Loading...
HomeMy WebLinkAboutHERITAGE PARK - MJA220001 - SUBMITTAL DOCUMENTS - ROUND 2 - RESPONSE TO STAFF REVIEW COMMENTS 1 Community Development and Neighborhood Services 281 North College Avenue PO Box 580 Fort Collins, CO 80522 970.221.6689 970.224.6134 - fax fcgov.com/developmentreview June 03, 2022 Cathy Mathis TB Group 444 Mountain Avenue Berthoud, CO 80513 RE: Heritage Park, MJA220001, Round Number 1 Please see the following summary of comments from City staff and outside reviewing agencies for your submittal of Heritage Park. If you have questions about any comments, you may contact the individual commenter or direct your questions through your Development Review Coordinator, Brandy Bethurem Harras via phone at 970-416-2744 or via email at bbethuremharras@fcgov.com. Comment Summary: Department: Development Review Coordinator Contact: Brandy Bethurem Harras, 970-416-2744, bbethuremharras@fcgov.com Topic: General Comment Number: 1 05/23/2022: INFORMATION: I will be your primary point of contact throughout the development review and permitting process. If you have any questions, need additional meetings with the project reviewers, or need assistance throughout the process, please let me know and I can assist you and your team. Please include me in all email correspondence with other reviewers and keep me informed of any phone conversations. Thank you! Response: Thank you! Comment Number: 2 05/23/2022: RESUBMITTAL: As part of your resubmittal, you will respond to the comments provided in this letter. This letter is provided to you in Microsoft Word format. Please use this document to insert responses to each comment for your submittal, using a different font color. When replying to the comment letter please be detailed in your responses, as all comments should be thoroughly addressed. Provide 2 reference to specific project plans or explanations of why comments have not been addressed, when applicable, avoiding responses like noted or acknowledged. Response: Thank you for the information. Comment Number: 3 05/23/2022: RESUBMITTAL: Resubmittals are accepted any day of the week, with Wednesday at noon being the cut-off for routing the same week. When you are ready to resubmit your plans, please notify me with as much advanced notice as possible. Response: Thank you for the information, our team will notify the City team when the resubmittal occurs. Comment Number: 4 05/23/2022: FOR HEARING: Please follow the Electronic Submittal Requirements and File Naming Standards found at https://www.fcgov.com/developmentreview/files/electronic submittal requirements and file naming standards_v1_8 1 19.pdf?1566857888. File names should begin with the file type, followed by the project information, and round number. Example: UTILITY PLANS_PROJECT NAME_PDP_Rd2.pdf File type acronyms maybe appropriate to avoid extremely long file names. Example: TIS for Traffic Impact Study, ECS for Ecological Characterization Study. *Please disregard any references to paper copies, flash drives, or CDs. Response: Thank you for the information. Comment Number: 5 05/23/2022: FOR HEARING: All plans should be saved as optimized/flattened PDFs to reduce file size and remove layers. Per the Electronic Submittal Requirements AutoCAD SHX attributes need to be removed from the PDF’s. AutoCAD turns drawing text into comments that appear in the PDF plan set, and these must be removed prior to submittal as they can cause issues with the PDF file. The default setting is "1" ("on") in AutoCAD. To change the setting and remove this feature, type "EPDFSHX" in the command line and enter "0". Read this article at Autodesk.com for more tips on this topic: https://knowledge.autodesk.com/support/autocad/troubleshooting/caas/sfdcarti cles/sfdcarticles/Drawing-text-appears-as-Comments-in-a-PDF-created-by-AutoCAD.html Response: Thank you for the information. Comment Number: 6 05/23/2022: INFORMATION: Temporary Service Changes - City of Fort Collins Development Review In order to continue providing thorough reviews and giving every project the attention it deserves, the City of Fort Collins is implementing temporary changes in how we serve our development customers. As you may be aware, we are experiencing staff shortages in a number of key departments, which has begun to impact the timeliness of our reviews. We recognize that development 3 and construction play a critical role in our community’s vibrancy and economic recovery, and we have been exploring options for mitigating impacts to our customers. As a result, we will be making some temporary service changes. Beginning Monday May 10, 2021, one additional week of review time will be added to all 1st and 2nd round submittals (increase from 3 weeks to 4 weeks). Response: Thank you for the information. Comment Number: 7 05/23/2022: RESUBMITTAL: Please resubmit within 180 days, approximately 6 months, to avoid the expiration of your project. (LUC 2.211 Lapse, Rounds of Review). Response: Thank you for the information. Comment Number: 8 05/23/2022: FOR HEARING: All "For Hearing" comments need to be addressed and resolved prior to moving forward with scheduling the Hearing. Staff will need to agree the project is ready for Hearing approximately 4 to 8 weeks prior to the hearing. Response: Thank you for the information. Comment Number: 9 05/23/2022: FOR HEARING: The proposed development project is subject to a Type 1 Review. The decision maker for your project will be an Administrative Hearing Officer at a public hearing. For the hearing, we will formally notify surrounding property owners within 800 feet (excluding public right-of-way and publicly owned open space). As your Development Review Coordinator, I will assist with preparing the mailing and coordinating the hearing date with your team. Response: Thank you for the information. Comment Number: 10 05/23/2022: FOR HEARING: I am letting you know that your quasi-judicial item could be heard remotely and that there is the option to hold off until an in-person hearing can be conducted. Any person or applicant seeking a quasi-judicial decision from City Council, a City board or commission or an administrative hearing officer under the City Code or the City's Land Use Code, shall be notified in writing or by email of the intention to conduct a Quasi-Judicial Hearing using Remote Technology. Such person or applicant shall be entitled to request that the Quasi-Judicial Hearing be delayed until such time as the Hearing can be conducted in person. Response: Thank you for the information. Department: Planning Services Contact: Will Lindsey, , wlindsey@fcgov.com Topic: General Comment Number: 1 4 05/31/2022: FOR HEARING: Planning still has major concerns about the plan as proposed. The plan’s building orientation, building height, footprint placement, grading transitions, garage locations and tree impacts all need further coordination. As discussed, at the time of Conceptual Review the “West Central” subarea plan area of the city places a high priority on compatibility and livability. Goals/principles of the plan focus on preserve and enhance existing neighborhoods, maintaining established, mature neighborhoods as areas of stability; emphasizing and respecting existing character and heritage of neighborhoods. Design must be sensitive to the context. The subarea plan and city code also call for preserving and enhancing tree canopy, providing walkable developments with building entrances that orient towards a street and with street enhancements. Planning staff does not feel that the current proposal satisfies all of these aspects of the Plan and will require further revision. Response: Thank you for your feedback, we have made the following changes: · Building orientation and footprint placement – The new buildings take advantage of open space on the site and face the main pool area or paseo to create a sense of community. The entries face green spaces and garages are oriented to a street or alley. · Building height – The new units will be three stories high, one story higher than the existing units, see Architectural Perspectives. The new units offer private garages on the ground floor and townhome living on the upper two levels to diversify the rental options. · Grading transitions – New sidewalks and unit entries will connect to existing sidewalks. · Garage locations – Garages are located at the rear of the units facing a street or alley. · Providing walkable developments – New walkways will be constructed so that residents can walk through the community and access amenities and surrounding areas. · Building entrances that orient towards the street and street enhancements – The new buildings are attached multi-family units. The unit entries face walkways with green spaces, and have porches and landscaping as a transition to sidewalks. The new buildings meet the requirements outlined in Division 3.5 of the Building Standards, Section E: o (4)Attached and multi-family dwellings which also face a second street or a major walkway spine shall be exempt from paragraphs (1) through (3) above. The façade oriented to the second street or walkway spine shall include windows, doorways and a structured transition from public to private areas using built elements such as porch features, pediments, arbors, low walls, fences, trellis work and/or similar elements integrated with plantings. Comment Number: 2 05/31/2022: FOR HEARING: ROW Improvements: As a Major Amendment the project is expected to make affiliated right-of-way improvements to Shields and Stuarts streets to bring them into compliance with current LCUASS requirements for arterial and collector streets. Please see the attached redlines for more details. Response: Per discussions with City staff, right-of-way improvements to Shields and Stuart are no longer required for this Major Amendment application. Comment Number: 3 05/31/2022: FOR HEARING: Private Street Standards: If Heritage Circle is going to become a private right-of-way it needs to be updated to the City’s current private street standards 5 (which means LCUASS or better). A street cross section demonstrating compliance with these standards should be provided for next submittal. An emphasis on pedestrian circulation, retention of existing trees, and the provision of detached walkways are key. Please see the attached redlines for more details. Response: The intention continues to make Heritage Circle a private right-of-way. The adjacent private street section has been updated to LCUASS standards. Please reference the resubmittal package for additional details. The project team has worked with City staff on the emphasis of pedestrian circulation, retention of existing trees where applicable, and providing detached walkways. Comment Number: 4 05/31/2022: FOR HEARING: Pedestrian Connectivity: This is a repeat comment from Conceptual – An overall exhibit should be prepared and analyzed showing the sidewalk system, and identifying gaps that should be connected and making certain that new improvements enhance the neighborhood. The plan should prioritize pedestrian circulation. See Planning’s redlines on the site plan for additional details and suggestions on how this can be achieved. Response: Please reference the resubmittal package for the emphasis and updates related to the pedestrian connectivity of the Site where improvements are being made. Comment Number: 5 05/31/2022: FOR HEARING: Landscaping: As a general note, please break the landscape plan out into a separate plan set or combine into the “planning set,” it should not be combined with the Utility, Drainage, and Grading plans. Response: Thank you for the note. Comment Number: 6 05/31/2022: FOR HEARING: Landscaping: The details of the previously approved landscape plan need to be carried over to the new landscape plan documentation, and all plant/tree totals should be updated for the entirety of the site. Any plantings from the previous plan that have died or are missing should be replaced. Response: Thank you for the note, please see the revised Landscape Plan. Comment Number: 7 05/31/2022: FOR HEARING: Trash Enclosures: Per LUC 3.2.5 – All trash and recycling enclosures on the site will need to be upgraded. This will likely take up additional space on the site. Development plans must include labeled drawings of all proposed enclosures, internal trash and recycling rooms, staging areas and the like and include all proposed dumpsters, containers, bins and other receptacles and label the capacity of each. Proposed recycling capacity must be at least fifty (50) percent of the proposed trash capacity. To provide equal access for trash, compostable and recyclable materials, space allotted for the collection and storage of compostable/recyclable materials must be adequate in size and provided everywhere space for trash is provided in a functional manner. Enclosures must be constructed of durable materials such as masonry and shall be compatible with the structure to which it is associated. All enclosures must 6 provide adequately sized, conveniently located, and easily accessible areas. All enclosures must be designed to allow walk in access for pedestrians separate from the service opening that is at least thirty two (32) inches wide and provides unobstructed and convenient access to all dumpsters, containers, bins, and other receptacles. Response: No additional trash enclosures are required for the new multi-family building as trash service will be individual bins. Existing trash enclosures will be upgraded to include new materials and metal gates, see Trash Enclosure Architectural Plans. Comment Number: 8 05/31/2022: FOR HEARING: Vehicle Parking: Minimum parking requirement based on the bedroom/unit count is 393 spaces, but parking provided is listed at 316. This parking deficiency is very significant, and the project is outside of the TOD overlay which allows for parking reductions. Please review site plan redlines to ensure that the unit count and parking calculation is correct. If it is accurate then Planning cannot support the project as proposed without a reduction in the number of units. Response: The parking data table has been updated and the site now has 58 excess spaces. 