HomeMy WebLinkAboutTHE FLATS AT HANSEN FARM - PDP220004 - DOCUMENT MARKUPS - ROUND 2 - OTHER WATER AND OR SANITATION DISTRICTSKETCHER ROADSOUTHTIMBERLINE
ROADEAST TRILBY
ROADZEPHYR ROADC 100COVER SHEET 1MARCH 2022CONTACT INFORMATIONPROJECT TEAM:
VICINITY MAPNORTHPROJECT BENCHMARKS:
THE FLATS AT
HANSEN FARMPROJECT TEAM:
Hansen MF, LLCAffinity Partners, LLCRyan Schaefer, Manager3665
John F Kennedy Parkway,
Building 2, Suite 202Fort Collins,
CO 80525(970) 663-
3150Northern Engineering Services, Inc.
Danny Weber, PE301 North Howes Street, Suite 100Fort Collins, Colorado 80521(970) 221-4158PLANNER/LANDSCAPE ARCHITECTOWNER/APPLICANTSITE ENGINEERSHEET INDEXTRACT
D, TRACT E, AND TRACT L OF HANSEN FARMLOCATED
IN THE EASTHALF
OF SECTION 7, TOWNSHIP 6 NORTH, RANGE 68 WEST
OF THE 6TH P.M.,
CITY OF FORT
COLLINS, COUNTY
CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE, OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
CALL UTILITY NOTIFICATION CENTER OF
COLORADO
Know what'sbelow.
before you dig.Call
R
A. GENERAL NOTES
1.All materials, workmanship, and construction of public improvements shall meet or exceed the standards and specifications set forth in the Larimer
County Urban Area Street Standards and applicable state and federal regulations. Where there is conflict between these plans and the
specifications, or any applicable standards, the most restrictive standard shall apply. All work shall be inspected and approved by the City of Fort
Collins.
2.All references to any published standards shall refer to the latest revision of said standard, unless specifically stated otherwise.
3.These public improvement construction plans shall be valid for a period of three years from the date of approval by the City of Fort Collins Engineer.
Use of these plans after the expiration date will require a new review and approval process by the City of Fort Collins prior to commencement of
any work shown in these plans.
4.The engineer who has prepared these plans, by execution and/or seal hereof, does hereby affirm responsibility to the City of Fort Collins, as
beneficiary of said engineer's work, for any errors and omissions contained in these plans, and approval of these plans by the City of Fort Collins
Engineer shall not relieve the engineer who has prepared these plans of all such responsibility. Further, to the extent permitted by law, the engineer
hereby agrees to hold harmless and indemnify the City of Fort Collins, and its officers and employees, from and against all liabilities, claims, and
demands which may arise from any errors and omissions contained in these plans.
5.All storm sewer construction, as well as power and other "dry" utility installations, shall conform to the City of Fort Collins standards and
specifications current at the date of approval of the plans by the City of Fort Collins Engineer.
6.The type, size, location and number of all known underground utilities are approximate when shown on the drawings. It shall be the responsibility of
the Developer to verify the existence and location of all underground utilities along the route of the work before commencing new construction. The
Developer shall be responsible for unknown underground utilities.
7.The Developer shall contact the Utility Notification Center of Colorado (UNCC) at 1-800-922-1987, at least 2 working days prior to beginning
excavation or grading, to have all registered utility locations marked. Other unregistered utility entities (i.e. ditch / irrigation company) are to be
located by contacting the respective representative. Utility service laterals are also to be located prior to beginning excavation or grading. It shall be
the responsibility of the Developer to relocate all existing utilities that conflict with the proposed improvements shown on these plans.
8.The Developer shall be responsible for protecting all utilities during construction and for coordinating with the appropriate utility company for any
utility crossings required.
9.If a conflict exists between existing and proposed utilities and/or a design modification is required, the Developer shall coordinate with the engineer
to modify the design. Design modification(s) must be approved by the City of Fort Collins prior to beginning construction.
10.The Developer shall coordinate and cooperate with the City of Fort Collins, and all utility companies involved, to assure that the work is
accomplished in a timely fashion and with a minimum disruption of service. The Developer shall be responsible for contacting, in advance, all
parties affected by any disruption of any utility service as well as the utility companies.
11.No work may commence within any public storm water, sanitary sewer or potable water system until the Developer notifies the utility provider.
Notification shall be a minimum of 2 working days prior to commencement of any work. At the discretion of the water utility provider, a
pre-construction meeting may be required prior to commencement of any work.
12.The Developer shall sequence installation of utilities in such a manner as to minimize potential utility conflicts. In general, storm sewer and sanitary
sewer should be constructed prior to installation of the water lines and dry utilities.
13.The minimum cover over water lines is 4.5 feet and the maximum cover is 5.5 feet unless otherwise noted in the plans and approved by the Water
Utility.
14.A State Construction Dewatering Wastewater Discharge Permit is required if dewatering is required in order to install utilities or if water is
discharged into a storm sewer, channel, irrigation ditch or any waters of the United States.
15.The Developer shall comply with all terms and conditions of the Colorado Permit for Storm Water Discharge (Contact Colorado Department of
Health, Water Quality Control Division, (303) 692-3590), the Storm Water Management Plan, and the Erosion Control Plan.
16.The City of Fort Collins shall not be responsible for the maintenance of storm drainage facilities located on private property. Maintenance of onsite
drainage facilities shall be the responsibility of the property owner(s).
17.Prior to final inspection and acceptance by the City of Fort Collins, certification of the drainage facilities, by a registered engineer, must be
submitted to and approved by the Stormwater Utility Department. Certification shall be submitted to the Stormwater Utility Department at least two
weeks prior to the release of a certificate of occupancy for single family units. For commercial properties, certification shall be submitted to the
Stormwater Utility Department at least two weeks prior to the release of any building permits in excess of those allowed prior to certification per the
Development Agreement.
18.The City of Fort Collins shall not be responsible for any damages or injuries sustained in this Development as a result of groundwater seepage,
whether resulting from groundwater flooding, structural damage or other damage unless such damage or injuries are sustained as a result of the
City of Fort Collins failure to properly maintain its water, wastewater, and/or storm drainage facilities in the development.
19.All recommendations of the Preliminary Drainage Report, dated March 16, 2022 by Northern Engineering shall be followed and implemented.
20.Temporary erosion control during construction shall be provided as shown on the Erosion Control Plan. All erosion control measures shall be
maintained in good repair by the Developer, until such time as the entire disturbed areas is stabilized with hard surface or landscaping.
21.The Developer shall be responsible for insuring that no mud or debris shall be tracked onto the existing public street system. Mud and debris must
be removed within 24 hours by an appropriate mechanical method (i.e. machine broom sweep, light duty front-end loader, etc.) or as approved by
the the City of Fort Collins street inspector.
