Loading...
HomeMy WebLinkAboutSILVER OAKS PAIRED HOUSING PUD - FINAL - 14-88M - REPORTS - RECOMMENDATION/REPORT W/ATTACHMENTSITEM NO. 3 MEETING DATE 5/ 2 3/ 94 STAFF Kirsten Whetstone City of Fort Collins PLANNING AND ZONING BOARD STAFF REPORT PROJECT: Silver Oaks PUD, Paired Housing, Final #14-88M APPLICANT: Taft Hill Investments, Ltd. c/o Gefroh-Hattman, Inc. 145 West Swallow Road Fort Collins, CO 80525 OWNER: Taft Hill Investments, Ltd. 7730 E. Belleview, Suite 100 Englewood, CO 80111 PROJECT DESCRIPTION: This is a request for a final PUD for 20 residential units in 10 duplexes on 3.86 acres. The site is Tract G of the Horsetooth West Overall Development Plan and is located at the northwest corner of Horsetooth Road and Auntie Stone Street, just south of Olander Elementary School. The property is zoned RLP, Low Density Planned Residential. RECOMMENDATION: Approval EXECUTIVE SUMMARY: The request for duplexes on Tract G of Horsetooth West Overall Development Plan conforms with the amended Overall Development Plan and is in substantial conformance with the approved preliminary PUD. The PUD satisfies applicable criteria of the All Development Chart of the LDGS. The request is found to be compatible with the surrounding area and the project is considered feasible from a transportation standpoint. COMMUNITY PLANNING AND ENVIRONMENTAL SERVICES 281 N. College Ave. P.O. Box 580 Fort Collins, CO 80522-0580 (303) 221-6750 PLANNING DEPARTMENT • • Silver Oaks Paired Housing PUD - Final, #14-88M May 23, 1994 P & Z Meeting Page 2 COMMENTS: 1. Background The surrounding zoning and land uses are as follows: N: R-L-P; Olander Elementary School S: M1, M (County); existing mobile home court and single family homes E: R-L-P; Vacant (Silver Oaks Third Filing PUD) W: FA-1 (County); Vacant (Future City Southwest Community Park) This parcel was part of a larger annexation approved in 1978. As part of Horsetooth West ODP (Tract G), the site was designated as "Multi -family" on the original ODP and approved in 1988. In 1992, during deliberations on the Horsetooth West ODP, First Amendment, the parcel was converted to "daycare/church". In February 1994, a second amendment to Horsetooth West ODP re- designated this parcel back to multi -family use. 2. Land Use The request for 20 units in 10 duplex structures on 3.86 acres represents a density of 5.18 dwelling units per acre. The layout and density of the proposed plan are in substantial conformance with the approved preliminary PUD. 3. Design The primary design features of Silver Oak Paired Housing PUD are the orientation of the structures and landscape treatment along Horsetooth Road. The streetscape along Horsetooth Road is enhanced with the garages and driveways placed on the north side of the structures. Berms and landscaping will be planted along the arterial to buffer the residential units and to create an attractive streetscape. 4. Solar Orientation Duplex lots are required to comply with the requirements of the Solar Orientation Ordinance. With eight of the ten lots facing south, or having a minimum of 50 feet of unobstructed open space along the south lot line, the PUD has a compliance rate of 80%. This exceeds the required minimum of 65%. Silver Oaks Paired Housing PUD - Final, #14-88M May 23, 1994 P & Z Meeting Page 3 5. Transportation A traffic impact analysis was done for the Horsetooth Overall Development Plan, in 1992. At the time the traffic study was performed, Tract G was given an anticipated land use of 58 multi- family dwelling units. It was concluded, in 1992, that the trip generation based on 