Phase E does not include any of the farm area. We will address this comment in
future submittals that include the farm area.
Comment Number: 8 Comment Originated: 08/24/2021
08/24/2021: OVERALL: 5 years of monitoring at the oil wells should begin
once development plans have been approved.
Response: (BHA) Understood.
Comment Number: 10 Comment Originated: 08/24/2021
08/24/2021: PHASE G – RESIDENTIAL AND PHASE E – TOWN CENTER:
The proposed phases will disturb existing wetlands, therefore a written
statement from the U.S. Army Corps of Engineers shall be provided to the
environmental planner that demonstrates the plan fully complies with all
applicable federal wetland regulations established in the federal Clean Water
Act.
Response: (BHA) The wetlands associated with the ditch have been determined to be non-
jurisdictional. The newer Jurisdictional Determination documents will be included with the Phase G
resubmittal scheduled for August 24th.
Comment Number: 11 Comment Originated: 08/24/2021
08/24/2021: OVERALL: Please clarify what features of the proposed phases
are intended to satisfy the PUD requirement of two Nature in the City features
per PDP, per Phase?
Response: (BHA) These have been indicated on the preliminary plans with the submittal.
Comment Number: 12 Comment Originated: 08/24/2021
08/24/2021: OVERALL: Please note that the Lighting Code (LUC 3.2.4) has
been updated. However, there is still no allowable light spillage in to natural
features or Natural Habitat Buffer Zones.
Response: (BHA) Understood. No NHBZs are in the plans for Phase E.
Department: Forestry
Contact: Molly Roche, 224-616-1992, mroche@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 08/24/2021
8/24/2021: OVERALL
Please provide street cross sections/diagrams and a typical right-of-way detail
per each transect district that includes locations of utilities (gas, water, electric,
communication, cable, fiber option, sewer, etc), street lights, driveways (if
25
applicable) and street trees. Standard tree-utility separation distances currently
used per Land Use Code standards are preferred and are as followed:
Additional coordination between Light and Power, Stormwater(?), and Forestry
needs to occur to determine alternative utility layout and tree placement
guidelines.
Street Light/Tree Separation:
Canopy shade tree: 40 feet
Ornamental tree: 15 feet
Stop Sign/Tree Separation:
50 feet between all tree types and signs
Driveway/Tr Separation:
At least 8 feet from edges of driveways and alleys
Utility/Tree Separation:
10’ between trees and electric utilities, public water, sanitary, and storm sewer
main lines
6’ between trees and public water, sanitary, and storm sewer service lines
4’ between trees and gas lines
Response: (BHA) The intent is to meet requirements for tree separations. As the final plans are
developed and streetlight locations are determined, we’ll continue to confirm these separations are
met.
Comment Number: 2 Comment Originated: 08/24/2021
8/24/2021: OVERALL
Please provide a landscape plan that meets the Land Use Code 3.2.1
requirements. This should include the existing tree inventory, any proposed tree
removals with their locations clearly noted and any proposed tree plantings
(including species, size, quantity, and method of transplant). The plans should
also include the following City of Fort Collins notes:
General Landscape Notes
Tree Protection Notes
Street Tree Permit Note, when applicable.
These notes are available from the City Planner or by following the link below
and clicking on Standard Plan Set Notes:
https://www.fcgov.com/developmentreview/applications.php
Required tree sizes and method of transplant:
Canopy Shade Tree: 2.0” caliper balled and burlapped
Evergreen tree: 6.0’ height balled and burlapped
Ornamental tree: 1.5” caliper balled and burlapped
Required mitigation tree sizes:
Canopy Shade Tree: 2.0” caliper balled and burlapped
Evergreen tree: 8.0’ height balled and burlapped
Ornamental tree: 2.0” caliper balled and burlapped
Response: (BHA) Existing tree plans and preliminary landscape plans are included in the Phase E
submittal. The plans meet the PDP level instead of submitting final plans to allow our team to
receive comments from the city before finalizing planting and construction plans.
