Commtd6ty Planning and Environmenta*rvices
Planning Department
City of Fort Collins
June 9, 1992
Tri Trend
c/o Dick Rutherford
Stewart & Associates
103 South Meldrum
Fort Collins, CO 80521
Dear Dick:
G/-a1s ,A�r~EfEa)cE =
For your information, attached is a copy of the Staff's comments concerning
Silver Oaks, presented before the Conceptual Review Team on June 8, 1992.
The comments are offered informally by Staff to assist you in preparing the
detailed components of the project application. Modifications and additions to
these comments may be made at the time of formal review of this project.
If you should have any questions regarding these comments or the next steps in
the review process, please feel free to call me at 221-6750.
Sincerely,
TTed Shepard
Senior Planner
TS/gjt
Attachment
cc: Tom Peterson, Planning Director
Kerrie Ashbeck, Civil Engineer
Transportation Department
Project Planner
File
281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (303) 221-6750
CONCEPTUAL REVIEW STAFF COMMENTS
MEETING DATE: June 8, 1992
ITEM: Silver Oaks (Formerly Horsetooth West Master Plan)
APPLICANT: Tri Trend c/o Dick Rutherford, Stewart and Associates,
103 South Meldrum Street, Fort Collins, CO. 80521
LAND USE DATA: Request to subdivide 41 acres into 144 single
family lots. The site is part of the Horsetooth West Master Plan,
and is located west of Taft Hill Road, south Horsetooth Road. The
parcel is bordered by the Olander Elementary School and is served
by Auntie Stone Street. Bronson Street will extend into the parcel
from Taft Hill Road.
COMMENTS:
1. The Horsetooth West Master Plan will have to amended to
reflect the proposed changes. The amendment should be
referred to as an "Overall Development Plan".
2. The site is well served by existing water and sewer. There is -
a 20 inch diameter water main in Horsetooth that runs as far
west as Auntie Stone Street. There is eight inch diameter
water and sewer mains in Auntie Stone Street. There is a 12
inch diameter sewer in Taft, and an eight inch diameter sewer
in Bronson. Please verify with Mark Taylor, Water and
Wastewater Department regarding any repayments due back to
Poudre R-1 for the sewer in Bronson.
3. There is three-phase electrical power available in Auntie
Stone Street. There is an existing electrical vault along
Taft. Power is available from either of these sources. If
phasing of development is such that it is not contiguous to
these sources, then special arrangements with Light and Power
may have to be made. Otherwise, normal development charges
will apply.
4. The zoning is R-L-P. Lots may subdivided according to the
requirements of Zoning Code. Minimum lot size is 6,000 square
feet and there must be a minimum of 60 feet of lot width at
the front building line, and a minimum of 20 feet at the front
curb line.
5. The Poudre Fire Authority will require standard streets,
standard hydrant spacing, and minimum water supply and
pressure. Phasing should consider the minimum fire access
requirements, and the ends of cul-de-sacs should not exceed
660 feet from a single point of access.
6. Ever since this site was selected for Olander School, Staff
has been concerned about access to the north and west.
Presently, there is no path or street to connect Quail Hollow
subdivision with Olander School. Keep in mind that Parks and
Recreation is in the process of developing "Cottonwood Glen"
neighborhood park about one -quarter mile north of the subject
site. In addition, there is no access from Moore Lane to the
school property. The northwest corner of the site should be
investigated for providing a bicycle/pedestrian connection
that either ties into Moore Lane or begins an offstreet path
system that connects the subdivisions, school, and
neighborhood park. Such a connection may be temporary until
a local street system is connected to the north. Both the
Parks and Recreation Department and the Planning Department
are willing to explore options and assist in working with
landowners in this area.
7. The Parkland Development Fee is $625 per dwelling unit payable
at the time of building permit issuance. The funds collected
from Silver Oaks will be earmarked for development of
Cottonwood Glen Park. The references to "Park Site" should be
deleted from the Plan.
8. Since Lots 9, 10, 19, 20, 29, and 30 have side lot frontage
along Horsetooth Road, it will be the responsibility of the
homeowners to maintain the right-of-way along their lots. It
is strongly suggested that six-foot, wood fencing not be
brought directly up to the cul-de-sac opening. Rather, any
perimeter fencing should be tapered down to 42" to 4811,
beginning at the front building line, to allow visibility and
relieve the repetitious, stockade appearance along an arterial
street.
9. The cul-de-sac openings should be provided with a sidewalk
that connect to the sidewalk on Horsetooth Road.
10. Lots 1 - 9 have double frontage. The Zoning Code states:
"Lots with both front and rear frontage on a street shall not
be permitted except where necessary to provide separation from
arterial streets or from incompatible land uses."