58 units could be accommodated on the surrounding street system in both the short and long term. With a reduction from 58 to 20 units, the anticipated traffic impact will be less. Thus the proposed PUD is considered feasible from a transportation standpoint. RECOMMENDATION In reviewing the request for Silver Oaks Paired Housing PUD-Final, Staff makes the following findings of fact: 1. The Final PUD is in substantial conformance with the approved preliminary PUD. 2. The Final PUD is in conformance with the approved Horsetooth West Overall Development Plan. 3. The Final PUD satisfies the All Development (Neighborhood Compatibility) criteria of the Land Development Guidance System. 4. The traffic impacts have been reviewed and can be accommodated on the existing surrounding street system in both the short and long term. Staff, therefore, recommends approval of Silver Oaks Paired Housing PUD, Final, #14-88M, with the following condition: 1. The Planning and Zoning Board approves this planned unit development final plan upon the condition that the development agreement, final utility plans, and final P.O.D., plans for the planned unit development be negotiated between the developer and City staff and executed by the developer prior to the second monthly meeting (July 25, 1994) of the Planning and Zoning Board following the meeting at which this planned unit development final plan was conditionally approved; or, if not so executed, that the developer, at said subsequent monthly meeting, apply to the Board for an extension of time. The Board shall not grant any such extension of time unless it shall first find that there exists with respect to said planned unit development final plan certain specific unique and extraordinary circumstances which require the granting of the extension in order to prevent exceptional and unique • C J Silver Oaks Paired Housing PUD - Final, #14-88M May 23, 1994 P & Z Meeting Page 4 hardship upon the owner or developer of such property and provided that such extension can be granted without substantial detriment to the public good. If the staff and the developer disagree over the provisions to be included in the development agreement, the developer may present such dispute to the Board for resolution if such presentation is made at the next succeeding or second succeeding monthly meeting of the Board. The Board may table any such decision, until both the staff and the developer have had reasonable time to present sufficient information to the Board to enable it to make its decision. (If the Board elects to table the decision, it shall also extend the term of this condition until the date such decision is made). If this condition is not met within the time established herein (or as extended, as applicable), then the final approval of this planned unit development shall become null and void and of no effect. The date of final approval for this planned unit development shall be deemed to be the date that the condition is met, for purposes of determining the vesting of rights. For purposes of calculating the running of time for the filing of an appeal pursuant to Chapter 2, Article II, Division 3, of the City Code, the Iffinal decisionve of the Board shall be deemed to have been made at the time of this conditional approval; however, in the event that the dispute is presented to the Board for resolution regarding provisions to be included in the development agreement, the running of time for the filing of an appeal of such "final decision" shall be counted from the date of the Board's decision resolving such dispute. -endt