HomeMy WebLinkAboutHORSETOOTH WEST MASTER PLAN - 14-88 - CORRESPONDENCE - RESPONSE TO STAFF REVIEW COMMENTSGEFROH HATTMAN INC.
ARCHITECTS/PLANNERS
CONSTRUCTION MANAGEMENT
135 West Swallow Road
Fort Collins, CO 80525
April 6, 1988 (303) 223-7335
Mr. Ted Shepard
City of Fort Collins
Planning & Development
Box 580
Fort Collins, CO 80522
RE: HORSETOOTH WEST MASTER PLAN
Dear Ted:
The following letter is in response to your comments regarding the Master
Plan for this project. I have responded numerically in sequential order
with respect to your comments.
1. Note Ten has been revised to reflect the terminology you requested
concerning the project's expectations. This note has been renumbered
as Note Sixteen.
2. The potential for a bus bay can be accommodated along Taft Hill North
of the Horsetooth intersection and is noted as a potential use at
this point accommodated within the public R.O.W.
3. We are aware of the paybacks required for both water and sewer ser-
vices on Taft Hill Road and understand that the payback is based on
the net property front footage and is due upon the development into
and adjacent to these services.
4. The East-West street aligning with Bronson Street will have a collec-
tor width intersection and taper to a local street width depended
upon the major access point to the neighborhood center. West of the
Parcel I major access, this street is noted as a local street.
5. The termination of the future collector street was reviewed with Rick
Ensdorff prior to the submission. Factors considered in this loca-
tion were the existing street right of ways adjacent to the property
which are county width local streets with residential uses accessing
on to them. Current city policy is to discourage residential access
from collector streets. If we tried to link into these existing
streets, we would not be adhering to these policies. If we link to
the existing streets,additional right of way would need to be ac-
quired from these front yards which may make the setbacks less than
desirable. In addition the future will more than likely provide in-
tensified land uses of a residential nature. With the collector lo-
cated between adjacent properties, the current land uses and local
infra -structure can remain, with the more intense uses in the future,
urban size residential lots and utilities would occur at on current
undeveloped land.
40 i •
Mr. Ted Shepard
HORSETOOTH WEST MASTER PLAN
April 6, 1988
Page 2
6. It is intended that Horsetooth would be improved providing access con-
tinuous from Taft Hill. Two points of access would be provided from
County Road 38 through the Springfield Subdivision. The collector
street would be constructed from Horsetooth continuous to their North
property boundary.
7. The Traffic Impact Study submitted by Matt Delich addressed the over-
all impact of the traffic at a Master Plan level and in particular a
First Phase consisting of the school site.
8. The access arrow from Taft Hill Road and Horsetooth Road have been
noted as minor access points and are so addressed within the traffic
report.
9. The 20-acre central size or Parcel 1 is appropriate due to location,
contacts of the owners, and timing where we are anticipating a 1995
development schedule.
10. Parcel G and H are sized with several considerations in mind. A. Par-
cel A needs to be sized for maximum regularity of lot size as it is
the prime residential ground in the project. B. At this time the
school has requested to be off Horsetooth but development costs are a
factor. C. Adding more property to G and H would hinder the ability
to loop two streets into Parcel A. D. A larger parcel for H would be
too costly for a day care and an access amount of land. We would
agree that a 15 d.u./ac. project could be layed out on the parcel to
current city requirement. The market would most probably dictate a
lower density. As we discussed, the dual potential of park land on
G and H may alleviate your potential constraint caused by size. Other
land uses that are market potentials could be a church site or other
similar single user entity. We understand that any use would be re-
quired to meet the intent of the Land Development Guidance System.
11. Zoning designations have been removed.
12. The plan currently indicates future signalization of the Horsetooth/
Taft intersection.
13. Note Six concerning the Storm Drainage Facility ownership has been
changed.
14. Drainage concept letter revision addresses the down stream flow of
water from the site.
15. At the time of a first phase plan a comprehensive drainage report would
be submitted.
16. A revised concept drainage letter has been submitted.
17. Tracts G and H indicate dual potential uses to address the potential
of the Parks Department purchasing these tracts. With this 3.8 acres
and a potential sharing of the 10-acre school site, the Parks Depart-
ment could acquire a 5-acre parcel for a neighborhood park.
This concludes our response to the items of concern with respect to this
4Fredric
We hope o % comments meet your expectations and thank you for
port.
J. t an
TMAN INC.