Loading...
HomeMy WebLinkAboutELEMENTARY SCHOOL 1990 - SPECIAL SITE PLAN REVIEW - 14-88A - CORRESPONDENCE - RESPONSE TO STAFF REVIEW COMMENTS2407 LAPORTE AVENUE FACILITIES SERVICES FORT COLLINS, COLORADO 80521 PHONE 303-482-7420 March 31, 1989 Dulaney Architecture 5261 S. Quebec Street Suite 210 Englewood, CO 80111 ATTN: Pat Dulaney RE: 1990 Elementary School - city letter of 2/24/89 Dear Pat: (; APR 3 L._ Enclosed is a copy of the City staffs comments made after reviewing the infor- mation you submitted for the April 24, 1989 Planning and Zoning Board meeting. We have the following responses relative to those comments for your information and which we would like you to incorporate in the 1990 Elementary School construction documents or the Offsite construction documents. 1. The 6' wide walks are required so that snowplows can travel with the tires on the walk as well as for pedestrian traffic. Please incorporate a 6' wide minimum, sidewalk along the school property. 2. Street name will be selected by the Board of Education or South Taft Hill Investments, Ltd,. 3. All sidewalks should have a handicapped ramp at intersection with streets and driveways to permit pedestrian crossing and access in both directions. 4. The 20" line can be shown on the drawings. However, the district will have to obtain a written security for payment from the City for the added cost above the 12" line and will also need to know the added cost between the water line size that the school would require alone, and the 12" line, before construction documents are complete and work is begun. Please include in the Offsite construction documents that the Contractor break out the cost of these differences. 5. The 8" sewer lines should be included in the Offsite construction documents. Please include in the contract documents that the Contractor breakout the cost of the difference between any stubs. etc. that would not have been required by the school alone. 0 • 6. Please show the eight foot utility easement on the school site plans and dimension to the future location of the gas line. 7. Please provide a vicinity map on the school site plans and also on the Offsite plans, and send a vicinity map to the City Planning Department. 8. Fencing (6' chain link) should be shown on the north, south and west property lines about 4"-6" inside the property line to center of posts. 9. Offsite improvements are not to be installed as part of the 90 Elementary School Project. The final determination of the extent of offsite improvements to be built is not complete, any offsite improvements will be built as a separate project. 10. Please submit landscape plans. 11. Omitted 12. Please submit 5 copies to City as requested. 13. Please submit 10 copies of the plans requested to the City. We realize that due to the continuing discussions between the school district and city it is not possible to finish the Offsite construction documents at this time, or to proceed with construction of Offsite work. However, please complete the documents as much as you can and then send us a progress set for review. If you have any questions please call. Sincerely, POUD E SCHOOL DISTR CT R-1 /4a George Galida Construction Manager enclosure c: Joe Frank