HomeMy WebLinkAboutHERITAGE PARK - MJA220001 - SUBMITTAL DOCUMENTS - ROUND 2 - TRAFFIC STUDYkimley-horn.com 4582 South Ulster Street, Suite 1500, Denver, CO 80237 303 228 2300
June 22, 2022
Mr. Mat Moiseve
Colrich, LLC
444 West Beach Street
Suite 300
San Diego, CA 92101
Re: Heritage Park Expansion
Traffic Study Letter
Fort Collins, Colorado
Dear Mr. Moiseve,
This letter documents the results of a traffic study including trip generation, trip distribution,
traffic assignment, and intersection analysis for the Heritage Park expansion project located
on the northwest corner of the Stuart Street and Shields Street intersection in Fort Collins,
Colorado. A vicinity map of the project site location is attached in Figure 1. A conceptual site
plan for the project is also attached. Heritage Park is proposing to add 31 townhomes to the
existing site by 2024. Therefore, analysis was conducted for the 2024 opening year horizon.
The signed Fort Collins TIS Base Assumption Form is attached for reference.
The following intersections were incorporated into this traffic study based on the City of Fort
Collins requested scope:
· Stuart Street and Heritage Circle (West)
· Stuart Street and Heritage Circle (East)
· Stuart Street and Shields Street
Regional access is provided by Interstate 25 (I-25) and US-287 while primary access to the
site is provided by Shields Street, Prospect Road, and Drake Road. Direct access to the site
is provided by Stuart Street.
EXISTING ROADWAY NETWORK
Stuart Street is classified by the City of Fort Collins as a 2-lane collector roadway and extends
eastbound and westbound with one through lane in each direction and has a posted speed
limit of 25 miles per hour. There are bike lanes and on-street parking on both sides of Stuart
Street adjacent to the project site.
Shields Street is classified by the City of Fort Collins as a 4-lane arterial roadway and extends
north-south with two through lanes in each direction with a center double yellow striped
median and left turn lanes at major intersections. The posted speed limit along Shields Street
is 40 miles per hour while bikes lanes are provided on both sides of the road.
Heritage Park
096277019
Page 2
kimley-horn.com 4852 South Ulster Street, Suite 1500, Denver, CO 80237 303 228 2300
The unsignalized ‘T’-intersection of Stuart Street and Heritage Circle (West) operates with
stop control on the southbound approach of Heritage Circle (West). All three approaches
provide a single lane for shared movements. An aerial photo that illustrates the existing
intersection configuration is below (north is up – typical).
Stuart Street & Heritage Circle (West)
Heritage Park
096277019
Page 3
kimley-horn.com 4852 South Ulster Street, Suite 1500, Denver, CO 80237 303 228 2300
The unsignalized intersection of Stuart Street and Heritage Circle (East) operates with stop
control on the northbound approach from a driveway and the southbound approach of
Heritage Circle (East). The north and south legs are offset by approximately 75 feet. All four
approaches provide a single lane for all movements. An aerial photo that illustrates the
existing intersection configuration is below.
Stuart Street & Heritage Circle (East)
Heritage Park
096277019
Page 4
kimley-horn.com 4852 South Ulster Street, Suite 1500, Denver, CO 80237 303 228 2300
The signalized ‘T’-intersection of Stuart Street and Shields Street operates with protected-
permitted left turn phasing on the northbound approach. The northbound approach provides
a left turn lane and two through lanes while the southbound approach provides two through
lanes and a right turn lane. The eastbound approach provides a left turn lane and a right turn
lane. An aerial photo that illustrates the existing intersection configuration is below.
Stuart Street & Shields Street
The intersection lane configuration and control for this study area intersection is shown in
attached Figure 2.
Heritage Park
096277019
Page 5
kimley-horn.com 4852 South Ulster Street, Suite 1500, Denver, CO 80237 303 228 2300
EXISTING AND FUTURE TRAFFIC VOLUMES
Existing peak hour turning movement counts were conducted at the key intersections on
Thursday, January 27, 2022. The counts were conducted during the morning and afternoon
peak hours of adjacent street traffic in 15-minute intervals from 7:00 AM to 9:00 AM and 4:00
PM to 6:00 PM on this count date. The existing intersection traffic volumes are also shown in
attached Figure 3 with count sheets attached.
Per discussion with City of Fort Collins, a two (2) percent annual traffic growth rate for the
surrounding area was determined and utilized in this study. Therefore, an annual growth rate
of two (2) percent was used to calculate short-term 2024 background traffic projections. In
addition, project traffic associated with the Quarry by Watermark development was included
in the background traffic volumes. The Quarry by Watermark development is proposed to
include multifamily housing and retail uses located on the northeast corner of the Stuart Street
and Shields Street intersection, with access on the east leg of the intersection. The project
trips associated with the Quarry by Watermark Traffic Impact Study prepared by Delich
Associates in November 2020 are attached for reference. In addition, the signal plans for the
Stuart Street and Shields Street intersection with the east leg is attached. The background
traffic volumes are shown in attached Figure 4.
TRIP GENERATION
Site-generated traffic estimates are determined through a process known as trip generation.
Rates and equations are applied to the proposed land use to estimate traffic generated by the
development during a specific time interval. The acknowledged source for trip generation
rates is the Trip Generation Manual1 published by the Institute of Transportation Engineers
(ITE). ITE has established trip rates in nationwide studies of similar land uses. For this study,
Kimley-Horn used the ITE Trip Generation Manual fitted-curve equations that apply to Single-
Family Attached Housing (ITE Land Use Code 215) for traffic associated with this expansion.
The following Table 1 summarizes the estimated trip generation (calculations attached).
Table 1 – Heritage Park Expansion Project Traffic Generation
Use
Weekday Vehicles Trips
Daily
AM Peak Hour PM Peak Hour
In Out Total In Out Total
Single Family Attached (ITE 215) –
31 DU 186 3 7 10 9 6 15
As shown in the table and based on ITE Trip Generation calculations, the expansion of
Heritage Park is anticipated to generate approximately 186 weekday daily trips, with 10 trips
occurring during the morning peak hour and 15 trips occurring during the afternoon peak hour.
1 Institute of Transportation Engineers,Trip Generation Manual, Eleventh Edition, Washington DC, 2021.
Heritage Park
096277019
Page 6
kimley-horn.com 4852 South Ulster Street, Suite 1500, Denver, CO 80237 303 228 2300
TRIP DISTRIBUTION AND TRAFFIC ASSIGNMENT
Distribution of site traffic on the street system was based on the area street system
characteristics, existing traffic patterns, existing and anticipated surrounding demographic
information, and the proposed access system for the project. The directional distribution of
traffic is a means to quantify the percentage of site-generated traffic that approaches the site
from a given direction and departs the site back to the original source. The traffic assignment
was obtained by applying the project trip distribution to the estimated traffic generation of the
development shown in Table 1.Figure 5 illustrates the trip distribution and Figure 6 illustrates
the traffic assignment for this project.
TOTAL (BACKGROUND PLUS PROJECT) TRAFFIC
Site traffic volumes were added to the background volumes to represent estimated total traffic
conditions for the 2024 horizon. These total traffic volumes for the study area is illustrated for
the 2024 horizon in Figures 7.
TRAFFIC OPERATIONS ANALYSIS METHODOLOGY
Kimley-Horn’s analysis of traffic operations in the site vicinity was conducted to determine
potential capacity deficiencies at the project key intersections for the 2024 horizon. The
acknowledged source for determining overall capacity is the Highway Capacity Manual2.
Capacity analysis results are listed in terms of Level of Service (LOS). LOS is a qualitative
term describing operating conditions a driver will experience while traveling on a particular
street or highway during a specific time interval. It ranges from A (very little delay) to F (long
delays and congestion). For intersections and roadways, standard traffic engineering practice
recommends LOS D as the minimum threshold for acceptable operations for intersections and
LOS E for movements.Table 2 below shows the definition of level of service for unsignalized
intersections.
Table 2 - Level of Service Definitions
Level of
Service
Unsignalized Intersection
Average Total Delay
(sec/veh)
A ≤ 10
B > 10 and ≤ 15
C > 15 and ≤ 25
D > 25 and ≤ 35
E > 35 and ≤ 50
F > 50
Transportation Research Board,Highway Capacity Manual, Sixth Edition, Washington DC, 2016.
Study area intersections were analyzed based on average total delay analysis for signalized
and unsignalized intersections. Under the unsignalized analysis, the LOS for a two-way stop-
controlled intersection is determined by the computed or measured control delay and is
2 Transportation Research Board,Highway Capacity Manual, Sixth Edition, Washington DC, 2016.
Heritage Park
096277019
Page 7
kimley-horn.com 4852 South Ulster Street, Suite 1500, Denver, CO 80237 303 228 2300
defined for each minor movement. LOS for a two-way stop-controlled intersection is not
defined for the intersection as a whole. LOS for signalized, roundabout, and all-way stop
controlled intersections are defined for each approach and for the overall intersection.
Calculations for the level of service at the key intersections identified for the study are
attached. The traffic analysis is based on the lane geometry and intersection control shown in
Figure 2. Existing peak hour factors were utilized in the existing and 2024 horizon analysis
years. Synchro traffic analysis software was used to analyze the study area key intersection
drives for level of service. The Synchro Highway Capacity Manual (HCM) methodology reports
were used to analyze intersection delay and level of service.
Stuart Street and Heritage Circle (West)
The unsignalized ‘T’-intersection of Stuart Street and Heritage Circle (West) operates with
stop control on the southbound approach of Heritage Circle (West). The intersection
movements operate acceptably at LOS A during both peak hours under existing conditions.
With the existing lane configurations and the addition of project traffic, the movements at this
intersection are expected to operate acceptably at LOS A during both peak hours throughout
the 2024 horizon. Therefore, improvements or modifications are not anticipated to be needed
at this intersection based on the addition of project traffic.Table 3 provides the results of the
level of service at this intersection.
Table 3 – Stuart Street & Heritage Circle (West) LOS Results
Scenario
AM Peak Hour PM Peak Hour
Delay
(sec/veh)LOS Delay
(sec/veh)LOS
2022 Existing
Eastbound Left
Southbound Approach
7.3
9.3
A
A
7.5
9.8
A
A
2024 Background
Eastbound Left
Southbound Approach
7.3
9.3
A
A
7.5
9.5
A
A
2024 Background Plus Project
Eastbound Left
Southbound Approach
7.3
9.4
A
A
7.5
9.6
A
A
Heritage Park
096277019
Page 8
kimley-horn.com 4852 South Ulster Street, Suite 1500, Denver, CO 80237 303 228 2300
Stuart Street and Heritage Circle (East)
The unsignalized intersection of Stuart Street and Heritage Circle (East) operates with stop
control on the northbound approach from a driveway and the southbound approach of
Heritage Circle (East). The intersection movements operate acceptably at LOS B or better
during both peak hours under existing conditions. With the existing lane configurations and
the addition of project traffic, the movements at this intersection are expected to operate
acceptably at LOS B or better during both peak hours throughout the 2024 horizon. Therefore,
improvements or modifications are not anticipated to be needed at this intersection based on
the addition of project traffic.Table 4 provides the results of the level of service at this
intersection.
Table 4 – Stuart Street & Heritage Circle (East) LOS Results
Scenario
AM Peak Hour PM Peak Hour
Delay
(sec/veh)LOS Delay
(sec/veh)LOS
2022 Existing
Northbound Approach
Eastbound Left
Westbound Left
Southbound Approach
9.3
0.0
0.0
9.7
A
A
A
A
9.3
7.6
7.4
10.3
A
A
A
B
2024 Background
Northbound Approach
Eastbound Left
Westbound Left
Southbound Approach
9.4
0.0
0.0
9.8
A
A
A
A
9.2
7.6
7.4
9.9
A
A
A
A
2024 Background Plus Project
Northbound Approach
Eastbound Left
Westbound Left
Southbound Approach
9.4
0.0
0.0
9.7
A
A
A
A
9.2
7.6
7.4
10.0
A
A
A
B
Heritage Park
096277019
Page 9
kimley-horn.com 4852 South Ulster Street, Suite 1500, Denver, CO 80237 303 228 2300
Stuart Street and Shields Street
The signalized ‘T’-intersection of Stuart Street and Shields Street operates with protected-
permitted left turn phasing on the northbound approach. The overall intersection operates
acceptably at LOS B or better during both peak hours under existing conditions. The Quarry
by Watermark development will be constructing the east leg of the intersection with a separate
southbound left turn lane and a northbound right turn lane for access to that project. The
eastbound and westbound approaches will provide a shared left turn/through lane and a
separate right turn lane as identified in the attached traffic signal plan. With the proposed lane
configurations and the addition of project traffic, the intersection is expected to operate
acceptably at LOS B or better during the 2024 horizon.Table 5 provides the results of the
level of service at this intersection.
Table 5 – Stuart Street & Shields Street LOS Results
Scenario
AM Peak Hour PM Peak Hour
Delay
(sec/veh)LOS
Delay
(sec/veh)LOS
2022 Existing 6.7 A 6.0 A
2024 Background #8.2 A 15.1 B
2024 Background Plus Project #8.4 A 15.4 B
# = Addition of East Leg and Associated Movements and Signal Modifications
Heritage Park
096277019
Page 10
kimley-horn.com 4852 South Ulster Street, Suite 1500, Denver, CO 80237 303 228 2300
VEHICLE QUEUING ANALYSIS
A vehicle queuing analysis was conducted for the study area intersections. The queuing
analysis was performed using Synchro presenting the results of the 95th percentile queue
lengths. Results are shown in the following Table 6 with calculations provided within the level
of service operational sheets for the unsignalized intersections and the attached queue sheets
for signalized intersections.
Table 6 – Turn Lane Queuing Analysis Results
Intersection Turn Lane
Existing
Turn Lane
Length
(feet)
2024
Calculated
Queue
(feet)
2024
Recommended
Length (feet)
Stuart St & Shields St
Eastbound Right
Westbound Right
Northbound Left
Northbound Right
Southbound Left
Southbound Right
C
C
150’
100’
DNE
75’
39’
7’
25’
0’
13’
27’
C
C
150’
100’
TWLTL
75’
The vehicle queues are all anticipated to be managed within the existing or recommended
turn lane lengths through 2024.
CONCLUSIONS AND RECOMMENDATIONS
Based on the traffic analysis presented in this report, Kimley-Horn and Associates, Inc.
believes the addition of the Heritage Park expansion will be successfully incorporated into the
existing and future roadway network. The intersection improvements associated with the
background study are attached as Figure 8.If you have any questions or require anything
further, please feel free to call me at (720) 943-9962.
Sincerely,
Jeffrey R. Planck, P.E.
