RE: Impala Redevelopment, PDP220005, Round Number 2
Please see the following summary of comments from City staff and outside reviewing
agencies for your submittal of Impala Redevelopment. If you have questions about any
comments, you may contact the individual commenter or direct your questions through your
Development Review Coordinator, Brandy Bethurem Harras via phone at 970-416-2744 or
via email at bbethuremharras@fcgov.com.
Housing Catalyst Response:
Ripley Design Response:
Northern Engineering Response:
Studio Architecture Response:
Comment Summary:
Department: Development Review Coordinator
Contact: Brandy Bethurem Harras, 970-416-2744, bbethuremharras@fcgov.com
Topic: General
Comment Number: 1
04/29/2022: INFORMATION:
I will be your primary point of contact throughout the development review and
permitting process. If you have any questions, need additional meetings with the
project reviewers, or need assistance throughout the process, please let me
know and I can assist you and your team. Please include me in all email
correspondence with other reviewers and keep me informed of any phone
conversations. Thank you!
Ripley Design Response: Thank you Brandy.
Comment Number: 2
04/29/2022: INFORMATION:
As part of your resubmittal, you will respond to the comments provided in this
letter. This letter is provided to you in Microsoft Word format. Please use this
document to insert responses to each comment for your submittal, using a
different font color. When replying to the comment letter please be detailed in
your responses, as all comments should be thoroughly addressed. Provide
reference to specific project plans or explanations of why comments have not
been addressed, when applicable, avoiding responses like noted or acknowledged.
Ripley Design Response: Updated comment response letter provided.
Comment Number: 3
04/29/2022: INFORMATION:
Please follow the Electronic Submittal Requirements and File Naming
Standards found at https://www.fcgov.com/developmentreview/files/electronic
submittal requirements and file naming standards_v1_8 1 19.pdf?1566857888.
File names should begin with the file type, followed by the project
information, and round number.
Example: UTILITY PLANS_PROJECT NAME_PDP_Rd2.pdf
File type acronyms maybe appropriate to avoid extremely long file names.
Example: TIS for Traffic Impact Study, ECS for Ecological Characterization Study.
*Please disregard any references to paper copies, flash drives, or CDs.
Ripley Design Response: File naming reflects these standards.
Comment Number: 4
04/29/2022: INFORMATION:
All plans should be saved as optimized/flattened PDFs to reduce file size and remove layers.
Per the Electronic Submittal Requirements AutoCAD SHX attributes need to be
removed from the PDF’s.
AutoCAD turns drawing text into comments that appear in the PDF plan set,
and these must be removed prior to submittal as they can cause issues with the
PDF file. The default setting is "1" ("on") in AutoCAD. To change the setting
and remove this feature, type "EPDFSHX" in the command line and enter "0".
Read this article at Autodesk.com for more tips on this topic:
https://knowledge.autodesk.com/support/autocad/troubleshooting/caas/sfdcarti
cles/sfdcarticles/Drawing-text-appears-as-Comments-in-a-PDF-created-by-Aut oCAD.html
Ripley Design Response: PDFs are flattened for optimal viewing.
Comment Number: 5
04/29/2022: INFORMATION:
Resubmittals are accepted any day of the week, with Wednesday at noon being
the cut-off for routing the same week. When you are ready to resubmit your
plans, please notify me with as much advanced notice as possible.
Ripley Design Response: We are re-submitting on 7/27/2022 for PDP Rd 3.
Comment Number: 7
04/29/2022: INFORMATION:
Please resubmit within 180 days, approximately 6 months, to avoid the
expiration of your project.
(LUC 2.211 Lapse, Rounds of Review).
Ripley Design Response: Acknowledged. Thank you.
Comment Number: 8
04/29/2022: FOR HEARING:
All "For Hearing" comments need to be addressed and resolved prior to
moving forward with scheduling the Hearing. Staff will need to agree the project
is ready for Hearing approximately 3 to 5 weeks prior to the hearing.
Ripley Design Response: Thank you. New review round times have been accounted for.
Comment Number: 9
04/29/2022: FOR HEARING:
This proposed project is processing as a Type 2 Development Plan. The
decision maker for Type 2 is the Planning and Zoning (P&Z) Commission. For
the hearing, we will formally notify surrounding property owners within 800 feet
(excluding public right--of-way and publicly owned open space). -Staff will need
to agree the project is ready for Hearing approximately 3-5 weeks prior to the
hearing. I have attached the P&Z schedule, which has key dates leading up to the hearing.
Ripley Design Response: Thank you Brandy.
Housing Catalyst Response: Thank you, understood.
Comment Number: 10
06/28/2022: INFORMATION:
ANY project that requires four or more rounds of review would be subject to an
additional fee of $3,000.00.
Housing Catalyst Response: Thank you, understood.
Ripley Design Response: Understood.
Department: Planning Services
Contact: Jenny Axmacher, , jaxmacher@fcgov.com
Topic: General
Comment Number: 3
06/28/2022: FOR HEARING UPDATED-:
Thank your for adding note 6. Please include the proposed modification language for the next submittal.
Ripley Design Response: The proposed Modifications can be seen on the cover sheet under “Site Plan Notes,” number 6.
05/03/2022: FOR HEARING:
Update site plan note 6 to include requested modifications.
Comment Number: 5
06/28/2022: FOR HEARING UNRESOLVED-:
Please include the sheet in the site plan set that shows existing conditions and demolition plan.
Ripley Design Response: From a liability standpoint, the design team would like to keep the demolition and existing conditions plan
separate from the civil set. However, we believe it is important to communicate that there are existing single-family homes on 306
Impala that will be demolished as part of this proposal. Detailed information regarding that process can be found in the civil set
(Sheet #’s 3-5). A tree inventory is still provided in the planning set on page L600 & L601
05/03/2022: FOR HEARING:
Please provide a sheet in the site plan set that shows the existing site
conditions and demolition plan.
Comment Number: 8
06/28/2022: FOR HEARING - UPDATED:
Thank you for the modification submittal.
Ripley Design Response: Please note that an updated ‘modification package’ has been submitted with this round of PDP. This
includes all of the modifications requested within a single document.
