HomeMy WebLinkAboutBLOOM FILING ONE - PDP210014 - DOCUMENT MARKUPS - ROUND 5 - DRAINAGE RELATED DOCUMENTD20
D19
D22
D24
D23
D21
acres
D11
0.65
0.81
1.15
acres
D24
0.15
0.19
3.02
acres
D22
0.15
0.19
0.24
acres
D23
0.43
0.53
0.99
acres
E19
0.80
1.00
2.72
-
-
-
-
-
-
-
-
-
-
-
-
-
-
STAMP
H:\Hartford Homes\CO Fort Collins HFH22 - Mulberry\0CIV\3-CD\FDP_F1\HFH022_C10.0_DRAINAGE.dwg - Matthew Pepin - 6/1/2022Init.#Issue / DescriptionDateFINAL DEVELOPMENT PLANS BLOOM FILING ONEFORT COLLINS, COTHESE PLANS ARE AN INSTRUMENT OF SERVICE
AND ARE THE PROPERTY OF GALLOWAY, AND MAY
NOT BE DUPLICATED, DISCLOSED, OR REPRODUCED
WITHOUT THE WRITTEN CONSENT OF GALLOWAY.
COPYRIGHTS AND INFRINGEMENTS WILL BE
ENFORCED AND PROSECUTED.
COPYRIGHT
GallowayUS.com
5265 Ronald Reagan Blvd., Suite 210
Johnstown, CO 80534
970.800.3300
PRELIMINARYNOT FOR BIDDINGNOT FOR CONSTRUCTIONDate:
Drawn By:
Project No:
Checked By:
06.01.2022
HFH000022MATCHLINE-SEE SHEET C10.6MATCHLINE-SEE SHEET C10.0MATCHLINE-SEE SHEET C10.4
DESIGN POINT
DETENTION POND BASIN BOUNDARY
(i.e., MHFD-Detention_v4.03 and/or SWMM)
SUB-BASIN BOUNDARY (i.e., Rational Method)
OVERLAND FLOW DIRECTION
(I.E., LANDSCAPING)
DIRECT FLOW DIRECTION
(I.E., PAVEMENT, CURB AND
GUTTER)
BASIN ID
2-YR RUNOFF
COEFFICIENT
BASIN AREA
(ACRES)
acres
A1
0.05
0.35
2.50
A
APPROXIMATE DETENTION POND
OVERFLOW PATH
100-YR RUNOFF
COEFFICIENT
FEMA CROSS SECTION
IRRIGATION POND LIMITS
KEYMAP
Know what's
before you dig.SCALE: 1"=50'
0 20 5010MATCHLINE-SEE SHEET C10.1JKD
JEP
DRAINAGE PLAN
C10.3
FLOODWAY RESTRICTIONS
1.NO FILL IN THE FLOODWAY UNLESS A HYDRAULIC ANALYSIS SHOWS "NO-RISE".
2.NO MANUFACTURED HOMES, EXECPT IN AN EXISTING PARK, CAN BE PLACED IN THE FLOODWAY.
3.NO CHANGING A NONCONFORMING NON-RESIDENTIAL OR MIXED USE STRUCTURE TO A RESIDENTIAL STRUCTURE
4.LANDSCAPING MEETS REQUIREMENTS FOR NO ENCROACHMENT IN THE FLOODAY WITHOUT A HYDRAULIC ANALYSIS TO SHOW "NO-RISE".
5.NO STORAGE OF MATERIALS OR EQUIPMENT
NOTES:
1.PORTIONS OF THIS PROPERTY ARE LOCATED IN THE FEMA-REGULATED, 100-YEAR COOPER SLOUGH FLOODPLAIN/FLOODWAY AND MUST
COMPLY WITH THE SAFETY REGULATIONS OF CHAPTER 10 OF CITY MUNICIPAL CODE.