Project Manager 06/22/2022
Figures
8(4)13(15)7(2)
114(76)
5(12)
23(136)0(5)1(0)7(12)1(4)0(1)7(12)0(3)
131(85)
1(2)
3(28)
22(141)
0(5)12(90)747(1107)19(94)781(1083)57(61)
83(68)
8(4)14(16)7(2)
119(79)
5(12)
24(141)0(5)1(0)7(12)1(4)0(1)7(12)0(3)
136(88)
1(2)
3(29)
23(147)
0(5)12(94)781(1164)7(20)20(98)825(1135)14(41)59(63)
86(71)
31(33)
14(14)
[3%][25%]3%
2%
25%
[2%][2%][70%]2%
[25%]
70%
25%35%60%[60%]
[35%]
1(1)2(2)1(1)
1(1)
1(2)
1(1)1(1)5(4)1(1)
2(2)
2(6)
1(2)1(3)2(5)4(4)
2(2)
9(5)17(18)8(4)
119(80)
6(16)
25(142)0(5)1(0)7(12)2(5)0(1)9(14)0(4)
139(90)
1(2)
4(32)
24(151)
0(5)13(97)781(1164)7(20)21(101)825(1135)14(41)61(65)
88(73)
31(33)
14(14)
Base Assumption Form
North:Project Boundary South:Stuart Street
East:West:Heritage Circle West
Short Range: 2024 Long Range: N/A
Sat: N/A
Passby:
Overall Trip Distribution
Mode Split Assumptions
Date:
Local Entity Engineering:
Attachement A
Transportation Impact Study
Base Assumptions
Shields Street
Heritage Park Expansion
NWC of Stuart Street and Shields Street
Project Information
Type of Study Memorandum: X
Study Area Bounderies
N/AAreas Requiring Special Study
2. Stuart St / Heritage Cir E
3. Stuart St / Shields St
4
5
6
7
8
N/A
PM: 4:00-6:00AM: 7:00-9:00
Study Years
Trip Adjustment Factors
Future Traffic Growth Rate
1/20/2022
Jeffrey R. PlanckTraffic Engineering:
Project Name
Project Location
Full:
N/A
The Quarry by Landmark
Committed Roadway Improvements
Other Traffic Studies
Captive Market: N/A
SEE ATTACHED
2% Annual Growth Rate plus Quarry by Landmark project traffic
TIS Assumptions
N/A - ITE Trip Generation all Vehicles
Study Intersections 1. Stuart St / Heritage Cir W
Time Period for Study
Trip Generation Rates SEE ATTACHED ITE CALCULATION SHEETS
Project Heritage Park Residential Expansion
Subject Trip Generation for Single-Family Attached Housing
Designed by JRP Date Job No.
Checked by Date Sheet No.of
TRIP GENERATION MANUAL TECHNIQUES
ITE Trip Generation Manual 11th Edition, Fitted Curve Equations
Land Use Code - Single-Family Attached Housing (215)
Independent Variable - Dwelling Units (X)
X =31
T =Average Vehicle Trip Ends
Peak Hour of Adjacent Street Traffic, One Hour Between 7 and 9 a.m. (200 Series Page 239)
Directional Distribution:31%ent. 69%exit.
(T) = 0.52 (X) - 5.70 T =Average Vehicle Trip Ends
(T) = 0.52 *(31)- 5.70 3 entering 7 exiting
3 +7 =10
Peak Hour of Adjacent Street Traffic, One Hour Between 4 and 6 p.m. (200 Series Page 240)
Directional Distribution:57%ent. 43%exit.
(T) = 0.60 (X) - 3.93 T =Average Vehicle Trip Ends
(T) = 0.60 *(31)- 3.93 9 entering 6 exiting
9 +6 =15
Weekday (200 Series Page 238)
Directional Distribution: 50% entering, 50% exiting
(T) = 7.62 (X) - 50.48 T =186 Average Vehicle Trip Ends
(T) = 7.62 *(31)+ 50.48 93 entering 93 exiting
93 +93 =186
096277019January 14, 2022
10
15
13 PARKING STALLS
REMOVED HERE
16 parking stalls
added
Pool
Fitness 100'-0"100'-0"100'-0"100'-0"APPROXIMATE LINE
OF WETLAND
APPROXIMATE LINE
OF WETLAND BUFFER
6 park
i
n
g
s
t
a
l
l
s
a
d
d
e
d
19 Townhomes
28'-0"12 Townhomes
42 needed
P
P
P
P
PP
P
P
P
P
PPPPPP
PPPPPPPPPP
PPPPPP
P P
8 parking stalls
added
Background Study
THE QUARRY BY WATERMARK
TRANSPORTATION IMPACT STUDY
FORT COLLINS, COLORADO
NOVEMBER 2020
Prepared for:
Watermark Residential
111 Monument Circle, Suite 1500
Indianapolis, IN 46024
Prepared by:
DELICH ASSOCIATES
2272 Glen Haven Drive
Loveland, CO 80538
Phone: 970-669-2061
FAX: 970-669-5034
Project #2071
DELICH The Quarry by Watermark TIS, November 2020 ASSOCIATES Page 10
III. PROPOSED DEVELOPMENT
The Quarry by Watermark project is a residential apartment development with 329
dwelling units and 10,000 square feet of retail. Figure 5 shows a site plan of The
Quarry by Watermark project. The proposed Quarry by Watermark apartments are
marketed to the general public. The short range analysis (Year 2025) includes
development of The Quarry by Watermark and an appropriate increase in background
traffic due to normal growth and other potential developments in the area. The long
range future is considered to be the year 2040. The site plan shows that The Quarry by
Watermark will use existing Hobbit Street to access Shields Street and will have an
access that will line up with Stuart Street.
Trip Generation
Trip generation is important in considering the impact of a development such as this
upon the existing and proposed street system. A compilation of trip generation information
contain in Trip Generation, 10th Edition, ITE is used to estimate the trips that would be
generated by the proposed/expected uses at a site. Land use code 221 (Mid-rise
Multifamily Housing) and code 820 (Shopping Center) from the cited reference were used.
A trip is defined as a one-way vehicle movement from origin to destination. Table 2 shows
the expected trip generation on a daily and peak hour basis. The trip generation of The
Quarry by Watermark development resulted in 2,170 daily trip ends, 120 morning peak
hour trip ends, and 177 afternoon peak hour trip ends.
TABLE 2
Trip Generation
Code Use Size AWDTE AM Peak Hour PM Peak Hour
Rate Trips Rate In Rate Out Rate In Rate Out
221 Multifamily Housing
(Mid-Rise) 329 D.U. EQ 1792 EQ 29 EQ 81 EQ 85 EQ 54
820
Mixed-Use
Commercial Building
(Shopping Center)
4.0 KSF 37.75 152 0.58 2 0.36 2 1.83 7 1.98 8
Subtotal 1944 31 83 92 62
820
South Commercial
Building 1 (Shopping
Center)
6.0 KSF 37.75 226 0.58 4 0.36 2 1.83 11 1.98 12
Total 2170 35 85 103 74
1 Not part of this proposal. However, it is included in this TIS
AM/PM
SITE GENERATED
PEAK HOUR TRAFFIC Figure 9
DELICH
ASSOCIATES
The Quarry by Watermark TIS, November 2020
Page 16
Prospect
HobbitShields9/825/2225/223/11
10/3011/3014/4110/3031/334/1228/19
12/8
Stuart 12/814/414/127/2031/33
14/14
Know what's
Intersection Count Sheets
www.idaxdata.com
to
to
Two-Hour Count Summaries
Note: Two-hour count summary volumes include heavy vehicles but exclude bicycles in overall count.
Total
1
0
0
0
0
1
0
1
3
11000000
1 1
Peak Hr 1 4 0 0 5 0 0
0 0 0 0 0 1Count Total 3 8 0 0 11 0
1 0 00000008:45 AM 1 2 0 0 3
0 0 0 0 0 0
1
8:30 AM 0 2 0 0 2 0 0 0
0 0 0 0 0 0
0 0
8:15 AM 0 0 0 0 0 0 0
0 0 0 0 0 0
0 0 0
8:00 AM 0 2 0 0 2 0
0 0 0 0 0 0
0 0 0
0
7:30 AM 1 1 0 0 2 0 0 0
0 0 0 0 0 0
0 0 0
EB WB NB SB Total East
7:45 AM 0 1 0 0 1
0 0 0
---HV%-0%1%--
1 0
7:15 AM 1 0 0 0 1 0 0
0 0 0 0 0 0
West North South
7:00 AM 0 0 0
0
0 0 0 0 13 00002350
0
Interval
Start
Heavy Vehicle Totals Bicycles Pedestrians (Crossing Leg)
EB WB NB SB Total
--0%-0%3%-17%0%
Peak
Hour
All 0 7 114
12 0 0 0 0 0
0 0 0 0 5 0400000
8 170 0
HV 0 0 1 0 0
Count Total 0 9 179 0 0 0 53 25 0 9 287 0
37 141000500009400
5 0 1 38 157
8:45 AM 0 1 18 0
3 0 0 0 0 0
32 170
8:30 AM 0 1 20 0 0 0 8
0 0 0 2 0 3003100
2 0 0 34 162
8:15 AM 0 2 21 0
1 0 0 0 0 0
53 146
8:00 AM 0 2 21 0 0 0 8
0 0 0 5 0 3005200
4 0 2 51 0
7:45 AM 0 3 35 0
1 0 0 0 0 0
24 0
7:30 AM 0 0 37 0 0 0 7
0 0 0 1 0 0009000
1 0 0 18 0
7:15 AM 0 0 14 0
0 0 0 0 0 07:00 AM 0 0 13 0 0 0 4
Rolling
One HourEastboundWestboundNorthboundSouthbound
UT LT TH RT
Interval
Start
W STUART ST W STUART ST N/A W HERITAGE CIR 15-min
TotalUTLTTHRT
SB 0.0%0.66
TOTAL 2.9%0.80
TH RTUTLTTHRTUTLT
WB 14.3%0.78
NB --
Peak Hour: 7:30 AM 8:30 AM
HV %:PHF
EB 0.8%0.80
Date: 01/27/2022
Peak Hour Count Period: 7:00 AM 9:00 AM
0
0 000
0
0
10 0N
W HERITAGE CIR
W STUART ST
W STUART STW HERITAGE CIRW STUART ST
170TEV:
0.8PHF:813211205
23 28
127
0
114
7121
31
0
Project Manager: (415) 310-6469 project.manager.ca@idaxdata.com
www.idaxdata.com
Two-Hour Count Summaries - Heavy Vehicles
Two-Hour Count Summaries - Bikes
Note: U-Turn volumes for bikes are included in Left-Turn, if any.
0 0 0000000Peak Hour 0 0 0 0 0
0 0 0 0 0 0Count Total 0 0 0 0 0 0 0 0
0000000
0 0
8:45 AM 0 0 0 0 0 0 0
0 0 0 0 0 0
0 0 0
8:30 AM 0 0 0 0 0 0
0 0 0 0 0 08:15 AM 0 0 0 0 0
0 0 0 0 0 0
0
8:00 AM 0 0 0 0 0 0 0 0
0 0 0 0 0 0
0 0
7:45 AM 0 0 0 0 0 0 0
0 0 0 0 0 0
0 0 0
7:30 AM 0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0
7:15 AM 0 0 0 0 0
0 0 0 0 0 0
TH RT LT TH RT
7:00 AM 0 0 0 0
Westbound Northbound Southbound
LT TH RT LT TH RT LT
5 0
Interval
Start
W STUART ST W STUART ST N/A W HERITAGE CIR 15-min
Total
Rolling
One HourEastbound
0 0 0 0 0 0004000
0 0 0 11 0
Peak Hour 0 0 1 0
0 0 0 0 0 0Count Total 0 0 3 0 0 0 8
3 7000000002000
0 0 0 2 5
8:45 AM 0 0 1 0
0 0 0 0 0 0
0 5
8:30 AM 0 0 0 0 0 0 2
0 0 0 0 0 0000000
0 0 0 2 6
8:15 AM 0 0 0 0
0 0 0 0 0 0
1 4
8:00 AM 0 0 0 0 0 0 2
0 0 0 0 0 0001000
0 0 0 2 0
7:45 AM 0 0 0 0
0 0 0 0 0 0
1 0
7:30 AM 0 0 1 0 0 0 1
0 0 0 0 0 0000000
0 0 0 0 0
7:15 AM 0 0 1 0
0 0 0 0 0 0
TH RT
7:00 AM 0 0 0 0 0 0 0
UT LT TH RT UT LT
Northbound Southbound
UT LT TH RT UT LT TH RT
Interval
Start
W STUART ST W STUART ST N/A W HERITAGE CIR 15-min
Total
Rolling
One HourEastboundWestbound
Project Manager: (415) 310-6469 project.manager.ca@idaxdata.com
www.idaxdata.com
to
to
Two-Hour Count Summaries
Note: Two-hour count summary volumes include heavy vehicles but exclude bicycles in overall count.
Total
2
1
2
3
2
0
0
1
11
30000021
6 0
Peak Hr 4 1 0 0 5 0 0
1 0 0 1 0 5Count Total 8 2 0 0 10 0
0 1 00000005:45 PM 1 0 0 0 1
0 0 0 0 0 0
0
5:30 PM 1 0 0 0 1 0 0 0
0 0 0 0 0 0
0 0
5:15 PM 2 0 0 0 2 0 0
0 0 0 0 0 2
1 2 0
5:00 PM 0 1 0 0 1 0
0 0 0 0 0 0
2 0 0
0
4:30 PM 1 0 0 0 1 0 1 0
0 0 0 0 0 1
0 1 0
EB WB NB SB Total East
4:45 PM 0 0 0 0 0
0 1 0
---HV%-0%5%-0%
2 0
4:15 PM 3 0 0 0 3 0 0
0 0 0 0 0 0
West North South
4:00 PM 0 1 0
0
0 0 0 0 15 0020134120
0
Interval
Start
Heavy Vehicle Totals Bicycles Pedestrians (Crossing Leg)
EB WB NB SB Total
--0%-0%2%-1%0%
Peak
Hour
All 0 2 76
28 0 0 0 0 0
0 0 0 0 5 0100000
4 245 0
HV 0 0 4 0 0
Count Total 0 5 163 0 2 0 224 36 0 8 466 0
52 2450001000027000
5 0 2 67 237
5:45 PM 0 1 23 0
3 0 0 0 0 0
68 223
5:30 PM 0 0 21 0 1 0 35
0 0 0 9 0 10035500
0 0 1 58 226
5:15 PM 0 0 18 0
4 0 0 0 0 0
44 221
5:00 PM 0 1 14 0 1 0 37
0 0 0 5 0 10020100
6 0 0 53 0
4:45 PM 0 0 17 0
3 0 0 0 0 0
71 0
4:30 PM 0 0 22 0 0 0 22
0 0 0 4 0 20030500
6 0 1 53 0
4:15 PM 0 2 28 0
7 0 0 0 0 04:00 PM 0 1 20 0 0 0 18
Rolling
One HourEastboundWestboundNorthboundSouthbound
UT LT TH RT
Interval
Start
W STUART ST W STUART ST N/A W HERITAGE CIR 15-min
TotalUTLTTHRT
SB 0.0%0.48
TOTAL 2.0%0.90
TH RTUTLTTHRTUTLT
WB 0.7%0.88
NB --
Peak Hour: 5:00 PM 6:00 PM
HV %:PHF
EB 5.1%0.81
Date: 01/27/2022
Peak Hour Count Period: 4:00 PM 6:00 PM
0
0 000
0
1
02 0N
W HERITAGE CIR
W STUART ST
W STUART STW HERITAGE CIRW STUART ST
245TEV:
0.9PHF:4151914012
134 148
93
2
76
278
138
0
Project Manager: (415) 310-6469 project.manager.ca@idaxdata.com
www.idaxdata.com
Two-Hour Count Summaries - Heavy Vehicles
Two-Hour Count Summaries - Bikes
Note: U-Turn volumes for bikes are included in Left-Turn, if any.