05/03/2022: FOR HEARING:
Please provide dimensions on the site plan showing the project's compliance
with 3.5.2 (D). If the requirements cannot be met, a request for a modification will be needed.
Comment Number: 14
06/28/2022: FOR HEARING - UPDATED:
Thank you for adding AC locations. Please provide a cross section on the
landscape plan sheet showing how units are screened.
Ripley Design Response: For all AC condenser units on the plans, a landscape screen will be provided. The planting selection will
be based on year-round screening capacity. A cross section has been added to sheet L502.
05/03/2022: FOR HEARING:
Show AC condenser locations on site and landscape plans.
Comment Number: 16
06/28/2022: FOR HEARING UPDATED:
After further discussion/evaluation it has been determined that the clubhouse
does not need to comply with the design standards found in 3.5.3.
Ripley Design Response: Thank you.
Studio Architecture Response: Noted. Thank you.
05/03/2022: FOR HEARING:
Staff is evaluating whether or not the clubhouse design must comply with 3.5.3
Mixed-Use, Institutional and Commercial Buildings.
Comment Number: 19
06/28/2022: FOR HEARING UNRESOLVED-:
Please consider incorporating brick on the Mulberry facade of the building to
increase compatibility with the adjacent historic structure as well as the surrounding properties.
05/03/2022: FOR HEARING:
Staff would like to see if brick material can be somehow incorporated into the
design of Building F, even as just an accent to honor the adjacent, all brick, historic structure.
Housing Catalyst Response: The current design and materials meets the land use code requirements LUC 3.5.1. We have
performed an analysis of incorporating brick into the design and identified that it would be very challenging to incorporate the
additional cost of brink into the project budget. We analyzed the brick accent as a wainscoting wrap and the estimated cost of this
is approximately $50,000 more than traditional lap siding. To put this into context of the overall project, this cost addition is the
equivalent of the rehab costs for one duplex. Unlike other market rate projects, we cannot change rents, number of units, etc. to
balance the increase in cost and we are highly restricted by our project budget. Our strategy is to use colors, massing, and
other design treatments that will complement the surrounding brick instead of incorporating brick into the design. We feel that the
current design compliments the surrounding structure while serving a great need in our community for households that earn 30% to
70% of the area median income.
Comment Number: 20
Commented [GU1]: Klara can you insert the code
section here?
Commented [GU2R1]: updated.
06/28/2022: FOR HEARING UPDATED:
Thank you for the explanation of why the one story unit is oriented towards the
interior of the site. The renderings of the view of the building from Impala were
also helpful in evaluating compatibility. Staff is satisfied with the applicant's rationale.
Studio Architecture Response: Noted. Thank you.
05/03/2022: FOR HEARING:
Staff believes that rotating building D so that the step down to one story is
adjacent to the one story duplex across Impala Circle would increase the building's compliance with 3.5.1.
Comment Number: 21
06/28/2022: FOR HEARING UPDATED:
Thank you for the details on how the park is meeting the requirements of 3.8.30
(C). The private park criteria specifically talks about Location and states the
following: "Such parks shall be highly visible, secure settings formed by the
street layout and pattern of lots and easily observed from streets. Rear facades
and rear yards of dwellings shall not abut more than two (2) sides or more than
fifty (50) percent of the perimeter frontage of the park." Staff is evaluating the
intent of this standard, and would like to discuss it further with the applicant team
in whether the project is meeting this requirement. A modification request may
be needed pending further evaluation.
Ripley Design Response: The current design and layout of the central gathering space (amenity area) meets the intent of the code
and most of the requirements for a privately owned park. The space will be designed for all ages, will be accessible, and is highly
visible from the surrounding building units. A modification is provided addressing concerns about the limited visibility from Impala
Drive. Please note that the modification is included within the ‘modification package’ provided with this submittal.
05/03/2022: FOR HEARING:
Please describe how the plan complies with 3.8.30 (C) Access to a Park,
Central Feature, or Gathering Place.
Comment Number: 23
06/28/2022: FOR HEARING UPDATED:
It was brought to our attention by staff in Light & Power that there is a desire to
increase the lighting strength along the Impala Dr sidewalk for safety and
security of residents and students. If this is something that the applicant wants to
propose a lighting plan may request alternative compliance to modify the
lighting requirements provided that it still accomplishes the intent of the code.
Studio Architecture Response: See lighting plan that shows increased lighting strength along Impala Drive, proposed for
increased pedestrian safety at the major pedestrian/auto intersections. The three poles within our project boundary are currently
operated and maintained by the City of Fort Collins. The team would like clarification if these poles will continue to be maintained
and operated as part of the City’s street lighting. The current lighting at the two intersections are of particular importance where
pedestrian-vehicular conflicts can occur. It is an industry standard that lights be provided at these locations. We request the city to
confirm that these lights will remain, and we will would like confirmation of the sources, lumen intensity and distribution.
05/06/2022: FOR HEARING:
The maximum light trespass limit is 0.1 along all lot lines, please revise the
proposed lighting and photometric plan to comply.
Contact: Will Lindsey, , wlindsey@fcgov.com
Topic: General
Comment Number: 30
06/28/2022: QUESTION:
Can an attached 6 foot sidewalk for the portion of Impala Circle that abuts 408 Impala Dr be provided?
There is already an existing sidewalk stub on the 400 Impala property to the east, and extending that
sidewalk out to Impala Dr would be beneficial for the development as well as helping the vacated ROW
meet the private street standards which require either detached sidewalks with a tree
lawn or attached sidewalks with trees in grates.
Ripley Design Response: Based on future pedestrian patterns within the site, we anticipate most of the foot traffic to travel along the
north side of the drive and have provided a crosswalk between 306 and 400 Impala to promote pedestrian safety. In addition, the
spaces is very narrow between the back of curb and property line. If a sidewalk were to be placed there, it would not be sub-
standard.
Comment Number: 31
06/28/2022: FOR HEARING:
The multi-family standards have a block size limitation 7 acres maximum (see
LUC section 3.8.30(D)(2)). The total project area is listed as 7.2 acres currently,
so a modification may be needed if a portion of the site cannot be platted
separately or the private drives cannot be brought up to the private street
standards as a means of defining the individual blocks of the development.