Comment Number: 3 Comment Originated: 08/24/2021
8/24/2021: OVERALL
Tree Species Diversity
Standard LUC standard for Tree Species Diversity states that in order to
26
prevent uniform insect or disease susceptibility and eventual uniform
senescence on a development site or in the adjacent area or the district,
species diversity is required and extensive monocultures are prohibited. The
following minimum requirements shall apply to any development plan.
Number of trees on site Maximum percentage of any one species
10-19 50%
20-39 33%
40-59 25%
60 or more 15%
The City of Fort Collins’ urban forest has reach the maximum percentage of the
following species. Please do not plant the following species and refer to the
alternative species list provided by Forestry. Ash (Fraxinus), Honeylocust
(Gleditsia triacanthose: ‘Shademaster’, ‘Skyline’, etc), Bur Oak (Quercus
macrocarpa), and Chanticleer Pear (Pyrus calleryana). Please note that
additional species might join this list as we work through the review process.
Response: (BHA) Per the response to Comment Number 2 above, we have included a
representative plant list but not final locations or quantities for each plant. Based on comments
received from this initial submittal we will keep in mind the species diversity requirements with our
final plan submittals.
Comment Number: 4 Comment Originated: 08/24/2021
8/24/2021: OVERALL
Full tree stocking
Tree Planting Standards. All developments shall establish groves and belts of
trees along all city streets, in and around parking lots, and in all landscape
areas that are located within fifty (50) feet of any building or structure in order to
establish at least a partial urban tree canopy. Full tree stocking shall mean
formal or informal groupings of trees planted according to the following spacing
dimensions:
Tree Type Minimum/Maximum Spacing
Canopy shade Trees 30'-40'
Coniferous evergreens 20'-30'
Ornamental trees 20'-30'
Exact locations and spacings may be adjusted at the option of the applicant to
support patterns of use, views and circulation as long as the minimum tree
planting requirement is met. Canopy shade trees shall constitute at least fifty
(50) percent of all tree plantings.
Response: (BHA) Phase E does not include any multi-family or commercial structures or parking
lots but we will consider this comment for future phases where applicable.
Comment Number: 5 Comment Originated: 08/24/2021
8/24/2021: INFORMATION ONLY
The Silva Cell is a modular suspended pavement system that holds unlimited
amounts of lightly compacted soil while supporting traffic loads beneath paving.
That soil serves two important functions: growing large trees and treating
stormwater on-site. Silva Cells can be used on almost any type of site including:
streets, plazas, parking areas, green roofs/on-structure, “break-out” zones.
City Forestry sees a critical opportunity to explore the greater utilization of Silva
Cells across the urban and suburban setting to increase tree root growth, storm
water treatment, and infrastructure support. We would be happy to pass along
additional resources and contact information for you to explore Silva Cells in
depth. BHA Design, particularly Angie Milewski, was a leader in introducing
27
City staff to the idea of Silva Cells and are a great resource to explain the
benefits of this infrastructure in depth.
Response: (BHA) We are aware of this product. As we move from preliminary to final plans we will
consider if and where this product might be considered.
Comment Number: 6 Comment Originated: 08/24/2021
8/24/2021: OVERALL
City Forestry and BHA (Angie Milewksi) met on site in October 2018 to review
all areas that contain existing trees. A formal tree inventory and mitigation
meeting shall occur prior to the first round PDP submittal. This inventory and
mitigation data will include species, size, condition, and mitigation value, which
summarizes the overall value of one particular tree. If a tree is a removed, the
mitigation value is defined by the number of trees that would need to be
replanted in order to replace the overall aesthetic, environmental, economical,
and social value of a tree based on its species, size, condition, and overall
character. Based on the full tree inventory and mitigation information received, a
certain number of mitigation trees will need to be planted with the
development’s boundary. Mitigation trees are upsized to the following calipers:
Canopy Shade trees: 2” caliper B&B
Ornamental tree: 2” caliper B&B
Evergreen tree: 8’ height B&B
Response: (BHA) There are only a handful of trees within the Phase E area associated with the
existing residence outbuildings. A site assessment was conducted with the Forestry staff on
August 8, and mitigation plans are included in the submittal.