0 0 0000000Peak Hour 0 0 0 0 0
0 0 0 0 1 0Count Total 0 0 0 0 1 0 0 0
0000000
0 0
5:45 PM 0 0 0 0 0 0 0
0 0 0 0 0 0
0 0 1
5:30 PM 0 0 0 0 0 0
0 0 0 0 0 05:15 PM 0 0 0 0 0
0 0 0 0 0 1
1
5:00 PM 0 0 0 0 0 0 0 0
0 0 0 0 0 0
1 0
4:45 PM 0 0 0 0 0 0 0
0 0 0 0 0 0
0 0 0
4:30 PM 0 0 0 0 1 0
0 0 0 0 0 0
0 0 0 0
4:15 PM 0 0 0 0 0
0 0 0 0 0 0
TH RT LT TH RT
4:00 PM 0 0 0 0
Westbound Northbound Southbound
LT TH RT LT TH RT LT
5 0
Interval
Start
W STUART ST W STUART ST N/A W HERITAGE CIR 15-min
Total
Rolling
One HourEastbound
0 0 0 0 0 0001000
0 0 0 10 0
Peak Hour 0 0 4 0
0 0 0 0 0 0Count Total 0 0 8 0 0 0 2
1 5000000000000
0 0 0 1 4
5:45 PM 0 0 1 0
0 0 0 0 0 0
2 4
5:30 PM 0 0 1 0 0 0 0
0 0 0 0 0 0000000
0 0 0 1 5
5:15 PM 0 0 2 0
0 0 0 0 0 0
0 5
5:00 PM 0 0 0 0 0 0 1
0 0 0 0 0 0000000
0 0 0 1 0
4:45 PM 0 0 0 0
0 0 0 0 0 0
3 0
4:30 PM 0 0 1 0 0 0 0
0 0 0 0 0 0000000
0 0 0 1 0
4:15 PM 0 0 3 0
0 0 0 0 0 0
TH RT
4:00 PM 0 0 0 0 0 0 1
UT LT TH RT UT LT
Northbound Southbound
UT LT TH RT UT LT TH RT
Interval
Start
W STUART ST W STUART ST N/A W HERITAGE CIR 15-min
Total
Rolling
One HourEastboundWestbound
Project Manager: (415) 310-6469 project.manager.ca@idaxdata.com
www.idaxdata.com
to
to
Two-Hour Count Summaries
Note: Two-hour count summary volumes include heavy vehicles but exclude bicycles in overall count.
Total
1
0
1
0
0
1
0
0
3
21102001
1 1
Peak Hour 1 3 0 0 4 0 1
1 1 0 2 0 1Count Total 2 7 0 0 9 0
0 0 00000008:45 AM 0 1 0 0 1
0 0 0 0 0 0
1
8:30 AM 0 3 0 0 3 0 0 0
0 0 0 0 0 0
0 0
8:15 AM 0 0 0 0 0 0 0
0 0 0 0 0 0
0 0 0
8:00 AM 0 1 0 0 1 0
0 0 0 0 0 0
0 1 0
0
7:30 AM 1 1 0 0 2 0 1 1
0 0 0 0 0 0
0 0 0
EB WB NB SB Total East
7:45 AM 0 1 0 0 1
0 2 0
--0%HV%--1%0%-
0 0
7:15 AM 1 0 0 0 1 0 0
0 0 0 0 0 1
West North South
7:00 AM 0 0 0
0
0 1 7 0 7 01002230
0
Interval
Start
Heavy Vehicle Totals Bicycles Pedestrians (Crossing Leg)
EB WB NB SB Total
0%-0%-0%2%-14%0%
Peak
Hour
All 0 0 131
8 0 2 1 18 0
0 0 0 0 4 0300000
1 173 0
HV 0 0 1 0 0
Count Total 0 1 204 2 1 2 56 19 0 2 316 0
44 1590103010012301
7 0 0 51 168
8:45 AM 0 0 23 0
1 0 0 0 9 0
36 173
8:30 AM 0 1 22 0 0 2 9
0 2 0 1 0 0005100
0 0 0 28 162
8:15 AM 0 0 27 0
0 0 0 0 1 0
53 157
8:00 AM 0 0 24 0 0 0 3
0 3 0 3 0 1006200
3 0 0 56 0
7:45 AM 0 0 37 1
0 0 0 1 1 0
25 0
7:30 AM 0 0 43 0 0 0 8
0 1 0 1 0 00010000
1 0 0 23 0
7:15 AM 0 0 12 1
1 0 1 0 0 07:00 AM 0 0 16 0 1 0 3
UT LT TH RT UT LT
Rolling
One HourEastboundWestboundNorthboundSouthbound
UT LT TH RT
Interval
Start
W STUART ST W STUART ST DRWY E HERITAGE CIR 15-min
TotalUTLTTHRT
Date: 01/27/2022
Peak Hour Count Period: 7:00 AM 9:00 AM
SB 0.0%0.50
TOTAL 2.3%0.77
TH RT
WB 12.0%0.78
NB 0.0%0.67
Peak Hour: 7:30 AM 8:30 AM
HV %:PHF
EB 0.8%0.77
0
0
0 0000100
0
1
1
10 0N
E HERITAGE CIR
W STUART ST
W STUART ST
DRWYW STUART STE HERITAGE CIR173TEV:
0.77PHF:1078403
22
0
25
1450
7108101
131
0
132
23 0
Project Manager: (415) 310-6469 project.manager.ca@idaxdata.com
www.idaxdata.com
Two-Hour Count Summaries - Heavy Vehicles
Two-Hour Count Summaries - Bikes
Note: U-Turn volumes for bikes are included in Left-Turn, if any.
0 0
0 0 0
0 0 0
0 0 0
0 0 0
000 1 0 0
000 1 0 0
0000
0
0
0
00
0
THLT
00000000
0
00
0
0
0 0 0
0 0 0
1
THLT
2000001
2 00010
0 0
0 0
Peak Hour
0 0Count Total
0
000000000
0 0
8:45 AM
0 0 0 0
2
8:30 AM
0000000
0 2
8:15 AM
0 0 0
0 0 0
0 0 0
0 0 0
2
8:00 AM
0000
2 0
7:45 AM
0 1 0 0
0
7:30 AM
00000007:15 AM 0
0 0
0 0 0
0 07:00 AM
RT
4 0
Interval
Start
W STUART ST W STUART ST DRWY E HERITAGE CIR 15-min
Total
Rolling
One Hour
0 0 0 0 0 0003000
RTTHLT RTTHLTRT
0 0 0 9 0
Peak Hour 0 0 1 0
0 0 0 0 0 0Count Total 0 0 2 0 0 0 7
1 5000000001000
0 0 0 3 5
8:45 AM 0 0 0 0
0 0 0 0 0 0
0 4
8:30 AM 0 0 0 0 0 0 3
0 0 0 0 0 0000000
0 0 0 1 5
8:15 AM 0 0 0 0
0 0 0 0 0 0
1 4
8:00 AM 0 0 0 0 0 0 1
0 0 0 0 0 0001000
0 0 0 2 0
7:45 AM 0 0 0 0
0 0 0 0 0 0
1 0
7:30 AM 0 0 1 0 0 0 1
0 0 0 0 0 0000000
0 0 0 0 0
7:15 AM 0 0 1 0
0 0 0 0 0 0
TH RT
7:00 AM 0 0 0 0 0 0 0
UT LT TH RT UT LT
Northbound Southbound
UT LT TH RT UT LT TH RT
Interval
Start
W STUART ST W STUART ST DRWY E HERITAGE CIR 15-min
Total
Rolling
One HourEastboundWestbound
SouthboundNorthboundWestboundEastbound
Project Manager: (415) 310-6469 project.manager.ca@idaxdata.com
www.idaxdata.com
to
to
Two-Hour Count Summaries
Note: Two-hour count summary volumes include heavy vehicles but exclude bicycles in overall count.
Total
1
3
3
3
3
0
7
3
23
137123150
6 9
Peak Hour 4 1 0 0 5 0 0
0 1 2 3 3 5Count Total 8 2 0 0 10 0
1 0 20000005:45 PM 1 0 0 0 1
0 0 0 3 0 4
0
5:30 PM 1 0 0 0 1 0 0 0
0 0 0 0 0 0
0 1
5:15 PM 2 0 0 0 2 0 0
0 1 2 3 1 1
0 2 1
5:00 PM 0 1 0 0 1 0
0 0 0 0 0 0
0 3 0
0
4:30 PM 1 0 0 0 1 0 0 0
0 0 0 2 0 1
0 1 0
EB WB NB SB Total East
4:45 PM 0 0 0 0 0
0 0 0
-0%-HV%-0%5%0%-
0 1
4:15 PM 3 0 0 0 3 0 0
0 0 0 0 0 0
West North South
4:00 PM 0 1 0
0
5 0 12 0 12 1205141280
0
Interval
Start
Heavy Vehicle Totals Bicycles Pedestrians (Crossing Leg)
EB WB NB SB Total
0%-0%0%0%2%0%1%0%
Peak
Hour
All 0 3 85
52 0 11 0 22 0
0 0 0 0 5 0100000
4 298 0
HV 0 0 4 0 0
Count Total 0 8 186 6 0 14 242 31 1 5 578 0
63 2980103010027602
3 0 1 78 293
5:45 PM 0 0 22 1
4 0 1 0 2 0
81 289
5:30 PM 0 2 26 0 0 2 37
0 5 0 3 0 10138901
3 1 1 76 295
5:15 PM 0 1 22 0
9 0 1 0 4 0
58 280
5:00 PM 0 0 15 1 0 2 39
0 3 0 5 0 00121401
5 0 0 74 0
4:45 PM 0 0 23 0
9 0 2 0 5 0
87 0
4:30 PM 0 1 25 2 0 2 23
0 1 0 3 0 00635702
6 0 1 61 0
4:15 PM 0 1 30 2
4 0 1 0 1 04:00 PM 0 3 23 0 0 0 22
UT LT TH RT UT LT
Rolling
One HourEastboundWestboundNorthboundSouthbound
UT LT TH RT
Interval
Start
W STUART ST W STUART ST DRWY E HERITAGE CIR 15-min
TotalUTLTTHRT
Date: 01/27/2022
Peak Hour Count Period: 4:00 PM 6:00 PM
SB 0.0%0.85
TOTAL 1.7%0.92
TH RT
WB 0.6%0.87
NB 0.0%0.71
Peak Hour: 5:00 PM 6:00 PM
HV %:PHF
EB 4.4%0.80
0
0
0 0111000
0
0
0
75 1N
E HERITAGE CIR
W STUART ST
W STUART ST
DRWYW STUART STE HERITAGE CIR298TEV:
0.92PHF:41121731028
141
5
174
1090
120517802
85
3
90
150 0
Project Manager: (415) 310-6469 project.manager.ca@idaxdata.com
www.idaxdata.com
Two-Hour Count Summaries - Heavy Vehicles
Two-Hour Count Summaries - Bikes
Note: U-Turn volumes for bikes are included in Left-Turn, if any.
0 0
0 0 0
1 1 0
0 0 0
0 0 0
000 0 0 0
000 0 0 0
0000
0
0
0
00
0
THLT
00000000
0
00
0
0
0 0 0
0 0 0
0
THLT
3111000
3 00001
0 0
0 0
Peak Hour
1 1Count Total
0
300000000
0 3
5:45 PM
0 0 0 0
3
5:30 PM
0000000
3 3
5:15 PM
0 0 1
0 0 0
0 0 0
0 0 0
0
5:00 PM
0000
0 0
4:45 PM
0 0 0 0
0
4:30 PM
00000004:15 PM 0
0 0
0 0 0
0 04:00 PM
RT
5 0
Interval
Start
W STUART ST W STUART ST DRWY E HERITAGE CIR 15-min
Total
Rolling
One Hour
0 0 0 0 0 0001000
RTTHLT RTTHLTRT
0 0 0 10 0
Peak Hour 0 0 4 0
0 0 0 0 0 0Count Total 0 0 8 0 0 0 2
1 5000000000000
0 0 0 1 4
5:45 PM 0 0 1 0
0 0 0 0 0 0
2 4
5:30 PM 0 0 1 0 0 0 0
0 0 0 0 0 0000000
0 0 0 1 5
5:15 PM 0 0 2 0
0 0 0 0 0 0
0 5
5:00 PM 0 0 0 0 0 0 1
0 0 0 0 0 0000000
0 0 0 1 0
4:45 PM 0 0 0 0
0 0 0 0 0 0
3 0
4:30 PM 0 0 1 0 0 0 0
0 0 0 0 0 0000000
0 0 0 1 0
4:15 PM 0 0 3 0
0 0 0 0 0 0
TH RT
4:00 PM 0 0 0 0 0 0 1
UT LT TH RT UT LT
Northbound Southbound
UT LT TH RT UT LT TH RT
Interval
Start
W STUART ST W STUART ST DRWY E HERITAGE CIR 15-min
Total
Rolling
One HourEastboundWestbound
SouthboundNorthboundWestboundEastbound
Project Manager: (415) 310-6469 project.manager.ca@idaxdata.com
www.idaxdata.com
to
to
Two-Hour Count Summaries
Note: Two-hour count summary volumes include heavy vehicles but exclude bicycles in overall count.