Ripley Design Response: It is the intent of the applicant to plat the property into one parcel, and bring it under one ownership. That,
and the inability to bring the street into compliance with Larimer County Street standard due to dimensional challenged is why a
modification has been requested for block standards. The modification is outlined within the modification package that is included
with this submittal.
Department: Historic Preservation
Contact: Jim Bertolini, 970-416-4250, jbertolini@fcgov.com
Topic: General
Comment Number: 2
05/02/2022: FOR PERMIT - PLAN OF PROTECTION – UPDATED 6/28:
A plan of protection for all nearby historic resources is required to be submitted
to Historic Preservation. This plan will need to detail the particular
considerations and protective measures that will be employed to prevent
shortterm- and long-termmail.googe material damage and avoidable impact to identified
historic resources within the 200-foot area of adjacency from demolition, new
construction, and operational activities, as well as any additional requirements
for rehabilitation, long-term stabilization and interpretation of historic resources.
Specific to this project, that plan of protection will only need to address staging
and operation of construction equipment in the vicinity of the City Landmark at
2300 W Mulberry (West side of the Building F development site). Please submit
to Historic Preservation staff once developed, prior to permitting/construction.
Studio Architecture Response: A plan of protection for all nearby historic resources will be submitted to Historic Preservation as
part of the Permit application.
Department: Engineering Development Review
Contact: Tim Dinger, , tdinger@fcgov.com
Topic: General
Comment Number: 1
06/21/2022: FOR HEARING UPDATED-:
Please see the redlines for complete plan comments.
Northern Engineering Response: Redlines have been addressed, please see attached markup.
04/28/2022: FOR HEARING:
Please see the redlines for complete plan comments.
Comment Number: 3
04/28/2022: FOR FINAL PLAN:
Once the Requests for Modifications get approval from the City, list the
approved requests for modification under note #48 in the general notes on
sheet 2 (Sheet C101) in the Utility Plans.
Northern Engineering Response: Acknowledged, approved modifications to be added to general notes.
Comment Number: 6
04/28/2022: FOR FINAL PLAN:
On page 4 of the plat, there are references to the existing right-of-way for Impala
Circle with blank spaces where the vacation ordinance and reception numbers
should be placed. We cannot approve of plans with intentional blank spaces on
them. Please fill in the numbers, if possible, otherwise remove the blank spaces
from the references.
Northern Engineering Response: The blank spaces will be filled in once the right-of-way vacation has been approved and reception
numbers are available at final plan.
Department: Traffic Operation
Contact: Spencer Smith, 970-221-6820, smsmith@fcgov.com
Topic: General
Comment Number: 1
06/28/2022: FOR HEARING UNRESOLVED-:
I did not see any improvements shown for Impala Drive related to the low-stress-
bike network.
Ripley Design Response: As discussed in staff review for the second round PDP, it is decided that the existing ‘Sharrows’ will
remain and are sufficient to uphold the current neighborhood greenway design standards designated for Impala Drive. Notes have
been added to the plan to help clarify the intent for those to remain along Impala Drive.
05/04/2022: FOR HEARING
The TIS recommends adding "sharrows" on Impala Drive north of Impala Cir.
(south) intersection. I'd like to see this reflected on the plans. We talked about
options for the low-stress bike network that needs to extend along your property
frontage. This may be an acceptable approach, but we will need to see exactly
what is proposed in order to evaluate.
Comment Number: 3
05/04/2022: INFORMATION ONLY:
It looks like you have quite a few utility installations in Impala Drive that have
proposed sawcuts shown. We will need you to work closely with our Work Area
Traffic Control staff (Tom Utech) once you get closer to construction to work out
the impacts to school and neighborhood access. This is especially important
with the proximity to the school. I would recommend your team think through the
construction and timing of the work in the street to come up with a plan that
minimizes disruption to traffic. I would also encourage you to reach out to Tom
Utech when you feel it is appropriate to discuss your traffic control plan and
options in more detail, prior to applying for your Development Construction
Permit (DCP). Tom can be reached via phone and email at: (970) 221-6815,
tutech@fcgov.com.
Northern Engineering Response: Note added to utility legend regarding contractor coordination with Traffic Operations (Note 11).
Comment Number: 4
06/28/2022: FOR FINAL PLAN - UNADDRESSED:
I did not see any proposed signage for this access.
Northern Engineering Response: Signage and striping to be addressed at final and provided in Civil Site Plan (C 200-C 202).
05/04/2022: FOR FINAL PLAN
Per previous discussion, we will want to see any proposed signage for the
Mulberry access that will be aimed at identifying the access as a private drive
and not a through street.
Comment Number: 6
06/28/2022: FOR HEARING:
There should be a signing and striping plan submitted for review that shows all
signing and striping improvements.
Northern Engineering Response: Signage and striping to be addressed at final and provided in Civil Site Plan (C 200-C 202). Per
conversations with City Staff this comments is not required for hearing, but at final plan.
Department: Erosion Control
Contact: Basil Hamdan, 970-222-1801, bhamdan@fcgov.com
Topic: Erosion Control
Comment Number: 2
06/23/2022: INFORMATION - UPDATED:
Please note the estimate below was based on 86 Building permits (not lots - as
previously stated), as you finalize the actual number of permits for the site, this
number might change, based on the total number of permits that will be issued.
If the number of permits on the site goes down, as indicated by the applicant,
the stormwater inspection fee amount will also be reduced.
Housing Catalyst Response: Thank you, understood.
Ripley Design Response: Thank you for clarifying.
04/27/2022: INFORMATION - UPDATED:
The City Manager’s development review fee schedule under City Code 7.5-2
was updated to include fees for Erosion Control and Stormwater Inspections.
As of January 1st, 2021, these fees will be collected on all projects for such inspections.
The Erosion Control fees are based on; the number of lots, the total site
disturbance, the estimated number of years the project will be active and the
Stormwater Inspection Fees are based on the number of LID/WQ Features that
are designed for on this project.
Based on the proposed site construction associated with this project we are
assuming 86 lots, 7.19 acres of disturbance, 2 years from demo through build
out of construction and an additional 3 years till full vegetative stabilization due
to seeding. Which results in an Erosion Control Fee estimate of $4246.31.