2.THE DEVELOPER SHALL OBTAIN A FLOODPLAIN USE PERMIT FROM THE CITY OF FORT COLLINS AND PAY ALL APPLICABLE FLOODPLAIN USE
PERMIT FEES PRIOR TO COMMENCING ANY CONSTRUCTION ACTIVITY (BUILDING OF STRUCTURES, GRADING, FILL, DETENTION PONDS, BIKE
PATHS, PARKING LOTS, UTILITIES, LANDSCAPED AREAS, FLOOD CONTROL CHANNELS, ETC.) WITHIN THE COOPER SLOUGH FLOODPLAIN
LIMITS--. STORAGE OF EQUIPMENT AND MATERIALS (TEMPORARY OR PERMANENT) IS NOT ALLOWED IN THE FLOODWAY. ALL ACTIVITIES WITHIN
THE FLOODPLAIN ARE SUBJECT TO THE REQUIREMENTS OF CHAPTER 10 OF THE FORT COLLINS MUNICIPAL CODE.
3.CRITICAL FACILITIES ARE PROHIBITED IN THE 100-YEAR FLOODPLAIN. CRITICAL FACILITIES INCLUDE ESSENTIAL SERVICES, AT-RISK
POPULATION, HAZARDOUS MATERIALS, AND GOVERNMENT FACILITIES.
4.CONSTRUCTION OF NEW STRUCTURES, HARD SURFACE PATHS, WALKWAYS, DRIVEWAYS, WALLS, AND PARKING AREAS IS PROHIBITED IN THE
FLOODWAY UNLESS NO-RISE CONDITIONS ARE MET. ANY CONSTRUCTION ACTIVITIES IN THE REGULATORY FLOODWAY MUST ALSO INCLUDE A
NO-RISE CERTIFICATION PREPARED BY A PROFESSIONAL ENGINEER LICENSED IN COLORADO. AN APPROVED FEMA ELEVATION CERTIFICATE
COMPLETED BY A LICENSED SURVEYOR OR CIVIL ENGINEER SHOWING THAT THE BUILDING IS CONSTRUCTED TO THE REQUIRED ELEVATION IS
REQUIRED POST-CONSTRUCTION PRIOR TO A CERTIFICATE OF OCCUPANCY (CO) BEING ISSUED. PLEASE NOTE: IF ANY PART OF THE
BUILDING IS WITHIN THE FLOODPLAIN BOUNDARY, THEN THE ENTIRE STRUCTURE IS CONSIDERED IN THE FLOODPLAIN AND THE ENTIRE
BUILDING ENVELOPE MUST MEET THE REQUIREMENTS OF ELEVATING TO THE RFPE.
5.ALL BASE FLOOD ELEVATIONS ARE BASED ON NAVD 1988 DATUM.
acres
FUT-B
0.80
1.00
15.30
acres
FUT-C
0.80
1.00
22.00
-
-
-
-
-
-
-
-
-
-
-
-
-
-
STAMP
H:\Hartford Homes\CO Fort Collins HFH22 - Mulberry\0CIV\3-CD\FDP_F1\HFH022_C10.0_DRAINAGE.dwg - Matthew Pepin - 6/1/2022Init.#Issue / DescriptionDateFINAL DEVELOPMENT PLANS BLOOM FILING ONEFORT COLLINS, COTHESE PLANS ARE AN INSTRUMENT OF SERVICE
AND ARE THE PROPERTY OF GALLOWAY, AND MAY
NOT BE DUPLICATED, DISCLOSED, OR REPRODUCED
WITHOUT THE WRITTEN CONSENT OF GALLOWAY.
COPYRIGHTS AND INFRINGEMENTS WILL BE
ENFORCED AND PROSECUTED.
