Loading...
HomeMy WebLinkAboutSILVER OAKS PUD, THIRD FILING - FINAL - 14-88L - REPORTS - RECOMMENDATION/REPORT W/ATTACHMENTS• ITEM NO. 2 MEETING DATE 4/25/94 Kirsten Whe tstone e stone City of Fort Collins PLANNING AND ZONING BOARD STAFF REPORT PROJECT: Silver Oaks Third Filing PUD, Final- #14-88L APPLICANT: Tri-Trend, Inc. c/o Stewart and Associates 103 South Meldrum Street Fort Collins, CO 80521 OWNER: Tri-Trend, Inc. PO Box 40 Timnath, CO 80547 PROJECT DESCRIPTION: This is a request for a Final PUD for 40 single family homes and 16 attached duplex units on 12.27 acres. The site is Tracts D and H of the Horsetooth West Overall Development Plan and is located at the northeast corner of Horsetooth Road and Auntie Stone Street, east of Olander Elementary School. The property is zoned R-L-P, Low Density Planned Residential. RECOMMENDATION: Approval with condition EXECUTIVE SUMMARY: The request for single family lots on Tract D and duplex lots on Tract H of Horsetooth West Overall Development Plan conforms with the approved amended Horsetooth West ODP. (August 24, 1992) and the approved Silver Oaks Preliminary PUD. The PUD satisfies applicable criteria of the All Development Point Chart of the LDGS. The proposed density is 4.56 dwelling units per acre. The request is found to be compatible with the surrounding area and the project is feasible from a transportation standpoint. Although only 41% of the lots meet the definition of a solar oriented lot, the overall approved preliminary plat satisfies the requirements of the Solar Orientation Ordinance with 67.7% of the lots meeting the definition. COMMUNITY PLANNING AND ENVIRONMENTAL SERVICES 281 N. College Ave. P.O. Box 580 Fort Collins, CO 80522-0580 (303) 221-6750 PLANNING DEPARTMENT Silver Oaks Third Filing PUD, Final, #14-88L April 25, 1994 P & Z Meeting Page 2 COMMENTS: 1. Background The surrounding zoning and land uses are as follows: N: R-L-P; Single Family (Silver Oaks First Filing PUD) S: M1, M (County); Existing Mobile Home Court and Single Family E: R-L-P; Vacant (Silver Oaks ODP Tract E for retail/commercial/office/neighborhood convenience) W: R-L-P; Olander Elementary School and Vacant (Silver Oaks Paired Housing PUD, preliminary) This parcel was part of a larger annexation approved in 1978. As part of Horsetooth West ODP (Tracts D and H), the site was designated for single family and patio homes on the amended Horsetooth West ODP approved in 1992. 2. Land Use The proposed PUD is located on Tracts D and E of the Horsetooth West ODP, designated for single family and patio home/duplex lots. The 56 residential units on 12.27 acres represents a density of 4.56 dwelling units per acre. This density exceeds the required minimum of three dwelling units per acre. The Final PUD is therefore in substantial conformance with the approved Amended Horsetooth West ODP and the approved Silver Oaks Preliminary PUD. 3. Design The 40 single family lots exceed the 6,000 square feet lot size with an average lot size of 7,855 sf. . Average lot size for the duplex lots is 3,933 sf. Each lot will feature a deciduous shade tree. Fencing guidelines dictate the fencing to be constructed along Horsetooth Road and Auntie Stone Street. This fence consists of a board on board cedar fence with brick columns and stone caps. The side yard fencing along Tracts A and B cannot exceed 48" in height from the front building line to the front lot line. The fence design shall have an open character, such as a split rail type. Tracts A, B, and C shall be maintained by the Homeowner's Association. No pedestrian access is allowed