22.No work may commence within any improved or unimproved public Right-of-Way until a Right-of-Way Permit or Development Construction Permit
is obtained, if applicable.
23.The Developer shall be responsible for obtaining all necessary permits for all applicable agencies prior to commencement of construction. The
Developer shall notify the the City of Fort Collins Inspector (Fort Collins - 221-6605) and the City of Fort Collins Erosion Control Inspector (Fort
Collins - 221-6700) at least 2 working days prior to the start of any earth disturbing activity, or construction on any and all public improvements. If
the City of Fort Collins Engineer is not available after proper notice of construction activity has been provided, the Developer may commence work
in the Engineer absence. However, the City of Fort Collins reserves the right not to accept the improvement if subsequent testing reveals an
improper installation.
24.The Developer shall be responsible for obtaining soils tests within the Public Right-of-Way after right of way grading and all utility trench work is
complete and prior to the placement of curb, gutter, sidewalk and pavement. If the final soils/pavement design report does not correspond with the
results of the original geotechnical report, the Developer shall be responsible for a re-design of the subject pavement section or, the Developer may
use the City of Fort Collins' default pavement thickness section(s). Regardless of the option used, all final soils/pavement design reports shall be
prepared by a licensed Professional Engineer. The final report shall be submitted to the Inspector a minimum of 10 working days prior to placement
of base and asphalt. Placement of curb, gutter, sidewalk, base and asphalt shall not occur until the City of Fort Collins Engineer approves the final
report.
25.The contractor shall hire a licensed engineer or land surveyor to survey the constructed elevations of the street subgrade and the gutter flowline at
all intersections, inlets, and other locations requested by the the City of Fort Collins inspector. The engineer or surveyor must certify in a letter to
the City of Fort Collins that these elevations conform to the approved plans and specifications. Any deviations shall be noted in the letter and then
resolved with the City of Fort Collins before installation of base course or asphalt will be allowed on the streets.
26.All utility installations within or across the roadbed of new residential roads must be completed prior to the final stages of road construction. For the
purposes of these standards, any work except c/g above the subgrade is considered final stage work. All service lines must be stubbed to the
property lines and marked so as to reduce the excavation necessary for building connections.
27.Portions of Larimer County are within overlay districts. The Larimer County Flood Plain Resolution should be referred to for additional criteria for
roads within these districts.
28.All road construction in areas designated as Wild Fire Hazard Areas shall be done in accordance with the construction criteria as established in the
Wild Fire Hazard Area Mitigation Regulations in force at the time of final plat approval.
29.Prior to the commencement of any construction, the contractor shall contact the Local Entity Forester to schedule a site inspection for any tree
removal requiring a permit.
30.The Developer shall be responsible for all aspects of safety including, but not limited to, excavation, trenching, shoring, traffic control, and security.
Refer to OSHA Publication 2226, Excavating and Trenching.
31.The Developer shall submit a Construction Traffic Control Plan, in accordance with MUTCD, to the appropriate Right-of-Way authority. (The City of
Fort Collins, Larimer County, Colorado), for approval, prior to any construction activities within, or affecting, the Right-of-Way. The Developer shall
be responsible for providing any and all traffic control devices as may be required by the construction activities.
32.Prior to the commencement of any construction that will affect traffic signs of any type, the contractor shall contact the City of Fort Collins Traffic
Operations Department, who will temporarily remove or relocate the sign at no cost to the contractor, however, if the contractor moves the traffic
sign then the contractor will be charged for the labor, materials and equipment to reinstall the sign as needed.
33.The Developer is responsible for all costs for the initial installation of traffic signing and striping for the Development related to the Development's
local street operations. In addition, the Developer is responsible for all costs for traffic signing and striping related to directing traffic access to and
from the Development.
34.There shall be no site construction activities on Saturdays, unless specifically approved by the City of Fort Collins Engineer, and no site
construction activities on Sundays or holidays, unless there is prior written approval by City of Fort Collins.
35.The Developer is responsible for providing all labor and materials necessary for the completion of the intended improvements, shown on these
drawings, or designated to be provided, installed, or constructed, unless specifically noted otherwise.
36.Dimensions for layout and construction are not to be scaled from any drawing. If pertinent dimensions are not shown, contact the Designer for
clarification, and annotate the dimension on the as-built record drawings.
37.The Developer shall have, onsite at all times, one (1) signed copy of the approved plans, one (1) copy of the appropriate standards and
specifications, and a copy of any permits and extension agreements needed for the job.
38.If, during the construction process, conditions are encountered which could indicate a situation that is not identified in the plans or specifications,
the Developer shall contact the Designer and the City of Fort Collins Engineer immediately.
39.The Developer shall be responsible for recording as-built information on a set of record drawings kept on the construction site, and available to the
Larimer County's Inspector at all times. Upon completion of the work, the contractor(s) shall submit record drawings to the City of Fort Collins
Engineer.
40.The Designer shall provide, in this location on the plan, the location and description of the nearest survey benchmarks (2) for the project as well as
the basis of bearings. The information shall be as follows:
Project Datum: NAVD88
Benchmark 2-02 East side of Timberline Road, 1/2 mile North of Trilby Road, on the middle concrete pad to an electric box.
elevation: 4964.37
Benchmark 16-01 South side of Willow Springs Way approx. 50 ft. West of the intersection of Willow Springs Way and Timberline Road on
the Southwest corner of a storm inlet. elevation: 4956.98
Please Note: this plan set is using NAVD88 for a vertical datum. Surrounding developments have used NGVD29 unadjusted datum (prior
City of Fort Collins datum) for their vertical datums.
If NGVD29 Unadjusted Datum (prior City of Fort Collins datum) is required for any purpose, the following equation should be used:
NGVD29 Unadjusted Datum (prior City of Fort Collins datum) = NAVD88 - 3.19'
Basis of Bearings
The basis of bearings is the East line of the Northeast Quarter of Section 7, as bearing South 00°00'53" East (assumed bearing) as
monumented on drawing.
41.All stationing is based on centerline of roadways unless otherwise noted.
42.Damaged curb, gutter and sidewalk existing prior to construction, as well as existing fences, trees, streets, sidewalks, curbs and gutters,
landscaping, structures, and improvements destroyed, damaged or removed due to construction of this project, shall be replaced or restored in like
kind at the Developer's expense, unless otherwise indicated on these plans, prior to the acceptance of completed improvements and/or prior to the
issuance of the first Certificate of Occupancy.
43.When an existing asphalt street must be cut, the street must be restored to a condition equal to or better than its original condition. The existing
street condition shall be documented by the City of Fort Collins Construction Inspector before any cuts are made. Patching shall be done in
accordance with the City of Fort Collins Street Repair Standards. The finished patch shall blend in smoothly into the existing surface. All large
patches shall be paved with an asphalt lay-down machine. In streets where more than one cut is made, an overlay of the entire street width,
including the patched area, may be required. The determination of need for a complete overlay shall be made by the Larimer County Engineer
and/or the City of Fort Collins Inspector at the time the cuts are made.