Dr. �t Michener Dr. 1 Lron nu o Aga Ct. i W 0 01> set • v re'� • Moffet Drive m o Pri m rose Or. � c v J in QTYLIMITS L)C HORSETOO 1 C o c c o W ■■ m � m a PI. Powell PI. E r _ � ITEM: SILVER OAKS PUD Paired Housing - Final NUMBER: 14-88M 1 U H line Or. 1 _ ■ t ■ Kinnison . Drive I ai s Birming� rn G o„ Devonshire c s l � Cheshire St. Derby Ct. Newcastle G�- ;nraey Amcs Cr. C f. Bronson St.T ter+ K�nr Ct. S Churchill Y Ct T-T•H RM a c � c c Q o WeslfFeld 0 C� Westfiel Or North IIOTti 1AND USE, DESIGN ,CRITER LEGAL aNtIRaL Bair ,, � w aw.w e.f. K. rw«Y. r.rt I. rr Y r r J:a . Y.Is'111.eP IB• n^ N Ya .Ian al teae e M 1 nlr otw1b.yapoo b ru• N sd.Bo teat r.r er trM Pbtl brtll a,� • rlr IF rYY on tl,t-wet I101 of .lunta Trove tM of 10. 1 tMz• el e t td wet , elon9 \ aYrr r l,r rr IY bra rat W� rIM j rF a r YxYr rlraWl. 11.W I IVa art •rWr r dl•raew r e era tM a N.I1 IPoa —N.ua tar tuft re.t tee 10.24 leer. . `r^eYrWr YYb YrYllY wrl I Y'•�y�Ky86 1 obu nMt. unblln•n xu F•Wu rrlr ��ry,r Yl,.ryWryyF r,IWrF r,y Mlen MN or rllcl wen S01' ll'E 00. Mue9.1n 106'21' \ ue.Ep TKIa T, io^ f si. io na ar m lenq ! r . u, rre r a ,. w r r�irY �riy�rjl �'�r� .ew.IrB raa IlPnty v rNly rp..t .o r W w.F.l r.. I,.. w twYub n.Y+K. rqM a a.at.n. ee xs'.o• r«a. w .rota er r r r. s al• ie' te' II \ rt • I '�« � IY rn� all taro a'�luer r rr w Ixvr.l o�.W I. r•lu. Ir w naa,�• w r Y 22.21 Ie•t to tM eater eI Mtn el ry 1 , lal r N Met rn er \ t.elt� r• w. "n. Ir r a. r. r ulr •r,rl r a t. � Yb tart �t r x•rr �Irlrrn � tall re Po �anr I� r•elnr�n• YluM1all ry lY r �.I xle r •yKF M e�l•e yn r rllW rw. yn.nr « W I•ss. ` R� _ .Y.LK r«. ruFrrb rbF rl�t 1. YWb�aurn `lYy•rYrYr �� e.vaeWC rpraWUlr IWUWtr ut�Vr ri Yryr.r lj•'P•a rnbr al aWn lrll \ YIve OM1Y n. YIY reYrrarYr Patnn� NP aprlT 1 rrrrrluyrrea br �bW YraYn. Y rr aalYr rYr W. pyE ME, 6 cRO HP IVe�� .]op. oO ,.I. �tlr r IMV. \'W I IWeIIYYYY�rbYr �r YxWB I « rrlaerEr Ybrbr rYwrr yrT / a3aa pf . urW brY ub YlY•our ryx WI YIIYurYiW ur IN Ira .r. wlr T y s I r. m• rl r..r W ._.F r bFF Alnr r i x. err +r Ylr mr R"rrr°w'iYar��. v�Y Ta°ary .e. 1 rY . •�• +•"'r'br.bW�art. �\ \ \ YYeaxr Y Y r�ryr.Wr r.1' I / I �� I x Yl wlewA xlV raYrYnYY•rr I :•I.r �lr Y axbrt r r Yl•r rt. / / 1 \ _ r \ Irr a. r.rs I I POlY7RE (.-I x1la�l. IOIS?FI�T \ a YI rrr robe x•rry we«Y 1ID PaIInIL14M1.1• I VERTICAL CURB - '�Ipik af. e.NIR)tb PaIW�I I \\ 1. �y'a•� "rY"'r'r'. FLuaN eowc. el DEArwL« I r=N•�fr (NUN1N rlN6£ 111C fMVWI'Yr11 rglG•,M1Ativt4b� 4i�� r Yr�l. xb aY. 1 1ttKrrT G1FsffltlJf \ iuvtn -� I«wnaNs ` \ rwYw pww". . 91ffz W nF rlr rrr nlYa. 31te Ir, le�•'nr YllYxrleY Yrb r. rblrlYlr -J '•— �� — _ I \\ YYreIY. _ - OT L ODTPRI In RYI YIIYYYrYrrryx lrb RNP ETYMy PRf O OARROE •F NT p IbraYY erarxrwyuY. / 'S WTTExr . EINWaR - rOi }� �I'•�T'4Lk i DwIVEYAY� CURB CUT \ n, Yn �4r.«YY yr rYr «r(�vNltl�j,+NYt\� / Nr11'4ti ci ll I"' I Lect«[Ni cwcrE owlet q � z �W± � F p'IT�I��L�pI�uJ \ n rT Mxr a�nr YlW rr«r•`r'`,r[ R_ a N+tvl�•I� \ ,,. b•r rJ uWrW x .•W r b ie, xb 2B T f a _ 5114LE ThM I LY gmvl\N` I" OT F Glh 1W5 3 , --tee; -- _ �R15e I FW,• y {XnTw4 ulRti +ylirnx GHuiJ 17Y [lAorl K I 2 F It ht spy uc tot F 5 m ° j � nctsilw, mute s1�tT r Yrxlru rrrbY dx..YYrd. w t - _� o1T I �< 1 ux'r'xrx vl`rr.ne M•Wa � 4W w �t I // DA , � __J - a x. rrr «rYrxl..x y/ir uY.yr+ - L zbT 2rw rYn.l.1. Pew.:. > v R'o D / L3dt I _ i H I t� - T o� - nuns NT — •s PA I _vl FAMP• TP An.1401'R _ T LINE - a (IG11L}11O�, L4 • _ - �18i0X6TL rlFM NC{d SN(•I:PLK 7T� s 'f6FP�+M1{aOlc�W f6VIN41 , �� �I�i •16'e1 �1 �GXISTYICI P6VIN4 I f BUIDLINO FOTPRiNT 1 A•25 0 - • _ C LYrNDBCAPE BEAR _ Il _ _ - -._ _ 'Io(o 9Z holAu NNC eC 4•'�— eAtaRAYF — K"--------- -------- •• �i 39'ISI II°u zb, i,fA - .. St /4 eb -• -- j � \ W. HORSETOOTH RD. 7f4z Ex r,iIN4 Glkn+ 4Jtt(A __ .. _ -• ••--�_•• ---�. r } }' `Collins 6r PAIRED HOUSING P. site _ IS I LV E R OiA KS _�� ..I;� 7�_ -•; . •— scale tin= 3O.Oft o fo zs so FINAL SITE PLAN Hdq 4,1994 PI ANNINr - OWNER ATTORNEY LE ION •-��• s% r.........It,CC i tl by the Plennivg a ovivg Boa[ o[ tRe city tna i/r• are c e larivl Snle ie to c rc�fy cae ien t day ox e�C of tort I undarelgnetl doe•/do nerMy Approve ady a la ra of r 1 p[op—' deecribedvoe'thia slcalplav end tle Rar•ny 19 xsrrn ee t e pproper�y a C hive, Colorado, cut — r[i[dy t [/we cope c6e cenditiooa avd yea iccivve tat torts aecenllened caae[ecLa or d p[19rietote f record of cneneaid ev ear slte plan. p[epatty Y rued vie 31-33-111. a eb — 9errecary of pi—i.q a d Z. inq B ezd R f co10cY or diver (e geedl �� Hey 0.egietralfov Yo. r VICINITY ST r rmr RrV BV,I. n I r aevR *rr .; �Rp«AP nalrrn rexisr �yq� vwBPr 1 .����� ,� �!ri�b::�_ c_:��raa•�i�l mac- � �= Q��= ��s;�=ui�aC=.:� �l �a;�l��_ L�� II s -/ �/� ' o-rr•■■�■.■ oc;...vu.� wus o■■■■ - •■uu■■ w--o-.■ ■ row■•■ `� 94- :_ k ■�1 C !i.a� ��� � I .;�,��.� it PENN— ME AIMS 21 ,�%,,'�/,,yyam;--- ��•�iAll _,; I — �; _a—I—� .� �. , ID C11� �. ram..:._ . I ��ii�� �� Lei G�l�ir�•:iiJ`�' !Jl - i��il •� gMix ILI :.�".���.i I� �'�.._ n. 'ate •� qu :.���►fj�►ic�� //// nia�rle �'/L ..�,' r,U�y!/ . t a owl' ...p., �mmn.Td �r�r �iiiaiiwrrnvo�•aG-42",1�;��9■�L rf�QA!■!� rFAMISMA s.'�f�.1�� s��!!: A�t�/ �>f�C'll�E �=lI�JIS.� tom_ _ ��w; �� �► .� li es bowl X .. �iJ / V N K,&s6-4 �ILry&-ri Df l NwH nave rm;4k. . rAliTw- Woo Ieca� - LWo aysw r,IWTW l~ ftKs Wwo i4lwnw., �(tONT �I,CVI�IGt�I.2 `.i�IZ7 1�p.}JC{-} ,�1cD�.lr E1C�✓IaTIDIJ-1�A}JCN-KAi�IGN KfaK tL�Vl� T IUN � - RANG �I KL&M G EvaTl cN 2 5my- r\" F� i - r. EP 2 hTDi�'r SIDF. �L. \/AJIDN mil -m ELEVATIONS SILVER OAKS PAIRED HOUSING P.U.D. • SCHOOL PROJECTIONS PROPOSAL: SILVER OAKS PUD, Paired Housing - Final DESCRIPTION: 20 single family units on 3.86 acres DENSITY: General Population 20 units x 3.5 5.18 du/acre (persons/unit) = 70 School Age Population Elementary - 20 (units) x .450 Junior High - 20 (units) x .210 Senior High - 20 (units) x .185 Affected Schools Olander Elementary Webber Junior High Rocky Mountain Senior High (pupils/unit) = 9 (pupils/unit) = 4.2 (pupils/unit) = 3.7 Design Capacky Enrollment 568 551 900 977 1312 1404 • 5/L vi. 6,q,-S A/�,6 i)1L Activity A: ALL DEVELOPMENT CRITERIA ALL CRITERIA APPLICABLE CRITERIA ONLY CRITERION Is the cnterion applicable? Will the criterion be satisfied? If no, please explain z c c 2 i` Z Yes No Al. COMMUNITY -WIDE CRITERIA 1.1 Solar Orientation x X 1.2 Comprehensive Plan 1X/ 1.3 Wildlife Habitat X 1.4 Mineral Deposit x 1.5 Ecologically Sensitive Areas reserved reserved 1.6 Lands of Agricultural Importance 1.7 Energy Conservation 1.8 Air Quality iE 1.9 Water QualityX 1.10 Sewage and Wastes A2. NEIGHBORHOOD COMPATIBILITY CRITERIA 2.1 Vehicular, Pedestrian, Bike Transportation ?( 2.2 Building Placement and Orientation X X 2.3 Natural Features X 2.4 Vehicular Circulation and Parkin ?C 2.5 Emergency Access X J( 2.6 Pedestrian Circulation X X 2.7 Architecture X 2.8 Building Height and Views x 2.9 Shading X 2.10 Solar Access X X 2.11 Historic Resources X 2.12 Setbacks X �( 2.13 Landscape x x( 2.14 Signs X 2.15 Site Lighting X 2.16 Noise and Vibration X 2.17 Glare or Heat X 2.18 Hazardous Materials X A3. ENGINEERING CRITERIA 3.1 Utility Capacity X X 3.2 Design Standards 3.3 Water Hazards 3.4 Geologic Hazards