on to Auntie Stone Street via a pedestrian path. This is to channel school children to cross at street intersections, rather than mid -block. Silver Oaks Third Filing PUD, Final, #14-88L April 25, 1994 P & Z Meeting Page 3 All landscaping of the duplex lots is to be the responsibility of a Homeowner's Association. A six foot high wood fence and evergreen trees are proposed as a buffer from the proposed commercial/office site to the east. 4. Solar Orientation Twenty-three of 56 lots meet the definition of a solar oriented lot (41%) for this filing. The approved preliminary PUD meets requirements of the Solar Orientation Ordinance with 101 of 149 lots (67.7%) meeting the solar oriented definition. It was recognized at the time of preliminary, that certain final filings would not meet the requirements, but the overall preliminary is in compliance. 5. Transportation A traffic impact analysis was done for Horsetooth West Overall Development Plan, First Amendment, in 1992. At the time the traffic study was performed, Tract D was anticipated to be single family lots and Tract H was designated for patio homes or duplex lots. It was concluded that the trip generation figures, based on these 56 lots, could be accommodated on the surrounding street system in both the short and long term. Thus, the proposed PUD is feasible from a transportation standpoint. RECOMMENDATION In reviewing the request for Silver Oaks Third Filing PUD, Final, Staff finds the following facts to be true: 1. The Final PUD conforms to the Amended Horsetooth West Overall Development Plan and is in substantial conformance with the approved Preliminary PUD. 2. The Final PUD satisfies applicable All Development (Neighborhood Compatibility) Criteria of the L.D.G.S. 3. The traffic impacts have been reviewed and can be accommodated on the existing surrounding street system in both the short and long term. Staff, therefore, recommends approval of Silver Oaks Third Filing PUD, Final, #14-88L with the following condition: 1. The Planning and Zoning Board approves this planned unit development final plan upon the condition that the development agreement, final utility plans, and final P.O.D., plans for Silver Oaks Third Filing PUD, Final, #14-88L April 25, 1994 P & Z Meeting Page 4 the planned unit development be negotiated between the developer and City staff and executed by the developer prior to the second monthly meeting (June 27, 1994) of the Planning and Zoning Board following the meeting at which this planned unit development final plan was conditionally approved; or, if not so executed, that the developer, at said subsequent monthly meeting, apply to the Board for an extension of time. The Board shall not grant any such extension of time unless it shall first find that there exists with respect to said planned unit development final plan certain specific unique and extraordinary circumstances which require the granting of the extension in order to prevent exceptional and unique hardship upon the owner or developer of such property and provided that such extension can be granted without substantial detriment to the public good. If the staff and the developer disagree over the provisions to be included in the development agreement, the developer may present such dispute to the Board for resolution if such presentation is made at the next succeeding or second succeeding monthly meeting of the Board. The Board may table any such decision, until both the staff and the developer have had reasonable time to present sufficient information to the Board to enable it to make its decision. (If