Loading...
HomeMy WebLinkAboutSILVER OAKS PUD, THIRD FILING - FINAL - 14-88L - CORRESPONDENCE - STAFF'S PROJECT COMMENTS' CommunitmiWanning and Environmental Semes e r' Planning Department City of Fort Collins ------------- --- March 25, 1994 Dick Rutherford Stewart and Associates, Inc. 103 S. Meldrum Fort Collins, CO 80521 Dear Mr. Rutherford, City Staff has- reviewed your submittal for Silver Oaks .PUD 3rd Filing, Final, -.and offers -..the following written comments: 1.. Review of these plans should not -be construed as a.commitment that telephone facilities sufficient to serve this project are presently available. US West will provide telephone service in accordance with the rates .and :tariffs on file with the Colorado Utilities Commission. 2. Telephone facilities generally occupy rear. lot utility - easements, which must be located. on terrain which permits trenching operations. 3. The developer is responsible, for provision of 'all trench,*.. street crossings, -and ditch crossings for telephone facilities =- within the project, and the developer pays up front construction costs for facilities within the development. 4. Any relocation of existing telephone:facilities-required by -these -plans will be paid -for by the developer. 5. Do Lots 32 thru '39 have a 61. utility and drainage easement along the back lot line, or is Tract C for this purpose? Please clarify this on the plat. 6. Street trees must not be planted within 4' of gas lines and utility easements. Please make a ,note of this on the landscape plan. 7. Fire hydrants shall be within 400' of all dwellings. Please note the location of hydrants on the site plan. 8. Exterior walls of residential structures (R-3) located within 3 feet of a property line, such as the duplex units, shall be of one -hour fire resistive construction with no openings permitted. Parapets extending 30" above the roof surface are required unless the exceptions to Section 1710 of the UBC are met. Projections such as roof overhangs or cornices shall not extend over property lines. Projections shall comply with. Sections 1711 and 504 of the UBC. 2S1 Nortli Colle e Avenue 1).0. Box 380 Fart Collins, CO S05t' '_"-7SO (303) 50 9. Engineering and drainage comments will be forwarded under separate cover. 10. Please be aware that there is an Oakhill PUD in the City, which may be confused with the Oakhill Court. 11.::.Please note on the site plan, that a variance to the solar .:_orientation ordinance was granted at the time of preliminary plan approval. 12. Please change the words "multi -family" to "duplex" in the site data. These aren't really multi -family units. 13. Did you submit architectural elevations for the duplexes? I have a print of some, but there is not label and I'm not sure whether they belong to this project. This concludes staff comments at this time. In order to stay on schedule for the April 25, 1994 Planning and Zoning Board hearing, please note the following deadlines: Plan revisions are due April 6th (4 sets of plans and written documentation responding to the above concerns), PMT's (one PMT of each plan sheet), colored renderings, and 8 prints are due April 18th. Final mylars and other documents are due as soon as possible following the hearing. Please be aware that the development agreement and utility plans must be signed prior to the Planning and Zoning Board Hearing, for all PUD's. If not, a condition will be placed on the project giving you 30 days to finalize the plans and agreement, after which time, you must submit a request for an extension, to the Planning and Zoning Board. If you have any questions about these comments or would like to schedule a time to meet to discuss them, please contact me at 221- 6750. Sincerely, Kirsten Whetstone, AICP Project Planner cc Kerrie Ashbeck, Engineering Department Tri-Trend, Inc.