Planning Department
City of Fort Collins
June 15, 1993
Rick Hattman
Gefroh-Hattman, Inc.
145 West Swallow Road
Fort Collins, CO 80525
Dear Ric:
For your information, attached is a copy of the Staff's comments concerning
Paired Housing at Silver Oaks, presented before the Conceptual Review Team on
June 14, 1993.
The comments are offered informally by Staff to assist you in preparing the
detailed components of the project application. Modifications and additions to
these comments may be made at the time of formal review of this project.
If you should have any questions regarding these comments or the next steps in
the review process, please feel free to call me at 221-6750.
Sincerely,
Ted Shepard, AICP
Senior Planner
TS/gjt
Attachments
cc: Tom Peterson, Planning Director
Kerrie Ashbeck, Civil Engineer
Transportation Department
Stormwater Department
Project Planner
File
281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (303) 221-6750
C�
i
CONCEPTUAL
MEETING DATE: June 14, 1993
ITEM: Paired Housing at Silver Oaks
COMMENTS
APPLICANT: Ken Scavo and Don Alber, Van Schaack & Company,
7730 East Belleview Avenue, Suite 200, Englewood,
CO. 80111, c/o Ric Hattman, Gefroh-Hattman Inc.,
145 West Swallow Road, Fort Collins, CO. 80525.
LAND USE DATA: Request for 22 units on 3.85 acres located at the
northwest corner of Auntie Stone Street and West Horsetooth Road.
Units would be arranged in a duplex, or "paired housing"
arrangement with zero lot line setback between structures. Unit
sizes are about 1,400 square feet with detached, two -car garages on
the opposite side of the interior private drive.
COMMENTS:
1. Electrical power is available at the southeast corner of the
site. Proper easements must be dedicated to install the
electrical facilities. The developer may wish to consider the
use of "blanket utility easements" located outside the
building envelopes. Because of the existing 60 inch diameter
water line, electrical facilities will be located behind the
sidewalk. Please keep in mind that the front yard utility
easement must be wide enough for Public Service Company The
sideyard areas between structures should also be cons- iered
utility easements for electrical facilities. Please
coordinate with Light and Power on the location of the
electrical transformer. For further information, please
contact Alan Rutz, 221-6700.
2. The site can be served by an existing 8 inch diameter water
main i9r Auntie Stone Street. . This line can be brought through
the site and is available for individual services. Similarly,
there is an existing sewer main in Auntie Stone that is
available to serve this project.
3. A 20 inch diameter water main in Horsetooth Road will have to
be extended to the west across the front of the project. The
developer is obligated for one-half the "local portion" (8
inches) of this main.
LJ
•
4. Please be aware that the Fort Collins -Loveland Water District
has an 18 inch diameter water line near this site. This line
is within a 20 foot wide easement.
5. Please keep street trees 15 feet away from the existing 60
inch diameter water line that parallels Horsetooth Road.
6. The Poudre Fire Authority has concerns about cars parking in
front of the garages and blocking the internal drive aisle,
which also serves as the fire lane. This area should be
signed: "No Parking - Fire Lane". Standard fire hydrant
spacing will be required as well as standard turning radii in
the drive aisle.
7. At this time, the Parkland Development Fee is $625 per unit,
payable at the time of building permit issuance. This fee may
go depending on action by City Council. The site plan should
contain a note that states the homeowner's association is
responsible for maintaining the landscaping located within the
Horsetooth Road right-of-way.
8. The site is located in the Spring Creek Drainage Basin. The
Storm Drainage Basin Fee is $1,804 per acre, subject to the
amount of impervious surface, the amount of detention, and the
runoff coefficient. A standard Drainage Report, Drainage and
Grading Plan, and Erosion Control Plan are due at the time of
submittal for P.U.D.
9. If the downstream detention pond built for Tri-Trend is to be
enlarged, then the size of the orifice plate at the outlet may
also need to be modified. For further information, please
contact Kate Malers, 221-6589.
10. The original traffic impact analysis that indicated this
parcel to be multi -family should be submitted as part of the
P.U.D. documents.
11. The developer will be responsible for dedicating the necessary
right-of-way and building Horsetooth Road to the arterial
standard. Adjacent to the right-of-way, the developer must
dedicate 15 feet for utilities. The developer's financial
obligation is for one-half of the "local street portion" of
this improvement. The balance is repaid back to the developer
out of the City's Street Oversizing Fund.
12. Since the 60 inch water line is already installed, it is
suggested that a utility coordination meeting take place with
all the affected parties to discuss location and sequence of
installation.
13. As part of the Horsetooth Road improvement, the developer must
supply a Soils Report and show pavement design, profiles, and
the necessary offsite information (in preliminary design form)
to assure a smooth transition to the west.
14. A standard utility plan will be required. The Development
Agreement, made between the City and the developer, will
outline the repay agreement for improvements to Horsetooth
Road.
15. Please contact Matt Baker, 221-6605, to see if there is any
money due back to the developer for construction of Auntie
Stone Drive.
16. The Street Oversizing Fee is $584 per dwelling unit, payable
at the time of building permit issuance.
17. The P.U.D. site plan should indicate the number of lots/units
that comply with the Solar Orientation Ordinance.
18. The concept of brick materials and berming along the south
side of garages is a good idea and will benefit the arterial
streetscape. A pedestrian connection out to the arterial
sidewalk should be considered.
19. The P.U.D. should indicate the existing and proposed treatment
(patio fencing) along the north property line.
20. A neighborhood meeting will be required.