Total
0
0
0
1
0
2
3
0
6
61000131
1 1
Peak Hr 0 0 22 9 31 0 0
0 0 2 2 1 3Count Total 1 0 31 27 59 0
0 0 00001108:45 AM 0 0 4 7 11
0 0 1 1 0 1
0
8:30 AM 0 0 7 2 9 0 0 0
0 0 0 0 2 0
0 0
8:15 AM 0 0 5 4 9 0 0
0 0 0 0 0 0
0 1 0
8:00 AM 0 0 6 1 7 0
0 0 0 0 0 0
0 0 0
0
7:30 AM 1 0 1 4 6 0 0 0
0 0 0 0 0 0
2 5 0
EB WB NB SB Total East
7:45 AM 0 0 4 2 6
0 0 0
-17%3%HV%-0%-0%-
0 0
7:15 AM 0 0 1 5 6 0 0
0 0 1 1 0 0
West North South
7:00 AM 0 0 3
0
12 747 0 0 0 7818300000
0
Interval
Start
Heavy Vehicle Totals Bicycles Pedestrians (Crossing Leg)
EB WB NB SB Total
---1%5%2%---
Peak
Hour
All 0 57 0
0 0 29 1,324 0 0
0 0 8 1 31 00002200
19 1,699 0
HV 0 0 0 0 0
Count Total 0 98 0 147 0 0 0 0 1,441 35 3,074 0
480 1,6851990002428000003
0 181 8 429 1,699
8:45 AM 0 12 0 16
0 0 2 199 0 0
360 1,668
8:30 AM 0 18 0 21 0 0 0
167 0 0 0 161 1000004
0 207 4 416 1,608
8:15 AM 0 12 0 15
0 0 4 173 0 0
494 1,389
8:00 AM 0 11 0 17 0 0 0
208 0 0 0 232 6000002
0 179 3 398 0
7:45 AM 0 16 0 30
0 0 3 168 0 0
300 0
7:30 AM 0 15 0 30 0 0 0
136 0 0 0 142 3000006
0 97 2 197 0
7:15 AM 0 6 0 7
0 0 5 74 0 07:00 AM 0 8 0 11 0 0 0
Rolling
One HourEastboundWestboundNorthboundSouthbound
UT LT TH RT
Interval
Start
W STUART ST N/A S SHIELDS ST S SHIELDS ST 15-min
TotalUTLTTHRT
SB 1.1%0.84
TOTAL 1.8%0.86
TH RTUTLTTHRTUTLT
WB --
NB 2.9%0.90
Peak Hour: 7:45 AM 8:45 AM
HV %:PHF
EB 0.0%0.76
Date: 01/27/2022
Peak Hour Count Period: 7:00 AM 9:00 AM
0
0 00001
13 1N
S SHIELDS ST
W STUART ST
S SHIELDS STS SHIELDS STW STUART ST
1,699TEV:
0.86PHF:19781800804074712759864083
57140
31
0
Project Manager: (415) 310-6469 project.manager.ca@idaxdata.com
www.idaxdata.com
Two-Hour Count Summaries - Heavy Vehicles
Two-Hour Count Summaries - Bikes
Note: U-Turn volumes for bikes are included in Left-Turn, if any.
0 0 0000000Peak Hour 0 0 0 0 0
0 0 1 1 2 0Count Total 0 0 0 0 0 0 0 0
1000011
0 0
8:45 AM 0 0 0 0 0 0 0
0 0 0 0 0 0
0 0 0
8:30 AM 0 0 0 0 0 0
0 0 0 0 0 08:15 AM 0 0 0 0 0
0 0 0 0 0 0
1
8:00 AM 0 0 0 0 0 0 0 0
0 0 0 0 0 0
0 0
7:45 AM 0 0 0 0 0 0 0
0 0 0 0 0 0
0 0 0
7:30 AM 0 0 0 0 0 0
0 0 0 0 0 0
1 0 1 0
7:15 AM 0 0 0 0 0
0 0 0 0 0 0
TH RT LT TH RT
7:00 AM 0 0 0 0
Westbound Northbound Southbound
LT TH RT LT TH RT LT
31 0
Interval
Start
W STUART ST N/A S SHIELDS ST S SHIELDS ST 15-min
Total
Rolling
One HourEastbound
20 0 0 0 8 1000002
0 24 3 59 0
Peak Hour 0 0 0 0
0 0 2 29 0 0Count Total 0 0 0 1 0 0 0
11 36400061000000
0 1 1 9 31
8:45 AM 0 0 0 0
0 0 1 6 0 0
9 28
8:30 AM 0 0 0 0 0 0 0
4 0 0 0 4 0000001
0 1 0 7 25
8:15 AM 0 0 0 0
0 0 0 6 0 0
6 23
8:00 AM 0 0 0 0 0 0 0
4 0 0 0 2 0000000
0 3 1 6 0
7:45 AM 0 0 0 0
0 0 0 1 0 0
6 0
7:30 AM 0 0 0 1 0 0 0
1 0 0 0 5 0000000
0 2 0 5 0
7:15 AM 0 0 0 0
0 0 0 3 0 0
TH RT
7:00 AM 0 0 0 0 0 0 0
UT LT TH RT UT LT
Northbound Southbound
UT LT TH RT UT LT TH RT
Interval
Start
W STUART ST N/A S SHIELDS ST S SHIELDS ST 15-min
Total
Rolling
One HourEastboundWestbound
Project Manager: (415) 310-6469 project.manager.ca@idaxdata.com
www.idaxdata.com
to
to
Two-Hour Count Summaries
Note: Two-hour count summary volumes include heavy vehicles but exclude bicycles in overall count.
Total
0
2
0
3
2
0
1
1
9
60022024
5 1
Peak Hr 3 0 14 4 21 0 0
0 0 3 3 0 3Count Total 8 0 28 15 51 0
1 0 00000005:45 PM 1 0 3 0 4
0 0 0 1 0 0
0
5:30 PM 1 0 3 0 4 0 0 0
0 0 0 0 0 0
2 0
5:15 PM 2 0 0 2 4 0 0
0 0 0 0 0 0
1 2 0
5:00 PM 0 0 4 2 6 0
0 0 0 2 2 0
0 0 0
1
4:30 PM 1 0 1 0 2 0 0 0
0 0 0 0 0 1
3 8 0
EB WB NB SB Total East
4:45 PM 0 0 7 0 7
1 1 0
-0%1%HV%-5%-0%-
0 0
4:15 PM 3 0 5 8 16 0 0
0 0 0 0 0 0
West North South
4:00 PM 0 0 5
0
90 1,107 0 0 0 1,0836800000
0
Interval
Start
Heavy Vehicle Totals Bicycles Pedestrians (Crossing Leg)
EB WB NB SB Total
---0%1%1%---
Peak
Hour
All 0 61 0
0 0 173 2,128 0 0
0 0 3 1 21 00000140
94 2,503 0
HV 0 3 0 0 0
Count Total 0 128 0 150 0 0 0 0 2,011 161 4,751 0
543 2,455263000213150000021
0 260 31 631 2,503
5:45 PM 0 14 0 17
0 0 23 285 0 0
667 2,427
5:30 PM 0 16 0 16 0 0 0
310 0 0 0 282 140000029
0 277 25 614 2,357
5:15 PM 0 15 0 17
0 0 28 256 0 0
591 2,296
5:00 PM 0 10 0 18 0 0 0
256 0 0 0 264 240000010
0 236 18 555 0
4:45 PM 0 20 0 17
0 0 17 239 0 0
597 0
4:30 PM 0 28 0 17 0 0 0
280 0 0 0 232 190000032
0 247 15 553 0
4:15 PM 0 13 0 21
0 0 13 239 0 04:00 PM 0 12 0 27 0 0 0
Rolling
One HourEastboundWestboundNorthboundSouthbound
UT LT TH RT
Interval
Start
W STUART ST N/A S SHIELDS ST S SHIELDS ST 15-min
TotalUTLTTHRT
SB 0.3%0.97
TOTAL 0.8%0.94
TH RTUTLTTHRTUTLT
WB --
NB 1.2%0.88
Peak Hour: 4:45 PM 5:45 PM
HV %:PHF
EB 2.3%0.87
Date: 01/27/2022
Peak Hour Count Period: 4:00 PM 6:00 PM
0
0 02004
02 0N
S SHIELDS ST
W STUART ST
S SHIELDS STS SHIELDS STW STUART ST
2,503TEV:
0.94PHF:941,0831,1771,16801,107901,1971,151068
61129
184
0
Project Manager: (415) 310-6469 project.manager.ca@idaxdata.com
www.idaxdata.com
Two-Hour Count Summaries - Heavy Vehicles
Two-Hour Count Summaries - Bikes
Note: U-Turn volumes for bikes are included in Left-Turn, if any.
0 2 0000002Peak Hour 0 0 0 0 0
0 0 3 0 3 0Count Total 0 0 0 0 0 0 0 0
0000000
0 2
5:45 PM 0 0 0 0 0 0 0
0 0 0 0 0 0
0 0 3
5:30 PM 0 0 0 0 0 0
0 0 0 0 0 05:15 PM 0 0 0 0 0
0 0 0 0 0 3
3
5:00 PM 0 0 0 0 0 0 0 0
0 0 0 2 0 2
1 0
4:45 PM 0 0 0 0 0 0 0
0 0 0 0 1 0
0 0 0
4:30 PM 0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0
4:15 PM 0 0 0 0 0
0 0 0 0 0 0
TH RT LT TH RT
4:00 PM 0 0 0 0
Westbound Northbound Southbound
LT TH RT LT TH RT LT
21 0
Interval
Start
W STUART ST N/A S SHIELDS ST S SHIELDS ST 15-min
Total
Rolling
One HourEastbound
14 0 0 0 3 1000000
0 14 1 51 0
Peak Hour 0 3 0 0
0 0 2 26 0 0Count Total 0 7 0 1 0 0 0
4 18300000000000
0 0 0 4 21
5:45 PM 0 1 0 0
0 0 0 3 0 0
4 19
5:30 PM 0 1 0 0 0 0 0
0 0 0 0 2 0000000
0 1 1 6 31
5:15 PM 0 2 0 0
0 0 0 4 0 0
7 33
5:00 PM 0 0 0 0 0 0 0
7 0 0 0 0 0000000
0 0 0 2 0
4:45 PM 0 0 0 0
0 0 0 1 0 0
16 0
4:30 PM 0 1 0 0 0 0 0
4 0 0 0 8 0000001
0 3 0 8 0
4:15 PM 0 2 0 1
0 0 1 4 0 0
TH RT
4:00 PM 0 0 0 0 0 0 0
UT LT TH RT UT LT
Northbound Southbound
UT LT TH RT UT LT TH RT
Interval
Start
W STUART ST N/A S SHIELDS ST S SHIELDS ST 15-min
Total
Rolling
One HourEastboundWestbound
Project Manager: (415) 310-6469 project.manager.ca@idaxdata.com
Trip Generation Worksheet
Project Heritage Park Residential Expansion
Subject Trip Generation for Single-Family Attached Housing
Designed by JRP Date Job No.
Checked by Date Sheet No.of
TRIP GENERATION MANUAL TECHNIQUES
ITE Trip Generation Manual 11th Edition, Fitted Curve Equations
Land Use Code - Single-Family Attached Housing (215)
Independent Variable - Dwelling Units (X)
X =31
T =Average Vehicle Trip Ends
Peak Hour of Adjacent Street Traffic, One Hour Between 7 and 9 a.m. (200 Series Page 239)
Directional Distribution:31%ent. 69%exit.
(T) = 0.52 (X) - 5.70 T =Average Vehicle Trip Ends
(T) = 0.52 *(31)- 5.70 3 entering 7 exiting
3 +7 =10
Peak Hour of Adjacent Street Traffic, One Hour Between 4 and 6 p.m. (200 Series Page 240)
Directional Distribution:57%ent. 43%exit.
