HomeMy WebLinkAboutHORSETOOTH WEST MASTER PLAN - 14-88 - SUBMITTAL DOCUMENTS - ROUND 1 - TRAFFIC STUDY0 0
00
M
LO
o
MEMORANDUM
O
o
To: Robert Scavo
ry
,o
N
Jim Scavo
0
c
Ric Hattman
00
°
Rick Ensdorff
M
z
From: Matt Del ich�`�
Q
J
>
Date: April 14, 1988
O
J
'
Subject: Phasing of road system at Horsetooth West
LU
D
z
w
Q
The City of Fort C:ol 1 i ns has requested a phasing
zz
program of the street system in/near Horsetooth West
z
that is in line t.)ith the phasing of the development
itself. This memorandum acts as an amendment to the
Horsetooth West Master Plan Site Access Study, March
1988.
M
The distances reflected in this memorandum are
approximate as scaled from the site plan provided by
Gefr•oh Hattman Associates, Inc. The width of the
pavement at the early phases of this development should
be in accordance with the City of Fort Collins criteria.
As traffic needs dictate under the later phases of the
development, the narrower pavement will need to be
widened.
- Phase 1 -- Horsetooth Road should be paved from
Taft Hill Road to the North -South Collector (1200 feet)
and the North -South Collector should be pawed from
z
Horsetooth Road to the north access to the school site
u;
(700 feet)
w
z
.
Z
- Phase 2 -- No additional paving required.
W
LU
Access is gained from the North -South Collector.
a_
>
- Phase 3 -- Horsetooth Road should be pared from
=
z
the North -South Collector to the west property line (750
feet).
_v
J
Q
Wo
C)
- Phase 4 -- The North -South Collector should be
v�
paved from the school site to the northernmost access to
Phase 4, residential (500 feet) . Pare the East-West
Collector from Taft Hill Road to the North -South
3
L;
Collector (1200 feet), since the North -South collector
W
, iz
exceeds the maximum length for a single access street.
x
Q
cc
Phases S, h, 7, and 8 -- All public roads have
Q
been paved under previous phases. Additional paring
viould be necessary with regards to attaining proper
oeometrics and ultimate street width.
3.3
. . ................. .
NJ LL
\AJ
s C;
IN,
cr
zoo,.
a