337 required Existing parking = 293 New garages = 60 On-street = 42 Total = 395 Comment Number: 9 05/31/2022: FOR HEARING: Bicycle Parking: Please provide additional information on specifications for the fixed bicycle racks, and the location of the enclosed bicycle parking spaces. Per the Land Use Code, enclosed bicycle parking shall mean bicycle storage in lockers, a room or other space within a parking structure or other building, including a shed or carport. All types of enclosed bicycle storage must be easily accessible to entrances and walkways, secure, lighted and protected from the weather. Each storage space shall provide a minimum of six (6) square feet in area. The storage space shall not impede fire exits or be located so that parked bicycles interfere with public access. Fixed bicycle parking shall mean bicycle parking that allows the bicycle frame and both wheels to be securely locked to the parking structure. The structure shall be of permanent construction such as heavy gauge tubular steel with angle bars permanently attached to the pavement foundation. Fixed bicycle parking facilities shall be at least two (2) feet in width and five and one half (5½) feet in length, with additional back out or maneuvering space of at least five (5) feet. Response: The fixed racks are existing and there are about 90 spaces for bikes. With 466 bedrooms, it will be very challenging to provide 280 enclosed racks and 186 fixed tacks so the applicant would like to request of Modification for this standard. Comment Number: 10 05/31/2022: FOR HEARING: 7 Exterior Lighting: The code requires that applicants for major amendments and changes of use pursuant to 2.2.10(B) must submit a lighting plan for the entire development site that meets the requirements of this Section 3.2.4 and, if necessary to meet such requirements, complete a site lighting retrofit for the entire development site. The property is within the LC1 context area. Detailed site lighting plans should provide lighting details, dimensions and BUG rating information – please tailor the documentation to demonstrate compliance with the maximum BUG (Backlight Uplight Glare) ratings for the LC1 area. Please provide plan dimensions and rating information as necessary to confirm compliance. Response: Photometric plans will be provided for the site and are designed to meet city requirements. Comment Number: 11 05/31/2022: FOR HEARING: Variation Among Buildings - Since the development (both proposed and existing) contains more than 5 buildings (excluding clubhouses/leasing offices), there needs to be at least 3 distinctly different building designs. This should be documented with a typical elevation of the existing buildings in addition to the new. For all developments, there cannot be similar buildings placed next to each other along a street, street-like private drive or major walkway spine. The two new buildings in the southeast of the site, and the three unit and four-unit buildings on the circle do not meet this standard. Different architectural styles, footprints, and scale can help to meet the standard. Please note that building designs are considered similar unless they vary significantly in footprint size and shape. Building designs must be distinguished by including unique architectural elevations and unique entrance features within a coordinated overall theme of roof forms, massing proportions and other characteristics. This standard applies to the new buildings, and to the extent feasible, the existing structures if significant architectural changes are proposed for the future. Response: The proposed enhancements to the community include upgrading existing buildings and providing new Townhome units as follows: · Three (3) distinctly different building designs – The proposed enhancements will include: oUpgrades to the existing buildings and new color scheme oNew Townhome units in Color Scheme 1 oNew Townhome units in Color Scheme 2 with a variation in materials · Typical elevation of the existing buildings – The existing buildings are shown with the new paint scheme in context in the Architectural Perspectives. · For all developments, there cannot be similar buildings placed next to each other along a street, street‑like private drive or major walkway spine – With three (3) new Color Schemes and different materials and design, there will be a variation of buildings along the streets. · Building designs must be distinguished by including unique architectural elevations and unique entrance features within a coordinated overall theme of roof forms, massing proportions and other characteristics o The existing buildings will provide enhancements to the entries, new wainscot and a new color paint scheme o The new Townhome units provide a mix of unit types which include variations of entry patios, different materials and color schemes, and coordinated roof forms to unify the community Comment Number: 12 05/31/2022: FOR HEARING: Variation of Color - Please provide additional color schemes for the 8 development that demonstrates compliance with this standard. For a development with more than 56 dwelling units, there must be at least 3 distinct color schemes used on structures throughout the development. For all developments, there shall be no more than 2 similarly colored structures placed next to each other along a street or major walkway spine. Since this is a major amendment, this standard must be applied to both the proposed and existing buildings. Please provide additional color schemes for the development that demonstrate compliance with this standard. Response: For the overall community, three (3) new color schemes are proposed for the apartments including an upgraded paint scheme for the existing buildings