44.Upon completion of construction, the site shall be cleaned and restored to a condition equal to, or better than, that which existed before
construction, or to the grades and condition as required by these plans.
45.Standard Handicap ramps are to be constructed at all curb returns and at all "T" intersections.
46.After acceptance by the City of Fort Collins, public improvements depicted in these plans shall be guaranteed to be free from material and
workmanship defects for a minimum period of two years from the date of acceptance.
47.The City of Fort Collins shall not be responsible for the maintenance of roadway and appurtenant improvements, including storm drainage
structures and pipes, for the following private streets: N.A.
48.Approved Variances are listed as follows:
1) N/A
CONSTRUCTION NOTES
A. Grading and Erosion Control Notes
1.The erosion control inspector must be notified at least twenty-four (24) hours prior to any construction on this site.
2.There shall be no earth-disturbing activity outside the limits designated on the accepted plans.
3.All required perimeter silt and construction fencing shall be installed prior to any land disturbing activity (stockpiling, stripping, grading, etc). All
other required erosion control measures shall be installed at the appropriate time in the construction sequence as indicated in the approved project
schedule, construction plans, and erosion control report.
4.At all times during construction, the Developer shall be responsible for preventing and controlling on-site erosion including keeping the property
sufficiently watered so as to minimize wind blown sediment. The Developer shall also be responsible for installing and maintaining all erosion
control facilities shown herein.
5.Pre-disturbance vegetation shall be protected and retained wherever possible. Removal or disturbance of existing vegetation shall be limited to the
area(s) required for immediate construction operations, and for the shortest practical period of time.
6.All soils exposed during land disturbing activity (stripping, grading, utility installations, stockpiling, filling, etc.) shall be kept in a roughened condition
by ripping or disking along land contours until mulch, vegetation, or other permanent erosion control BMPs are installed. No soils in areas outside
project street rights-of-way shall remain exposed by land disturbing activity for more than thirty (30) days before required temporary or permanent
erosion control (e.g. seed/mulch, landscaping, etc.) is installed, unless otherwise approved by the City/County.
7.In order to minimize erosion potential, all temporary (structural) erosion control measures shall:
a.Be inspected at a minimum of once every two (2) weeks and after each significant storm event and repaired or reconstructed as necessary in
order to ensure the continued performance of their intended function.
b.Remain in place until such time as all the surrounding disturbed areas are sufficiently stabilized as determined by the erosion control inspector.
c.Be removed after the site has been sufficiently stabilized as determined by the erosion control inspector.
8.When temporary erosion control measures are removed, the Developer shall be responsible for the clean up and removal of all sediment and
debris from all drainage infrastructure and other public facilities.
9.The contractor shall immediately clean up any construction materials inadvertently deposited on existing streets, sidewalks, or other public rights of
way, and make sure streets and walkways are cleaned at the end of each working day.
10.All retained sediments, particularly those on paved roadway surfaces, shall be removed and disposed of in a manner and location so as not to
cause their release into any waters of the United States.
11.No soil stockpile shall exceed ten (10) feet in height. All soil stockpiles shall be protected from sediment transport by surface roughening, watering,
and perimeter silt fencing. Any soil stockpile remaining after thirty (30) days shall be seeded and mulched.
12.The stormwater volume capacity of detention ponds will be restored and storm sewer lines will be cleaned upon completion of the project and
before turning the maintenance over to the City/County or Homeowners Association (HOA).
13.City Ordinance and Colorado Discharge Permit System (CDPS) requirements make it unlawful to discharge or allow the discharge of any pollutant
or contaminated water from construction sites. Pollutants include, but are not limited to discarded building materials, concrete truck washout,
chemicals, oil and gas products, litter, and sanitary waste. The developer shall at all times take whatever measures are necessary to assure the
proper containment and disposal of pollutants on the site in accordance with any and all applicable local, state, and federal regulations.
14.A designated area shall be provided on site for concrete truck chute washout. The area shall be constructed so as to contain washout material and
located at least fifty (50) feet away from any waterway during construction. Upon completion of construction activities the concrete washout
material will be removed and properly disposed of prior to the area being restored.
15.Conditions in the field may warrant erosion control measures in addition to what is shown on these plans. The Developer shall implement whatever
measures are determined necessary, as directed by the City.
16.For additional information see separate Stormwater Management Plan / Erosion Control Report for The Flats at Hansen Farm.
B. Street Improvement Notes
1.All street construction is subject to the General Notes on the cover sheet of these plans as well as the Street Improvements Notes listed here.
2.A paving section design, signed and stamped by a Colorado licensed Engineer, must be submitted to the City of Fort Collins Engineer for approval,
prior to any street construction activity, (full depth asphalt sections are not permitted at a depth greater than 8 inches of asphalt). The job mix shall
be submitted for approval prior to placement of any asphalt.
3.Where proposed paving adjoins existing asphalt, the existing asphalt shall be saw cut, a minimum distance of 12 inches from the existing edge, to
create a clean construction joint. The Developer shall be required to remove existing pavement to a distance where a clean construction joint can
be made. Wheel cuts shall not be allowed unless approved by the City of Fort Collins Engineer in Fort Collins.
4.Street subgrades shall be scarified the top 12 inches and re-compacted prior to subbase installation. No base material shall be laid until the
subgrade has been inspected and approved by the City of Fort Collins Engineer.
5.Ft. Collins only. Valve boxes and manholes are to be brought up to grade at the time of pavement placement or overlay. Valve box adjusting rings
are not allowed.
6.When an existing asphalt street must be cut, the street must be restored to a condition equal to or better than its original condition. The existing
street condition shall be documented by the Inspector before any cuts are made. Cutting and patching shall be done in conformance with Chapter
25, Reconstruction and Repair. The finished patch shall blend smoothly into the existing surface. The determination of need for a complete overlay
shall be made by the City of Fort Collins Engineer. All overlay work shall be coordinated with adjacent landowners such that future projects do not
cut the new asphalt overlay work.
7.All traffic control devices shall be in conformance with these plans or as otherwise specified in M.U.T.C.D. (including Colorado supplement) and as
per the Right-of-Way Work Permit traffic control plan.
8.The Developer is required to perform a gutter water flow test in the presence of the City of Fort Collins Inspector and prior to installation of asphalt.
Gutters that hold more than 1/4 inch deep or 5 feet longitudinally, of water, shall be completely removed and reconstructed to drain properly.
9.Prior to placement of H.B.P. or concrete within the street and after moisture/density tests have been taken on the subgrade material (when a full
depth section is proposed) or on the subgrade and base material (when a composite section is proposed), a mechanical "proof roll" will be required.