COPYRIGHT
GallowayUS.com
5265 Ronald Reagan Blvd., Suite 210
Johnstown, CO 80534
970.800.3300
PRELIMINARYNOT FOR BIDDINGNOT FOR CONSTRUCTIONDate:
Drawn By:
Project No:
Checked By:
06.01.2022
HFH000022MATCHLINE-SEE SHEET C10.4MATCHLINE-SEE SHEET C10.6
DESIGN POINT
DETENTION POND BASIN BOUNDARY
(i.e., MHFD-Detention_v4.03 and/or SWMM)
SUB-BASIN BOUNDARY (i.e., Rational Method)
OVERLAND FLOW DIRECTION
(I.E., LANDSCAPING)
DIRECT FLOW DIRECTION
(I.E., PAVEMENT, CURB AND
GUTTER)
BASIN ID
2-YR RUNOFF
COEFFICIENT
BASIN AREA
(ACRES)
acres
A1
0.05
0.35
2.50
A
APPROXIMATE DETENTION POND
OVERFLOW PATH
100-YR RUNOFF
COEFFICIENT
FEMA CROSS SECTION
IRRIGATION POND LIMITS
KEYMAP
Know what's
before you dig.SCALE: 1"=50'
0 20 5010
JKD
JEP
DRAINAGE PLAN
C10.5
FLOODWAY RESTRICTIONS
1.NO FILL IN THE FLOODWAY UNLESS A HYDRAULIC ANALYSIS SHOWS "NO-RISE".
2.NO MANUFACTURED HOMES, EXECPT IN AN EXISTING PARK, CAN BE PLACED IN THE FLOODWAY.
3.NO CHANGING A NONCONFORMING NON-RESIDENTIAL OR MIXED USE STRUCTURE TO A RESIDENTIAL STRUCTURE
4.LANDSCAPING MEETS REQUIREMENTS FOR NO ENCROACHMENT IN THE FLOODAY WITHOUT A HYDRAULIC ANALYSIS TO SHOW "NO-RISE".
5.NO STORAGE OF MATERIALS OR EQUIPMENT
NOTES:
1.PORTIONS OF THIS PROPERTY ARE LOCATED IN THE FEMA-REGULATED, 100-YEAR COOPER SLOUGH FLOODPLAIN/FLOODWAY AND MUST
COMPLY WITH THE SAFETY REGULATIONS OF CHAPTER 10 OF CITY MUNICIPAL CODE.
2.THE DEVELOPER SHALL OBTAIN A FLOODPLAIN USE PERMIT FROM THE CITY OF FORT COLLINS AND PAY ALL APPLICABLE FLOODPLAIN USE
PERMIT FEES PRIOR TO COMMENCING ANY CONSTRUCTION ACTIVITY (BUILDING OF STRUCTURES, GRADING, FILL, DETENTION PONDS, BIKE
PATHS, PARKING LOTS, UTILITIES, LANDSCAPED AREAS, FLOOD CONTROL CHANNELS, ETC.) WITHIN THE COOPER SLOUGH FLOODPLAIN
LIMITS--. STORAGE OF EQUIPMENT AND MATERIALS (TEMPORARY OR PERMANENT) IS NOT ALLOWED IN THE FLOODWAY. ALL ACTIVITIES WITHIN
THE FLOODPLAIN ARE SUBJECT TO THE REQUIREMENTS OF CHAPTER 10 OF THE FORT COLLINS MUNICIPAL CODE.
3.CRITICAL FACILITIES ARE PROHIBITED IN THE 100-YEAR FLOODPLAIN. CRITICAL FACILITIES INCLUDE ESSENTIAL SERVICES, AT-RISK
POPULATION, HAZARDOUS MATERIALS, AND GOVERNMENT FACILITIES.