(T) = 0.60 (X) - 3.93 T =Average Vehicle Trip Ends
(T) = 0.60 *(31)- 3.93 9 entering 6 exiting
9 +6 =15
Weekday (200 Series Page 238)
Directional Distribution: 50% entering, 50% exiting
(T) = 7.62 (X) - 50.48 T =186 Average Vehicle Trip Ends
(T) = 7.62 *(31)+ 50.48 93 entering 93 exiting
93 +93 =186
096277019January 14, 2022
10
15
Intersection Capacity Analysis Outputs
HCM 6th TWSC 2022 Existing AM
1: Stuart Street & Heritage Cirlce (West)02/28/2022
Synchro 11 Report
Page 1
Intersection
Int Delay, s/veh 1.4
Movement EBL EBT WBT WBR SBL SBR
Lane Configurations
Traffic Vol, veh/h 7 114 23 5 13 8
Future Vol, veh/h 7 114 23 5 13 8
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length ----0 -
Veh in Median Storage, # -0 0 -0 -
Grade, %-0 0 -0 -
Peak Hour Factor 80 80 80 80 80 80
Heavy Vehicles, %2 2 2 2 2 2
Mvmt Flow 9 143 29 6 16 10
Major/Minor Major1 Major2 Minor2
Conflicting Flow All 35 0 -0 193 32
Stage 1 ---- 32 -
Stage 2 ---- 161 -
Critical Hdwy 4.12 --- 6.42 6.22
Critical Hdwy Stg 1 ---- 5.42 -
Critical Hdwy Stg 2 ---- 5.42 -
Follow-up Hdwy 2.218 --- 3.518 3.318
Pot Cap-1 Maneuver 1576 --- 796 1042
Stage 1 ---- 991 -
Stage 2 ---- 868 -
Platoon blocked, %---
Mov Cap-1 Maneuver 1576 --- 791 1042
Mov Cap-2 Maneuver ---- 791 -
Stage 1 ---- 985 -
Stage 2 ---- 868 -
Approach EB WB SB
HCM Control Delay, s 0.4 0 9.3
HCM LOS A
Minor Lane/Major Mvmt EBL EBT WBT WBR SBLn1
Capacity (veh/h)1576 --- 871
HCM Lane V/C Ratio 0.006 --- 0.03
HCM Control Delay (s)7.3 0 -- 9.3
HCM Lane LOS A A --A
HCM 95th %tile Q(veh)0 --- 0.1
HCM 6th TWSC 2022 Existing PM
1: Stuart Street & Heritage Cirlce (West)02/28/2022
Synchro 11 Report
Page 1
Intersection
Int Delay, s/veh 0.8
Movement EBL EBT WBT WBR SBL SBR
Lane Configurations
Traffic Vol, veh/h 2 76 136 12 15 4
Future Vol, veh/h 2 76 136 12 15 4
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length ----0 -
Veh in Median Storage, # -0 0 -0 -
Grade, %-0 0 -0 -
Peak Hour Factor 90 90 90 90 90 90
Heavy Vehicles, %2 2 2 2 2 2
Mvmt Flow 2 84 151 13 17 4
Major/Minor Major1 Major2 Minor2
Conflicting Flow All 164 0 -0 246 158
Stage 1 ---- 158 -
Stage 2 ---- 88 -
Critical Hdwy 4.12 --- 6.42 6.22
Critical Hdwy Stg 1 ---- 5.42 -
Critical Hdwy Stg 2 ---- 5.42 -
Follow-up Hdwy 2.218 --- 3.518 3.318
Pot Cap-1 Maneuver 1414 --- 742 887
Stage 1 ---- 871 -
Stage 2 ---- 935 -
Platoon blocked, %---
Mov Cap-1 Maneuver 1414 --- 741 887
Mov Cap-2 Maneuver ---- 741 -
Stage 1 ---- 870 -
Stage 2 ---- 935 -
Approach EB WB SB
HCM Control Delay, s 0.2 0 9.8
HCM LOS A
Minor Lane/Major Mvmt EBL EBT WBT WBR SBLn1
Capacity (veh/h)1414 --- 768
HCM Lane V/C Ratio 0.002 --- 0.027
HCM Control Delay (s)7.5 0 -- 9.8
HCM Lane LOS A A --A
HCM 95th %tile Q(veh)0 --- 0.1
HCM 6th TWSC 2024 Background AM
1: Stuart Street & Heritage Cirlce (West)02/28/2022
Synchro 11 Report
Page 1
Intersection
Int Delay, s/veh 1.4
Movement EBL EBT WBT WBR SBL SBR
Lane Configurations
Traffic Vol, veh/h 7 119 24 5 14 8
Future Vol, veh/h 7 119 24 5 14 8
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length ----0 -
Veh in Median Storage, # -0 0 -0 -
Grade, %-0 0 -0 -
Peak Hour Factor 80 80 80 80 80 80
Heavy Vehicles, %2 2 2 2 2 2
Mvmt Flow 9 149 30 6 18 10
Major/Minor Major1 Major2 Minor2
Conflicting Flow All 36 0 -0 200 33
Stage 1 ---- 33 -
Stage 2 ---- 167 -
Critical Hdwy 4.12 --- 6.42 6.22
Critical Hdwy Stg 1 ---- 5.42 -
Critical Hdwy Stg 2 ---- 5.42 -
Follow-up Hdwy 2.218 --- 3.518 3.318
Pot Cap-1 Maneuver 1578 --- 794 1049
Stage 1 ---- 994 -
Stage 2 ---- 863 -
Platoon blocked, %1 ---1 1
Mov Cap-1 Maneuver 1578 --- 789 1049
Mov Cap-2 Maneuver ---- 789 -
Stage 1 ---- 988 -
Stage 2 ---- 863 -
Approach EB WB SB
HCM Control Delay, s 0.4 0 9.3
HCM LOS A
Minor Lane/Major Mvmt EBL EBT WBT WBR SBLn1
Capacity (veh/h)1578 --- 867
HCM Lane V/C Ratio 0.006 --- 0.032
HCM Control Delay (s)7.3 0 -- 9.3
HCM Lane LOS A A --A
HCM 95th %tile Q(veh)0 --- 0.1
HCM 6th TWSC 2024 Background PM
1: Stuart Street & Heritage Cirlce (West)02/28/2022
Synchro 11 Report
Page 1
Intersection
Int Delay, s/veh 0.8
Movement EBL EBT WBT WBR SBL SBR
Lane Configurations
Traffic Vol, veh/h 2 79 141 12 16 4
Future Vol, veh/h 2 79 141 12 16 4
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length ----0 -
Veh in Median Storage, # -0 0 -0 -
Grade, %-0 0 -0 -
Peak Hour Factor 90 90 90 90 90 90
Heavy Vehicles, %2 2 2 2 2 2
Mvmt Flow 2 88 157 13 18 4
Major/Minor Major1 Major2 Minor2
Conflicting Flow All 170 0 -0 256 164
Stage 1 ---- 164 -
Stage 2 ---- 92 -
Critical Hdwy 4.12 --- 6.42 6.22
Critical Hdwy Stg 1 ---- 5.42 -
Critical Hdwy Stg 2 ---- 5.42 -
Follow-up Hdwy 2.218 --- 3.518 3.318
Pot Cap-1 Maneuver 1436 --- 794 963
Stage 1 ---- 910 -
Stage 2 ---- 932 -
Platoon blocked, %1 ---1 1
Mov Cap-1 Maneuver 1436 --- 794 963
Mov Cap-2 Maneuver ---- 794 -
Stage 1 ---- 909 -
Stage 2 ---- 932 -
Approach EB WB SB
HCM Control Delay, s 0.2 0 9.5
HCM LOS A
Minor Lane/Major Mvmt EBL EBT WBT WBR SBLn1
Capacity (veh/h)1436 --- 823
HCM Lane V/C Ratio 0.002 --- 0.027
HCM Control Delay (s)7.5 0 -- 9.5
HCM Lane LOS A A --A
HCM 95th %tile Q(veh)0 --- 0.1
HCM 6th TWSC 2024 Total AM
1: Stuart Street & Heritage Cirlce (West)03/03/2022
Synchro 11 Report
Page 1
Intersection
Int Delay, s/veh 1.5
Movement EBL EBT WBT WBR SBL SBR
Lane Configurations
Traffic Vol, veh/h 7 119 24 6 16 8
Future Vol, veh/h 7 119 24 6 16 8
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length ----0 -
Veh in Median Storage, # -0 0 -0 -
Grade, %-0 0 -0 -
Peak Hour Factor 80 80 80 80 80 80
Heavy Vehicles, %2 2 2 2 2 2
Mvmt Flow 9 149 30 8 20 10
Major/Minor Major1 Major2 Minor2
Conflicting Flow All 38 0 -0 201 34
Stage 1 ---- 34 -
Stage 2 ---- 167 -
Critical Hdwy 4.12 --- 6.42 6.22
Critical Hdwy Stg 1 ---- 5.42 -
Critical Hdwy Stg 2 ---- 5.42 -
Follow-up Hdwy 2.218 --- 3.518 3.318
Pot Cap-1 Maneuver 1575 --- 793 1047
Stage 1 ---- 993 -
Stage 2 ---- 863 -
Platoon blocked, %1 ---1 1
Mov Cap-1 Maneuver 1575 --- 788 1047
Mov Cap-2 Maneuver ---- 788 -
Stage 1 ---- 987 -
Stage 2 ---- 863 -
Approach EB WB SB
HCM Control Delay, s 0.4 0 9.3
HCM LOS A
Minor Lane/Major Mvmt EBL EBT WBT WBR SBLn1
Capacity (veh/h)1575 --- 859
HCM Lane V/C Ratio 0.006 --- 0.035
HCM Control Delay (s)7.3 0 -- 9.3
HCM Lane LOS A A --A
HCM 95th %tile Q(veh)0 --- 0.1
HCM 6th TWSC 2024 Total PM
1: Stuart Street & Heritage Cirlce (West)03/03/2022
Synchro 11 Report
Page 1
Intersection
Int Delay, s/veh 0.9
Movement EBL EBT WBT WBR SBL SBR
Lane Configurations
Traffic Vol, veh/h 2 79 141 14 18 4
Future Vol, veh/h 2 79 141 14 18 4
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length ----0 -
Veh in Median Storage, # -0 0 -0 -
Grade, %-0 0 -0 -
Peak Hour Factor 90 90 90 90 90 90
Heavy Vehicles, %2 2 2 2 2 2
Mvmt Flow 2 88 157 16 20 4
Major/Minor Major1 Major2 Minor2
Conflicting Flow All 173 0 -0 257 165
Stage 1 ---- 165 -
Stage 2 ---- 92 -
Critical Hdwy 4.12 --- 6.42 6.22
Critical Hdwy Stg 1 ---- 5.42 -
Critical Hdwy Stg 2 ---- 5.42 -
Follow-up Hdwy 2.218 --- 3.518 3.318
Pot Cap-1 Maneuver 1432 --- 793 962
Stage 1 ---- 908 -
Stage 2 ---- 932 -
Platoon blocked, %1 ---1 1
Mov Cap-1 Maneuver 1432 --- 793 962
Mov Cap-2 Maneuver ---- 793 -
Stage 1 ---- 907 -
Stage 2 ---- 932 -
Approach EB WB SB
HCM Control Delay, s 0.2 0 9.5
HCM LOS A
Minor Lane/Major Mvmt EBL EBT WBT WBR SBLn1
Capacity (veh/h)1432 --- 819
HCM Lane V/C Ratio 0.002 --- 0.03
HCM Control Delay (s)7.5 0 -- 9.5
HCM Lane LOS A A --A
HCM 95th %tile Q(veh)0 --- 0.1
HCM 6th TWSC 2022 Existing AM
2: Stuart Street & Heritage Circle (East)02/28/2022
Synchro 11 Report
Page 1
Intersection
Int Delay, s/veh 0.9
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 0 131 1 0 22 3 0 1 7 7 0 1
Future Vol, veh/h 0 131 1 0 22 3 0 1 7 7 0 1
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized -- None -- None -- None -- None
Storage Length ------------
Veh in Median Storage, # -0 --0 --0 --0 -
Grade, %-0 --0 --0 --0 -
Peak Hour Factor 77 77 77 77 77 77 77 77 77 77 77 77
Heavy Vehicles, %2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 0 170 1 0 29 4 0 1 9 9 0 1
Major/Minor Major1 Major2 Minor1 Minor2
Conflicting Flow All 33 0 0 171 0 0 203 204 171 207 202 31
Stage 1 ------ 171 171 - 31 31 -
Stage 2 ------ 32 33 - 176 171 -
Critical Hdwy 4.12 -- 4.12 -- 7.12 6.52 6.22 7.12 6.52 6.22
Critical Hdwy Stg 1 ------ 6.12 5.52 - 6.12 5.52 -
Critical Hdwy Stg 2 ------ 6.12 5.52 - 6.12 5.52 -
Follow-up Hdwy 2.218 -- 2.218 -- 3.518 4.018 3.318 3.518 4.018 3.318
Pot Cap-1 Maneuver 1579 -- 1406 -- 755 692 873 751 694 1043
Stage 1 ------ 831 757 - 986 869 -
Stage 2 ------ 984 868 - 826 757 -
Platoon blocked, %----
Mov Cap-1 Maneuver 1579 -- 1406 -- 754 692 873 742 694 1043
Mov Cap-2 Maneuver ------ 754 692 - 742 694 -
Stage 1 ------ 831 757 - 986 869 -
Stage 2 ------ 983 868 - 816 757 -
Approach EB WB NB SB
HCM Control Delay, s 0 0 9.3 9.7
HCM LOS A A
Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBRSBLn1
Capacity (veh/h)845 1579 -- 1406 -- 770
HCM Lane V/C Ratio 0.012 ------ 0.013
HCM Control Delay (s)9.3 0 --0 -- 9.7
HCM Lane LOS A A --A --A
HCM 95th %tile Q(veh)0 0 --0 --0
HCM 6th TWSC 2022 Existing PM
2: Stuart Street & Heritage Circle (East)02/28/2022
Synchro 11 Report
Page 1
Intersection
Int Delay, s/veh 1.3
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 3 85 2 5 141 28 5 0 12 12 1 4
Future Vol, veh/h 3 85 2 5 141 28 5 0 12 12 1 4
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized -- None -- None -- None -- None
Storage Length ------------
Veh in Median Storage, # -0 --0 --0 --0 -
Grade, %-0 --0 --0 --0 -
Peak Hour Factor 92 92 92 92 92 92 92 92 92 92 92 92
Heavy Vehicles, %2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 3 92 2 5 153 30 5 0 13 13 1 4
Major/Minor Major1 Major2 Minor1 Minor2
Conflicting Flow All 183 0 0 94 0 0 280 292 93 284 278 168
Stage 1 ------ 99 99 - 178 178 -
Stage 2 ------ 181 193 - 106 100 -
Critical Hdwy 4.12 -- 4.12 -- 7.12 6.52 6.22 7.12 6.52 6.22
Critical Hdwy Stg 1 ------ 6.12 5.52 - 6.12 5.52 -
Critical Hdwy Stg 2 ------ 6.12 5.52 - 6.12 5.52 -
Follow-up Hdwy 2.218 -- 2.218 -- 3.518 4.018 3.318 3.518 4.018 3.318
Pot Cap-1 Maneuver 1392 -- 1500 -- 672 619 964 668 630 876
Stage 1 ------ 907 813 - 824 752 -
Stage 2 ------ 821 741 - 900 812 -
Platoon blocked, %----
Mov Cap-1 Maneuver 1392 -- 1500 -- 665 615 964 656 626 876
Mov Cap-2 Maneuver ------ 665 615 - 656 626 -
Stage 1 ------ 905 811 - 822 749 -
Stage 2 ------ 812 738 - 886 810 -
Approach EB WB NB SB
HCM Control Delay, s 0.3 0.2 9.3 10.3
HCM LOS A B
Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBRSBLn1
Capacity (veh/h)851 1392 -- 1500 -- 695
HCM Lane V/C Ratio 0.022 0.002 -- 0.004 -- 0.027
HCM Control Delay (s)9.3 7.6 0 - 7.4 0 - 10.3
HCM Lane LOS A A A -A A -B
HCM 95th %tile Q(veh)0.1 0 --0 -- 0.1
HCM 6th TWSC 2024 Background AM