Based on 2 number of bioretention/level spreaders the estimate of the
Stormwater LID/WQ Inspection fee is $630.
Please note that as the plans and any subsequent review modifications of the
above-mentioned values change the fees may need to be modified. I have
provided a copy of the spreadsheet used to arrive at these estimates for you to review.
The fee will need to be provided at the time of erosion control escrow.
Housing Catalyst Response: Thank you, understood.
Department: Stormwater Floodplain
Contact: Claudia Quezada, (970)416-2494, cquezada@fcgov.com
Topic: Floodplain
Comment Number: 4
06/28/2022: FOR FINAL PLAN - UPDATED: Please see updated redlines.
Northern Engineering Response:
05/02/2022: FOR FINAL PLAN:
Please see redlines for minor comments.
Department: Stormwater Engineering
Contact: Wes Lamarque, 970-416-2418, wlamarque@fcgov.com
Topic: General
Comment Number: 6
06/28/2022: PRIOR TO HEARING UNRESOLVED-:
Additional documentation is still needed for the release rate for the site. This
can be excerpts from previous reports, example calcs, etc.
Northern Engineering Response: A “Pond Sizing Exhibit” was distributed to City Staff and provided in the latest drainage report to
provide clarification on approach and justification for the site release rate. The exhibit combines the Hill Crest PUD drainage exhibit,
with the proposed drainage exhibit and the pond size increase calculations.
05/03/2022: PRIOR TO HEARING:
Please provide additional documentation and explanation in the text of the
Drainage Report on the release rate from the site justifying the rate from the
southern pond into the Mulberry Street storm sewer.
Comment Number: 10
Northern Engineering Response: The report text has been updated to justify the release rate from the pond.
05/03/2022: FOR FINAL APPROVAL:
Please include forebays at the entrances into both rain gardens.
Comment Number: 11
Northern Engineering Response: Forbays and design details shall be provided for all raingardens at final design
05/06/2022: FOR FINAL APPROVAL:
A shade tree is too close to the northern rain garden's soil sand media. Please
provide 6 feet of separation and 10 feet of separation from the underdrain as well.
Comment Number: 12
Northern Engineering Response: Shade tree locations relative to the raingarden will be coordinated at final design.
05/06/2022: FOR FINAL APPROVAL:
To meet the City's Detention Pond Landscape standards, the City suggests
additional plantings, including trees, within each detention pond.
Comment Number: 13
Northern Engineering Response: Design point locations shall be updated at final design.
06/27/2022: FOR FINAL APPROVAL:
It appears that the design point for basin 100 should be moved north to the Rain Garden. Please confirm
Northern Engineering Response: Design point locations shall be updated at final design.
Comment Number: 14
06/27/2022: FOR FINAL APPROVAL:
Please revise all sections of report that pertain to the rain garden 2. This
consists of any exhibits, text, etc
Northern Engineering Response: Sections of the report pertaining to rain garden 2 have been revised.
Comment Number: 15
06/27/2022: FOR FINAL APPROVAL:
Please include all detention pond and drainage basin summary tables on the Drainage Plan.
Northern Engineering Response: Drainage basing summary tables have been included and detention pond summary tables shall be
provided with final design.
Comment Number: 16
06/27/2022: PRIOR TO HEARING:
We noticed that the C100yr was calculated incorrectly in the flow calcs and in
the detention calcs. The City of Fort Collins has calculated the 100 year storm
coefficient as C2yr*1.25. This will then give you a larger detention pond volume
than what you have already calculated.
Northern Engineering Response: The C100yr flow calculations have been updated to utilize the appropriate 1.25x factor.
Department: Water-Wastewater Engineering
Contact: Wes Lamarque, 970-416-2418, wlamarque@fcgov.com
Topic: General
Comment Number: 1
07/01/2022: PRIOR TO HEARING - UNRESOLVED
Please confirm all landscaping areas of the development are being served by irrigation services.
Northern Engineering Response: The preliminary irrigation point of connection has been shown within the utility layout based upon
the conceptual irrigation design. The final location(s) to service all landscaping areas will be determined at final.
Ripley Design Response: All landscaping areas will be served by irrigation. A preliminary irrigation plan will be submitted at the time
of final plan, and shall be designed to meet the requirements of each different hydrozone area on the plans.
05/03/2022: PRIOR TO HEARING:
A separate irrigation service or services are required for all irrigation of
landscaping. Please revise.
Comment Number: 2
07/01/2022: FOR FINAL APPROVAL - UNRESOLVED
Northern Engineering Response: Water meter sizing calculations will be coordinated with the mechanical engineer and provided at
final design.
Ripley Design Response: Meter sizes and locations have been coordinated for 306 Impala.
05/06/2022: FOR FINAL APPROVAL:
Please provide water meter sizing calculations for all the proposed water services.
Comment Number: 3
05/06/2022: FOR FINAL APPROVAL:
The two (2) new water valves placed next to the two new hydrants should be
moved to the other side of the hydrant tap. This would isolate the hydrants with
less water main out of service. Please revise.
Northern Engineering Response: Revised, hydrant line valves moved to opposite sides of taps.
Comment Number: 4
05/06/2022: FOR FINAL APPROVAL:
The southwest fire hydrant is within 10 feet of a shade tree. Please provide 10
feet of separation. Another option would be to propose an ornamental tree with 6 to10 feet of separation.
Ripley Design Response: This issue will be tracked and resolved at final plan.
Comment Number: 5
05/06/2022: FOR FINAL APPROVAL:
A proposed tree is too close to the most upstream public sewer manhole just
northeast of Building D. Please revise.
Northern Engineering Response: Manhole is existing, tree type/location will need to be changed.
Comment Number: 6
05/06/2022: FOR FINAL APPROVAL:
At the most upstream public sewer manhole just northeast of Building D, two
services are proposed to enter into the manhole. Please have these services
enter the sewer main just downstream of the manhole. There should be 5 feet
between services.
Northern Engineering Response: Services adjusted to connect downstream of manhole with 5’ separation.
Comment Number: 7
05/06/2022: FOR FINAL APPROVAL:
The northeast fire hydrant is too close to the electric transformer. Please
provide proper separation.