4.CONSTRUCTION OF NEW STRUCTURES, HARD SURFACE PATHS, WALKWAYS, DRIVEWAYS, WALLS, AND PARKING AREAS IS PROHIBITED IN THE
FLOODWAY UNLESS NO-RISE CONDITIONS ARE MET. ANY CONSTRUCTION ACTIVITIES IN THE REGULATORY FLOODWAY MUST ALSO INCLUDE A
NO-RISE CERTIFICATION PREPARED BY A PROFESSIONAL ENGINEER LICENSED IN COLORADO. AN APPROVED FEMA ELEVATION CERTIFICATE
COMPLETED BY A LICENSED SURVEYOR OR CIVIL ENGINEER SHOWING THAT THE BUILDING IS CONSTRUCTED TO THE REQUIRED ELEVATION IS
REQUIRED POST-CONSTRUCTION PRIOR TO A CERTIFICATE OF OCCUPANCY (CO) BEING ISSUED. PLEASE NOTE: IF ANY PART OF THE
BUILDING IS WITHIN THE FLOODPLAIN BOUNDARY, THEN THE ENTIRE STRUCTURE IS CONSIDERED IN THE FLOODPLAIN AND THE ENTIRE
BUILDING ENVELOPE MUST MEET THE REQUIREMENTS OF ELEVATING TO THE RFPE.
5.ALL BASE FLOOD ELEVATIONS ARE BASED ON NAVD 1988 DATUM.
E17
acres
E17
0.65
0.81
0.59
acres
0.60
0.75
0.41
acres
FUT-G
0.90
1.00
40.3
acres
G1
0.79
0.99
1.15
acres
G2
0.79
0.99
1.15
-
-
-
-
-
-
-
-
-
-
-
-
-
-
STAMP
H:\Hartford Homes\CO Fort Collins HFH22 - Mulberry\0CIV\3-CD\FDP_F1\HFH022_C10.0_DRAINAGE.dwg - Matthew Pepin - 6/1/2022Init.#Issue / DescriptionDateFINAL DEVELOPMENT PLANS BLOOM FILING ONEFORT COLLINS, COTHESE PLANS ARE AN INSTRUMENT OF SERVICE
AND ARE THE PROPERTY OF GALLOWAY, AND MAY
NOT BE DUPLICATED, DISCLOSED, OR REPRODUCED
WITHOUT THE WRITTEN CONSENT OF GALLOWAY.
COPYRIGHTS AND INFRINGEMENTS WILL BE
ENFORCED AND PROSECUTED.
COPYRIGHT
GallowayUS.com
5265 Ronald Reagan Blvd., Suite 210
Johnstown, CO 80534
970.800.3300
PRELIMINARYNOT FOR BIDDINGNOT FOR CONSTRUCTIONDate:
Drawn By:
Project No:
Checked By:
06.01.2022
HFH000022MATCHLINE-SEE SHEET C10.9MATCHLINE-SEE SHEET C10.2
MATCHLINE-SEE SHEET C10.10
DESIGN POINT
DETENTION POND BASIN BOUNDARY
(i.e., MHFD-Detention_v4.03 and/or SWMM)
SUB-BASIN BOUNDARY (i.e., Rational Method)
OVERLAND FLOW DIRECTION
(I.E., LANDSCAPING)
DIRECT FLOW DIRECTION
(I.E., PAVEMENT, CURB AND
GUTTER)
BASIN ID
2-YR RUNOFF
COEFFICIENT
BASIN AREA
(ACRES)
acres
A1
0.05
0.35
2.50
A
APPROXIMATE DETENTION POND
OVERFLOW PATH
100-YR RUNOFF
COEFFICIENT
FEMA CROSS SECTION
IRRIGATION POND LIMITS
KEYMAP
Know what's
before you dig.SCALE: 1"=50'
0 20 5010
JKD
JEP
DRAINAGE PLAN
C10.8
FLOODWAY RESTRICTIONS
1.NO FILL IN THE FLOODWAY UNLESS A HYDRAULIC ANALYSIS SHOWS "NO-RISE".
2.NO MANUFACTURED HOMES, EXECPT IN AN EXISTING PARK, CAN BE PLACED IN THE FLOODWAY.
3.NO CHANGING A NONCONFORMING NON-RESIDENTIAL OR MIXED USE STRUCTURE TO A RESIDENTIAL STRUCTURE
4.LANDSCAPING MEETS REQUIREMENTS FOR NO ENCROACHMENT IN THE FLOODAY WITHOUT A HYDRAULIC ANALYSIS TO SHOW "NO-RISE".
