HomeMy WebLinkAboutGALLEGOS SUBDIVISION - 10-88 - CORRESPONDENCE - STAFF'S PROJECT COMMENTSCITY OF FORT COLLINS
OFFICE OF DEVELOPMENT SERVICES, PLANNING DEPARTMENT
March 9, 1988
Mr. Dick Rutherford
Stewart and Associates
214 North Howes Street
Fort Collins, CO. 80521
Dear Mr. Rutherford:
Staff has reviewed the request for a one lot subdivision known as the Galle-
gos Subdivision. This request is being processed administratively through
the Minor Subdivision Ordinance and will be heard by the Planning Director
as opposed to the Planning and Zoning Board. Please note the following
revisions that should be considered prior to the administrative hearing.
1. The Stormwater Utility needs to have the calculated runoff from the lot
compared with the flow of the floodplain. The argument needs to be made
that the flows from the lot will be released from the lot before the
peak of the 100-year flood arrives. This would prove that the runoff
from the lot is not contributing to the peak 100-year flows.
2. Please delete any reference to participation in a special improvement
district and construction of a basin detention pond. The Stormwater
Utility would not create a special improvement district. Rather, fees
are collected on the City utility bill to construct basin improvements.
3. It is important to emphasize that the first floor elevation must be
raised above the 100-year flood elevation. This reference should remain
in the report.
4. The calculations on the drainage report do not have to be redone. How-
ever, a new cover letter should be submitted addressing the above con-
cerns.
OFFICE OF DEVELOPMENT
SERVICES, PLANNING
• P.O. Box 580 • Fort Collins, Colorado 80522 • (303) 221.6750
•
0
This concludes staff comments at this time.
age report to the Planning Department. Af
will schedule an administrative hearing wi
important that all signatures and notari
this hearing. After the Planning Director
over to the Office of the City Clerk who
the document with the Larimer County Cler
questions.
Sincerely,
Ted Shepard "
Project Planner
TS/kb
xc: Mike Herzig, Development Engineer
Please submit the revised drain -
ter the revisions are approved, I
th the Planning Director. it is
als be executed on the mylar for
approval, the plat will be turned
will be responsible for recording
k. Please call if there are any