HomeMy WebLinkAboutSILVER OAKS - PRELIMINARY - 14-88F - SUBMITTAL DOCUMENTS - ROUND 1 - LDGS ACTIVITY FORMPRJJEC 1 kJ;l iL : S IL
v cr e U,o, &S
PROJECT NUMBER:
Au& urr 30 /997
ALL DEVELOPMENT: NUMBERED CRITERIA CHART
ALL CRITERIA
APPLICABLE CRITERIA ONLY
CRITERION°N
Is the Criterion opplicoble)
WIN the crltenon
be sotisliecP
If no, please explain
�,6
ae,� F,�°��P<�°° ves Na
NEIGHBORHOOD COMPATABILITY
1. Social Compatibility
x
x
2. Neighborhood Character
X;;,,
X
3, Land Use Conflicts,
X
4. Adverse Traffic Impact
X"-'
PLANS AND POLICIES
5. Comprehensive Plan X `-si'k^;> x
PUBLIC FACILITIES & SAFETY
6, Street Capacity
X
7. Utility Capacity
X
8. Design Standards
rs
���'
;
:........ .
9. Emergency Access
10. Security Lighting
11. Water Hazards
X
L 16 iN /J U O r P L N
RESOURCE PROTECTION
12. Soils & Slope Hazard
x
13. Significant Vegetation
14. Wildlife Habitat
X
15, Historical Landmark
x
16. Mineral Deposit
17. Eco-Sensitive Areas
X
18. Agricultural Lands
X
ENVIRONMENTAL STANDARDS
19. Air Quality
20. Water QualityX
�(
14.
X
X
21. Noise
x
22. Glare & Heat
a'
23. Vibrations
24. Exterior Lighting
x!
�C
X
25. Sewage & Wastes
x
SITE DESIGN
26. Community Organization
27. Site Organizationx
x
;>
X
28. Natural Features.:
K' r
X
29. Energy Conservation
30, Privacy
x
K
31. Open Space Arrangement
32. Building Height
x
(
33. Vehicular Movement
x
X
34. Vehicular Design
x
35, Parking
K
36. Active Recreational Areas
X
37. Private Outdoor Areas
38. Pedestrian Convenience
x
x
:�.,
ja r:>>
X
X
39. Pedestrian Conflicts
X
S,ry iflo ✓
40. Landscaping/Open Areas
Xx.:
zC
x
41. Landscaping/Buildings
X
42. Landscaping/Screening
X
43. Public Access
X
44. Signs
X
-12-
0
ACTIVITY: Residential Uses
DEFINITION
All residential uses. Uses would include single family attached
dwellings, townhomes, duplexes, mobile homes, and multiple family
dwellings; group homes; boarding and rooming houses; fraternity and
sorority houses; nursing homes; public and private schools; public and
non-profit quasi -public recreational uses as a principal use; uses
providing meeting places and places for public assembly with inciden-
tal office space; and child-care centers.
CRITERIAEach of
answered
plan.
the following applicable criteria must be
"yes" and implemented within the development
Yes No
1. On a gross acreage basis, is the average resi-
dential density in the project at least three (3)
dwelling units per acre (calculated for residential
portion of the site only)?
2.1 DOES THE PROJECT EARN THE MINIMUM PERCENTAGE POINTS
AS CALCULATED ON THE FOLLOWING "DENSITY CHART" FOR ® ❑
THE PROPOSED DENSITY OF THE RESIDENTIAL PROJECT?
THE REQUIRED EARNED CREDIT FOR A RESIDENTIAL
i PROJECT SHALL BE BASED ON THE FOLLOWING:
30-40
PERCENTAGE
POINTS =
3-4
DWELLING
UNITS/ACRE;
40-50
PERCENTAGE
POINTS =
4-5
DWELLING
UNITS/ACRE;
50-60
PERCENTAGE
POINTS =
5-6
DWELLING
UNITS/ACRE;
60-70
PERCENTAGE
POINTS =
6-7
DWELLING
UNITS/ACRE;
70-80
PERCENTAGE
POINTS =
7-8
DWELLING
UNITS/ACRE;
80-90
PERCENTAGE
POINTS =
8-9
DWELLING
UNITS/ACRE;
90-100
PERCENTAGE
POINTS
= 9-10 DWELLING
UNITS/ACRE;
100 OR
MORE PERCENTAGE POINTS
= 10 OR MORE
DWELLING
UNITS/ACRE.