2: Stuart Street & Heritage Circle (East)02/28/2022
Synchro 11 Report
Page 1
Intersection
Int Delay, s/veh 0.9
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 0 136 1 0 23 3 0 1 7 7 0 1
Future Vol, veh/h 0 136 1 0 23 3 0 1 7 7 0 1
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized -- None -- None -- None -- None
Storage Length ------------
Veh in Median Storage, # -0 --0 --0 --0 -
Grade, %-0 --0 --0 --0 -
Peak Hour Factor 77 77 77 77 77 77 77 77 77 77 77 77
Heavy Vehicles, %2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 0 177 1 0 30 4 0 1 9 9 0 1
Major/Minor Major1 Major2 Minor1 Minor2
Conflicting Flow All 34 0 0 178 0 0 211 212 178 215 210 32
Stage 1 ------ 178 178 - 32 32 -
Stage 2 ------ 33 34 - 183 178 -
Critical Hdwy 4.12 -- 4.12 -- 7.12 6.52 6.22 7.12 6.52 6.22
Critical Hdwy Stg 1 ------ 6.12 5.52 - 6.12 5.52 -
Critical Hdwy Stg 2 ------ 6.12 5.52 - 6.12 5.52 -
Follow-up Hdwy 2.218 -- 2.218 -- 3.518 4.018 3.318 3.518 4.018 3.318
Pot Cap-1 Maneuver 1581 -- 1398 -- 753 690 865 748 692 1050
Stage 1 ------ 824 752 - 992 872 -
Stage 2 ------ 991 870 - 819 752 -
Platoon blocked, %1 ----1 1 1 1 1
Mov Cap-1 Maneuver 1581 -- 1398 -- 752 690 865 739 692 1050
Mov Cap-2 Maneuver ------ 752 690 - 739 692 -
Stage 1 ------ 824 752 - 992 872 -
Stage 2 ------ 990 870 - 809 752 -
Approach EB WB NB SB
HCM Control Delay, s 0 0 9.4 9.8
HCM LOS A A
Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBRSBLn1
Capacity (veh/h)838 1581 -- 1398 -- 767
HCM Lane V/C Ratio 0.012 ------ 0.014
HCM Control Delay (s)9.4 0 --0 -- 9.8
HCM Lane LOS A A --A --A
HCM 95th %tile Q(veh)0 0 --0 --0
HCM 6th TWSC 2024 Background PM
2: Stuart Street & Heritage Circle (East)02/28/2022
Synchro 11 Report
Page 1
Intersection
Int Delay, s/veh 1.2
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 3 88 2 5 147 29 5 0 12 12 1 4
Future Vol, veh/h 3 88 2 5 147 29 5 0 12 12 1 4
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized -- None -- None -- None -- None
Storage Length ------------
Veh in Median Storage, # -0 --0 --0 --0 -
Grade, %-0 --0 --0 --0 -
Peak Hour Factor 92 92 92 92 92 92 92 92 92 92 92 92
Heavy Vehicles, %2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 3 96 2 5 160 32 5 0 13 13 1 4
Major/Minor Major1 Major2 Minor1 Minor2
Conflicting Flow All 192 0 0 98 0 0 292 305 97 296 290 176
Stage 1 ------ 103 103 - 186 186 -
Stage 2 ------ 189 202 - 110 104 -
Critical Hdwy 4.12 -- 4.12 -- 7.12 6.52 6.22 7.12 6.52 6.22
Critical Hdwy Stg 1 ------ 6.12 5.52 - 6.12 5.52 -
Critical Hdwy Stg 2 ------ 6.12 5.52 - 6.12 5.52 -
Follow-up Hdwy 2.218 -- 2.218 -- 3.518 4.018 3.318 3.518 4.018 3.318
Pot Cap-1 Maneuver 1407 -- 1495 -- 732 651 959 727 666 946
Stage 1 ------ 903 810 - 881 777 -
Stage 2 ------ 878 764 - 895 809 -
Platoon blocked, %1 ----1 1 1 1 1
Mov Cap-1 Maneuver 1407 -- 1495 -- 724 647 959 714 662 946
Mov Cap-2 Maneuver ------ 724 647 - 714 662 -
Stage 1 ------ 901 808 - 879 774 -
Stage 2 ------ 869 761 - 881 807 -
Approach EB WB NB SB
HCM Control Delay, s 0.2 0.2 9.2 9.9
HCM LOS A A
Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBRSBLn1
Capacity (veh/h)875 1407 -- 1495 -- 754
HCM Lane V/C Ratio 0.021 0.002 -- 0.004 -- 0.025
HCM Control Delay (s)9.2 7.6 0 - 7.4 0 - 9.9
HCM Lane LOS A A A -A A -A
HCM 95th %tile Q(veh)0.1 0 --0 -- 0.1
HCM 6th TWSC 2024 Total AM
2: Stuart Street & Heritage Circle (East)03/03/2022
Synchro 11 Report
Page 1
Intersection
Int Delay, s/veh 1.1
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 0 138 1 0 24 5 0 1 7 12 0 1
Future Vol, veh/h 0 138 1 0 24 5 0 1 7 12 0 1
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized -- None -- None -- None -- None
Storage Length ------------
Veh in Median Storage, # -0 --0 --0 --0 -
Grade, %-0 --0 --0 --0 -
Peak Hour Factor 77 77 77 77 77 77 77 77 77 77 77 77
Heavy Vehicles, %2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 0 179 1 0 31 6 0 1 9 16 0 1
Major/Minor Major1 Major2 Minor1 Minor2
Conflicting Flow All 37 0 0 180 0 0 215 217 180 219 214 34
Stage 1 ------ 180 180 - 34 34 -
Stage 2 ------ 35 37 - 185 180 -
Critical Hdwy 4.12 -- 4.12 -- 7.12 6.52 6.22 7.12 6.52 6.22
Critical Hdwy Stg 1 ------ 6.12 5.52 - 6.12 5.52 -
Critical Hdwy Stg 2 ------ 6.12 5.52 - 6.12 5.52 -
Follow-up Hdwy 2.218 -- 2.218 -- 3.518 4.018 3.318 3.518 4.018 3.318
Pot Cap-1 Maneuver 1577 -- 1396 -- 748 685 863 744 688 1047
Stage 1 ------ 822 750 - 989 870 -
Stage 2 ------ 988 868 - 817 750 -
Platoon blocked, %1 ----1 1 1 1 1
Mov Cap-1 Maneuver 1577 -- 1396 -- 747 685 863 735 688 1047
Mov Cap-2 Maneuver ------ 747 685 - 735 688 -
Stage 1 ------ 822 750 - 989 870 -
Stage 2 ------ 987 868 - 807 750 -
Approach EB WB NB SB
HCM Control Delay, s 0 0 9.4 9.9
HCM LOS A A
Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBRSBLn1
Capacity (veh/h)836 1577 -- 1396 -- 752
HCM Lane V/C Ratio 0.012 ------ 0.022
HCM Control Delay (s)9.4 0 --0 -- 9.9
HCM Lane LOS A A --A --A
HCM 95th %tile Q(veh)0 0 --0 -- 0.1
HCM 6th TWSC 2024 Total PM
2: Stuart Street & Heritage Circle (East)03/03/2022
Synchro 11 Report
Page 1
Intersection
Int Delay, s/veh 1.3
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 3 90 2 5 149 35 5 0 12 16 1 4
Future Vol, veh/h 3 90 2 5 149 35 5 0 12 16 1 4
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized -- None -- None -- None -- None
Storage Length ------------
Veh in Median Storage, # -0 --0 --0 --0 -
Grade, %-0 --0 --0 --0 -
Peak Hour Factor 92 92 92 92 92 92 92 92 92 92 92 92
Heavy Vehicles, %2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 3 98 2 5 162 38 5 0 13 17 1 4
Major/Minor Major1 Major2 Minor1 Minor2
Conflicting Flow All 200 0 0 100 0 0 299 315 99 303 297 181
Stage 1 ------ 105 105 - 191 191 -
Stage 2 ------ 194 210 - 112 106 -
Critical Hdwy 4.12 -- 4.12 -- 7.12 6.52 6.22 7.12 6.52 6.22
Critical Hdwy Stg 1 ------ 6.12 5.52 - 6.12 5.52 -
Critical Hdwy Stg 2 ------ 6.12 5.52 - 6.12 5.52 -
Follow-up Hdwy 2.218 -- 2.218 -- 3.518 4.018 3.318 3.518 4.018 3.318
Pot Cap-1 Maneuver 1396 -- 1493 -- 724 642 957 718 659 940
Stage 1 ------ 901 808 - 876 773 -
Stage 2 ------ 872 758 - 893 807 -
Platoon blocked, %1 ----1 1 1 1 1
Mov Cap-1 Maneuver 1396 -- 1493 -- 716 638 957 705 655 940
Mov Cap-2 Maneuver ------ 716 638 - 705 655 -
Stage 1 ------ 899 806 - 874 770 -
Stage 2 ------ 863 755 - 879 805 -
Approach EB WB NB SB
HCM Control Delay, s 0.2 0.2 9.2 10
HCM LOS A B
Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBRSBLn1
Capacity (veh/h)871 1396 -- 1493 -- 737
HCM Lane V/C Ratio 0.021 0.002 -- 0.004 -- 0.031
HCM Control Delay (s)9.2 7.6 0 - 7.4 0 - 10
HCM Lane LOS A A A -A A -B
HCM 95th %tile Q(veh)0.1 0 --0 -- 0.1
Timings 2022 Existing AM
3: Stuart Street & Shields Street 02/28/2022
Synchro 11 Report
Page 1
Lane Group EBL EBR NBL NBT SBT SBR
Lane Configurations
Traffic Volume (vph)57 83 12 747 781 19
Future Volume (vph)57 83 12 747 781 19
Turn Type Prot Perm pm+pt NA NA Perm
Protected Phases 4 5 2 6
Permitted Phases 4 2 6
Detector Phase 4 4 5 2 6 6
Switch Phase
Minimum Initial (s)5.0 5.0 5.0 5.0 5.0 5.0
Minimum Split (s)22.5 22.5 9.5 22.5 22.5 22.5
Total Split (s)26.0 26.0 12.0 64.0 52.0 52.0
Total Split (%)28.9% 28.9% 13.3% 71.1% 57.8% 57.8%
Yellow Time (s)3.5 3.5 3.5 3.5 3.5 3.5
All-Red Time (s)1.0 1.0 1.0 1.0 1.0 1.0
Lost Time Adjust (s)0.0 0.0 0.0 0.0 0.0 0.0
Total Lost Time (s)4.5 4.5 4.5 4.5 4.5 4.5
Lead/Lag Lead Lag Lag
Lead-Lag Optimize?Yes Yes Yes
Recall Mode None None None C-Max C-Max C-Max
Act Effct Green (s)8.7 8.7 74.3 75.2 73.1 73.1
Actuated g/C Ratio 0.10 0.10 0.83 0.84 0.81 0.81
v/c Ratio 0.38 0.40 0.03 0.29 0.32 0.02
Control Delay 43.8 13.3 2.3 2.6 3.8 2.4
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 43.8 13.3 2.3 2.6 3.8 2.4
LOS D B A A A A
Approach Delay 25.6 2.6 3.8
Approach LOS C A A
Intersection Summary
Cycle Length: 90
Actuated Cycle Length: 90
Offset: 0 (0%), Referenced to phase 2:NBTL and 6:SBT, Start of Green
Natural Cycle: 55
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 0.40
Intersection Signal Delay: 5.0 Intersection LOS: A
Intersection Capacity Utilization 34.2%ICU Level of Service A
Analysis Period (min) 15
Splits and Phases: 3: Stuart Street & Shields Street
HCM 6th Signalized Intersection Summary 2022 Existing AM
3: Stuart Street & Shields Street 02/28/2022
Synchro 11 Report
Page 2
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations
Traffic Volume (veh/h)57 83 12 747 781 19
Future Volume (veh/h)57 83 12 747 781 19
Initial Q (Qb), veh 0 0 0 0 0 0
Ped-Bike Adj(A_pbT)1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870
Adj Flow Rate, veh/h 66 97 14 869 908 22
Peak Hour Factor 0.86 0.86 0.86 0.86 0.86 0.86
Percent Heavy Veh, %2 2 2 2 2 2
Cap, veh/h 151 134 508 2898 2662 1187
Arrive On Green 0.08 0.08 0.02 0.82 0.75 0.75
Sat Flow, veh/h 1781 1585 1781 3647 3647 1585
Grp Volume(v), veh/h 66 97 14 869 908 22
Grp Sat Flow(s),veh/h/ln 1781 1585 1781 1777 1777 1585
Q Serve(g_s), s 3.2 5.4 0.2 5.4 7.8 0.3
Cycle Q Clear(g_c), s 3.2 5.4 0.2 5.4 7.8 0.3
Prop In Lane 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 151 134 508 2898 2662 1187
V/C Ratio(X)0.44 0.72 0.03 0.30 0.34 0.02
Avail Cap(c_a), veh/h 426 379 627 2898 2662 1187
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I)1.00 1.00 1.00 1.00 1.00 1.00
Uniform Delay (d), s/veh 39.2 40.2 2.6 2.0 3.8 2.9
Incr Delay (d2), s/veh 2.0 7.2 0.0 0.3 0.3 0.0
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 1.5 4.9 0.0 1.1 2.2 0.1
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 41.2 47.4 2.6 2.3 4.2 2.9
LnGrp LOS D D A A A A
Approach Vol, veh/h 163 883 930
Approach Delay, s/veh 44.8 2.3 4.1
Approach LOS D A A
Timer - Assigned Phs 2 4 5 6
Phs Duration (G+Y+Rc), s 77.9 12.1 6.0 71.9
Change Period (Y+Rc), s 4.5 4.5 4.5 4.5
Max Green Setting (Gmax), s 59.5 21.5 7.5 47.5
Max Q Clear Time (g_c+I1), s 7.4 7.4 2.2 9.8
Green Ext Time (p_c), s 7.7 0.4 0.0 8.0
Intersection Summary
HCM 6th Ctrl Delay 6.7
HCM 6th LOS A
Timings 2022 Existing PM
3: Stuart Street & Shields Street 02/28/2022
Synchro 11 Report
Page 1
Lane Group EBL EBR NBL NBT SBT SBR
Lane Configurations
Traffic Volume (vph)61 68 90 1107 1083 94
Future Volume (vph)61 68 90 1107 1083 94
Turn Type Prot Perm pm+pt NA NA Perm
Protected Phases 4 5 2 6
Permitted Phases 4 2 6
Detector Phase 4 4 5 2 6 6
Switch Phase
Minimum Initial (s)5.0 5.0 5.0 5.0 5.0 5.0
Minimum Split (s)22.5 22.5 9.5 22.5 22.5 22.5
Total Split (s)24.0 24.0 13.0 66.0 53.0 53.0
Total Split (%)26.7% 26.7% 14.4% 73.3% 58.9% 58.9%
Yellow Time (s)3.5 3.5 3.5 3.5 3.5 3.5
All-Red Time (s)1.0 1.0 1.0 1.0 1.0 1.0
Lost Time Adjust (s)0.0 0.0 0.0 0.0 0.0 0.0
Total Lost Time (s)4.5 4.5 4.5 4.5 4.5 4.5
Lead/Lag Lead Lag Lag
Lead-Lag Optimize?Yes Yes Yes
Recall Mode None None None C-Max C-Max C-Max
Act Effct Green (s)8.7 8.7 74.3 75.2 66.2 66.2