5.NO STORAGE OF MATERIALS OR EQUIPMENT
NOTES:
1.PORTIONS OF THIS PROPERTY ARE LOCATED IN THE FEMA-REGULATED, 100-YEAR COOPER SLOUGH FLOODPLAIN/FLOODWAY AND MUST
COMPLY WITH THE SAFETY REGULATIONS OF CHAPTER 10 OF CITY MUNICIPAL CODE.
2.THE DEVELOPER SHALL OBTAIN A FLOODPLAIN USE PERMIT FROM THE CITY OF FORT COLLINS AND PAY ALL APPLICABLE FLOODPLAIN USE
PERMIT FEES PRIOR TO COMMENCING ANY CONSTRUCTION ACTIVITY (BUILDING OF STRUCTURES, GRADING, FILL, DETENTION PONDS, BIKE
PATHS, PARKING LOTS, UTILITIES, LANDSCAPED AREAS, FLOOD CONTROL CHANNELS, ETC.) WITHIN THE COOPER SLOUGH FLOODPLAIN
LIMITS--. STORAGE OF EQUIPMENT AND MATERIALS (TEMPORARY OR PERMANENT) IS NOT ALLOWED IN THE FLOODWAY. ALL ACTIVITIES WITHIN
THE FLOODPLAIN ARE SUBJECT TO THE REQUIREMENTS OF CHAPTER 10 OF THE FORT COLLINS MUNICIPAL CODE.
3.CRITICAL FACILITIES ARE PROHIBITED IN THE 100-YEAR FLOODPLAIN. CRITICAL FACILITIES INCLUDE ESSENTIAL SERVICES, AT-RISK
POPULATION, HAZARDOUS MATERIALS, AND GOVERNMENT FACILITIES.
4.CONSTRUCTION OF NEW STRUCTURES, HARD SURFACE PATHS, WALKWAYS, DRIVEWAYS, WALLS, AND PARKING AREAS IS PROHIBITED IN THE
FLOODWAY UNLESS NO-RISE CONDITIONS ARE MET. ANY CONSTRUCTION ACTIVITIES IN THE REGULATORY FLOODWAY MUST ALSO INCLUDE A
NO-RISE CERTIFICATION PREPARED BY A PROFESSIONAL ENGINEER LICENSED IN COLORADO. AN APPROVED FEMA ELEVATION CERTIFICATE
COMPLETED BY A LICENSED SURVEYOR OR CIVIL ENGINEER SHOWING THAT THE BUILDING IS CONSTRUCTED TO THE REQUIRED ELEVATION IS
REQUIRED POST-CONSTRUCTION PRIOR TO A CERTIFICATE OF OCCUPANCY (CO) BEING ISSUED. PLEASE NOTE: IF ANY PART OF THE
BUILDING IS WITHIN THE FLOODPLAIN BOUNDARY, THEN THE ENTIRE STRUCTURE IS CONSIDERED IN THE FLOODPLAIN AND THE ENTIRE
BUILDING ENVELOPE MUST MEET THE REQUIREMENTS OF ELEVATING TO THE RFPE.
5.ALL BASE FLOOD ELEVATIONS ARE BASED ON NAVD 1988 DATUM.
acres
G5
0.77
0.96
0.34
acres
G6
0.77
0.96
0.45
acres
G7
0.78
0.98
0.46
acres
G8
0.78
0.97
0.48
acres
FUT-G
0.90
1.00
40.3
acres
E17.1
0.55
0.69
0.40
acres
G6.1
0.77
0.96
0.45
acres
G7.1
0.81
1.00
0.42
G7
-
-
-
-
-
-
-
-
-
-
-
-
-
-
STAMP
H:\Hartford Homes\CO Fort Collins HFH22 - Mulberry\0CIV\3-CD\FDP_F1\HFH022_C10.0_DRAINAGE.dwg - Matthew Pepin - 6/1/2022Init.#Issue / DescriptionDateFINAL DEVELOPMENT PLANS BLOOM FILING ONEFORT COLLINS, COTHESE PLANS ARE AN INSTRUMENT OF SERVICE
AND ARE THE PROPERTY OF GALLOWAY, AND MAY
NOT BE DUPLICATED, DISCLOSED, OR REPRODUCED
WITHOUT THE WRITTEN CONSENT OF GALLOWAY.