The entire subgrade and/or base material shall be rolled with a heavily loaded vehicle having a total GVW of not less than 50,000 lbs. and a single
axle weight of at least 18,000 lbs. with pneumatic tires inflated to not less that 90 p.s.i.g. "Proof roll" vehicles shall not travel at speeds greater than
3 m.p.h. Any portion of the subgrade or base material which exhibits excessive pumping or deformation, as determined by the City of Fort Collins
Engineer, shall be reworked, replaced or otherwise modified to form a smooth, non-yielding surface. The City of Fort Collins Engineer shall be
notified at least 24 hours prior to the "proof roll." All "proof rolls" shall be preformed in the presence of an Inspector.
C. Traffic Signing and Pavement Marking Construction Notes
1.All signage and marking is subject to the General Notes on the cover sheet of these plans, as well as the Traffic Signing and Marking Construction
Notes listed here.
2.All symbols, including arrows, ONLYS, crosswalks, stop bars, etc. shall be pre-formed thermo-plastic.
3.All signage shall be per the City of Fort Collins Standards and these plans or as otherwise specified in MUTCD.
4.All lane lines for asphalt pavement shall receive two coats of latex paint with glass beads.
5.All lane lines for concrete pavement should be epoxy paint.
6.Prior to permanent installation of traffic striping and symbols, the Developer shall place temporary tabs or tape depicting alignment and placement
of the same. Their placement shall be approved by the City of Fort Collins Traffic Engineer prior to permanent installation of striping and symbols.
7.Pre-formed thermo-plastic applications shall be as specified in these Plans and/or these Standards.
8.Epoxy applications shall be applied as specified in CDOT Standard Specifications for Road and Bridge Construction.
9.All surfaces shall be thoroughly cleaned prior to installation of striping or markings.
10.All sign posts shall utilize break-away assemblies and fasteners per the Standards.
11.A field inspection of location and installation of all signs shall be performed by the City of Fort Collins Traffic Engineer. All discrepancies identified
during the field inspection must be corrected before the 2-year warranty period will begin.
12.The Developer installing signs shall be responsible for locating and protecting all underground utilities.
13.Special care shall be taken in sign location to ensure an unobstructed view of each sign.
14.Signage and striping has been determined by information available at the time of review. Prior to initiation of the warranty period,the City of Fort
Collins Traffic Engineer reserves the right to require additional signage and/or striping if the City of Fort Collins Traffic Engineer determines that an
unforeseen condition warrants such signage according to the MUTCD or the CDOT M and S Standards. All signage and striping shall fall under the
requirements of the 2-year warranty period for new construction (except fair wear on traffic markings).
15.Sleeves for sign posts shall be required for use in islands/medians. Refer to Chapter 14, Traffic Control Devices, for additional detail.
D. Storm Drainage Notes
1.The City of Fort Collins shall not be responsible for the maintenance of storm drainage facilities located on private property. Maintenance of onsite
drainage facilities shall be the responsibility of the property owner(s).
2.All recommendations of the Preliminary Drainage Report, dated March 16, 2022 by Northern Engineering shall be followed and implemented.
3.Prior to final inspection and acceptance by the City of Fort Collins, certification of the drainage facilities, by a registered engineer, must by
submitted to and approved by the Stormwater Utility Department. Certification shall be submitted to the Stormwater Utility Department at least two
weeks prior to the release of a certificate of occupancy for single family units. For commercial properties, certification shall by submitted to the
Stormwater Utility Department at least two weeks prior to the release of any building permits in excess of those allowed prior to certification per the
Development Agreement.
E. Utility Notes
1.All water and sanitary sewer construction shall be performed according to the Fort Collins-Loveland Water District and the South Fort Collins
Sanitation District standards and specifications.
2.Construction of water and sewer facilities require a precon meeting with district operations staff prior to construction.
3.Contractor shall notify district inspectors prior to starting work.
4.Contractor shall contact the sanitation district for sewer inspection 48 hours prior to connecting to existing sewer stubs.
5.All commercial domestic services require a reduced pressure backflow prevention device.
6.All water lines shall be a minimum of (5) five feet and a maximum of (6) feet below final grade.
7.All district shall only be operated by district operations staff.
8.Pipe Pressure and vacuum testing shall be witnessed by district inspectors. Waterline bacteria tests shall also be taken by district inspectors.
9.Once the system is operational and all tests have passed, contractor shall request substantial completion with a letter to the district that includes
the dollar value of the water and sewer improvements listed separately.
10.As-builts shall be submitted in pdf and dwg to the district for final approval.
11.If groundwater is encountered within the depth of sewer construction, manholes must be water-proofed.
12.The size, type and location of all known underground utilities are approximate when shown on these drawings. It shall be the responsibility of the
contractor to verify the existence of all underground utilities in the area of work. Before commencing new construction , the contractor shall be
responsible for locating all underground utilities and shall be responsible for all unknown underground utilities.
13.All water fittings and valves are only graphically represented and are not to scale.
14.Manhole rim elevations are to be adjusted to 1
4" below finished grade. If necessary, cone sections shall be rotated to prevent lids being located
within bicycle or vehicle wheel paths
C 101CONSTRUCTION
NOTES
GENERAL &
2 SheetTHE
XX X
XXXXXWT
TTTTTTTFFWSFSSSSSUDUDUD UD
UDFWWFWSS
SWWFFFWEEEEEEEEEEEEEEE16"
W16" W16"
W16"
W16"
W16" W16"
W16" W16"
W16"
W16"
W16"
W16"
W16"
WCTVCTVCTVCTVCTVCTVCTVCTVCTVCTVCTVCTVCTVCTVCTVCTVCTVCTVCTVCTVCTVCTVCTVCTVCTVVAULT
F.
O.
T
VAULT
F.
O.
8"
W
8
S S
8 S
S 8"
S S 8" S S 8"
S S 8" SS 8" SS 8" SS 8" SS 8" SS 8" SS
8" SS8" SS8" SS8" SS8" SS8" SS8" SS8" SS10" SS10" SS10" SS10" SS10" SS10"
SS10"
SS10"
SS8"
W
8"
W
8"
W
8"
W 8"
W 8"
W 8"
W 8" W 8" W 8" W 8"
W
8"
W
8"
W
8"
W8" W8" W8"
W8" W8"
W8" W8" W8"
W8"
W8" W8"
W8" W8" W8"
W8" W8"
W8" W8
W 8
W
8
W 8"
W 8"
W 8"
W 8" W
8" W
8"
W 8"
W 8"
W 8"
W 8"
W WSWSSSSS
S
SS
S S
WWWWWWWW8" SS8"
WFMFMFMFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFO16"W
KNOBBY PINE
DRIVE ZEPHYR
ROADBURLY TREE
DRIVETWISTED
ROOT
DRIVE
SOUTH TIMBERLINE
ROADPROPOSED
FIRE
HYDRANT
PROPOSED 8" PVC
WATER MAIN
PROPOSED FIRE SERVICE (
TYP.)PROPOSED
SANITARY SERVICE (TYP.)