and two (2) new color schemes with material variations for the new Townhome units. Department: Engineering Development Review Contact: John Gerwel, , jgerwel@fcgov.com Topic: General Comment Number: 1 05/19/2022: FOR HEARING: Any utilities in the vacated ROW will need dedicated utility easements. It is recommended that the vacated ROW be rededicated as an access and utility easement. Response: The design team is working on a replat that will abandon the Heritage Circle public right-of-way and dedicate all necessary easements on the parcel. Comment Number: 2 05/19/2022: FOR HEARING: There is a building that is encroaching into the easement. Buildings cannot be placed within easements. See redlines. Response: The building in question will not be placed in the easement with the replat. Comment Number: 3 05/19/2022: FOR HEARING: There is a sidewalk in the northeast that is apparently being moved from its original easement dedication. Will that easement be vacated? Will there be a new easement dedication? See redlines. Response: That easement will be vacated during the replat process and a new easement will be dedicated. Comment Number: 4 05/19/2022: FOR HEARING: The 3plex on the west is overlapping with the proposed- sidewalk. See redlines. Response: Please see the resubmittal package that demonstrates no overlap with the proposed sidewalk. Comment Number: 5 05/19/2022: FOR HEARING: Given the amount of easements and ROW needing to be dedicated and vacated, it is recommended that this project replat the property. The new plat would include legal descriptions and exhibits for new easements, prepared by a licensed Colorado Land Surveyor, and point out the easements and ROW that have been vacated, with previous reception numbers cited. Response: The design team is working on the replat process for this project. 9 Comment Number: 6 05/19/2022: FOR HEARING: Stuart Street is a 2-lane collector road with parking. Per LCUASS standards, the amount of ROW required is 81 feet. This area is about 5 feet short on each side. Please confirm the ROW length and dedicate the ROW needed to bring this property's half of Stuart to 40.5 feet. Similarly, Shields Street is a 4-lane arterial road, making the ROW required to be 115 feet. So the half of Shields that is adjacent to this property will need to dedicate ROW so that your half of the ROW is 57.5 feet. Response: The project team will discuss with City staff during the replating process if additional ROW is to be granted during this replat process or during the eventual ROW improvements per LCUASS standards. Comment Number: 7 05/19/2022: FOR HEARING: Frontage improvements will be required for Shields and Stuart. This includes a parkway and detached sidewalk as described in LCUASS chapter 7. Response: Per discussions with City staff, no frontage improvements will be required with this Major Amendment process along Shields and Stuart. Comment Number: 8 05/19/2022: FOR FINAL PLAN: The ROW vacation application will be needed for after the hearing. Forms for ROW vacation can be found here: https://www.fcgov.com/engineering/devrev Response: Thank you for the information. Comment Number: 9 05/19/2022: FOR FINAL PLAN: Please call out all existing and proposed easements with dimensions in the utility plans. Please provide reception numbers for any recorded easements. Response: Please see the updated Grading and Utility Plans showing the easements and the corresponding reception numbers. Comment Number: 10 05/31/2022: FOR FINAL PLAN: On the northern part of the property, there is an easement for a sewer line that does not align with the sewer. This will need to be adjusted. See redlines. Response: Please see the updated survey linework with this submittal package. The survey team went onsite to verify the location of the sanitary sewer and the survey has been updated accordingly. Thank you for this notice. Comment Number: 11 05/31/2022: FOR FINAL PLAN: The utility sheet is crowded with labeling. It is preventing a proper review of the utility set. Consider spreading out the utilities over multiple sheets for clarity. Response: Thank you for the note. Please see the resubmittal package for a more properly laid out plan. 10 Comment Number: 12 05/31/2022: FOR FINAL PLAN: Please address all other redline comments made in the attached pdfs. Response: Thank you for your comment, please reference the resubmittal package. Department: Traffic Operation Contact: Spencer Smith, 970-221-6820, smsmith@fcgov.com Topic: General Comment Number: 1 05/31/2022: FOR HEARING: Please see traffic letter redlines for minor comments. Response: Thank you for your comments, please reference the updated Traffic Impact Study in the resubmittal package. Department: Stormwater Floodplain Contact: Claudia Quezada, (970)416-2494, cquezada@fcgov.com Topic: Floodplain Comment Number: 4 05/27/2022: FOR HEARING: Please add the following notes to the site plan, grading, and drainage plan: 1.Portions of this property are located in the City designated-, 100-year Canal Importation floodplain and floodway. Any development within the floodplain must comply with the safety regulations of Chapter 10 of City Municipal Code. 2.The Developer shall obtain a Floodplain Use Permit from the City of Fort Collins and pay all applicable floodplain use permit fees prior to commencing any construction activity (building of structures, grading, fill, detention ponds, bike paths, parking lots, utilities, landscaped areas, flood control channels, etc.) within the Canal Importation floodplain. All activities within the floodplain are subject to the requirements of Chapter 10 of the Fort Collins Municipal Code. Response: Thank you for your comment, please reference the resubmittal package. Comment Number: 5 05/27/2022: FOR HEARING: Please utilize the floodplain development review checklist when preparing your plans for submittal (including drainage report), see redlines. Site, grading, and drainage plans are missing floodplain linework. Response: Thank you for your comment, please reference the resubmittal package for the floodplain linework. Comment Number: 6 05/27/2022: FOR HEARING: Please show the boundaries of the floodplain and floodway on site drawings as applicable. Contact Ted Bender of Stormwater Master Planning at tbender@fcgov.com for floodplain CAD line work. Response: Please reference the resubmittal package for the floodplain and floodway linework. 