Actuated g/C Ratio 0.10 0.10 0.83 0.84 0.74 0.74
v/c Ratio 0.38 0.33 0.24 0.40 0.44 0.08
Control Delay 43.7 13.7 3.5 3.0 7.2 3.1
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 43.7 13.7 3.5 3.0 7.2 3.1
LOS D B A A A A
Approach Delay 27.9 3.1 6.9
Approach LOS C A A
Intersection Summary
Cycle Length: 90
Actuated Cycle Length: 90
Offset: 0 (0%), Referenced to phase 2:NBTL and 6:SBT, Start of Green
Natural Cycle: 60
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 0.44
Intersection Signal Delay: 6.1 Intersection LOS: A
Intersection Capacity Utilization 50.3%ICU Level of Service A
Analysis Period (min) 15
Splits and Phases: 3: Stuart Street & Shields Street
HCM 6th Signalized Intersection Summary 2022 Existing PM
3: Stuart Street & Shields Street 02/28/2022
Synchro 11 Report
Page 2
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations
Traffic Volume (veh/h)61 68 90 1107 1083 94
Future Volume (veh/h)61 68 90 1107 1083 94
Initial Q (Qb), veh 0 0 0 0 0 0
Ped-Bike Adj(A_pbT)1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870
Adj Flow Rate, veh/h 65 72 96 1178 1152 100
Peak Hour Factor 0.94 0.94 0.94 0.94 0.94 0.94
Percent Heavy Veh, %2 2 2 2 2 2
Cap, veh/h 120 107 438 2958 2601 1160
Arrive On Green 0.07 0.07 0.05 0.83 0.73 0.73
Sat Flow, veh/h 1781 1585 1781 3647 3647 1585
Grp Volume(v), veh/h 65 72 96 1178 1152 100
Grp Sat Flow(s),veh/h/ln 1781 1585 1781 1777 1777 1585
Q Serve(g_s), s 3.2 4.0 1.0 7.5 11.6 1.6
Cycle Q Clear(g_c), s 3.2 4.0 1.0 7.5 11.6 1.6
Prop In Lane 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 120 107 438 2958 2601 1160
V/C Ratio(X)0.54 0.67 0.22 0.40 0.44 0.09
Avail Cap(c_a), veh/h 386 343 516 2958 2601 1160
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I)1.00 1.00 1.00 1.00 1.00 1.00
Uniform Delay (d), s/veh 40.6 41.0 3.1 1.9 4.8 3.5
Incr Delay (d2), s/veh 3.7 7.1 0.2 0.4 0.5 0.1
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 1.5 3.7 0.2 1.3 3.5 0.5
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 44.3 48.1 3.4 2.3 5.3 3.6
LnGrp LOS D D A A A A
Approach Vol, veh/h 137 1274 1252
Approach Delay, s/veh 46.3 2.4 5.2
Approach LOS D A A
Timer - Assigned Phs 2 4 5 6
Phs Duration (G+Y+Rc), s 79.4 10.6 9.0 70.4
Change Period (Y+Rc), s 4.5 4.5 4.5 4.5
Max Green Setting (Gmax), s 61.5 19.5 8.5 48.5
Max Q Clear Time (g_c+I1), s 9.5 6.0 3.0 13.6
Green Ext Time (p_c), s 12.1 0.3 0.1 11.3
Intersection Summary
HCM 6th Ctrl Delay 6.0
HCM 6th LOS A
Timings 2024 Background AM
3: Stuart Street & Shields Street 02/28/2022
Synchro 11 Report
Page 1
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph)59 0 86 14 0 31 12 781 7 14 825 20
Future Volume (vph)59 0 86 14 0 31 12 781 7 14 825 20
Turn Type Perm NA Perm Perm NA Perm pm+pt NA Perm pm+pt NA Perm
Protected Phases 4 8 5 2 1 6
Permitted Phases 4 4 8 8 2 2 6 6
Detector Phase 4 4 4 8 8 8 5 2 2 1 6 6
Switch Phase
Minimum Initial (s)5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0
Minimum Split (s)22.5 22.5 22.5 22.5 22.5 22.5 9.5 22.5 22.5 9.5 22.5 22.5
Total Split (s)26.0 26.0 26.0 26.0 26.0 26.0 11.0 53.0 53.0 11.0 53.0 53.0
Total Split (%)28.9% 28.9% 28.9% 28.9% 28.9% 28.9% 12.2% 58.9% 58.9% 12.2% 58.9% 58.9%
Yellow Time (s)3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5
All-Red Time (s)1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0
Lost Time Adjust (s)0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Lost Time (s)4.5 4.5 4.5 4.5 4.5 4.5 4.5 4.5 4.5 4.5
Lead/Lag Lead Lag Lag Lead Lag Lag
Lead-Lag Optimize?Yes Yes Yes Yes Yes Yes
Recall Mode None None None None None None None C-Max C-Max None C-Max C-Max
Act Effct Green (s)9.8 9.8 9.8 9.8 72.3 72.0 72.0 72.3 72.0 72.0
Actuated g/C Ratio 0.11 0.11 0.11 0.11 0.80 0.80 0.80 0.80 0.80 0.80
v/c Ratio 0.46 0.38 0.10 0.14 0.03 0.32 0.01 0.03 0.34 0.02
Control Delay 46.3 12.0 35.8 2.7 2.8 4.3 0.0 2.8 4.4 0.1
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 46.3 12.0 35.8 2.7 2.8 4.3 0.0 2.8 4.4 0.1
LOS D B D A A A A A A A
Approach Delay 26.0 12.8 4.2 4.3
Approach LOS C B A A
Intersection Summary
Cycle Length: 90
Actuated Cycle Length: 90
Offset: 0 (0%), Referenced to phase 2:NBTL and 6:SBTL, Start of Green
Natural Cycle: 60
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 0.46
Intersection Signal Delay: 6.2 Intersection LOS: A
Intersection Capacity Utilization 43.5%ICU Level of Service A
Analysis Period (min) 15
Splits and Phases: 3: Stuart Street & Shields Street
HCM 6th Signalized Intersection Summary 2024 Background AM
3: Stuart Street & Shields Street 02/28/2022
Synchro 11 Report
Page 2
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h)59 0 86 14 0 31 12 781 7 14 825 20
Future Volume (veh/h)59 0 86 14 0 31 12 781 7 14 825 20
Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Ped-Bike Adj(A_pbT)1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870
Adj Flow Rate, veh/h 69 0 100 15 0 34 14 908 8 15 959 23
Peak Hour Factor 0.86 0.92 0.86 0.92 0.92 0.92 0.86 0.86 0.92 0.92 0.86 0.86
Percent Heavy Veh, %2 2 2 2 2 2 2 2 2 2 2 2
Cap, veh/h 192 0 141 227 0 141 482 2643 1179 514 2646 1180
Arrive On Green 0.09 0.00 0.09 0.09 0.00 0.09 0.02 0.74 0.74 0.02 0.74 0.74
Sat Flow, veh/h 1255 0 1585 1648 0 1585 1781 3554 1585 1781 3554 1585
Grp Volume(v), veh/h 69 0 100 15 0 34 14 908 8 15 959 23
Grp Sat Flow(s),veh/h/ln 1255 0 1585 1648 0 1585 1781 1777 1585 1781 1777 1585
Q Serve(g_s), s 4.4 0.0 5.5 0.0 0.0 1.8 0.2 7.9 0.1 0.2 8.5 0.3
Cycle Q Clear(g_c), s 5.1 0.0 5.5 0.7 0.0 1.8 0.2 7.9 0.1 0.2 8.5 0.3
Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 192 0 141 227 0 141 482 2643 1179 514 2646 1180
V/C Ratio(X)0.36 0.00 0.71 0.07 0.00 0.24 0.03 0.34 0.01 0.03 0.36 0.02
Avail Cap(c_a), veh/h 398 0 379 439 0 379 581 2643 1179 611 2646 1180
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I)1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Uniform Delay (d), s/veh 40.0 0.0 39.9 37.7 0.0 38.2 3.0 4.0 3.0 2.9 4.0 3.0
Incr Delay (d2), s/veh 1.1 0.0 6.4 0.1 0.0 0.9 0.0 0.4 0.0 0.0 0.4 0.0
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 1.5 0.0 2.4 0.3 0.0 0.7 0.0 2.3 0.0 0.0 2.4 0.1
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 41.1 0.0 46.3 37.8 0.0 39.0 3.0 4.3 3.0 3.0 4.4 3.0
LnGrp LOS D A D D A D A A A A A A
Approach Vol, veh/h 169 49 930 997
Approach Delay, s/veh 44.2 38.7 4.3 4.4
Approach LOS D D A A
Timer - Assigned Phs 1 2 4 5 6 8
Phs Duration (G+Y+Rc), s 6.1 71.4 12.5 6.0 71.5 12.5
Change Period (Y+Rc), s 4.5 4.5 4.5 4.5 4.5 4.5
Max Green Setting (Gmax), s 6.5 48.5 21.5 6.5 48.5 21.5
Max Q Clear Time (g_c+I1), s 2.2 9.9 7.5 2.2 10.5 3.8
Green Ext Time (p_c), s 0.0 7.9 0.5 0.0 8.6 0.1
Intersection Summary
HCM 6th Ctrl Delay 8.2
HCM 6th LOS A
Timings 2024 Background PM
3: Stuart Street & Shields Street 02/28/2022
Synchro 11 Report
Page 1
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph)63 0 71 14 0 33 94 1164 20 41 1135 98
Future Volume (vph)63 0 71 14 0 33 94 1164 20 41 1135 98
Turn Type Perm NA Perm Perm NA Perm pm+pt NA Perm pm+pt NA Perm
Protected Phases 4 8 5 2 1 6
Permitted Phases 4 4 8 8 2 2 6 6
Detector Phase 4 4 4 8 8 8 5 2 2 1 6 6
Switch Phase
Minimum Initial (s)5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0
Minimum Split (s)22.5 22.5 22.5 22.5 22.5 22.5 9.5 22.5 22.5 9.5 22.5 22.5
Total Split (s)24.0 24.0 24.0 24.0 24.0 24.0 13.0 55.0 55.0 11.0 53.0 53.0
Total Split (%)26.7% 26.7% 26.7% 26.7% 26.7% 26.7% 14.4% 61.1% 61.1% 12.2% 58.9% 58.9%
Yellow Time (s)3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5
All-Red Time (s)1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0
Lost Time Adjust (s)0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Lost Time (s)4.5 4.5 4.5 4.5 4.5 4.5 4.5 4.5 4.5 4.5
Lead/Lag Lead Lag Lag Lead Lag Lag
Lead-Lag Optimize?Yes Yes Yes Yes Yes Yes
Recall Mode None None None None None None None C-Max C-Max None C-Max C-Max
Act Effct Green (s)9.7 9.7 9.7 9.7 71.2 67.7 67.7 69.1 65.1 65.1
Actuated g/C Ratio 0.11 0.11 0.11 0.11 0.79 0.75 0.75 0.77 0.72 0.72
v/c Ratio 0.45 0.32 0.10 0.15 0.26 0.46 0.02 0.12 0.47 0.09
Control Delay 46.1 12.5 35.9 3.4 4.2 7.2 0.1 3.4 8.2 2.8
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 46.1 12.5 35.9 3.4 4.2 7.2 0.1 3.4 8.2 2.8
LOS D B D A A A A A A A
Approach Delay 28.3 13.0 6.8 7.6
Approach LOS C B A A
Intersection Summary
Cycle Length: 90
Actuated Cycle Length: 90
Offset: 0 (0%), Referenced to phase 2:NBTL and 6:SBTL, Start of Green
Natural Cycle: 60
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 0.47
Intersection Signal Delay: 8.3 Intersection LOS: A
Intersection Capacity Utilization 58.0%ICU Level of Service B
Analysis Period (min) 15
Splits and Phases: 3: Stuart Street & Shields Street
HCM 6th Signalized Intersection Summary 2024 Background PM
3: Stuart Street & Shields Street 02/28/2022
Synchro 11 Report
Page 2
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h)63 0 71 14 0 33 94 1164 20 41 1135 98
Future Volume (veh/h)63 0 71 14 0 33 94 1164 20 41 1135 98
Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Ped-Bike Adj(A_pbT)1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870
Adj Flow Rate, veh/h 67 0 76 15 0 36 100 1238 22 45 1207 104
Peak Hour Factor 0.94 0.92 0.94 0.92 0.92 0.92 0.94 0.94 0.92 0.92 0.94 0.94
Percent Heavy Veh, %2 2 2 2 2 2 2 2 2 2 2 2
Cap, veh/h 80 0 343 80 0 343 325 2117 944 314 2069 923
Arrive On Green 0.22 0.00 0.22 0.22 0.00 0.22 0.05 0.60 0.60 0.04 0.58 0.58
Sat Flow, veh/h 0 0 1585 0 0 1585 1781 3554 1585 1781 3554 1585
Grp Volume(v), veh/h 67 0 76 15 0 36 100 1238 22 45 1207 104
Grp Sat Flow(s),veh/h/ln 0 0 1585 0 0 1585 1781 1777 1585 1781 1777 1585
Q Serve(g_s), s 0.0 0.0 3.6 0.0 0.0 1.6 2.0 19.4 0.5 0.9 19.3 2.6
Cycle Q Clear(g_c), s 19.5 0.0 3.6 19.5 0.0 1.6 2.0 19.4 0.5 0.9 19.3 2.6
Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 80 0 343 80 0 343 325 2117 944 314 2069 923
V/C Ratio(X)0.84 0.00 0.22 0.19 0.00 0.10 0.31 0.58 0.02 0.14 0.58 0.11
Avail Cap(c_a), veh/h 80 0 343 80 0 343 402 2117 944 376 2069 923
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I)1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Uniform Delay (d), s/veh 45.0 0.0 29.0 45.0 0.0 28.3 9.1 11.3 7.5 8.7 11.9 8.4
Incr Delay (d2), s/veh 50.9 0.0 0.3 1.1 0.0 0.1 0.5 1.2 0.0 0.2 1.2 0.2
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 2.6 0.0 1.4 0.4 0.0 0.6 0.7 7.2 0.2 0.3 7.2 0.9
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 95.9 0.0 29.3 46.1 0.0 28.4 9.7 12.5 7.5 8.9 13.1 8.6
LnGrp LOS F A C D A C A B A A B A
Approach Vol, veh/h 143 51 1360 1356
Approach Delay, s/veh 60.5 33.6 12.2 12.6
Approach LOS E C B B
Timer - Assigned Phs 1 2 4 5 6 8
Phs Duration (G+Y+Rc), s 7.9 58.1 24.0 9.1 56.9 24.0
Change Period (Y+Rc), s 4.5 4.5 4.5 4.5 4.5 4.5
Max Green Setting (Gmax), s 6.5 50.5 19.5 8.5 48.5 19.5