PROPOSED WATER SERVICE (TYP.)
PROPOSED 8"
PVC SANITARY SEWER
PROPOSED STORM
DRAIN
PROPOSED WATER
SERVICE (
TYP.)PROPOSED
FIRE
SERVICE (TYP.)
PROPOSED
SANITARYCLEAN-
OUT PROPOSED
SANITARY CLEAN-
OUT
PROPOSED SANITARY
CLEAN-OUT
CONNECT TO
EXISTING SANITARY
MANHOLE CONNECT
TO
EXISTING
SANITARY
MANHOLE
PROPOSED
8"
PVC
WATER
MAIN PROPOSED
8" PVC
SANITARY
SEWER
CONNECT
TO
EXISTING
8"
PVC
WATER
MAIN
CONNECTTOEXISTING8" PVCWATERMAIN
26'FL-FL24'FL-
FL26'FL-
FL
24'
FL-
FL26'
FL-
FL
59'
ROW
36'
FL-
FL
RAIN
GARDEN
BIOMEDIA
AREA
RAIN
GARDEN
BIOMEDIA
AREA
EASEMENT
EXCLUSION
EASEMENT
EXCLUSIONEASEMENT
EXCLUSION EASEMENT EXCLUSION
RAIN GARDEN BIOMEDIA
AREA DRAINAGE EASEMENT
DRAINAGE EASEMENT
DRAINAGE
EASEMENT
DRAINAGE
EASEMENT
9'
UT
I L
I T
Y E
A S
E M
E N
T 9'
UTILITY EASEMENT26'EMERGENCY
ACCESS EASEMENT
26'EMERGENCY
ACCESS EASEMENT
26'EMERGENCY ACCESS EASEMENT
26'EMERGENCY ACCESS
EASEMENT
26'EMERGENCY ACCESS
EASEMENT
26'EMERGENCY ACCESS
EASEMENT9' UTILITY
EASEMENT4.5'
SIDEWALK9' UTILITY
EASEMENT
6' SIDEWALK9'
UTILITY EASEMENT
2' CONCRETE PAN
HANSEN FARM)
EASEMENT EXCLUSION EASEMENT
EXCLUSION EASEMENT
EXCLUSIONEASEMENT EXCLUSION
RAIN GARDEN
BIOMEDIA AREA
RAIN GARDEN
BIOMEDIA AREA
8" PVC
SANITARY SEWER HANSEN
FARM)8"
PVC WATER HANSEN
FARM)FIRE
HYDRANT HANSEN FARM)
EXISTING 9'
UTILITY EASEMENT 9' UTILITY
EASEMENT EXISTING
DETENTION POND 1
EXISTING DETENTION
POND 2 DETENTION
POND 315'
UTILITY &PUBLIC ACCESS
TRAIL EASEMENT9'
UTILITY EASEMENT36'FL-
FL 59'
ROW POND OUTLET
STRUCTURE HANSEN
FARM)18" STORM
DRAIN HANSEN
FARM)HANSEN FARM
15' UTILITY &
PUBLIC ACCESS
TRAIL EASEMENT FIRE
HYDRANT HANSEN
FARM)
30" STORM
DRAIN
HANSEN FARM)
POND OUTLET
STRUCTURE HANSEN
FARM)8"
PVC WATER
HANSEN FARM)
10" PVC
SANITARY
SEWER HANSEN
FARM)
8" PVC
WATER
HANSEN FARM)
8" PVC WATER
HANSEN FARM)
30"
STORM DRAIN
HANSEN
FARM)18"
STORM DRAIN HANSEN
FARM)18" STORM
DRAIN
HANSENFARM)2'
CONCRETE
PAN HANSEN
FARM)36'FL-
FL59'
ROW15"
STORM DRAIN
HANSEN FARM)129' ROW POND OUTLET STRUCTURE HANSEN
FARM)EXISTING FORCE MAIN EXISTING 16" WATER FIRE
HYDRANT HANSEN FARM)
FIRE HYDRANT HANSEN FARM)FIRE
HYDRANT
HANSEN FARM)PROPOSED
FIRE HYDRANT PROPOSEDFIRE
HYDRANT
PROPOSED STORM
DRAIN
15"
STORM DRAIN
HANSEN
FARM)
PROPOSED FIRE HYDRANT PROPOSED TRANSFORMER (TYP.)CONNECT TO EXISTING 8" PVC WATER
54'FL-FL76' ROW NORTH IN FEET )1 inch = ft.
Feet05050 50 100 150 CALL 2 BUSINESS DAYS IN ADVANCE
BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND
MEMBER UTILITIES.CALL UTILITY NOTIFICATION CENTER OF COLORADO Know
what'sbelow.before you dig.Call R C 300OVERALL
UTILITY PLAN
7 SheetTHE FLATS AT HANSEN FARMThese drawings areinstruments of serviceprovided by
NorthernEngineering Services, Inc.and are not to be used forany
type of constructionunless signed and sealed bya Professional Engineer inthe employ of
NorthernEngineering Services, Inc.NOT FOR CONSTRUCTIONREVIEW SETENGINEERNGIEHTRONRNFORT COLLINS: 301
North Howes Street, Suite 100, 80521GREELEY: 820 8th Street, 80631970.221.
4158northernengineering.comof
17 KEYMAP NOTES:1.THE SIZE, TYPE AND LOCATION OF ALL
KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON
THESE DRAWINGS.
IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE
OF ALL UNDERGROUND
UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE
FOR LOCATING ALL
UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR ALL UNKNOWN UNDERGROUND UTILITIES.2.
ALL WATER CONSTRUCTION SHALL BE PER FORT COLLINS-LOVELAND WATER DISTRICT
STANDARDS, LATEST EDITION, EXCEPT FOR THE STANDARDS
RELATED TO THE WATER SERVICES, WHICH SHALL BE PER CITY OF
FORT COLLINS STANDARDS,EXCEPT THAT NO
MECHANICAL JOINT RESTRAINTS ARE REQUIRED BETWEEN FITTINGS UNLESS SPECIFICALLY SHOWN ON THE PLAN
OR AS REQUIRED FOR ABNORMAL DEFLECTIONS.3.ALL
SEWER CONSTRUCTION SHALL BE PER SOUTH FORT COLLINS SANITATION DISTRICT STANDARDS SANITARY SEWER
DESIGN TECHNICAL CRITERIA MANUAL,LATEST EDITION.4.ALL WATER FITTINGS AND VALVES ARE
ONLY GRAPHICALLY REPRESENTED AND ARE NOT TO SCALE.