COPYRIGHTS AND INFRINGEMENTS WILL BE
ENFORCED AND PROSECUTED.
COPYRIGHT
GallowayUS.com
5265 Ronald Reagan Blvd., Suite 210
Johnstown, CO 80534
970.800.3300
PRELIMINARYNOT FOR BIDDINGNOT FOR CONSTRUCTIONDate:
Drawn By:
Project No:
Checked By:
06.01.2022
HFH000022MATCHLINE-SEE SHEET C10.8MATCHLINE-SEE SHEET C10.4
MATCHLINE-SEE SHEET C10.11
DESIGN POINT
DETENTION POND BASIN BOUNDARY
(i.e., MHFD-Detention_v4.03 and/or SWMM)
SUB-BASIN BOUNDARY (i.e., Rational Method)
OVERLAND FLOW DIRECTION
(I.E., LANDSCAPING)
DIRECT FLOW DIRECTION
(I.E., PAVEMENT, CURB AND
GUTTER)
BASIN ID
2-YR RUNOFF
COEFFICIENT
BASIN AREA
(ACRES)
acres
A1
0.05
0.35
2.50
A
APPROXIMATE DETENTION POND
OVERFLOW PATH
100-YR RUNOFF
COEFFICIENT
FEMA CROSS SECTION
IRRIGATION POND LIMITS
KEYMAP
Know what's
before you dig.SCALE: 1"=50'
0 20 5010
JKD
JEP
DRAINAGE PLAN
C10.9
FLOODWAY RESTRICTIONS
1.NO FILL IN THE FLOODWAY UNLESS A HYDRAULIC ANALYSIS SHOWS "NO-RISE".
2.NO MANUFACTURED HOMES, EXECPT IN AN EXISTING PARK, CAN BE PLACED IN THE FLOODWAY.
3.NO CHANGING A NONCONFORMING NON-RESIDENTIAL OR MIXED USE STRUCTURE TO A RESIDENTIAL STRUCTURE
4.LANDSCAPING MEETS REQUIREMENTS FOR NO ENCROACHMENT IN THE FLOODAY WITHOUT A HYDRAULIC ANALYSIS TO SHOW "NO-RISE".
5.NO STORAGE OF MATERIALS OR EQUIPMENT
NOTES:
1.PORTIONS OF THIS PROPERTY ARE LOCATED IN THE FEMA-REGULATED, 100-YEAR COOPER SLOUGH FLOODPLAIN/FLOODWAY AND MUST
COMPLY WITH THE SAFETY REGULATIONS OF CHAPTER 10 OF CITY MUNICIPAL CODE.
2.THE DEVELOPER SHALL OBTAIN A FLOODPLAIN USE PERMIT FROM THE CITY OF FORT COLLINS AND PAY ALL APPLICABLE FLOODPLAIN USE
PERMIT FEES PRIOR TO COMMENCING ANY CONSTRUCTION ACTIVITY (BUILDING OF STRUCTURES, GRADING, FILL, DETENTION PONDS, BIKE
PATHS, PARKING LOTS, UTILITIES, LANDSCAPED AREAS, FLOOD CONTROL CHANNELS, ETC.) WITHIN THE COOPER SLOUGH FLOODPLAIN
LIMITS--. STORAGE OF EQUIPMENT AND MATERIALS (TEMPORARY OR PERMANENT) IS NOT ALLOWED IN THE FLOODWAY. ALL ACTIVITIES WITHIN
THE FLOODPLAIN ARE SUBJECT TO THE REQUIREMENTS OF CHAPTER 10 OF THE FORT COLLINS MUNICIPAL CODE.