Please verify with the Zoning Administrator whether an
elementary school is considered an incompatible land use. If
not, then a variance may be needed or the proj ect could be
submitted and reviewed as a P.U.D. In either case, these lots
should have extra depth and be treated with a common rear yard
fence for uniformity along the collector street.
11. The Stormwater Utility will require a revised overall drainage
plan. The final outfall should be specified. The commercial
area will have to provide its own stormwater detention. The
phasing of the development and pond development must be
coordinated so that each phase has adequate detention.
r
12. The site is located in the Spring Creek Drainage Basin. The
fees are $1,691 per acre. Credit on the fees for providing
the detention pond will only be applied toward that phase in
which the pond is platted. The pond is not regional in nature
but serves only the proposed Silver Oaks. As a result, the
Stormwater Utility will not bear any responsibility for
maintenance.
13. A Drainage Report and Drainage and Grading Plan will be
required. An Erosion Control Plan will also be required.
14. Please check with Matt Baker, 221-6605, for information on any
potential repays due to the City for the arterial improvements
along Taft Hill Road and Horsetooth Road. Also, please check
the records for the agreement between the City and Poudre R-1
on any potential repays for street extensions. Finally, a
repay may be due for the construction of Auntie Stone Street.
15. Improving the arterial frontage along Taft Hill Road adjacent
to the detention pond will be the developer's obligation.
16. The Street Oversizing Fee is $584 per dwelling unit payable at
the time of building permit issuance.
17. The Transportation Department advises that a local street
connection to the northwest be kept open at this stage. There
is a critical need to connect this area with developing areas
(Quail Hollow). A connection to Moore Lane must be
investigated. What is the potential for creating a connection
to the collector system in Quail Hollow? The Traffic Impact
Analysis should address this issue. Lots 60 and 61 should be
deleted for a transportation connection.
18. There will not be a traffic signal at Taft/Bronson yet this
seems to be the prioritized entry point. The project would
benefit from an additional local street connection to
Horsetooth Road. This would direct traffic to the signalized
intersection versus Taft/Bronson. Left turn exits from
Bronson during the A.M. and P.M. peaks will experience
significant delays. Bronson may need to be equipped with a
separate left turn lane. The Traffic Impact Analysis should
also address this issue.
19. The traffic consultant should contact the City's
Transportation Department to define the scope of the study and
to obtain the latest background traffic volume figures.
20. The access to the five acre commercial area must be defined at
the amended Overall Development Plan (Amended Master Plan)
stage. Access issues should not be unresolved and left for
future phases to decide but investigated at this time in order
to guide future development.
T 9 0
21. Staff is concerned about Lots 30 - 38 and the relationship to
the commercial area. Since the O.D.P. is indicating a
commercial area, steps should be implemented to provide
buffering along the rear yards as early as possible. It is
suggested that these lots be increased in length to create
additional separation. Also, establishing landscaping with
the first phase would allow a certain degree of maturation.
The drainage study should investigate the feasibility of
installing a berm in this area to promote buffering. Buyers
of these lots should be fully informed of the planned
commercial area. Our experience is that homeowners that are
closest to a commercial project are the most vocal opponents
of commercial development, despite the commercial designation
on the Overall Development Plan.
22. The five acre commercial site would be defined as a
Neighborhood Convenience Shopping Center and should be
indicated as such on the amended Overall Development Plan.
Consequently, this land use must obtain a total 65% (not 500)
on the Point Chart J of the Land Development Guidance System.
You are advised to investigate the feasibility of achieving
this minimum score before carving out a commercial parcel of
this size. The previous land use designation was for a full
Neighborhood Service Center.
23. Staff is also concerned about the change in the mixture of
residential densities under the proposed amendment. The
currently approved plan calls for a more generous supply of
multi -family housing than what is proposed by the amendment.
This is contrary to City policy. The Land Use Policies Plan,
an element of the City's Comprehensive Plan, states that each
square mile section of the City should provide a mixture of
housing types. Also, the City Council goal of promoting
affordable housing suggests that each O.D.P. offer a range of
housing opportunities. Since the proposed amendment does not
accomplish these objectives, the applicant must justify the
proposed amendment. You are encouraged to look at the housing
types available in the square mile section. Historically,
Fort Collins has maintained a rough mix of 60% single family
and 40% multi -family. For further information on this issue,
please contact Ken Waido, 221-6376.
24. Lots 105, 106, and 130 will be eligible to be included as
solar oriented lots if a commitment is made for a sufficient
amount of south facing windows for solar gain.
25. A landscape plan will be required for treatment along Auntie
Stone Street (collector), Horsetooth Road (arterial), and
along the Taft Hill Road detention pond(arterial street).