Northern Engineering Response: Hydrant location revised to be east of bike rack pad on same curb island.
Comment Number: 8
06/27/2022: FOR FINAL APPROVAL:
You will need to add a water meter on the northwestern water service line.
Northern Engineering Response: Meter added to clubhouse water service line.
Comment Number: 9
06/27/2022: FOR HEARING:
The easement exclusion for the existing buildings in the middle of the property is
reducing the existing sanitary sewer easement. In addition, the city would prefer
if it were to have a 30-foot easement instead.
Northern Engineering Response: The easement exclusion easements have been expanded to meet the existing 30 foot easement
location.
Comment Number: 10
06/27/2022: FOR HEARING:
The city would like northern ss service line that cross the 6inch water line to be-
closer to 90 degrees. For the southern service line crossing, there is no need to
demo the existing sewer line. It could just be made private and then you could
tie into it for a service line.
Northern Engineering Response: The sanitary service crossings have been revised to provide perpendicular crossings and utilize
the existing sewer line and manhole. The sidewalk location has been revised to accommodate the existing manhole.
Department: Light And Power
Contact: Austin Kreager, 970-224-6152, akreager@fcgov.com
Topic: General
Comment Number: 1
06/28/2022: INFORMATION:
Thank you for all of the coordination work that has taken place in between
rounds. At time of construction, there will need to be a high degree of
coordination to lessen the impacts to surrounding properties.
Northern Engineering Response: Thank you as well, we will continue coordination as the process progresses.
Housing Catalyst Response: Thank you, we appreciate the continued coordination.
05/03/2022: INFORMATION:
Any existing electric infrastructure that needs to be relocated as part of this
project will be at the expense of the developer. Please coordinate relocations
with Light and Power Engineering. Please coordinate with me prior to your next
submittal to get a proposed design on your plans for the relocation of our facilities.
Housing Catalyst Response: Acknowledged, thank you.
Comment Number: 3
05/03/2022: INFORMATION ONLY:
Light and Power would like to remind you that all of our facilities must have a ten
foot clearance away from all water, wastewater, and storm sewer facilities. We
also require a three foot clearance away from all other utilities with the exception of communication lines.
Housing Catalyst Response: Acknowledged, thank you.
Comment Number: 4
05/03/2022: INFORMATION ONLY:
Electric capacity fees, development fees, building site charges and any system
modification charges necessary to feed the site will apply to this development.
Please contact me to discuss development fees or visit the following website for
an estimate of charges and fees related to this project:
http://www.fcgov.com/utilities/business/builders-and-developers/plant-investment-development-fees
Housing Catalyst Response: Acknowledged, thank you.
Comment Number: 5
05/03/2022: INFORMATION ONLY:
Please document the size of the electrical service(s) that feeds the existing
property prior to demolition of the buildings to receive capacity fee credits.
Northern Engineering Response: Electrical services shall be documented prior to demolition.
Studio Architecture Response (Mazzetti): The electrical services will be documented prior to demolition.
Comment Number: 6
05/03/2022: INFORMATION ONLY:
Transformer locations will need to be coordinated with Light & Power.
Transformers must be placed within 10 ft of a drivable surface for installation
and maintenance purposes. The transformer must also have a front clearance of
10 ft and side/rear clearance of 3 ft minimum. When located close to a building,
please provide required separation from building openings as defined in
Figures ESS4 - ESS7 within the Electric Service Standards. Please show all
proposed transformer locations on the Utility Plans.
Northern Engineering Response: Transformer locations comply with spacing standards, and will continue to coordinate with any
future changes.
Comment Number: 7
05/03/2022: INFORMATION ONLY:
Single phase transformers are limited to a maximum of 8 runs of secondary, not
to exceed a wire size of 350KCMIL. Three phase transformers are limited to a
maximum of 12 runs of secondary, not to exceed a wire size of 500KCMIL.
Studio Architecture Response (Mazzetti): Noted. Thank you.
Comment Number: 9
05/03/2022: FOR FINAL PLAN:
Multi family buildings and duplexes are treated as customer owned services;
therefore a C-1 form and one line diagram must be filled out and submitted to
Light & Power Engineering for each building. All secondary electric service
work is the responsibility of the developer and their electrical consultant or
contractor. A C-1 form can be found here:
https://www.fcgov.com/utilities/business/builders-and-developers/development-f
orms-guidelines-regulations
Studio Architecture Response (Mazzetti): A C1 form and one-line diagram will be provided to Light & Power for each building.
Comment Number: 10
05/03/2022: INFORMATION ONLY:
This project will need to comply with our electric metering standards. Electric
meter locations will need to be coordinated with Light and Power Engineering.
Residential units will need to be individually metered. Please gang the electric
meters on one side of the building, opposite of the gas meters. Reference
Section 8 of our Electric Service Standards for electric metering standards. A
link has been provided here:
https://www.fcgov.com/utilities/img/site_specific/uploads/ElectricServiceStanda
rds_FINAL_18November2016_Amendment.pdf
Studio Architecture Response (Mazzetti): Noted. Thank you.
Comment Number: 11
05/03/2022: INFORMATION ONLY:
If the private drives/alleys are proposed to be illuminated, the streetlights are
considered private and will need to be privately metered. Please show all
private streetlights and private meters on the plans.
Studio Architecture Response (Mazzetti): Noted. Thank you. All private streetlights and private meters will be shown on the
plans.
Comment Number: 12
05/03/2022: INFORMATION ONLY:
You may contact Austin Kreager with project engineering if you have questions.
(970) 224-6152. You may reference Light & Power’s Electric Service
Standards at:
https://www.fcgov.com/utilities/img/site_specific/uploads/electricservicestandar
ds.pdf?1645038437
You may reference our policies, development charge processes, and use our
fee estimator at
http://www.fcgov.com/utilities/business/builders-and-developers.
Northern Engineering Response: Acknowledged, thank you.
Studio Architecture Response (Mazzetti): Noted. Thank you.
Comment Number: 13
06/28/2022: FOR HEARING:
Please provide a transformer location for the new six-plex on the southern
portion of the project. The current route for power for the existing structure will
not have the capacity to service the new six-plex. Light and Power will need to
bring primary power from the duplex area to the north and set a new transformer. Thank you
Northern Engineering Response: Transformer added between proposed six-plex and existing duplexes. The transformer location
and alignment has been coordinated with City Staff.