Comment Number: 7 Comment Originated: 08/24/2021
8/24/2021: OVERALL
If applicable, please provide an Existing Tree Removal Feasibility Letter for City
Forestry staff to review. Proposals to remove significant existing trees must
provide a justification letter detailing the reason for tree removal. This is
required for all development projects proposing significant tree removal
regardless of the scale of the project. The purpose of this letter is to provide a
document of record with the project’s approval and for the City to maintain a
record of all proposed significant tree removals and justifications. Existing
significant trees within the project’s Limits of Disturbance (LOD) and within
natural area buffer zones shall be preserved to the extent reasonably feasible.
Streets, buildings and lot layouts shall be designed to minimize the disturbance
to significant existing trees.
(Extent reasonably feasible shall mean that, under the circumstances,
reasonable efforts have been undertaken to comply with the regulation, that the
costs of compliance clearly outweigh the potential benefits to the public or would
unreasonably burden the proposed project, and reasonable steps have been
undertaken to minimize any potential harm or adverse impacts resulting from
noncompliance with the regulation.) Where it is not feasible to protect and retain
significant existing tree(s) or to transplant them to another on -site location, the
applicant shall replace such tree(s) according to City mitigation requirements.
Response: (BHA) There are only a handful of trees within the Phase E area associated with the
existing residence outbuildings. A site assessment was conducted with the Forestry staff on
August 8, and mitigation plans are included in the submittal. If a letter is needed we can provide
this following the initial plan review by forestry staff.
Department: Park Planning
28
Contact: Aaron Wagner, aawagner@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 08/24/2021
08/24/2021: GENERAL
Parks Department and PP&D Planning staff can help with any questions you
may have regarding these comments. We will be your point of contact for both
Parks and PP&D until further notice. Please contact Aaron Wagner
(aawagner@fcgov.com) 970-682.0344; or Jill Wuertz (jwuertz@fcgov.com),
970-416-2062, or Parks Planning Technician, 413 S. Bryan Ave, Fort Collins,
CO 80521 regarding the Parks’ Department’s interest
Response: (BHA) Thank you. We look forward to working with Parks and PP&D staff.
Comment Number: 2 Comment Originated: 08/24/2021
08/24/2021: GENERAL
The cover sheet for the approved PUD has all of the items that PP&D wants for
the Trail, trail crossings, irrigation pond, etc. Please refer to the approved PUD
cover sheet and coordinate with Parks Planning & Development and the Parks
Depts. regarding our interests.
Response: (BHA) Understood and we look forward to continuing the discussions on how these
PUD goals are being incorporated into the final designs for each phase.
Comment Number: 3 Comment Originated: 08/24/2021
08/24/2021: GENERALIt appears the shared irrigation pond is shown on park property. During the PUD
phase, it was established that only a proportionate share of the pond would be
on the park site. Please clarify this change and coordinate with PP&D and the
Parks Dept. to ensure the pond is located in a viable location that is satisfactory
to all parties. If the City, PSD and Montava are to share an irrigation pond(s),
the spatial separation currently shown will require additional coordination and
infrastructure planning.
a. Below is an excerpt from the PDR documents describing the pond and its
location.
This pond will be located adjacent to the planned City of Fort Collins community
park, a future elementary school site, and other planned Montava development
areas and is envisioned to serve all three of these entities with shared
non-potable irrigation through a distributed system if possible. If this shared
system cannot be achieved, a non-potable irrigation system.
b. Below is the language from the Approved PUD agreement:
If a shared irrigation pond is agreed upon between the City and the Developer
and/or Poudre School District, the pond must be located proportionally on
Developer and/or Poudre School District property.
Response (BHA) This shared pond design and coordination with the City staff is ongoing, and
updates and revisions to the pond and pumpstation are included in the submittal. We have
indicated the irrigation storage pond design plans with our submittal for Phase G as it will need to
be constructed to serve our initial development phase. While we are designing the pond so that it
could ultimately be a shared pond serving the City park and the school district, no plans are
confirmed for these future partnerships. We look forward to continuing to discuss the benefits of
the potential sharing this facility if desired by these entities in the future.