5.ALL WATERLINES SHALL HAVE 5.0 - 6.0 FEET OF COVER FROM
FINISHED GRADE TO TOP OF PIPE.6.UTILITY SERVICES ARE SHOWN
IN A SCHEMATIC FASHION ONLY. EXACT LOCATIONS SHALL BE PER
THE REQUIREMENTS OF
THE RESPECTIVE
UTILITYPROVIDERS, AND
ARESUBJECTTO
CHANGE IN THE
FIELD.7.MAINTAIN
10' HORIZONTAL AND
18"
VERTICAL
MINIMUM
SEPARATION BETWEEN ALL
SANITARY SEWER
MAINS, WATER
MAINS & SERVICES.8.
REFER TO THE
PLAT FOR LOT
AREAS, TRACT SIZES,
EASEMENTS, LOT DIMENSIONS,
UTILITY EASEMENTS, OTHER
EASEMENTS, AND
OTHER SURVEY
INFORMATION.9.LIMITS
OF
STREET
CUT ARE APPROXIMATE.
FINAL LIMITS
ARE TO
BE DETERMINED IN
THE
FIELD BY
THE FORT
COLLINS ENGINEERING
INSPECTOR. ALL
8" SS8"
SS8"
SS8"
SS8"
SS8" SS8"
SS8" SS8"
SS8" SS8"
SS8" SS8"
W 8"
W8" W8"
W8" W8" W8"
W8" W8"
W8" W8" W8" W8"
W8" W8" WW8" SS8"
SS8" W8" W8" SS8"
SSTTF SS
SUDUDUDUDFWW
PROPOSED
SANITARY MANHOLE (
TYP.)PROPOSED
FIRE SERVICE (
TYP.)
PROPOSED SANITARY
CLEAN-OUT
CONNECT TO
EXISTING
SANITARY
MANHOLE
RE-
ORIENT UPPER
CONE SECTION
TO PLACE
MANHOLE RIM ON
NORTH SIDE
PROPOSED
FIRE
HYDRANT
24'
FL-
FL
RAIN
GARDEN
BIOMEDIA
AREA
RAIN
GARDEN
B RAIN GARDEN
BIOMEDIA AREA
DRAINAGE
EASEMENT 9' UTILITY
EASEMENT4.
5' SIDEWALKPROPOSED
SANITARY SERVICE (
TYP.)PROPOSED WATER
SERVICE (TYP.)
PROPOSED 8" PVC
SANITARY SEWER
EASEMENT EXCLUSION EASEMENT
EXCLUSION DRAINAGE
EASEMENT DRAINAGE
EASEMENT 26'
EMERGENCY
ACCESS EASEMENT
8"
PVC WATER
HANSEN
FARM)EXISTING
DETENTION POND 1
36'FL-
FL 59' ROW
POND OUTLET
STRUCTURE
HANSEN
FARM)18" STORM
DRAIN HANSEN
FARM)2'
CONCRETE PAN
HANSEN FARM)
FIRE
HYDRANT HANSEN
FARM)
RAIN
GARDEN A
PROPOSED AREA
DRAIN PROPOSED
AREA DRAIN
PROPOSED RAIN
GARDEN OVERFLOW
PIPE
PROPOSED
RAIN
GARDEN
OVERFLOW
PIPE
EASEMENT
EXCLUSION PROPOSED
8"
PVC WATER
MAIN 8" PVC
SANITARY
SEWER
HANSEN FARM)
PROPOSED STORM DRAIN PROPOSED SANITARY SERVICE (TYP.)PROPOSED
WATER METER (TYP.)CONNECT TO EXISTING WATER PROPOSED
4'SIDEWALK CULVERT
BURLY TREE DRIVEPROPOSED UNDERDRAIN PROPOSED
UNDERDRAIN
PROPOSED CURB INLET
NORTH IN FEET )1
inch =
ft.Feet02020
20
40
60
MATCH LINE - SEE SHEET C 303CALL 2 BUSINESS DAYS IN ADVANCE BEFORE
YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND
MEMBER UTILITIES.CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'
sbelow.before you dig.Call R C 301UTILITY PLAN 8 KEYMAP
NOTES:1.THE SIZE, TYPE AND LOCATION OF ALL
KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THESE
DRAWINGS. IT
SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE
OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK.
BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL
UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR ALL UNKNOWN
UNDERGROUND UTILITIES.2.ALL WATER CONSTRUCTION SHALL BE PER FORT COLLINS-
LOVELAND WATER
DISTRICT STANDARDS, LATEST EDITION, EXCEPT FOR THE STANDARDS RELATED TO THE
WATER SERVICES, WHICH SHALL BE PER CITY OF
FORT COLLINS
STANDARDS,EXCEPT THAT NO MECHANICAL JOINT RESTRAINTS ARE REQUIRED BETWEEN FITTINGS UNLESS
SPECIFICALLY SHOWN ON
THE PLAN OR AS REQUIRED FOR ABNORMAL DEFLECTIONS.3.ALL SEWER CONSTRUCTION SHALL BE PER SOUTH
FORT COLLINS SANITATION
DISTRICT STANDARDS SANITARY SEWER DESIGN TECHNICAL CRITERIA MANUAL,LATEST EDITION.4.ALL
WATER FITTINGS AND VALVES ARE ONLY GRAPHICALLY REPRESENTED AND ARE NOT
TO SCALE.5.ALL WATERLINES SHALL HAVE
5.0 - 6.0 FEET OF COVER FROM FINISHED GRADE TO
TOP OF PIPE.6.UTILITY SERVICES
ARE SHOWN IN A SCHEMATIC FASHION ONLY. EXACT LOCATIONS SHALL BE PER THE
REQUIREMENTS OF THE RESPECTIVE UTILITY PROVIDERS, AND ARE
SUBJECT TO CHANGE IN THE FIELD.7.MAINTAIN 10' HORIZONTAL AND 18" VERTICAL
MINIMUM SEPARATION BETWEEN ALL SANITARY SEWER MAINS, WATER MAINS & SERVICES.8.REFER TO
THE PLAT FOR LOT AREAS, TRACT SIZES, EASEMENTS,
LOT DIMENSIONS,UTILITY EASEMENTS, OTHER EASEMENTS, AND OTHER SURVEY INFORMATION.9.LIMITS OF
STREET CUT ARE APPROXIMATE. FINAL LIMITS ARE TO BE DETERMINED IN
THE FIELD BY THE FORT COLLINS ENGINEERING INSPECTOR. ALL REPAIRS
TO BE IN
ACCORDANCE WITH
FORTCOLLINSSTREET
REPAIRSTANDARDS.10.
