Loading...
HomeMy WebLinkAboutHORSETOOTH WEST MASTER PLAN - 14-88 - CORRESPONDENCE - STREET RELATED DOCUMENTs GEFROH HATTMAN INC. ARCHITECTSIPLANNERS CONSTRUCTION MANAGEMENT 135 west swallow Road Fort Collins, CO 80525 April 7, 1988 (303) 223-7335 Mr. Lou Phillippe, Columbine Cablevision Mr. Ed Heinze, Mountain Bell "XI Mr. Mike Hertzig, City Engineering Mr. Webb Jones, City Water & Sanitary Sewer Mr. Doug Martine, City Light & Power Mr. Jim Slaggle, Public Service RE: UTILITY EASEMENTS REQUIRED NORTH SIDE OF HORSETOOTH WEST OF TAFT HILL ROAD Dear Gentlemen: We are currently working with the property owners on the Northwest cor- ner of Horsetooth and Taft Hill Road. The property joins Horsetooth Road as it travels West from the intersection at Taft Hill Road approximately 1980 feet. The property is annexed to the City of Fort Collins. On be- half of the owner we have submitted a Master Plan for the property through the City's planning process. Dedicated right of way of 50 feet from cen- terline of the street will be provided continuously along the property. The City is negotiating with the property owner for an easement to con- struct a 60 inch diameter water transmission line directly North of Horsetooth Road. To accommodate this waterline the City is asking the Developer for an utility easement of 10 feet adjacent to the 50 foot from centerline right of way. We have prepared a cross section of the right of way and easement which shows the proposed location of services and structures required to be placed within the right of ways as development occurs. We are request- ing that you review this cross section which is typical for the entire length of Horsetooth at this property. We would appreciate any comments concerning the location of your utility. If you have no concerns, would you please sign the cross section and in- itial the transmittal letter which indicates that no additional easements are necessary to achieve proper placement of your utility. We have enclosed a self-addressed stamped envelope in which to return the letter. We have also included a copy for your files of the letter, sec- tion and project Master Plan which shows our intended uses. Sinure,4 y IFFOr i c J .;�fla t� Vitre Pre ent kam enc: INITIALS HORSETOOTH RD. UTILITY SECTION Telephone Cable— 1 r- -- Cable Television Shrubs Gas Berm 4/1 Slop i 10.0 SITE EASEMENT R. O.W. Shade Tree Future Electric Service 35.0 STREET Existing Sewer • We have reviewed the utility configuration and see no reason to request addition- al easement to place our utility. We will work within the right of way or the ten -foot easement to place our utility. APRIL 1988 r