Comment Number: 4 Comment Originated: 08/24/2021
08/24/2021: GENERAL
Please clarify and coordinate with PP&D and The Parks Dept. regarding trail
29
alignment associated with this phase. PP&D and Parks would also like to have
a better understanding of the timing and role of the City related to the grade
separated crossings for the trail at Mountain View and potentially Timberline.
Below is language from the approved PUD Master Plan document (pgs 218 –
220).
a. Grade-separated pedestrian and trail underpass crossings will be provided
by the Developer at locations #2 and #3 as shown on the attached map. The
design of such crossings shall be reasonable and feasible under all the
circumstances and shall consider the feasible preservation of useable parkland
and the provision of convenient, safe and attractive pedestrian access.
Crossing design to be mutually agreed to before PDP approval for the relevant
phase(s) of the development.
b. The Montava PUD Master Plan identifies grade-separated pedestrian and
trail underpass crossings at locations #1 and #4 on the attached map. The
Developer acknowledges that an equitable, proportionate share of the design
and construction cost of such underpass crossings will be necessary; such cost
sharing shall be identified and mutually agreed upon before PDP approval of
the relevant phase(s) of the development, recognizing that adjacent
developments and the City (Park Planning & Development) should equitably
and proportionately share in such cost.
Response: (BHA) Based on the continued discussions over the last year and requirements of the
ditch company, the No. 8 canal will be piped from Mountain Vista to Country Club Road, and
Timberline Road is being designed as a unique pedestrian and bicycle-focused road through the
Phase G, Phase E, Town Center and Community Park areas. The result is a trail underpass planned
at Mountain Vista Drive, and the bike-priority at-grade crossings north of this to Country Club
Road.
Comment Number: 5 Comment Originated: 08/24/2021
08/24/2021: GENERAL
Please coordinate with PP&D and the Parks Dept. regarding necessary
easements for the trail along ditch #8. Additionally, please clarify the intent of
potential regrading within Ditch #8 for the SW neighborhood and Town Center.
A Letter of Intent from the ditch company will be required prior to hearing. An
understanding of the regrading will need to be thoroughly understood. Below is
the language from the Approved PUD Master Plan (pg. 219) The ditch corridor
cross sections describing potential changes referenced on pages (pg 91 &
221) show a 4:1 side slope, this grading exercise needs to be coordinated with
Utilities, Traffic, PP&D, Parks, Stormwater and other depts.
a. A public access and trail easement along the proposed #8 ditch corridor will
be provided by Developer between trail crossings #1 and #4. As indicated
conceptually in the Master Plan and the cross-section on the attached exhibit,
the easement area along any portions of the ditch that are not piped north of the
Community Park will be designed to create a wider, more natural experience.
South of the park and adjacent to the Town Center, the easement area along
any portions of the ditch that are not piped are planned as a narrower section
designed to facilitate connections into the adjacent neighborhoods and
mixed-use areas and with the ditch in close proximity of North Timberline Road
to facilitate ditch maintenance. Final design of the trail, ditch, ditch maintenance
access and associated easement widths, along with equitable and
proportionate cost sharing for design and construction of the trail, will be
determined at the time of PDP for the relevant phase(s) of the development.
30
Response: (BHA) Based on the continued discussions over the last year and requirements of the
ditch company, the No. 8 canal will be piped from Mountain Vista to Country Club Road.
But we intend to provide any needed trail easements. More detailed design information on the
ditch, trail, and Timberline Road designs will be included with the Phase G resubmittal scheduled
for August 24th.
Department: Building Services
Contact: Katy Hand, khand@fcgov.com
Topic: Building Insp Plan Review
Comment Number: 1 Comment Originated: 08/24/2021
08/24/2021: INFORMATIONAL: Please visit our website for a list of current
adopted building codes and local amendments for building permit submittal:
https://www.fcgov.com/building/codes.php
https://www.fcgov.com/building/energycode
https://www.fcgov.com/building/application.php
Response: (BHA) Our architects plan to follow the current building codes as we move from the
planning/engineering reviews into building permit plan development.
Comment Number: 2 Comment Originated: 08/24/2021
08/24/2021: Provide site-wide accessibility plan in accordance with CRS 9-5.