the Board elects to table the decision, it shall also extend the term of this condition until the date such decision is made). If this condition is not met within the time established herein (or as extended, as applicable), then the final approval of this planned unit development shall become null and void and of no effect. The date of final approval for this planned unit development shall be deemed to be the date that the condition is met, for purposes of determining the vesting of rights. For purposes of calculating the running of time for the filing of an appeal pursuant to Chapter 2, Article II, Division 3, of the City Code, the "final decision$$ of the Board shall be deemed to have been made at the time of this conditional approval; however, in the event that the dispute is presented to the Board for resolution regarding provisions to be included in the development agreement, the running of time for the filing of an appeal of such "final decision" shall be counted from the date of the BoardIs decision resolving such dispute. i7A\ :may a I I D f*00 004 sf"t � T V. � f-- t -tYf. KMf" 040r� FW - 15190[fu�4Y ft P4kk )k K Hplfit" ALL KAmr 44T COIA �kk,4_ 'City. WK-Rq -5,00 p byy AWio&4Afv PLAN 6HW 1 �.i MA L-mv, F M0 W, wf:= 'AL%l'T=rw. Z 9,.F* l,"P6.Af6 MAN 1,14W t, F4 IN IA - ----- o Lots. Pupisx 0s. UAwllltllloN ky VAKQ "PNO t 4=� OF rz "A'.. OVAL, I jqa�p.wa SNOW � wttRIN 4AT"" MON AILM 10, A.�10 �11 WIN 146 S' WALJI IN lKAlt. *' 15, 'A' 'Ib' AND '(,' a HALL Pr, MAlfWAIRPP fi wwaf. A'��atio 4 SCALE - 1'-W' ........... 4� 4f fg�M �FPMLANN it cr c M70Nt 15UILPI 4 ulw -to I" rr of UHO:. 6 rp" P"IQW hp ALL. 4XV0 pg AN aplim Ck*ALf]"K 6WA A. 6" PLAIi, vre ­.p I- V W Ir I... lest: :d m.,l 23 fTl. •I� ft ... 0• 94.71 foe a IM ­1,1 'T cMrd f ",I. E 223.43 feet. .1d ­tl l. N or 11 1 16 curve La the left • dlalsuce of IZfi.91 feet. t .f If f_ _'n. _11r, l-, "ol f 22.92 I_ 1�9 _ along tM arc ­Mtz Ml­e-H 0 ­h N 85- 55' W F $9.0 feat, I . W 473.49 fl.l. 1vd •gfr lM I footC-) lI.q . f %.24 — - 21. fh t 1. 's 5 orcur31�* ll_ntt.f"68­3�3 ;.­t! 1-o E 118 ­t; I— S W 42' W E 142 . ..... of ­10, 12.2111 •ciao, mre or leas. < 1 tHku 9 will, NO PA Ai`www ". Nhylk v RlU.6 hLLbhy r".1A Auwilli, 6I.Nw Et. CO a. =W Tx"� wi6� NatFw PtAwsp witRiO 4' UtlWtY LL Or 6t - LIN44- AND 9. A 114AI4 tIR0% TO 160LAr oFltNtAfjl* OfLVI"Nl* wAb '4 , t., At T4 fIMS' OF rVIXOMINAiLY PLAN ArPADY4. • I* DKY bW? (tzbss MIx WE41*0 WHoAf!IFA" ;ARFIgA, BAFto1J) LO LE/nr. Sex �ow NEe4LEAFA44 (LAD6FM) 12 UA/A6 soy. <IVF, Atb ykAMA (VAU(00, Eut'IE) IL w/A6 Ie✓ sWtt6NL�F0.h4 (coo,6IVIL4E) G III/A4 $�•/. .f.0 6Ar --1Rb 6Ar ww Uogcwmm FW yw� HDfw, , �\ b. A .3EntAtc IRRina+Y:N srcirn 15 -to eA xStALLAv f R (II) Ago 1M k' cik409 e,' ALK 8' WALK IN ¶u4E ARMS 1NM Al. AL O 1 Io FUEL. es 9.e—f— 'to' 'A' ANO #lIE 6' WALK IN 106t 1 ►'. 1NA1 ARA wotw iNR nU - g" O-ct-L'uY, I1. MV6 , L*W WILL Not P.i ,-PMEP WION II. �Px hNALL N HA MNINENAHC* Q ANY RING iY 6HY AP •}'AP Mtr LIN65 pNo VYILIfY 6ASiMENt4, 6"10 MAINtANAN6{ &l4K, IN4LNMNy SNOW thMWAL NMNIN i4 NoH-PUWCLY PGGI6At" LUMM011 MAA4 A{ iNA 1ErMIIXt or No IWo "L-of-5A— ALONl, NARwsl-jg rv. 1-MA b PP / SW 3- BO p p O 1-2N s } vFY•Lk+vc�n �I�ht �ILIN[� � Z•PP� Q N.-MA W _ S 3 I: (i P-1 n +.;,h I be ,n .mmYnd v+N A.. Y. fw<III<.tlm. L i. I �. mine. WI, h..ewwt.lr +mfp.4. Im «ttlll.hat - m �fallw..wefrfc.efona. .erl e.m«.wm m w b�. to [+4 •I lert LK oP fNYf A. "�tM blwt+on eme, sMlt d r,.tA1M Ay t#e Ismwn' 6t. nf«f.t+m ler r. m.wt. li I, th. b..lme. sh. I .Item trcwmn .4ael ! e« fw r v..e irmOtp.` the .w<I« ., 11 M ..i«t�l hm tti [;tY, rA<mmE.! f4Ael rV4lel e W a olw m+e. to tw rsw.m. . <«l+I,at.