ALL MANHOLE RIM
ELEVATIONS (EXISTING & PROPOSED)
ARE TO BE
ADJUSTED
TO
14"
BELOW FINISHED GRADE.
IF NECESSARY,
CONE SECTIONS
SHALL BE ROTATED
TO PREVENT LIDS
BEING LOCATED WITHIN
VEHICLE OR BICYCLE
WHEEL PATHS.EXISTING
LOT LINE EASEMENT
LINE SPROPOSED
SEWER SERVICE
WPROPOSED WATER SERVICE
EXISTING
WATER
MAIN PROPOSED WATER
MAIN PROPOSED
STORM SEWER
LEGEND:G T
EXISTING
STORM
SEWER EXISTING
TELEPHONE EXISTING GAS EXISTING SANITARY SEWER
PROPOSED STORM
INLET PROPOSED
CURB & GUTTER
PROPOSED SANITARY
8"
S
S
8"
S
S
8"
S
S
8"
S
S
8" SS
8" SS
8" SS
8" SS
8" SS
8" SS
8" SS
8" SS 8" SS 8" SS 8" SS 8" SS 8" SS 8" SS 8" SS
8"
SS8"
SS8"
SS8"
SS8"
SS8"
SS8"
SS8"
SS8"
SS8"
SS8" SS10"
SS10" SS10"
SS8" W8"
W8" W8"
W8" W8"
W8" W8"
W8" W8"
W8" W8" W8" W8" W8" W8" W 8" W 8" W 8" W 8" W 8" W 8" W 8"
W8"
W 8" W 8" W
8" W8"
W8"
W 8" W
8" W 8"
W 8"
W 8"
W 8"
W 8"
W 8"
W 8"
SS8" W8"
W8" SS8"
SSXXXX X
X X
X XT
TFW
SFSS UDUDUDUDUDUD
UDW
KNOBBY PINE
DRIVE BURLY TREE
DRIVEPROPOSED
8" PVC
WATER
MAIN
PROPOSED SANITARY
CLEAN-
OUT PROPOSED
WATER
METER (
TYP.)
PROPOSED
FIRE
SERVICE (TYP.)
PROPOSED WATER
SERVICE (TYP.)
PROPOSED
SANITARY
SERVICE (
TYP.)
26'FL-FL20'FL-
FL
4.
5'
SIDEWALK
9'
UTILITY
EASEMENT4.
5'
SIDEWALKPROPOSED
FIRE
HYDRANT
PROPOSED
SANITARY
SERVICE (TYP.)
26'FL-
FL EASEMENT
EXCLUSION EASEMENT
EXCLUSION RAIN
GARDEN C RAIN
GARDEN BIOMEDIA AREA
DRAINAGE EASEMENT 9'
U T
I L
I T
Y E A
S E
M
E
N
T
26'EMERGENCY ACCESS
EASEMENT 4.
5' SIDEWALK8" PVC
SANITARY SEWER
HANSEN FARM)
FIRE HYDRANT
HANSEN
FARM)9'
UTILITY EASEMENT
9' UTILITY
EASEMENT
36'FL-
FL59' ROW15"
STORM
DRAIN
HANSEN
FARM)
FIRE HYDRANT
HANSEN FARM)
PROPOSED RAIN
GARDEN OVERFLOW
PIPE 26'
EMERGENCY
ACCESS EASEMENT
8" PVC WATER
HANSEN
FARM)
8" PVC
WATER HANSEN FARM)CONNECT TO EXISTING WATER PROPOSED
AREA DRAIN PROPOSED 2'CURB CHASE PROPOSED AREA
DRAIN PROPOSED 4'
SIDEWALK CULVERT PROPOSED UNDERDRAIN 10"
PVC
SANITARY SEWER HANSEN
FARM)PROPOSED WATERMETER (
TYP.)
NORTH IN
FEET )
1
inch =
ft.Feet02020 20 40 60 MATCH LINE - SEE SHEET C 303CALL 2
BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE
FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES.CALL UTILITY NOTIFICATION
CENTER OF COLORADO Know what'sbelow.before you dig.Call R
C 302UTILITY PLAN 9 KEYMAP NOTES:1.THE SIZE,
TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE
APPROXIMATE WHEN
SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE
CONTRACTOR TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN
THE AREA OF THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL
BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL
BE RESPONSIBLE FOR ALL UNKNOWN UNDERGROUND UTILITIES.2.ALL WATER CONSTRUCTION
SHALL BE
PER FORT COLLINS-LOVELAND WATER DISTRICT STANDARDS, LATEST EDITION, EXCEPT FOR
THE STANDARDS RELATED TO THE WATER SERVICES, WHICH
SHALL BE
PER CITY OF FORT COLLINS STANDARDS,EXCEPT THAT NO MECHANICAL JOINT RESTRAINTS
ARE REQUIRED BETWEEN
FITTINGS UNLESS SPECIFICALLY SHOWN ON THE PLAN OR AS REQUIRED FOR ABNORMAL DEFLECTIONS.3.ALL SEWER
CONSTRUCTION SHALL BE
PER SOUTH FORT COLLINS SANITATION DISTRICT STANDARDS SANITARY SEWER DESIGN TECHNICAL CRITERIA
MANUAL,LATEST EDITION.4.ALL WATER FITTINGS AND VALVES ARE ONLY
GRAPHICALLY REPRESENTED AND ARE NOT TO SCALE.
5.ALL WATERLINES SHALL HAVE 5.0 - 6.0 FEET OF
COVER FROM FINISHED GRADE TO TOP
OF PIPE.6.UTILITY SERVICES ARE SHOWN IN A SCHEMATIC FASHION ONLY. EXACT
LOCATIONS SHALL BE PER THE REQUIREMENTS OF THE
RESPECTIVE UTILITY PROVIDERS, AND ARE SUBJECT TO CHANGE IN THE FIELD.7.MAINTAIN
10' HORIZONTAL AND 18" VERTICAL MINIMUM SEPARATION BETWEEN ALL SANITARY SEWER MAINS, WATER
MAINS & SERVICES.8.REFER TO THE PLAT FOR
LOT AREAS, TRACT SIZES, EASEMENTS, LOT DIMENSIONS,UTILITY EASEMENTS, OTHER EASEMENTS, AND OTHER
SURVEY INFORMATION.9.LIMITS OF STREET CUT ARE APPROXIMATE. FINAL LIMITS
ARE TO BE DETERMINED IN THE FIELD BY THE FORT
COLLINS ENGINEERING INSPECTOR.