11 Department: Stormwater Engineering Contact: Dan Mogen, 970-305-5989, dmogen@fcgov.com Topic: General Comment Number: 1 05/27/2022: FOR HEARING: Additional information is needed to determine if Stormwater requirements including Low Impact Development, Water Quality, and Detention are being met. It is not clear the detention pond will provide adequate detention for the allowable release rate, and it is not clear if the new and modified impervious areas are being treated for WQ/LID. Please see redlines for additional details. Prior to next submittal, please contact me/Brandy to schedule a meeting to discuss the proposed stormwater approach to ensure appropriate City Criteria is being followed and all requirements are being met. Response: Please reference the updated Preliminary Drainage Report for added information related to the detention being met in the proposed condition, the LID/WQ strucutre treating adequete impervious area, and the release rates of the outlet structure. Comment Number: 2 05/27/2022: FOR HEARING: Please show drainage easement for proposed bioretention, detention pond, and outfalls. Response: Drainage easement to be dedicated with replat process. Comment Number: 3 05/27/2022: DEVELOPMENT AGREEMENT: Please note a development agreement will be required prior to final approval. Response: Noted, development agreement will be provided prior to final approval. Department: Water-Wastewater Engineering Contact: Dan Mogen, 970-305-5989, dmogen@fcgov.com Topic: General Comment Number: 1 05/27/2022: FOR HEARING: Please see redlines regarding proposed water and sewer services. Clarification is needed to understand if these will be single family attached townhomes or multifamily buildings. I encourage you to reach out with any questions or to review potential revisions, and I’d be happy to set up a meeting or conference call to do so. Response: These proposed structures are to be treated as multi-family buildings. Comment Number: 2 05/27/2022: FOR HEARING: If ROW is being vacated, are easements being dedicated in its place? Response: Yes, utility, access, and drainage easements will be dedicated with the replat of the overall parcel. Comment Number: 3 05/27/2022: FOR FINAL PLAN: 12 The water service and meter for this project site will need to be sized based on the AWWA M22 manual design procedure. A sizing justification letter that includes demand calculations for maximum flows and estimated continuous flows will need to be provided as a part of the final submittal package for this project. Response: Noted, sizing justification letter will be provided in future submittals. Comment Number: 4 06/01/2022: FOR INITIAL FDP SUBMITTAL: The initial FDP submittal will need to include separate irrigation service(s) for the site. Separate irrigation service is required due to recent changes to Fort Collins Utilities Water Supply Requirements (WSR) and Plant Investment Fees (PIF). Please ensure the project submittal includes: - Preliminary Irrigation Plan (PIP) – plan requirements can be found at: www.fcgov.com/WCS. Please contact Irrigation Development Review (irrigation@fcgov.com) with questions regarding the required PIP. - Water budget (annual usage) and peak flow (gallons per minute) for each irrigation service. Note: this information should be included on the PIP. - Landscape Plan including hydrozone table updated with 2022 values – 3, 8, 14, and 18 gallons/square foot/year for very low, low, medium, and high zones, respectively. - Water Need Form – form is available at: www.fcgov.com/WFF Please contact Utility Fee and Rate Specialists (UtilityFees@fcgov.com or 970-416-4252) with questions regarding the Water Need Form. - Irrigation service(s), including curb stop and meter location, shown on the Utility and Site Plans. Irrigation service location(s) must match information on the PIP. On Oct. 5, 2021 Council adopted changes to Fort Collins Utilities Water Supply Requirements and Plant Investment Fees. In general developments that use more water may pay more and developments that use less water may pay less. These changes were implemented 1/1/2022; more information can be found at: www.fcgov.com/wsr-update Response: Irrigation Plan will be provided with FDP submittal. Department: Erosion Control Contact: Basil Hamdan, 970-222-1801, bhamdan@fcgov.com Topic: Erosion Control Comment Number: 7 06/01/2022: FOR FINAL PLAN: Please submit an Erosion Control Plan and other supporting materials in accordance with City stormwater criteria. Response: Erosion Control Plan will be submitted with future submittals. Department: Light And Power Contact: Rob Irish, 970-224-6167, rirish@fcgov.com Topic: General Comment Number: 1 05/31/2022: FOR HEARING: Light & Power would like to see more of the West side of Heritage Circle across from the new proposed townhomes. We will need to see all existing utilities and structures to determine where we can place a transformer and/or vault to feed the new units. Please see submitted redline for location of this comment. Response: Please reference the resubmittal package. Let us know if you need to see more of the West 13 area of Heritage Circle. Comment Number: 2 05/31/2022: FOR HEARING: The farthest South proposed building 4 is shown on top of existing electric primary and the transformer that feeds two other existing buildings. Please shift the building a minimum of 6 feet from the existing electric facilities or coordinate with Light & Power on the relocation of these facilities. Relocating these facilities will require extensive secondary work by the owner and possibly long outages on existing buildings. Please see submitted redline for location of this comment. Response: Thank you for the comment, please see the updated Utility Plan showing the relocation of the electrical line. Comment Number: 3 05/31/2022: FOR HEARING: The plan set appears to be missing many existing electric structures, i.e. vaults. Please show these on the Utility Plan set along with all existing electric facilities. Response: Thank you for your comment, our team reached out to the surveyor for any outstanding electric structures. If we are still missing structures, please let us know and we will update accordingly. Let us know if a site walk to identify all structures would be recommended. Comment Number: 4 05/31/2022: FOR HEARING: Any existing and/or proposed Light & Power electric facilities that will remain within the limits of the project will need to be located within a dedicated easement or the public right-of-way. Please coordinate relocations with Light & Power Engineering. Response: Noted, easements to be dedicated with replat. Comment Number: 5 05/31/2022: FOR HEARING: Utility Plan shows the proposed buildings secondary services connecting to existing primary lines. This is not possible. Transformers will need to be installed to provide power to these buildings. Please