Department: PFA
Contact: Marcus Glasgow, 970-416-2869, marcus.glasgow@poudre-fire.org
Topic: General
Comment Number: 1
06/28/2022: FOR FINAL PLAN - UPDATED:
The provided EAE through the cul-de-sac is 40 feet in width and through
landscaping and islands. The EAE will need to be dedicated only in the areas
to be used as fire lane.
Northern Engineering Response: The emergency access easement has been updated to more closely match the drive lane
alignment. The cul-de-sac Island to be removed and paved flush to allow emergency access, labeling in civil plans updated for
clarity.
04/27/2022: FOR FINAL PLAN:
EMERGENCY ACCESS EASEMENT - The existing access through the Duplex
site shall be dedicated as an Emergency Access Easement. The plat currently
shows an access easement only.
Comment Number: 3
Northern Engineering Response: The easement through the duplex site has been revised to indicate emergency access as well.
04/27/2022: FOR FINAL PLAN:
EMERGENCY ACCESS LOADING Fire- lanes shall be designed as a flat,
hard, all-weather driving surface capable of supporting 40 tons. A note shall be
added to the civil plans.
Northern Engineering Response: See note 12 of Civil Site Plan (C 200-C 202) legend.
Comment Number: 4
04/27/2022: FOR FINAL PLAN:
FIRE LANE SIGNS - The limits of the fire lane shall be fully defined. Fire lane
sign locations should be indicated on future plan sets. Refer to LCUASS detail
#1418 & #1419 for sign type, placement, and spacing. Appropriate directional
arrows required on all signs. Posting of additional fire lane signage may be
determined at time of fire inspection. Code language provided below.
Northern Engineering Response: Striping and signage to be detailed at final in Civil Site Plan sheets (C 200-C 202) and comply with
LCUASS and PFA standards.
Comment Number: 5
04/27/2022: FOR FINAL PLAN:
PREMISE IDENTIFICATION: ADDRESS POSTING & WAYFINDING
Where possible, the naming of private drives is usually recommended to aid in
wayfinding. Addresses shall be posted on each structure and where otherwise
needed to aid in wayfinding. Code language provided below.
- IFC 505.1: New and existing buildings shall have approved address numbers,
building numbers or approved building identification placed in a position that is
plainly legible, visible from the street or road fronting the property, and posted
with a minimum of eight-inch numerals on a contrasting background. Where
access is by means of a private road and the building cannot be viewed from
the public way, a monument, pole or other sign or means shall be used to
identify the structure and best route.
Northern Engineering Response: Striping and signage to be detailed at final in Civil Site Plan sheets (C 200-C 202) and comply with
LCUASS and PFA standards.
Comment Number: 6
06/28/2022: FOR HEARING:
AERIAL ACCESS
The 3 story building does not meet aerial access requirements. One entire
parallel side of the building shall be within 1530 feet from the edge of the fire-
lane. The majority of the edge of this building is 34 feet from the fire lane.
Other portions that are within 30 feet are gable end dormers and not accessible
by ladder from the street.
Ripley Design Response: As discussed in the staff review for the second round PDP, the sections of the 3-story building that are 34’
from the fire lane have bene shifted to get within 32’. Please see the revised plans indicating this change.
Studio Architecture Response: Building C has been moved east to comply with aerial access requirements. See revised plans
for new location.
Comment Number: 7
06/28/2022: FOR FINAL PLAN:
SECURITY GATE/BOLLARDS
A security gate would be preferred for the second point of access to the duplex
site. If you would like to install bollards, a spec sheet will be required for
submittal. Bollards with low level padlock options that require keys will not be
allowed as they are prone to freezing and snowpack. Collapsible bollard
options that use a 1" square hydrant nut operated by a hydrant wrench would be acceptable.
If gates are proposed, they shall meet IFC D103.5: Gates securing fire
apparatus access roads shall comply with all of the following criteria:
1. The minimum gate width shall be the same width as the fire lane.
2. Gates shall be of the swinging or sliding type.
3. Construction of gates shall be of materials that allow manual operation by one person.
4. Gate components shall be maintained in an operative condition at all times
and replaced or repaired when defective.
5. Electric gates shall be equipped with a means of opening the gate by fire
department personnel for emergency access. Emergency opening devices shall
be approved by the fire code official. Gates must have a Knox Gate Key Switch
that fits the Knox Key system for Poudre Fire Authority.
6. Gate design and locking device specifications shall be submitted for
approval by the fire code official prior to installation.
7. Electric gate operators, where provided, shall be listed in accordance with
UL 325 and have a means of emergency, manual operation during power loss.
8. Gates intended for automatic operation shall be designed, constructed and
installed to comply with the requirements of ASTM F 2200.
Gates or bollards shall be signed with vertical letters on both sides stating
"FIRE ACCESS" and bollards shall have an additional label on the hydrant nut
side stating "HYDRANT WRENCH".
Ripley Design Response: Bollards have been provided on the plans that are operable with a wrench and shall be signed with
vertical letter indicating fire access. A detail has been provided on sheet L502.
Department: Parks
Contact: Aaron Wagner, , aawagner@fcgov.com
Topic: General
Comment Number: 1
06/28/2022: FOR INFORMATION:
Parks Department Planning staff can help with any questions you may have
regarding these comments. Please contact Jill Wuertz (jwuertz@fcgov.com),
970-416-2062, or Parks Planning Technician, Aaron Wagner
(aawagner@fcgov.com) 970-682-0344, 413 S. Bryan Ave, Fort Collins, CO
80521 regarding the Parks’ Department’s interest.
Northern Engineering Response: Acknowledged, thank you.
Ripley Design Response: Acknowledged. Thank you!
Comment Number: 2
06/28/2022: FOR FINAL PLAN:
2. Thank you for proposing to replace the clay irrigation pipe with PVC pipe in
the section that is to be relocated. Parks shares this irrigation fill line with PSD
and need to ensure that water is available during times of high ET rates.