This requires accessible units per that state standard. This requirement
includes single family attached homes and accessible path must be provided
into the dwelling entrance (no step). Accessible units should be distributed
throughout the site in various building types. Site grading should be planned
accordingly
Response: (BHA) Our submittal is a preliminary level. As we receive comments from the various
departments we will incorporate these paths to the attached units as required.
Comment Number: 3 Comment Originated: 08/24/2021
08/24/2021:
-Single family, duplex and townhomes (defined as: units each on their own
platted lot/parcel) should be designed under the adopted IRC code.
-Multi-family, Commercial, mixed use building should be designed under the
adopted IBC
Response: (BHA) Understood, and our architects intend to follow these when we reach the building
permit stage of our designs.
Comment Number: 4 Comment Originated: 08/24/2021
08/24/2021: Townhomes and duplexes require an minimum of a P2904
(plumbing code) sprinkler system. Plan for adequate water service and
pressure accordingly.
Response: (BHA) Understood, and our architects intend to follow these when we reach the building
permit stage of our designs.
Comment Number: 5 Comment Originated: 08/24/2021
08/24/2021: Multi-family Items:
-10% of all parking spaces must be EV ready (conduit in place)
-A City licensed commercial general contractor is required to construct any new
multi-family structure.
-Multi-family Residential located within 1000ft of rail tracks, 500 of highway, or
250ft of a 4 lane road must provide ext wall composite sound transmission of 39
STC min.
31
-R-2 occupancies apartment/condo must provide 10ft setback from property
line and 20 feet between other buildings or provide fire rated walls and
openings per chapter 6 and 7 of the IBC.
-City of Fort Collins amendments to the 2018 IBC require a full NFPA-13
sprinkler system in multifamily units with an exception to allow NFPA 13R
systems in buildings with no more than 6 dwelling units (or no more than 12
dwelling units where the building is divided by a 2 hour fire barrier with no more
than 6 dwelling units on each side).
-If trash chutes are proposed in the building, dedicated recycle chutes must also
be provided.
-Accessibility is required per IBC, ICC-A117.1 and state law CRS 9-5
-Accessible parking and loading zones must be provided in covered and open
parking areas per current IBC including van spaces where required
Response: (BHA) Our current Phase E plans do not include multi-family but we will include this
information with future phases that include multi-family.
Comment Number: 6 Comment Originated: 08/24/2021
08/24/2021: Townhome (with property lines) Items:
- ·Attached single-family provide 3ft setback from the furthest projecting element
to property line or provide fire rated walls/ projections and openings ,must be
limited or fire protected per chap 3 of the IRC
-(2) 1hr walls (i.e.) 2hr fire barriers constructed between townhomes should be
continuous to the roof deck and furthest projecting element per current IRC and
local amendments (this includes covered patios and decks).
Response: (BHA) Understood, and our architects intend to follow these when we reach the building
permit stage of our designs.
Department: Technical Services
Contact: Jeff County, 970-221-6588, jcounty@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 08/24/2021
08/24/2021: OVERALL:
As of January 1, 2015, all development plans are required to be on the
NAVD88 vertical datum. Please make your consultants aware of this, prior to
any surveying and/or design work. Please contact our office for up to date
Benchmark Statement format and City Vertical Control Network information.
Response: (TST) Comment noted. The project has been set up on the NAVD88 vertical datum.
Comment Number: 2 Comment Originated: 08/24/2021
08/24/2021: OVERALL:
When submitting the Subdivision Plats for this property/project, addresses are
not acceptable in the Subdivision Plat title/name. Numbers in numeral form may
not begin the title/name. Please contact our office with any questions.
Response: (TST) Comment noted.
Department: Outside Agencies
Contact: Don Kapperman, Comcast, don_kapperman@comcast.com,
Topic: General
32
Comment Number: 5 Comment Originated: 08/24/2021
08/24/2021: Comcast has no issues at this time. Thanks
Contact: Heidi Jensen, Boxelder, 970-498-0604, heidij@boxeldersanitation.org,
Topic: General
Comment Number: 3 Comment Originated: 08/24/2021
08/24/2021: See attached comments from Boxelder Sanitation District.