see submitted redlines. Transformer and meter locations must be coordinated with Light & Power Engineering and shown on the plan set. Transformers must be located within 10 feet of an all-weather surface accessible by a line truck. Please adhere to all clearance requirements in the Electric Service Standards at the following link. http://www.fcgov.com/utilities/business/builders-and-developers/development-forms-guidelines-regulations Response: Please see updated Utility Plan for proposed transformer locations. Comment Number: 6 05/31/2022: FOR HEARING: With the vacation of the existing Heritage Circle ROW, the existing streetlights will need to be removed or a determination will need to be made on what to do with the lights. Light & Power does not provide lighting on private drives/streets. Relocations or modifications to existing electric facilities will be at the expense of the owner/developer. Any existing and/or proposed Light & Power electric facilities that will remain within the limits of the project will need to be located 14 within a dedicated easement or the public right-of-way. Please coordinate relocations with Light & Power Engineering. Response: Per the Photometric Plan and conversations with City staff, the project team is planning to remove the existing street lights and provide new lighting structures in its place to meet City criteria. Comment Number: 7 05/31/2022: FOR HEARING: It will help to know early on what size electric services you will be needing for the proposed buildings. This will help determine how many transformers and/or vaults will be needed and where best to locate them. A Customer Information Form (C-1 Form) and a One-line diagram will need to be submitted to Light & Power Engineering for any proposed electric changes and/or additions. A link to the C-1 form is below: http://www.fcgov.com/utilities/business/builders-and-developers/development-fo rms-guidelines-regulations Response: A C-1 form will be provided closer to Final. Department: PFA Contact: Marcus Glasgow, 970-416-2869, marcus.glasgow@poudre-fire.org Topic: General Comment Number: 1 05/26/2022: INFORMATION: 2021 IFC CODE ADOPTION Poudre Fire Authority will be adopting the 2021 International Fire Code (IFC) in the upcoming months. Future development plans and building plan reviews shall be subject to the adopted version of the fire code as amended. The following codes are the current adopted 2018 IFC amendments. Once the 2021 IFC has been adopted, the approved amendments will be available online. - Copies of our current local amendments can be found here: https://www.poudre-fire.org/programs-services/community-safety-services-fire-p revention/fire-code-adoption - Free versions of the IFC can be found here: https://codes.iccsafe.org Response: Acknowledged, thank you. Comment Number: 2 05/26/2022: FOR PERMIT: The comment response indicates no sprinkler system is planned. The narrative states these are multifamily units. I do not see property lines for each unit so these will be considered R2 Multi-family and will be constructed according to the IBC/IFC. This will require a fire sprinkler system as follows: · New multi-family buildings shall be provided with NFPA13 (full protection) fire suppression systems. o Exception 1: M-F units with six (6) or fewer dwelling units per building will be allowed to install 13-R fire suppression systems provided the units are separated by one-hour construction (walls & floors). o Exception 2: M-F units with seven to twelve (7 - 12) units per building will be allowed to install 13-R fire suppression systems provided the units are separated by two-hour construction (walls & floors). Response: The new buildings will have 2, 3, 4 and 6 dwelling units per building and 13-R sprinkler system 15 will be provided. Comment Number: 3 05/26/2022: FOR PERMIT: FIRE ALARM AND DETECTION SYSTEMS Fire alarm systems and smoke detection shall be installed in Group R-2 occupancies as required by IFC Section 907.2.9.1 and 907.2.9.3. Response: Fire alarm systems and smoke detection shall be provided for all new units. Comment Number: 4 05/26/2022: FOR HEARING: Heritage Circle does not appear to provide 20 feet of unobstructed access when vehicles are parked on street. The installation of no parking/ fire lane signage can help to support access width. Response: Fire lane signs will be provided. Comment Number: 5 05/26/2022: FOR FINAL PLAN: ALLEY LOADED UNITS There is a reasonable expectation that emergency services personnel can quickly arrive at a person-door to the residence. This is usually the front door; however, plans containing alley/access road loaded lots present an added obstacle to access. Front doors onto a greenbelt or other landscape feature shall be provided with an approved sidewalk to the front door that connects to with the alley/access drive to provide direct and efficient access to any individual unit. A walkway from access road to front doors shall be provided from both ends of the building. Future plans should include all walkways to the front door. Response: New walkways are planned from the new unit entries to the alley ways or streets. Additionally, alleys are a 28’ wide for fire truck access to each unit. Comment Number: 6 05/27/2022: FOR FINAL PLAN: PREMISE IDENTIFICATION: ADDRESS POSTING & WAYFINDING Where possible, the naming of private drives is usually recommended to aid in wayfinding. New and existing buildings shall be provided with approved address identification. The address identification shall be legible and placed in a position that is visible from the street or road fronting the property. Address identification characters shall contrast with their background. Address numbers shall be arabic numbers or alphabetical letters. Numbers shall not be spelled out. The address numerals for any commercial or industrial buildings shall be placed at a height to be clearly visible from the street. They shall be a minimum of 8 inches in height unless distance from the street or other factors dictate larger numbers. Refer to Table 505.1.3 of the 2018 IFC as amended. The address numbers for one and -twofamily- dwellings shall be a minimum of 4” in height with a minimum ½” stroke and shall be posted on a contrasting background. If bronze or brass numerals are used, they shall only be posted on a black background for visibility. Monument signs may be used in lieu of address numerals on the building as approved by the fire code official. Buildings, either individually or part of a multi- building complex, that have emergency access lanes on sides other than on the addressed street side, shall 16 have the address numbers and