3.CRITICAL FACILITIES ARE PROHIBITED IN THE 100-YEAR FLOODPLAIN. CRITICAL FACILITIES INCLUDE ESSENTIAL SERVICES, AT-RISK
POPULATION, HAZARDOUS MATERIALS, AND GOVERNMENT FACILITIES.
4.CONSTRUCTION OF NEW STRUCTURES, HARD SURFACE PATHS, WALKWAYS, DRIVEWAYS, WALLS, AND PARKING AREAS IS PROHIBITED IN THE
FLOODWAY UNLESS NO-RISE CONDITIONS ARE MET. ANY CONSTRUCTION ACTIVITIES IN THE REGULATORY FLOODWAY MUST ALSO INCLUDE A
NO-RISE CERTIFICATION PREPARED BY A PROFESSIONAL ENGINEER LICENSED IN COLORADO. AN APPROVED FEMA ELEVATION CERTIFICATE
COMPLETED BY A LICENSED SURVEYOR OR CIVIL ENGINEER SHOWING THAT THE BUILDING IS CONSTRUCTED TO THE REQUIRED ELEVATION IS
REQUIRED POST-CONSTRUCTION PRIOR TO A CERTIFICATE OF OCCUPANCY (CO) BEING ISSUED. PLEASE NOTE: IF ANY PART OF THE
BUILDING IS WITHIN THE FLOODPLAIN BOUNDARY, THEN THE ENTIRE STRUCTURE IS CONSIDERED IN THE FLOODPLAIN AND THE ENTIRE
BUILDING ENVELOPE MUST MEET THE REQUIREMENTS OF ELEVATING TO THE RFPE.
5.ALL BASE FLOOD ELEVATIONS ARE BASED ON NAVD 1988 DATUM.
MODULAR
HOME
H3
H4
acres
FUT-H
0.80
1.00
33.3
acres
H3
0.80
1.00
0.92
acres
H4
0.80
0.99
1.02
-
-
-
-
-
-
-
-
-
-
-
-
-
-
STAMP
H:\Hartford Homes\CO Fort Collins HFH22 - Mulberry\0CIV\3-CD\FDP_F1\HFH022_C10.0_DRAINAGE.dwg - Matthew Pepin - 6/1/2022Init.#Issue / DescriptionDateFINAL DEVELOPMENT PLANS BLOOM FILING ONEFORT COLLINS, COTHESE PLANS ARE AN INSTRUMENT OF SERVICE
AND ARE THE PROPERTY OF GALLOWAY, AND MAY
NOT BE DUPLICATED, DISCLOSED, OR REPRODUCED
WITHOUT THE WRITTEN CONSENT OF GALLOWAY.
COPYRIGHTS AND INFRINGEMENTS WILL BE
ENFORCED AND PROSECUTED.
COPYRIGHT
GallowayUS.com
5265 Ronald Reagan Blvd., Suite 210
Johnstown, CO 80534
970.800.3300
PRELIMINARYNOT FOR BIDDINGNOT FOR CONSTRUCTIONDate:
Drawn By:
Project No:
Checked By:
06.01.2022
HFH000022MATCHLINE-SEE SHEET C10.12MATCHLINE-SEE SHEET C10.11
DESIGN POINT
DETENTION POND BASIN BOUNDARY
(i.e., MHFD-Detention_v4.03 and/or SWMM)
SUB-BASIN BOUNDARY (i.e., Rational Method)
OVERLAND FLOW DIRECTION
(I.E., LANDSCAPING)
DIRECT FLOW DIRECTION
(I.E., PAVEMENT, CURB AND
GUTTER)
BASIN ID
2-YR RUNOFF
COEFFICIENT
BASIN AREA
(ACRES)
acres
A1
0.05
0.35
2.50
A
APPROXIMATE DETENTION POND
OVERFLOW PATH
100-YR RUNOFF
COEFFICIENT
FEMA CROSS SECTION
IRRIGATION POND LIMITS
KEYMAP
Know what's
before you dig.SCALE: 1"=50'
0 20 5010
JKD
JEP
DRAINAGE PLAN
C10.13
FLOODWAY RESTRICTIONS
1.NO FILL IN THE FLOODWAY UNLESS A HYDRAULIC ANALYSIS SHOWS "NO-RISE".