�`r1t'1f it'll I��`i
`/ \/ 1 11 11 I\A \/ \/I
-29-
DENSITY CHART
Maximum
Earned
Criterion
Credit
If All Dwelling Units Are Within:
Credit
a
20%
20001ee1 or on existing orooproved no,ghbp hood stopp,ng center
b
10%
650 feet of an existing tr°nslt stop
C
10%
4000 feet of on existing or approved regional shopping Center.
d
20%
3500 feet of on existing or reserved neighborhood park community park of community facility
nn
ZV e/O
we
10%
1000 feet of a school, meeting all the requirements of the compulsory education laws of the State of Colorado.
, D C/
D
It
20%
3000feet ofamajoremploymentCenter.
I W
g
5%
t0001eetofachild carecenter.
h
20%
'North'Forl Collin&
i
20%
The Central Business District.
A project whose boundary Is contiguous to existing urban development, Credit may be earned as follow&
0%— For projects whose property boundary has 0 to 10%contiguity, I
10 to 15%—For projects whose property boundary has 10 to 20%conhgWty,_ 1
30%
15to 20%—For projects whose properly boundary has 20 to 30%contiguity
ZS
20 to 25%—For projects whose property boundary has 30 to 40% contguity,
25 to 30%—For projects whos property boundary has 40 to 50% contiguity,
k
If It can be demonstrated that the project will reduce non-renewable energy useoge either through the application of alternative energy
systems of through committed energy conservation measures beyond that normally required by City Code. a 5% bonus maybe earned
for every 5% reduction In energy use.
Calculate l% bonus for every 50 acres Included In the project.
m
Calculate the percentage of the total acres In the project that are devoted to recreational use. enter 112 of that percentage as a bonus.
If the applicant commits to preserving permanent offsite open space that meets the Citys minimum requirements, calculate the percentage
n
of this open space acreage to the total development acreage, enter this percentage as a bonus.
If part of the total development budget is to be spent on neighborhood public transit facilities which are not otherwise required by City Code.
O
enter 2%bonus for every$100 per dwelling unit invested.
If part of the total development budget Is to be spent on neighborhood facilities and services which are not otherwise required by City Code.
P
enter al%bonus for every $100 per dwelling unit invested.
^
If a commitment is being made to develop a specified percentage of the total number of dwelling units for low income families. enter that
I�
Q
percentage as a bonus. up to a maximum of 30%.
If a commitment is being mode to develop a specified percentage of the total number of dwelling units for Type "A" and Type 'B" handicapped
housing as defined by the City of Fort Collins calculate the bonus as follows:
lO
r
Type"— .5fimes Type A units
Total units
M
LLL!!
Type'B"-1.Ofimes Type'B"units
ola un is
In no case shall the combined bonus be greater Han 30%.
If the site or adjacent property Contains on historic building or place. a bonus may be earned for the following:
3% — For prevenfing or mitigating outside Influences (e.g. environmental, land use, aesthetic, economic and social factors) adverse tons
preservation;
S
3% — For assuring that new structures will be In keeping with the character of the building or place, while avoiding total units
3% — For proposing adaptive use of the building or place that will lead to Its continuance. preservation and improvement in an
appropriate manner.
If a portion or all of the required parking in the multiple family project Is provided underground, within the bulldingL or In an elevated parking
structure as an accessory use to the primary structure, a bonus may be earned as follows:
t
9% — For providing 75%or more of the parking in a structure;
6% — For providing 50-74%of the parking In a structure;
3% — For providing 25-49%of the parking in a structure.
u
- if a Commitment Is being mode to provide approved automatic fire extinguishing systems for the dwelling unit, enter a bonus of 10%
TOTAL SS i
- 30-