Loading...
HomeMy WebLinkAboutTHE LEARNING CASTLE PUD - PRELIMINARY & FINAL - 13-88 - CORRESPONDENCE - CORRESPONDENCE-CONCEPTUAL REVIEWCITY OF FORT COLLINS OFFICE OF DEVELOPMENT SERVICES, PLANNING DEPARTMENT February 23, 1988 Susan Widhalm Jan Henderson Nancy Kraushaar 900 Bitterbush Fort Collins, CO 80526 Dear Ladies, For your information, attached is a copy of the Staff's comments concerning E.D.S. Preschool and Enrichment Program, which was presented before the Conceptual Review Team on February 22, 1988. The comments are offered informally by Staff to assist you in preparing the detailed components of the project application. Modifications and additions to these comments may be made at the time of formal review of this project. If you should have any questions regarding these comments or the next steps in the review process, please feel free to call me at 221-6750. Sincerely, T , Ted Shepard J Project Planner Attachment TS/bh xc: Tom Peterson, Director of Planning Mike Herzig, Development Coordinator Jim Faulhaber, Civil Engineer I Project Planner File OFFICE OF DEVELOPMENT 300 LaPorte Ave. • P.O. Box 580 • Fort Collins, Colorado 80522 • (303) 221-6750 SERVICES, PLANNING CONCEPTUAL REVIEW STAFF COMMENTS MEETING DATE: February 22, 1988 ITEM: E.D.S. Preschool and Enrichment Program APPLICANT: Ms. Susan Widhalm, Ms. Jan Henderson, and Mrs. Nancy Kraush- aar, 900 Bitterbush, Fort Collins, CO. 80526. LAND USE DATA: Request approval for a child care center in a single fam- ily home located at the northwest corner of Horsetooth and Riva Ridge Drive in the Warren Farm P.U.D. on Tract A. COMMENTS: 1. Both single and three phase power are available in the area. All normal development charges for a commercial use would apply. A commercial form must be filled out for the Light and Power Department. 2. It is apparent from the site plan that there will be more impervious surface for parking than a typical single family home. A letter from an engineer should be provided stating that the Warren Farm retention pond is still adequate and will be capable of handling the anticipated runoff associated with this site. The retention pond was designed by RBD Engineering. 3. Please be advised that gravel parking is not allowed. 4. The driveway curb cut on Riva Ridge Road is not in conformance with the requirement that it be 25 feet from the intersection. The site plan shows a distance of only 20 feet. 5. The proposed parallel parking in the driveway would cause blocking during a drop off or pick up. This is inadvisable. Please consider redesigning the parking stalls so a free travel lane will remain available during a typical drop off and pick up. 6. The following space requirements are calculated for a maximum of 45 students: 1800 square feet interior floor area (excludes restrooms, kitchens, hallways, closets, etc.) 4850 square feet of outdoor play area (must be defined by a six foot solid screen fence) 7. The Water and Sewer Department will consider this a commercial use and will require a water tap. 8. Please work with the project planner in researching the design guidelines associated with the Warren Farm P.U.D. The design treatment along West Horsetooth Road and Riva Ridge will contribute to quality streetscapes in the City. 9. A neighborhood meeting has been scheduled for March 3, 1988 at the Southside Baptist Church located at 620 West Horsetooth Road. The hours are from 7:00 to 9:00 P.M. Please make copies of an 8 1/2 x 11 fact sheet in addition to any other site plans, graphics, or visual aids. 10. Due to a conflict of interest with the new site, Linda Ripley will no longer be the project planner. Ted Shepard has now been assigned the project. It is advisable that the project planner be contacted a few days before the neighborhood meeting to review the details.