Response: (TST) Noted that review comments will be coming based on initial submittal.
Contact: Randy Siddens, ELCO, 970-493-2044, randys@elcowater.org,
Topic: General
Comment Number: 1 Comment Originated: 08/24/2021
08/24/2021: See attached ELCO response.
Response: (TST) Noted.
Contact: Ryan Donovan, Larimer and Weld Irrigation Co, 970-622-8181,
ryan@lcwaterlaw.com,
Topic: General
Comment Number: 4 Comment Originated: 08/24/2021
08/24/2021: Please find attached a letter on behalf of Larimer and Weld
Irrigation Co., Larimer and Weld Reservoir Co., and WRCC, Inc.
1. Storm Water. No official storm water or drainage plan has been provided to the Companies. If such a
report exists, then a copy should be provided to the Companies. If no such report exists, then obviously
Montava will need to provide one to the City, and the Companies request a copy be sent to them. The
strong preference of the Companies is that storm water be discharged in such a way as to avoid the No. 8
Outlet Ditch altogether. If that is not to occur, then the Companies would need to approve any plans to
discharge storm water into the No. 8 Outlet Ditch, upon protective terms and conditions reached with
Montava.
In addition, as the City is well aware the area around the No. 8 Outlet Ditch from Mountain Vista Drive
northward is facing extreme development pressure. The City should develop a comprehensive storm water
drainage plan that addresses all the proposed development in this area, rather than conducting piecemeal
reviews.
Response: (TST) The No. 8 ditch modifications are shown under the Phase G and Phase G offsite package.
2. Water Supply. Presumably the “Farm” will be lawfully irrigated using existing groundwater wells on the
property. However, the Companies have serious concerns about what water sources Montava has the
legal right to use for serving Phases G and E with potable water. With Montava’s water court case still
very much pending and in the early stages, the City and other water uses need to know where the treated
water is coming from.
Response: (Max) Montava has purchased water rights in ELCO to begin development of the project. Other
water rights are also contracted for and will be secured as needed. Montava continues to work on its water
court case for a more affordable long term water supply and will transition to that supply when it is available
for areas of the development no built in ELCO. This assumes ELCO does not decide to work with us to
expand its water supply portfolio as we have offered many times and continue to offer.
3. No. 8 Outlet Ditch Easement. At all times during and following construction, the Companies’ right to
access the ditch for repairs, operations, maintenance, etc. must be respected. This includes prohibiting any
33
physical intrusion into the ditch and easement area, but also extends to activities proximate to the ditch
that may cause settling or disturbance to the ditch banks or increase seepage from the ditch. Long term,
proper fencing and signage should be constructed whereby Montava residents are denied access to the
ditch and ditch access road.
Response: Comment noted.
Contact: Samantha Lasher, Larimer County, 970-498-7723,
Topic: General
Comment Number: 6 Comment Originated: 08/25/2021
08/25/2021: Larimer County Planning comments are as follows:
1. What is the level and type of development proposed for the various open
space/park amenities in Phase 1? For example, what are the plans for the
“Partially Improved Park,” located east of Phase G? Weed management within
the proposed open spaces will need to comply with all requirements set forth in
the Larimer County Noxious Weed Management Plan.
Response: (BHA) Planned civic spaces for Phase E are indicated in our preliminary plans. Weed
management requirements will be met.
2. Will there be a road connection to the Farm from Phases E and G? Will
property owners be able to access/use the farm during Phase 1 and if so, pay
into a fee system for use of the farm?
Response: (BHA) We intend to get the farm and crops operational in early phases of Montava, but
the more public aspects of the farm (market, farm stand) are planned for later in the development.
Road connections would be planned and designed when public uses of the farm are designed.
3. Will the Phase E and G neighborhoods have access to the proposed
non-potable irrigation delivery system or will it not be available until the entirety
of the Montava development is built?
Response: (BHA) The non-potable pond will be built with the initial phase of development (Phase
G).
Contact: Sarah Brucker, State of CO Water Resources, 303-866-3581,
sarah.brucker@state.co.us,
Topic: General
Comment Number: 2 Comment Originated: 08/24/2021
08/24/2021: Please see attached for comments from the Colorado Division of
Water Resources.