street name on each side that fronts the fire lane. Response: Address signs will be provided for each unit entry and garage that faces the street or alley. Comment Number: 7 05/27/2022: FOR HEARING: TURNING RADII The turning radius into the drive access of the 6 plex buildings does not meet the requirements. Please correct or submit an Autoturn exhibit. - IFC 503.2.4 and Local Amendments: The required turning radii of a fire apparatus access road shall be a minimum of 25 feet inside and 50 feet outside. Response: Please see in the submittal package for the AutoTurn exhibit showing the PFA fire truck making the route around the site. Comment Number: 8 05/27/2022: FOR HEARING: FIRE LANES If the access drives for the 6 plex buildings is to be used as fire apparatus access, they shall meet fire lane requirements and be dedicated EAE. Response: Fire lane requirements will be met with a 28’ alley drive. Department: Environmental Planning Contact: Scott Benton, (970)416-4290, sbenton@fcgov.com Topic: General Comment Number: 1 05/31/2022: FOR HEARING: The wetland boundary needs to be portrayed on all applicable plan sets: civil, landscaping, etc. The wetland boundary determines the buffer extent, and the proposed stormwater detention pond comes very close to the possible buffer boundary. Response: Please see updated submittal package showing the wetland boundary delineation. Comment Number: 2 05/31/2022: FOR HEARING: Please provide the details of all seed mixes to be used: species (both scientific and common names), proportions of each species, and seeding rate(s). Detail with hatching where each mix will be used. Response: Please reference Landscape Plan in submittal package for seed mixes. Comment Number: 3 05/31/2022: FOR HEARING: Please include the following standard Native Seed Mix Notes: NATIVE SEED MIX NOTES 1. THE TIME OF YEAR SEEDING IS TO OCCUR SHOULD BE OCTOBER THROUGH EARLY MAY. 2. PREPARE SOIL AS NECESSARY AND APPROPRIATE FOR NATIVE SEED MIX SPECIES THROUGH LOOSENING AND ADDITION OF AMENDMENTS THAT PROMOTE WATER ABSORPTION AND RELEASE, THEN SEED IN TWO DIRECTIONS TO DISTRIBUTE SEED EVENLY OVER ENTIRE AREA. DRILL SEED ALL INDICATED AREAS AS SOON AS POSSIBLE AFTER COMPLETION OF GRADING OPERATIONS. 17 3. IF CHANGES ARE TO BE MADE TO SEED MIX BASED ON SITE CONDITIONS THEN APPROVAL MUST BE PROVIDED BY CITY ENVIRONMENTAL PLANNER. 4. APPROPRIATE NATIVE SEEDING EQUIPMENT WILL BE USED (STANDARD TURF SEEDING EQUIPMENT OR AGRICULTURE EQUIPMENT SHALL NOT BE USED). 5. DRILL SEED APPLICATION RECOMMENDED PER SPECIFIED APPLICATION RATE TO NO MORE THAN ½ INCH DEPTH. FOR BROADCAST SEEDING INSTEAD OF DRILL SEEDING METHOD DOUBLE SPECIFIED APPLICATION RATE. REFER TO NATIVE SEED MIX TABLE FOR SPECIES, PERCENTAGES AND APPLICATION RATES. 6. PREPARE A WEED MANAGEMENT PLAN TO ENSURE THAT WEEDS ARE PROPERLY MANAGED BEFORE, DURING AND AFTER SEEDING ACTIVITIES. 7. AFTER SEEDING THE AREA SHALL BE COVERED WITH CRIMPED STRAW, JUTE MESH, OR OTHER APPROPRIATE METHODS. PLASTIC-BASED EROSION CONTROL MATERIALS (I.E., PLASTIC-WELDED BLANKETS) SHALL NOT BE USED WITHOUT EXPRESS PERMISSION FROM THE ENVIRONMENTAL PLANNER AS THESE MATERIALS HAVE PROVEN TO CAUSE WILDLIFE ENTRAPMENT ISSUES. 8. WHERE NEEDED, TEMPORARY IRRIGATION SHOULD BE PROVIDED UNTIL SEED IS GERMINATED THEN WEEN THE SEED FROM IRRIGATION. IF IRRIGATION IS USED, THE IRRIGATION SYSTEM FOR SEEDED AREAS SHALL BE FULLY OPERATIONAL AT THE TIME OF SEEDING AND SHALL ENSURE 100% HEAD-TO-HEAD COVERAGE OVER ALL SEEDED AREAS. ALL METHODS AND REQUIREMENTS IN THE APPROVED IRRIGATION PLAN SHALL BE FOLLOWED. 9. CONTRACTOR SHALL MONITOR SEEDED AREA FOR PROPER IRRIGATION, EROSION CONTROL, GERMINATION AND RESEEDING AS NEEDED TO ESTABLISH COVER. 10. THE APPROVED NATIVE SEED MIX AREA IS INTENDED TO BE MAINTAINED IN A NATURAL LIKE LANDSCAPE AESTHETIC. DO NOT MOW DURING HOT, DRY PERIODS. DO NOT MOW LOWER THAN 6 TO 8 INCHES IN HEIGHT TO AVOID INHIBITING NATIVE PLANT GROWTH. 11. NATIVE SEED AREA WILL BE CONSIDERED ESTABLISHED WHEN SEVENTY PERCENT VEGETATIVE COVER IS REACHED WITH LESS THAN TEN PERCENT OF COVER CONSISTING OF NOXIOUS WEEDS, NO BARE SPOTS LARGER THAN ONE FOOT SQUARE, AND/OR UNTIL DEEMED ESTABLISHED BY CITY PLANNING SERVICES AND EROSION CONTROL. 12. THE DEVELOPER AND/OR LANDSCAPE CONTRACTOR IS RESPONSIBLE FOR ADEQUATE SEEDLING COVERAGE AND GROWTH AT THE TIME OF FINAL STABILIZATION, AS DEFINED BY STATE AND LOCAL AGENCIES. IF FINAL STABILIZATION IS NOT ACHIEVED TO THE SATISFACTION OF THE AGENCY, THE DEVELOPER AND/OR LANDSCAPE CONTRACTOR SHALL BE RESPONSIBLE FOR ADDITIONAL CORRECTIVE MEASURES TO SATISFY FINAL VEGETATIVE REQUIREMENTS FOR CLOSEOUT. Response: Please see updated Landscape Plan with applicable notes. Department: Forestry Contact: Christine Holtz, , choltz@fcgov.com 18 Topic: General Comment Number: 2 05/31/2022: FOR HEARING: Please include the Tree Protection Notes per Land Use Code 3.2.1 requirements. These notes are available from the City Planner or by following the link below and clicking on Standard Plan Set Notes: https://www.fcgov.com/developmentreview/applications.php Response: Please see updated Landscape Plan with applicable notes. Comment Number: 3 05/31/2022: FOR HEARING: Although there may be a new tree inventory implemented, currently there are 32 trees proposed as mitigation. See the standards below for mitigation sizes. Please adjust your ornaments sizes from 1.5” B&B to 2”, and your evergreen sizes from 6’ B&B to 8’. Required mitigation tree sizes: Canopy Shade Tree: 2.0” caliper balled and burlapped Evergreen tree: 8.0’ height balled and burlapped Ornamental tree: 2.0” caliper balled and burlapped Response: Thank you for the comment, see Landscape Plan for updates. Comment Number: 4 05/31/2022: FOR HEARING: Please ensure tree locations maintain proper tree/utility separation. 10’ between trees and public water, sanitary, and storm sewer main lines 6’ between trees and water or sewer service lines 4’ between trees and gas lines 10’ between trees and electric vaults 40’ between canopy shade trees and streetlights 15’ between ornamental trees and streetlights Response: Thank you for the comment, please see Landscape Plan for updates. Comment Number: 5 05/31/2022: FOR HEARING: The 3 spruce trees proposed for removal on the northeast side of the submitted plans are extremely significant to this property. They provide a good buffer for Shields, and they are all in good condition—‘good’ condition is the highest rated condition for trees. Please consider reconfiguring the building proposed in that location to accommodate these trees. Response: Acknowledged, thank you for your concern. Comment Number: 6 05/31/2022: FOR HEARING: Please use a different species for honey locust, white fir, and Tartarian maple for the reasons stated below: -Honey locust: The City of Fort Collins’ urban forest has reached the maximum percentage of the Honeylocust (Gleditsia triacanthose: ‘Shademaster’, ‘Skyline’, etc), Bur Oak (Quercus macrocarpa), and Chanticleer Pear (Pyrus calleryana). -White fir: soil intolerance can sub white spruce -Tartarian maple: trees tend to break apart 19 Response: Noted, please see updated submittal with different species. Comment Number: 7 05/31/2022: FOR HEARING: According to Land Use Code 3.2.1.