2.NO MANUFACTURED HOMES, EXECPT IN AN EXISTING PARK, CAN BE PLACED IN THE FLOODWAY.
3.NO CHANGING A NONCONFORMING NON-RESIDENTIAL OR MIXED USE STRUCTURE TO A RESIDENTIAL STRUCTURE
4.LANDSCAPING MEETS REQUIREMENTS FOR NO ENCROACHMENT IN THE FLOODAY WITHOUT A HYDRAULIC ANALYSIS TO SHOW "NO-RISE".
5.NO STORAGE OF MATERIALS OR EQUIPMENT
NOTES:
1.PORTIONS OF THIS PROPERTY ARE LOCATED IN THE FEMA-REGULATED, 100-YEAR COOPER SLOUGH FLOODPLAIN/FLOODWAY AND MUST
COMPLY WITH THE SAFETY REGULATIONS OF CHAPTER 10 OF CITY MUNICIPAL CODE.
2.THE DEVELOPER SHALL OBTAIN A FLOODPLAIN USE PERMIT FROM THE CITY OF FORT COLLINS AND PAY ALL APPLICABLE FLOODPLAIN USE
PERMIT FEES PRIOR TO COMMENCING ANY CONSTRUCTION ACTIVITY (BUILDING OF STRUCTURES, GRADING, FILL, DETENTION PONDS, BIKE
PATHS, PARKING LOTS, UTILITIES, LANDSCAPED AREAS, FLOOD CONTROL CHANNELS, ETC.) WITHIN THE COOPER SLOUGH FLOODPLAIN
LIMITS--. STORAGE OF EQUIPMENT AND MATERIALS (TEMPORARY OR PERMANENT) IS NOT ALLOWED IN THE FLOODWAY. ALL ACTIVITIES WITHIN
THE FLOODPLAIN ARE SUBJECT TO THE REQUIREMENTS OF CHAPTER 10 OF THE FORT COLLINS MUNICIPAL CODE.
3.CRITICAL FACILITIES ARE PROHIBITED IN THE 100-YEAR FLOODPLAIN. CRITICAL FACILITIES INCLUDE ESSENTIAL SERVICES, AT-RISK
POPULATION, HAZARDOUS MATERIALS, AND GOVERNMENT FACILITIES.
4.CONSTRUCTION OF NEW STRUCTURES, HARD SURFACE PATHS, WALKWAYS, DRIVEWAYS, WALLS, AND PARKING AREAS IS PROHIBITED IN THE
FLOODWAY UNLESS NO-RISE CONDITIONS ARE MET. ANY CONSTRUCTION ACTIVITIES IN THE REGULATORY FLOODWAY MUST ALSO INCLUDE A
NO-RISE CERTIFICATION PREPARED BY A PROFESSIONAL ENGINEER LICENSED IN COLORADO. AN APPROVED FEMA ELEVATION CERTIFICATE
COMPLETED BY A LICENSED SURVEYOR OR CIVIL ENGINEER SHOWING THAT THE BUILDING IS CONSTRUCTED TO THE REQUIRED ELEVATION IS
REQUIRED POST-CONSTRUCTION PRIOR TO A CERTIFICATE OF OCCUPANCY (CO) BEING ISSUED. PLEASE NOTE: IF ANY PART OF THE
BUILDING IS WITHIN THE FLOODPLAIN BOUNDARY, THEN THE ENTIRE STRUCTURE IS CONSIDERED IN THE FLOODPLAIN AND THE ENTIRE
BUILDING ENVELOPE MUST MEET THE REQUIREMENTS OF ELEVATING TO THE RFPE.
5.ALL BASE FLOOD ELEVATIONS ARE BASED ON NAVD 1988 DATUM.