Response: (M/M) Stormwater detention facilities are being designed in accordance with the
provisions identified in CRS 37-92-602(8), also identified in the City of Fort Collins Stormwater
Criteria.
Contact: Steven Rothwell, Larimer County Engineering, srothwell@larimer.org,
970-498-5715,
Topic: General
Comment Number: 7 Comment Originated: 08/31/2021
08/31/2021: Please see the attached comments from Larimer County
Engineering for Phase 1 of the Montava PUD Master Plan.
1. To address transportation adequate public facility needs, the County requests that the City
require the Montava development to evaluate any needed transportation improvements that
34
are warranted as a result of this project. Montava should be responsible for constructing any
necessary improvements or be expected to participate in any designs and c onstruction of
such improvements.
Response: (Kimley Horn) A traffic impact study is included with this submittal. It identifies any
intersection that is not anticipated to meet City and County standards. Responsibility for improvements
will be discussed with the City and County and based on the project’s percentage contribution to the
intersection.
2. The TIS for each phase of the Montava Development needs to include Country Club Road as
well as the intersections of Country Club Road with Lemay/Gregory. Larimer County
appreciates being invited to the TIS Scoping Meeting earlier this month. We look forward to
reviewing the TIS once it has been completed.
Response: (Kimley Horn) The Montava Traffic Impact Study dated June 2022 is completed and includes the
intersection of Country Club Road and Lemay Avenue.
3. With each phase of the Montava Development, the County requests that the City closely
monitors the capacity and safety of Country Club Road as the substantial increase in
background traffic over the recent years has increased neighborhood concern over the
capacity and safety of the current road configuration. As the Montava development phases
commence and continue, we understand that the City will continue discussions with the
County on potential mitigation measures and plans to address, or improve, vehicle and
pedestrian mobility along this corridor.
Response: (Kimley Horn) Comment noted.
4. As future phases commence, there will be a major impact to City roadways as well as County
roadways that are not yet annexed by the City. To mitigate for these impacts, it is essential
that the Turnberry extension to the south is diligently pursued, as well as the needed
connections to the west such as the planned extension of Suniga Road, It is the County’s
position that these connections need to be functional before substantial traffic generating
development is permitted within the Montava Development Area.
Response: (Kimley Horn) The Montava Traffic Impact Study dated June 2022 includes the future roadway
extensions that were discussed with City and County staff. It is the applicant’s understanding that the
City continues work on the extension of Turnberry and Suniga. However, if future roadway plans change
with the City or the County, discussions would like to be made with the project team.
5. The developments in this area pose a substantial change to the citizens and homeowners in this
area. The County asks that the City and Developer continue to do outreach to these citizens and
commit to making an effort to coordinate with them and mitigate their concerns where applicable
and reasonable.
Response: (BHA) We are working together with the City to continue neighborhood outreach as a key p art of
the Montava planning.
BNSF Railway comments:
BNSF has not reviewed any design details or calculations for structural integrity or engineering
Accuracy. BNSF accepts no responsibility for errors or omissions in the design or execution of the project.
If a contractor needs to work within 25 feet of BNSF track or within BNSF property, the contractor must
contact BNSF Rea; Estate/Permitting consultant Jones Lang LaSalle (JLL) for a permit. Their contact
information can be found on our website at www.BNSF.com. If any changes are made to the plans
affecting BNSF property, plans must be resubmitted for review.
Here are our general comments:
35
- Show BNSF property boundaries on plans more clearly.
- BNSF will need to review the drainage plan as current drainage might be altered near tracks
- Fencing plans will need to be reviewed by BNSF to ensure it complies with BNSF standards
- If grading on BNSF property is required, grading plan will need to be reviewed by BNSF, and permits
will be required to occupy BNSF property as well as a BNSF supplied flagger will be required and paid
for by agency or contractor.
- If access to BNSF property is required, an agreement with BNSF will be required as well as safety
badging for all employees on BNSF property
Response: This submittal is for Phase E. We plan to meet BNSF requirements for future
phases near BNSF properties.