Please coordinate closely with Parks for relocation of the irrigation pipe and the
disruption of irrigation fill service. If/when service is going to be disrupted,
please let us know the following and include this text in a highly visible location on the plans:
a. The dates of disruption,
b. Anticipated length of time for the disruption,
c. Any impacts to the irrigation infrastructure (i.e. main line cut, valve box
removal, controller disconnection etc.)
Northern Engineering Response: We do not believe we will need to remove and relocate the Fort Collins Parks Department irrigation
ditch because we will be able to match the existing grade more closely. Potholes shall be conducted at final design. The irrigation
lateral will be called out in the demolition sheet as removed and replaced by the City of Fort Collins and the contractor shall
coordinate the construction schedule. Added note regarding required coordination with parks department for irrigation removal and
replacement to utility sheet legend (Note 12).
Comment Number: 3
06/28/2022: FOR HEARING:
The Parks Dept. is requesting further information as to why the easement for the
irrigation pipe needs to be vacated and rededicated? Please provide a written
response to the Parks Dept. Parks will need to check with the City Attorney’s
Office (CAO) for this request.
Northern Engineering Response: The existing irrigation ditch easement will not be vacated and rededicated but will remain in place
and be referred to in the plat appropriately.
Comment Number: 4
06/28/2022: FOR HEARING:
Please label the Irrigation pipe/Easement as ‘Owned by the City of Fort Collins
Parks Department’ for future reference.
Northern Engineering Response: Irrigation line and easement labeling updated as requested.
Department: Forestry
Contact: Carrie Tomlinson <ctomlinson@fcgov.com>
Topic: General
Comment Number: 8
06/28/2022: FOR HEARING:
Please review new Forestry redlines. Thank you for changing the spacing on the
street for the street light conflict. Please review redlines for additional tree
planting along Impala Drive. Also thank you for adding trees in the redlined
detention areas from the previous plan. Considering the number of trees being
mitigated and removed on site please consider adding more. There is
considerable space that additional trees could be added.
Ripley Design Response: Additional trees have been added to the plans. Please see updated planting plan for more
information.Plant schedule and tree diversity charts have been updated.
5/3/2022: RESOLVED
Please review Forestry redlines. There is one tree that is too close to a street
light along S Impala Drive. I also indicated a few areas where additional trees can added.
Comment Number: 9
06/28/2022: FOR INFORMATION ONLY:
Please consider reducing the percentage of honeylocust on your plant schedule
to 5% or below. Fort Collins has reached the maximum percentage of
honeylocust due to popularity in the community. Also thank you for marking the
mitigation trees on your plant schedule. Please include a total for the mitigation
trees below your table along with the total required number of trees in your table.
Ripley Design Response: Thank you for the information. Our team will continue to work with Forestry regarding tree species
selection in the final plan round.
5/3/2022: RESOLVED
Please include the City of Fort Collins Tree Protection Notes and existing tree
inventory/mitigation table to the utility plan set. Critical root zone dimensions
should also be included on these plans.
Department: Park Planning
Contact: Kyle Lambrecht, 970-221-6566, klambrecht@fcgov.com
Topic: General
Comment Number: 1
05/03/2022: INFORMATION:
The Park Planning & Development Department is available to discuss these
comments in more detail. Please contact Kyle Lambrecht, PE at
970.416.4340, klambrecht@fcgov.com.
Ripley Design Response: Noted, thank you.
Comment Number: 2
05/03/2022: INFORMATION:
The City of Fort Collins Land Use Code Section 3.4.8 “Parks and Trails”
addresses compliance with the 2021 Parks and Recreation Master Plan
(“Master Plan”). The Master Plan indicates the general location of all parks and
regional recreational trails. Parcels adjacent to or including facilities indicated
in the Master Plan may be required to provide area for development of these
facilities. The Parks and Recreation Master Plan is available at
https://www.fcgov.com/parksandrecplan/.
Ripley Design Response: Noted, thank you for the information.
Comment Number: 3
05/03/2022: INFORMATION:
The 2013 Paved Recreational Trail Master Plan (“Trail Master Plan”) was
adopted by City Council and provides conceptual locations and general trail
design guidelines for future regional recreational trails. The Trail Master Plan is
available at Plans and Policies - City of Fort Collins (fcgov.com).
Ripley Design Response: Thank you for providing this information.
Comment Number: 4
05/03/2022: INFORMATION:
The Larimer County Urban Area Street Standards (“LCUASS”), Chapter 16
Pedestrian Facilities and Chapter 17 Bicycle Facilities provide additional
design guidelines for multiuse recreational trails.
Ripley Design Response: Acknowledged.
Comment Number: 5
05/03/2022: INFORMATION:
Grade separated crossings of arterial roadways and major collectors are
required (LCUASS Chapter 17.3) and provide safe trail connectivity. Additional
easement area for underpass/overpass approaches may be required in
locations of potential grade separated crossings for the trail.
Ripley Design Response: Noted, thank you.
Comment Number: 6
05/03/2022: INFORMATION:
Local street at grade intersections with a recreational trail are to be avoided.
When necessary, the location of a future recreational trail at grade- crossing
must be coordinated with both Park Planning and Development and Traffic Operations.
Ripley Design Response: Acknowledged. No grade separated crossing are proposed.
Comment Number: 7
05/03/2022: INFORMATION:
Thank you for the previous discussion to clarify the intent of the path around the
detention pond as well as the responses to previous comments! Park Planning
and Development staff understands the intent of the path around the pond is for
the development and is to be a crusher fines walking path. Please verify this is
consistently shown as a soft surface path on all submittal docs.
Ripley Design Response: Thank you. We will continue to verify the surfacing across all the documents.
Department: Building Services
Contact: Russell Hovland, 970-416-2341, rhovland@fcgov.com
Topic: Building Insp Plan Review
Comment Number: 1
05/02/2022: BUILDING PERMIT:
Construction shall comply with adopted codes as amended. Current adopted codes are:
2021 International Residential Code (IRC) with local amendments
2018 International Plumbing Code (IPC) as amended by the State of Colorado
2020 National Electrical Code (NEC) as amended by the State of Colorado
Copies of current City of Fort Collins code amendments can be found at fcgov.com/building.
Please read the residential permit application submittal checklist for complete requirements.