Max Q Clear Time (g_c+I1), s 2.9 21.4 21.5 4.0 21.3 21.5
Green Ext Time (p_c), s 0.0 11.3 0.0 0.1 11.0 0.0
Intersection Summary
HCM 6th Ctrl Delay 15.1
HCM 6th LOS B
Timings 2024 Total AM
3: Stuart Street & Shields Street 03/03/2022
Synchro 11 Report
Page 1
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph)63 0 88 14 0 31 13 781 7 14 825 22
Future Volume (vph)63 0 88 14 0 31 13 781 7 14 825 22
Turn Type Perm NA Perm Perm NA Perm pm+pt NA Perm pm+pt NA Perm
Protected Phases 4 8 5 2 1 6
Permitted Phases 4 4 8 8 2 2 6 6
Detector Phase 4 4 4 8 8 8 5 2 2 1 6 6
Switch Phase
Minimum Initial (s)5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0
Minimum Split (s)22.5 22.5 22.5 22.5 22.5 22.5 9.5 22.5 22.5 9.5 22.5 22.5
Total Split (s)26.0 26.0 26.0 26.0 26.0 26.0 11.0 53.0 53.0 11.0 53.0 53.0
Total Split (%)28.9% 28.9% 28.9% 28.9% 28.9% 28.9% 12.2% 58.9% 58.9% 12.2% 58.9% 58.9%
Yellow Time (s)3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5
All-Red Time (s)1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0
Lost Time Adjust (s)0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Lost Time (s)4.5 4.5 4.5 4.5 4.5 4.5 4.5 4.5 4.5 4.5
Lead/Lag Lead Lag Lag Lead Lag Lag
Lead-Lag Optimize?Yes Yes Yes Yes Yes Yes
Recall Mode None None None None None None None C-Max C-Max None C-Max C-Max
Act Effct Green (s)10.0 10.0 10.0 10.0 72.1 71.8 71.8 72.1 71.8 71.8
Actuated g/C Ratio 0.11 0.11 0.11 0.11 0.80 0.80 0.80 0.80 0.80 0.80
v/c Ratio 0.47 0.38 0.10 0.14 0.03 0.32 0.01 0.03 0.34 0.02
Control Delay 46.5 11.8 35.4 2.6 2.8 4.4 0.0 2.9 4.5 0.0
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 46.5 11.8 35.4 2.6 2.8 4.4 0.0 2.9 4.5 0.0
LOS D B D A A A A A A A
Approach Delay 26.3 12.7 4.3 4.3
Approach LOS C B A A
Intersection Summary
Cycle Length: 90
Actuated Cycle Length: 90
Offset: 0 (0%), Referenced to phase 2:NBTL and 6:SBTL, Start of Green
Natural Cycle: 60
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 0.47
Intersection Signal Delay: 6.3 Intersection LOS: A
Intersection Capacity Utilization 43.7%ICU Level of Service A
Analysis Period (min) 15
Splits and Phases: 3: Stuart Street & Shields Street
HCM 6th Signalized Intersection Summary 2024 Total AM
3: Stuart Street & Shields Street 03/03/2022
Synchro 11 Report
Page 2
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h)63 0 88 14 0 31 13 781 7 14 825 22
Future Volume (veh/h)63 0 88 14 0 31 13 781 7 14 825 22
Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Ped-Bike Adj(A_pbT)1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870
Adj Flow Rate, veh/h 73 0 102 15 0 34 15 908 8 15 959 26
Peak Hour Factor 0.86 0.92 0.86 0.92 0.92 0.92 0.86 0.86 0.92 0.92 0.86 0.86
Percent Heavy Veh, %2 2 2 2 2 2 2 2 2 2 2 2
Cap, veh/h 194 0 143 230 0 143 481 2637 1176 512 2637 1176
Arrive On Green 0.09 0.00 0.09 0.09 0.00 0.09 0.02 0.74 0.74 0.02 0.74 0.74
Sat Flow, veh/h 1257 0 1585 1655 0 1585 1781 3554 1585 1781 3554 1585
Grp Volume(v), veh/h 73 0 102 15 0 34 15 908 8 15 959 26
Grp Sat Flow(s),veh/h/ln 1257 0 1585 1655 0 1585 1781 1777 1585 1781 1777 1585
Q Serve(g_s), s 4.6 0.0 5.6 0.0 0.0 1.8 0.2 8.0 0.1 0.2 8.6 0.4
Cycle Q Clear(g_c), s 5.3 0.0 5.6 0.7 0.0 1.8 0.2 8.0 0.1 0.2 8.6 0.4
Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 194 0 143 230 0 143 481 2637 1176 512 2637 1176
V/C Ratio(X)0.38 0.00 0.71 0.07 0.00 0.24 0.03 0.34 0.01 0.03 0.36 0.02
Avail Cap(c_a), veh/h 398 0 379 440 0 379 578 2637 1176 610 2637 1176
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I)1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Uniform Delay (d), s/veh 40.0 0.0 39.8 37.5 0.0 38.0 3.0 4.0 3.0 3.0 4.1 3.0
Incr Delay (d2), s/veh 1.2 0.0 6.4 0.1 0.0 0.8 0.0 0.4 0.0 0.0 0.4 0.0
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 1.6 0.0 2.4 0.3 0.0 0.7 0.1 2.3 0.0 0.0 2.5 0.1
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 41.2 0.0 46.1 37.7 0.0 38.9 3.1 4.4 3.0 3.0 4.5 3.1
LnGrp LOS D A D D A D A A A A A A
Approach Vol, veh/h 175 49 931 1000
Approach Delay, s/veh 44.1 38.5 4.3 4.4
Approach LOS D D A A
Timer - Assigned Phs 1 2 4 5 6 8
Phs Duration (G+Y+Rc), s 6.1 71.3 12.6 6.1 71.3 12.6
Change Period (Y+Rc), s 4.5 4.5 4.5 4.5 4.5 4.5
Max Green Setting (Gmax), s 6.5 48.5 21.5 6.5 48.5 21.5
Max Q Clear Time (g_c+I1), s 2.2 10.0 7.6 2.2 10.6 3.8
Green Ext Time (p_c), s 0.0 7.9 0.5 0.0 8.6 0.1
Intersection Summary
HCM 6th Ctrl Delay 8.4
HCM 6th LOS A
Timings 2024 Total PM
3: Stuart Street & Shields Street 03/03/2022
Synchro 11 Report
Page 1
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph)67 0 73 14 0 33 97 1164 20 41 1135 103
Future Volume (vph)67 0 73 14 0 33 97 1164 20 41 1135 103
Turn Type Perm NA Perm Perm NA Perm pm+pt NA Perm pm+pt NA Perm
Protected Phases 4 8 5 2 1 6
Permitted Phases 4 4 8 8 2 2 6 6
Detector Phase 4 4 4 8 8 8 5 2 2 1 6 6
Switch Phase
Minimum Initial (s)5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0
Minimum Split (s)22.5 22.5 22.5 22.5 22.5 22.5 9.5 22.5 22.5 9.5 22.5 22.5
Total Split (s)24.0 24.0 24.0 24.0 24.0 24.0 13.0 55.0 55.0 11.0 53.0 53.0
Total Split (%)26.7% 26.7% 26.7% 26.7% 26.7% 26.7% 14.4% 61.1% 61.1% 12.2% 58.9% 58.9%
Yellow Time (s)3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5
All-Red Time (s)1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0
Lost Time Adjust (s)0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Lost Time (s)4.5 4.5 4.5 4.5 4.5 4.5 4.5 4.5 4.5 4.5
Lead/Lag Lead Lag Lag Lead Lag Lag
Lead-Lag Optimize?Yes Yes Yes Yes Yes Yes
Recall Mode None None None None None None None C-Max C-Max None C-Max C-Max
Act Effct Green (s)9.9 9.9 9.9 9.9 71.0 67.5 67.5 68.8 64.8 64.8
Actuated g/C Ratio 0.11 0.11 0.11 0.11 0.79 0.75 0.75 0.76 0.72 0.72
v/c Ratio 0.46 0.32 0.10 0.15 0.27 0.47 0.02 0.12 0.47 0.09
Control Delay 46.4 12.2 35.6 3.3 4.4 7.3 0.1 3.5 8.3 3.0
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 46.4 12.2 35.6 3.3 4.4 7.3 0.1 3.5 8.3 3.0
LOS D B D A A A A A A A
Approach Delay 28.5 12.8 7.0 7.8
Approach LOS C B A A
Intersection Summary
Cycle Length: 90
Actuated Cycle Length: 90
Offset: 0 (0%), Referenced to phase 2:NBTL and 6:SBTL, Start of Green
Natural Cycle: 60
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 0.47
Intersection Signal Delay: 8.5 Intersection LOS: A
Intersection Capacity Utilization 58.4%ICU Level of Service B
Analysis Period (min) 15
Splits and Phases: 3: Stuart Street & Shields Street
HCM 6th Signalized Intersection Summary 2024 Total PM
3: Stuart Street & Shields Street 03/03/2022
Synchro 11 Report
Page 2
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h)67 0 73 14 0 33 97 1164 20 41 1135 103
Future Volume (veh/h)67 0 73 14 0 33 97 1164 20 41 1135 103
Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Ped-Bike Adj(A_pbT)1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870
Adj Flow Rate, veh/h 71 0 78 15 0 36 103 1238 22 45 1207 110
Peak Hour Factor 0.94 0.92 0.94 0.92 0.92 0.92 0.94 0.94 0.92 0.92 0.94 0.94
Percent Heavy Veh, %2 2 2 2 2 2 2 2 2 2 2 2
Cap, veh/h 80 0 343 80 0 343 324 2117 944 314 2068 923
Arrive On Green 0.22 0.00 0.22 0.22 0.00 0.22 0.05 0.60 0.60 0.04 0.58 0.58
Sat Flow, veh/h 0 0 1585 0 0 1585 1781 3554 1585 1781 3554 1585
Grp Volume(v), veh/h 71 0 78 15 0 36 103 1238 22 45 1207 110
Grp Sat Flow(s),veh/h/ln 0 0 1585 0 0 1585 1781 1777 1585 1781 1777 1585
Q Serve(g_s), s 0.0 0.0 3.6 0.0 0.0 1.6 2.0 19.4 0.5 0.9 19.3 2.8
Cycle Q Clear(g_c), s 19.5 0.0 3.6 19.5 0.0 1.6 2.0 19.4 0.5 0.9 19.3 2.8
Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 80 0 343 80 0 343 324 2117 944 314 2068 923
V/C Ratio(X)0.89 0.00 0.23 0.19 0.00 0.10 0.32 0.58 0.02 0.14 0.58 0.12
Avail Cap(c_a), veh/h 80 0 343 80 0 343 401 2117 944 376 2068 923
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I)1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Uniform Delay (d), s/veh 45.0 0.0 29.0 45.0 0.0 28.3 9.2 11.3 7.5 8.7 11.9 8.4
Incr Delay (d2), s/veh 64.4 0.0 0.3 1.1 0.0 0.1 0.6 1.2 0.0 0.2 1.2 0.3
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 3.0 0.0 1.4 0.4 0.0 0.6 0.7 7.2 0.2 0.3 7.3 1.0
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 109.4 0.0 29.4 46.1 0.0 28.4 9.7 12.5 7.5 8.9 13.1 8.7
LnGrp LOS F A C D A C A B A A B A
Approach Vol, veh/h 149 51 1363 1362
Approach Delay, s/veh 67.5 33.6 12.2 12.6
Approach LOS E C B B
Timer - Assigned Phs 1 2 4 5 6 8
Phs Duration (G+Y+Rc), s 7.9 58.1 24.0 9.1 56.9 24.0
Change Period (Y+Rc), s 4.5 4.5 4.5 4.5 4.5 4.5
Max Green Setting (Gmax), s 6.5 50.5 19.5 8.5 48.5 19.5
Max Q Clear Time (g_c+I1), s 2.9 21.4 21.5 4.0 21.3 21.5
Green Ext Time (p_c), s 0.0 11.3 0.0 0.1 11.0 0.0
Intersection Summary
HCM 6th Ctrl Delay 15.6
HCM 6th LOS B
Queue Analysis Worksheets
Queues 2024 Total AM
3: Stuart Street & Shields Street 03/03/2022
Synchro 11 Report
Page 1
Lane Group EBT EBR WBT WBR NBL NBT NBR SBL SBT SBR
Lane Group Flow (vph)73 102 15 34 15 908 8 15 959 26
v/c Ratio 0.47 0.38 0.10 0.14 0.03 0.32 0.01 0.03 0.34 0.02
Control Delay 46.5 11.8 35.4 2.6 2.8 4.4 0.0 2.9 4.5 0.0
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 46.5 11.8 35.4 2.6 2.8 4.4 0.0 2.9 4.5 0.0
Queue Length 50th (ft)40 0 8 0 1 58 0 1 62 0
Queue Length 95th (ft)79 39 25 6 6 153 0 6 163 0
Internal Link Dist (ft)241 173 353 417
Turn Bay Length (ft)150 75
Base Capacity (vph)332 455 315 433 504 2822 1277 529 2822 1277
Starvation Cap Reductn 0 0 0 0 0 0 0 0 0 0
Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 0
Storage Cap Reductn 0 0 0 0 0 0 0 0 0 0
Reduced v/c Ratio 0.22 0.22 0.05 0.08 0.03 0.32 0.01 0.03 0.34 0.02
Intersection Summary
Queues 2024 Total PM
3: Stuart Street & Shields Street 03/03/2022
Synchro 11 Report
Page 1
Lane Group EBT EBR WBT WBR NBL NBT NBR SBL SBT SBR
Lane Group Flow (vph)71 78 15 36 103 1238 22 45 1207 110
v/c Ratio 0.46 0.32 0.10 0.15 0.27 0.47 0.02 0.12 0.47 0.09
Control Delay 46.4 12.2 35.6 3.3 4.4 7.3 0.1 3.5 8.3 3.0
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 46.4 12.2 35.6 3.3 4.4 7.3 0.1 3.5 8.3 3.0
Queue Length 50th (ft)39 0 8 0 10 162 0 4 161 6
Queue Length 95th (ft)77 38 25 7 25 254 0 13 256 28
Internal Link Dist (ft)241 173 353 417
Turn Bay Length (ft)150 75
Base Capacity (vph)301 404 286 400 411 2655 1206 381 2548 1160
Starvation Cap Reductn 0 0 0 0 0 0 0 0 0 0
Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 0
Storage Cap Reductn 0 0 0 0 0 0 0 0 0 0
Reduced v/c Ratio 0.24 0.19 0.05 0.09 0.25 0.47 0.02 0.12 0.47 0.09
Intersection Summary
Conceptual Site Plan
13 PARKING STALLS
REMOVED HERE
16 parking stalls
added
Pool
Fitness 100'-0"100'-0"100'-0"100'-0"APPROXIMATE LINE
OF WETLAND
APPROXIMATE LINE
OF WETLAND BUFFER
6 park
i
n
g
s
t
a
l
l
s
a
d
d
e
d
19 Townhomes
28'-0"12 Townhomes
42 needed
P
P
P
P
PP
P
P
P
P
PPPPPP
PPPPPPPPPP
PPPPPP
P P
8 parking stalls
added