(D)(c), canopy shade trees shall constitute at least (50%) of all tree plantings. Please ensure the tree planting proposed with the Major Amendment adheres to this requirement for the original approved landscape plan. Response: Noted, thank you for your comment. Department: Technical Services Contact: Jeff County, 970-221-6588, jcounty@fcgov.com Topic: General Comment Number: 1 05/26/2022: INFORMATION: Unless required during MJA, a complete review of all plans will be done at FDP. Response: Acknowledged. Comment Number: 2 05/26/2022: Please provide a closure report for the ROW Vacation. Response: Closure report to be provided with replat process. Department: Building Services Contact: Russell Hovland, 970-416-2341, rhovland@fcgov.com Topic: Building Insp Plan Review Comment Number: 1 05/30/2022: Townhome and duplex construction shall comply with adopted codes as amended. Current adopted codes are: 2021 International Residential Code (IRC) with local amendments 2018 International Plumbing Code (IPC) as amended by the State of Colorado 2020 National Electrical Code (NEC) as amended by the State of Colorado Copies of current City of Fort Collins code amendments can be found at fcgov.com/building. Please read the residential permit application submittal checklist for complete requirements. · Snow Live Load: Ground Snow Load 35 PSF. · Frost Depth: 30 inches. · Wind Loads: Risk Category II (most structures): · 140mph (Ultimate) exposure B or Front Range Gust Map published by The Structural Engineer's Association of Colorado · Seismic Design: Category B. · Climate Zone: Zone 5 · Energy Code: 2021 IECC residential chapter. INFORMATIONAL ITEMS: · For a fire-sprinkled building, 3ft setback required from property line or provide fire rated walls & openings per chap 3 of the IRC. · Bedroom egress windows (emergency escape openings) required in all bedrooms. 20 · For buildings using electric heat, heat pump equipment is required. · Attached single-family townhomes and duplexes are required to be fire sprinkled per local amendment and must provide a P2904 system min and provide fire rated wall per R302. This fire sprinkler system usually requires a ¾” or 1” water line and meter to meet all P2904 requirements. · New homes must provide electric vehicle ready wiring if garages are attached, see local amendment. · Provide site-wide accessibility plan in accordance with CRS 9-5. This requires accessible units per that state standard. STOCK PLANS: When residential buildings will be built at least three times with limited variations, a stock plan design or master plan can be submitted for a single review and then built multiple times with site specific permits. More information can be found in our Stock Plan Guide at fcgov.com/building/resrequirements.php-. Response: Acknowledged, thank you. Comment Number: 2 05/30/2022: Construction shall comply with adopted codes as amended. Current adopted codes are: 2021 International Building Code (IBC) with local amendments 2021 International Existing Building Code (IEBC) with local amendments 2021 International Energy Conservation Code (IECC) with local amendments 2021 International Mechanical Code (IMC) with local amendments 2021 International Fuel Gas Code (IFGC) with local amendments 2021 International Swimming Pool and Spa Code (ISPSC) with local amendments Colorado Plumbing Code (currently on the 2018 IPC) 2020 National Electrical Code (NEC) as amended by the State of Colorado Copies of current City of Fort Collins code amendments can be found at fcgov.com/building. Important: Fort Collins will be adopting the new 2021 Building Codes in April of 2022. Accessibility: State Law CRS 9-5 & ICC/ANSI A117.1-2017. Snow Live Load: Ground Snow Load 35 PSF. Frost Depth: 30 inches. Wind Loads: Risk Category II (most structures): · 140mph (Ultimate) exposure B or Front Range Gust Map published by The Structural Engineer's Association of Colorado Seismic Design: Category B. Climate Zone: Zone 5 Energy Code: • Multi-family and Condominiums 3 stories max: 2021 IECC residential chapter. • Commercial and Multi-family 4 stories and taller: 2021 IECC commercial chapter. INFORMATIONAL ITEMS: · Electric vehicle charging parking spaces are required, see local amendment. · This building is located within 250ft of a 4 lane road or 1000 ft of an active railway, must provide exterior composite sound transmission of 39 STC min. · R-2 occupancies must provide 10ft setback from property line and 20 feet between other buildings or provide fire rated walls and openings per chapter 6 and 7 of the IBC. 21 · All multi-famliy buildings must be fire sprinkled. City of Fort Collins amendments to the 2021 International Fire Code limit what areas can avoid fire sprinklers with a NFPA 13R, see local IFC 903 amendment. · Bedroom egress windows required below 4th floor regardless of fire-sprinkler. All egress windows above the 1st floor require minimum sill height of 24”. · If using electric systems to heat or cool the building, ground source heat pump or cold climate heat pump technology is required. · A City licensed commercial general contractor is required to construct any new multi-family structure. STOCK PLANS: When the exact same residential building will be built more then once with limited variations, a stock plan design or master plan can be submitted for a single review and then built multiple times with site specific permits. More information can be found in our Stock Plan Guide at fcgov.com/building/resrequirements.php-. BUILDING PERMIT PRE-SUBMITTAL MEETING: Please schedule a pre-submittal meeting with Building Services for this project. Pre-Submittal meetings assist the designer/builder by assuring, early on in the design, that the new projects are on track to complying with all of the adopted City codes and Standards listed above. The proposed project should be in the mid-design stage for this meeting to be effective. Applicants of new projects should your development review coordinator to schedule a presubmittal- meeting. Response: Acknowledged, thank you.