SUBMITTAL REQUIREMENTS
1. The mailing labels were previously submitted in December for
mailing of the Neighborhood meeting. A copy of that listed is
included with the submission.
2. Soils information is on file for the project having
previously submitted with the first phases of the project. These
indicate no significant geological hazards, high water table, nor
the existence of any flood plain. Soils information is not
included since it is on file in order to preserve our natural
resources.
?. The traffic report was revised in July of 1992. It documents
the uses on tracts G and E as we are planning them with this
project. The Traffic Engineer discussed the project with the City
Transportation Engineer who informed him that no update is
necessary. The Current Assess Study is on file so we are
providing two copies in order to preserve our natural resources.
4. A temporary Sales Unit is not planned at this time.