Snow Load Live Load: Ground Snow Load 35 PSF.
Frost Depth: 30 inches.
Wind Loads: Risk Category II (most structures):
· 140mph (Ultimate) exposure B or
· Front Range Gust Map published by The Structural Engineer's Association of Colorado
Seismic Design: Category B.
Climate Zone: Zone 5
Energy Code: 2021 IECC residential chapter.
INFORMATIONAL ITEMS:
· For a fire-sprinkled building, 3ft setback required from property line or provide
fire rated walls & openings per chap 3 of the IRC.
· Bedroom egress windows (emergency escape openings) required in all bedrooms.
· For buildings using electric heat, heat pump equipment is required.
· Attached single-family townhomes are required to be fire sprinkled per local
amendment and must provide a P2904 system min and provide fire rated wall
per R302. This fire sprinkler system usually requires a ¾” or 1” water line and
meter to meet all P2904 requirements.
· New homes must provide electric vehicle ready wiring if garages are attached, see local amendment.
· Provide site-wide accessibility plan in accordance with CRS 9-5. This requires
accessible units per that state standard.
STOCK PLANS:
When residential buildings will be built at least three times with limited
variations, a stock plan design or master plan can be submitted for a single
review and then built multiple times with site specific permits. More information
can be found in our Stock Plan Guide at fcgov.com/building/res-requirements.php.
Comment Number: 2
05/02/2022: BUILDING PERMIT:
Construction shall comply with adopted codes as amended. Current adopted codes are:
2021 International Building Code (IBC) with local amendments
2021 International Existing Building Code (IEBC) with local amendments
2021 International Energy Conservation Code (IECC) with local amendments
2021 International Mechanical Code (IMC) with local amendments
2021 International Fuel Gas Code (IFGC) with local amendments
2021 International Swimming Pool and Spa Code (ISPSC) with local amendments
Colorado Plumbing Code (currently on the 2018 IPC)
2020 National Electrical Code (NEC) as amended by the State of Colorado
Copies of current City of Fort Collins code amendments can be found at fcgov.com/building.
Important: Fort Collins will be adopting the new 2021 Building Codes in April of 2022.
Accessibility: State Law CRS 9-5 & ICC/ANSI A117.1-2017.
Snow Load Live Load: Ground Snow Load 35 PSF.
Frost Depth: 30 inches.
Wind Loads: Risk Category II (most structures):
· 140mph (Ultimate) exposure B or Front Range Gust Map published by The
Structural Engineer's Association of Colorado
Seismic Design: Category B.
Climate Zone: Zone 5
Energy Code:
• Multi-family and Condominiums 3 stories max: 2021 IECC residential chapter.
• Commercial and Multi-family 4 stories and taller: 2021 IECC commercial chapter.
INFORMATIONAL ITEMS:
· Electric vehicle charging parking spaces are required, see local amendment.
· This building is located within 250ft of a 4 lane road or 1000 ft of an active
railway, must provide exterior composite sound transmission of 39 STC min.
· R-2 occupancies must provide 10ft setback from property line and 20 feet
between other buildings or provide fire rated walls and openings per chapter 6 and 7 of the IBC.
· City of Fort Collins amendments to the 2021 International Fire Code limit what
areas can avoid fire sprinklers with a NFPA 13R, see local IFC 903 amendment.
· Bedroom egress windows required below 4th floor regardless of fire-sprinkler.
All egress windows above the 1st floor require minimum sill height of 24”.
· If using electric systems to heat or cool the building, ground source heat pump
or cold climate heat pump technology is required.
· A City licensed commercial general contractor is required to construct any new multi-family structure.
STOCK PLANS:
When the exact same residential building will be built more then once with
limited variations, a stock plan design or master plan can be submitted for a
single review and then built multiple times with site specific permits. More
information can be found in our Stock Plan Guide at
fcgov.com/building/res-requirements.php.
BUILDING PERMIT PRE-SUBMITTAL MEETING:
Please schedule a pre-submittal meeting with Building Services for this project.
Pre-Submittal meetings assist the designer/builder by assuring, early on in the
design, that the new projects are on track to complying with all of the adopted
City codes and Standards listed above. The proposed project should be in the
early to mid-design stage for this meeting to be effective. Applicants of new
projects should email your coordinator to schedule a pre-submittal meeting.
Studio Architecture Response: Noted. Thank you.
Department: Technical Services
Contact: Jeff County, 970-221-6588, jcounty@fcgov.com
Topic: General
Comment Number: 2
06/28/2022: INFORMATION ONLY:
Unless required during PDP, a complete review of all plans will be done at FDP.
Ripley Design Response: Noted, thank you.
Northern Engineering Response: Acknowledged, thank you.
Topic: Plat
Comment Number: 1
06/28/2022: FOR HEARING-UPDATED:
Please make changes as marked. If changes are not made or you disagree
with comments, please provide written response of why corrections were not
made. Please provide any responses on redlined sheets and/or in response
letter. If you have any specific questions about the redlines, please contact John
Von Nieda at 970-221-6565 or jvonnieda@fcgov.com
Northern Engineering Response: Plat comments and written responses have been addressed in the redlined sheets.
Department: Water Conservation
Contact: Eric Olson, 970-221-6704, eolson@fcgov.com
Topic: General
Comment Number: 1
04/27/2022: FOR FINAL PLAN:
Preliminary irrigation plans (PIP) are required for review at Final Development
Plan (FDP), prior to issuance of building permit. The requirements for the PIP
must comply with the provisions outlined in Section 3.2.1(J) of the Land Use
Code. Direct questions concerning irrigation requirements to
irrigationdr@fcgov.com or Eric Olson eolson@fcgov.com
Ripley Design Response: A PIP will be provided at final plan. The PIP will be put together by a license irrigation designer.
Comment Number: 2
04/27/2022: BUILDING PERMIT:
Irrigation plans are required no later than at the time of building permit. The
irrigation plans must comply with the provisions outlined in Section 3.2.1(J) of
the Land Use Code. Direct questions concerning irrigation requirements to Eric
Olson, at 221-6704 or eolson@fcgov.com
Ripley Design Response: Full irrigation plans will be submitted at the time of building permit.