�.l 4• Z onL'-- rlrM'WNq 3w 1"m K1Y G N" NAMP, BO�AN"L ,U AMIL 611E 6 9 r o BUFF OAR quo" M1"P06AFrA 4 4 MA MOWALL'6 6UPL", A4 PFAYINUS pENIISY. 'mAf"ALL'4 VV FP' jvNDEFA4A PING FNN4 F-140 06A 9 8 6W 6MAMMA4'fW 4041P( OaW4 aOP 41A IIAI AW. 'IAMM4too' 2Yti 9L BJ WALO JUNIpw JuWIrEFUs 6NIW61l414 'eNrPAW, 5g1L 0 0 D IJWI6 146 MUAL6 fp POwto scut- r•�,w• n o w m da wwAc srwle - r¢. PANT I I-iT qfy KEY I Lo wo NAM6 64t'ANIGAL tdAM6 s1t6 IZ SN 1411pWt1AL H46WLODUS/I gL6p1{'alA fKiALANhb6 INbfmw 'LMP6RIM. yVi'Ud. 4 MA MA"A" A5H fKAIlINU9'""Y. 'MA Agkw665v L659' 214a [-4 5 �iL• lrfM{ 61J6W e,�AM ,A U6 6p• '6"Iwo *,NOW' I'Vi vN -HAPXMASF6fL {4OvsYL116t O W11'41A JFIAIANfNO*, INIAp M19'S4AD6MAENY ' yVti e PP fnxD6�tosA p1N6 plNuh `oHDyzn'.kA b' N{. I& 6MA Baprw m,,UoAla A6H "d15 AU"P*X IVi'LAL LLJ 4-4 W 6UPPALo aUNIPOl' LkWir6Fa6 6AW14A 'euppALo' S (4AL < 46 e f GWjBNA pLUM PRaNU6 LI6t6NA 5 — Bo o HJ NWliS JuNlpe� aaNlprfdes NoRlaoOAL16 'Nugw"' S S u d0 *,5 NIOWMDUNO 6PIKM 6rIPA6A 0IPpON1LA '2NOWMOUND' S Opd Hof.; AW I( ILF A�6Ah ID BE hOPMP WIfN KENIULK.Y %UBAJkok" N "D. Q Ob 0wlcs 1. I. All plan! uterrals zMil M it ,«oNan<e rrtM1 A.A... zpezrllz,tlona se. nWe. oz yede. 411 pl.ntl�g Beds atoll M nrlcMd rl tn3-iMh a.p LM1 0 � FFF d. of rood lays of .naeana pr zfmrlar hods<epe f,brl<. All lluMzini� <M1lpa ue. �p �l 1. fi. fi. z sMll M inipald ey m autmtic uMeryrpmq All IaMnprp dull M eatntatrotl by lM Np1160NIKks Ay.KJAnazLij A I'llprnrt rill 0. rwutrM free !M Ct ly :onat,r Mlo...ny tr.es en pl.ntm rn. prvntl e. rno.ea Ine en W Ir< p -o -rey. Il lenaa<.ptrq .et M rn ailed or ae<rrN rIU m r.macael. le r U U ) r d-aJ '. rwn<e eo,a (or IISS .! lM ra 5'f t661 N06S WIw W E4D WI{NIFI 4' Dp lgA6 WLIN66 ANp UtlWty iA160M 6M6N16. 'AKW to L e-LP yop 5" NJ 9. 66 d-6U 'rYplGdl, OtI l.bj' I,kf{I�hGAp� ccALs� I'•�a Note 6pF{Iuy aEtwBBN 4A.s ANC .opt 86p2 6HAw [!E VA r 4" S1G6L ser U Ai, WhM Top Df sop. SCHOOL PROJECTIONS PROPOSAL: SILVER OAKS .PUD, 3rd Filing - Final DESCRIPTION: 56 homes on 12.27 acres DENSITY: General Population 56 units x 3.5 4.5 6 du/acre (persons/unit) = 196 School Age Population Elementary - 56 (units) x .450 (pupils/unit) = 25.2 Junior High - 56 (units) x .210 (pupils/unit) = 11.76 zr Senior High - 56 (units) x .185 (pupils/unit) = 10.36 Design Affected Schools Capacity Enrollment Olander Elementary 568 551 Webber Junior High 900 977 Rocky Mountain Senior High 1312 1404 *LUC_(ZoAK5 344::ltu,J6- PJO *1-►y-F2L Activity A: ALL DEVELOPMENT CRITERIA ALL CRITERIA APPLICABLE CRITERIA ONLY CRFERION Is the criterion applicable? Will the criterion be satisfied? If no, please explain z E a i= z Yes No Al. COMMUNITY -WIDE CRITERIA 1.1 Solar Orientation ✓ ✓ r1&nce ext �i�tiwQ 1.2 Comprehensive Plan ✓ �% 1.3 Wildlife Habitat 1.4 Mineral Deposit 1.5 Ecologically Sensitive Areas reserved reserved 1.6 Lands of Agricultural Importance 1.7 Energy Conservation 1.8 Air Qualit ✓ 1.9 Water Qualit ✓ 1.10 Sewage and Wastes ✓ ✓ A2. NEIGHBORHOOD COMPATIBILITY CRITERIA 2.1 Vehicular, Pedestrian, Bike Transportation 2.2 Building Placement and Orientation ✓ ✓ 2.3 Natural Features ✓ 2.4 Vehicular Circulation and Parkin ✓ ✓ 2.5 Emergency Access ✓ '� 2.6 Pedestrian Circuiation ✓ ✓ 2.7 Architecture ✓ 2.8 Building Height and Views ✓ 2.9 Shadin ✓ ✓ 2.10 Solar Access ✓ ✓ 2.11 Historic Resources 2.12 Setbacks ✓ `� 2.13 Landscape 2.14 Signs ✓ ✓ 2.15 Site Lighting✓ 2.16 Noise and Vibration 2.17 Glare or Heat 2.18 Hazardous Materials A3. ENGINEERING CRITERIA 3.1 Utility Capacity V V 3.2 Design Standards 3.3 Water Hazards 3.4 Geologic Hazards