ALL REPAIRS
TOBEIN
ACCORDANCEWITHFORT
COLLINS STREET REPAIR
STANDARDS.10.ALL
MANHOLE RIM ELEVATIONS (
EXISTING &
PROPOSED)
ARE
TO BE ADJUSTED
TO 14"
BELOW FINISHED
GRADE. IF NECESSARY,
CONE SECTIONS SHALL
BE ROTATED TO
PREVENT LIDS BEING
LOCATED WITHIN VEHICLE
OR BICYCLE WHEEL
PATHS.EXISTING
LOT LINE
EASEMENT LINE SPROPOSED
SEWER
SERVICE
WPROPOSED WATER SERVICE
EXISTING WATER
MAIN PROPOSED
WATER MAIN PROPOSED
STORM
SEWER
LEGEND:G
T EXISTING STORM SEWER EXISTING TELEPHONE
EXISTING GAS
EXISTING SANITARY
SEWER PROPOSED
STORM INLET
EEEEEEEEEEEEEEEEEEEE16" W16" W16" W16" W16" W16" W16" W16" W16" W16" W16" W16" W16" W16" W16" W16" WCTVCTVCTVCTVCTVCTVCTVCTVCTVCTVCTVCTVCTVCTVCTVCTVCTVCTVCTVCTVCTVCTVCTVCTVCTVCTVCTVCTVCTVCTVCTVCTVCTVCTVCTVCTVCTVCTV8" SS8" SS8" SS8" SS8" SS8" SS8" SS8" SS8" SS8" SS8" SS8" SS8" SS8" SS8" SS8" SS8" SS8"
SS8" SS8"
W
8" W 8"
W 8"
W 8"
W 8" W
8" W
8" W 8"
W 8"
W 8"
W
8" W
8" W
8"
W 8"
W 8" W
8"
W
8" W8"
W8" W8"
W8"
W8" W8"
W8" W8" W8"
W8" W8" W8" W8"
W8"
W8" W8"
W8"
W8" W8"
W8"
W8" W8"
SSFMFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFO16"
W
TTUDUDUDUDS
SWWFFTWISTED
ROOT DRIVE SOUTH
TIMBERLINE ROADBURLY TREE
DRIVEPROPOSED WATER
SERVICE (
TYP.)
PROPOSED
8" PVC
SANITARY SEWER
PROPOSED 8"
PVC WATER
MAIN PROPOSED
FIRE HYDRANT
PROPOSED WATER METER (
TYP.)26'
FL-
FL 4.
5' SIDEWALK4.
5' SIDEWALK9' UTILITY
EASEMENT15' UTILITY &
PUBLICTRAIL ACCESSEASEMENT6' SIDEWALK4.
5' SIDEWALK
EASEMENT EXCLUSION PROPOSED
FIRE SERVICE (
TYP.)
PROPOSED STORM
DRAIN CONNECT TO
EXISTING 8"
PVC WATER MAIN
24'FL-
FL 26'
FL-FL
36'FL-
FL 26'EMERGENCY
ACCESS EASEMENT
4.5' SIDEWALK9'
UTILITY EASEMENT 2'
CONCRETE PAN
HANSEN FARM)
EASEMENT EXCLUSION
RAIN GARDEN
D RAIN
GARDEN
BIOMEDIA
AREA 8"
PVC
SANITARY SEWER
HANSEN
FARM)
8" PVC
WATER HANSEN
FARM)
DETENTION POND
336'
FL-FL
59'
ROW 8"
PVC WATER HANSEN
FARM)
18"
STORM DRAIN
HANSEN FARM)POND OUTLET STRUCTURE HANSEN
FARM)PROPOSED STORM DRAIN 15" STORM DRAIN HANSEN
FARM)PROPOSED RAIN GARDEN OVERFLOW PIPE 8" PVC
SANITARY SEWER HANSEN
FARM)8" PVC WATER HANSEN
FARM)
REMOVED EXISTING FES
CONNECT TO EXISTINGSTORM
DRAIN
PROPOSED 2'
SIDEWALK
CHASE
PROPOSED
2'CONCRETE PAN PROPOSED SANITARY SERVICE (TYP.)BURLY TREE DRIVEEXISTING 16" WATER
PROPOSED UNDERDRAIN PROPOSED SANITARY CLEAN-OUT PROPOSED CURB INLET PROPOSED
AREA INLET NORTH IN FEET )1 inch = ft.Feet02020 20
40 60 MATCH LINE - SEE SHEET C 304 CALL 2 BUSINESS
DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE
FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES.CALL UTILITY
NOTIFICATION CENTER
OF COLORADO Know what'sbelow.before you dig.Call R C
303UTILITY PLAN 10 KEYMAP NOTES:1.THE SIZE, TYPE AND
LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THESE
DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR
TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA
OF THE
WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR
LOCATING ALL UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE
FOR ALL
UNKNOWN UNDERGROUND UTILITIES.2.ALL WATER CONSTRUCTION SHALL BE PER FORT COLLINS-
LOVELAND WATER DISTRICT
STANDARDS, LATEST EDITION, EXCEPT FOR THE STANDARDS RELATED TO THE WATER SERVICES, WHICH SHALL BE PER
CITY OF FORT
COLLINS STANDARDS,EXCEPT THAT NO MECHANICAL JOINT RESTRAINTS ARE REQUIRED BETWEEN FITTINGS
UNLESS SPECIFICALLY SHOWN ON THE PLAN OR AS REQUIRED FOR ABNORMAL
DEFLECTIONS.3.ALL SEWER CONSTRUCTION SHALL BE
PER SOUTH FORT COLLINS SANITATION DISTRICT STANDARDS SANITARY SEWER DESIGN TECHNICAL
CRITERIA MANUAL,LATEST EDITION.4.ALL
WATER FITTINGS AND VALVES ARE ONLY GRAPHICALLY REPRESENTED AND ARE NOT TO SCALE.
5.ALL WATERLINES SHALL HAVE 5.0 - 6.
0 FEET OF COVER FROM FINISHED GRADE TO TOP OF PIPE.6.UTILITY
SERVICES ARE SHOWN IN A SCHEMATIC FASHION ONLY. EXACT LOCATIONS SHALL BE PER
THE REQUIREMENTS OF THE RESPECTIVE UTILITY PROVIDERS, AND
ARE SUBJECT TO CHANGE IN THE FIELD.7.MAINTAIN 10' HORIZONTAL AND 18"
VERTICAL MINIMUM SEPARATION BETWEEN ALL SANITARY SEWER MAINS, WATER MAINS & SERVICES.
8.REFER TO THE PLAT FOR LOT AREAS, TRACT SIZES,
EASEMENTS, LOT DIMENSIONS,
UTILITY EASEMENTS,
OTHEREASEMENTS, AND
OTHERSURVEYINFORMATION.
9.LIMITS OF
STREET CUT ARE
APPROXIMATE. FINAL LIMITS
ARE
TO
BE
DETERMINED IN THE
FIELD BY
THE FORT
COLLINS ENGINEERING INSPECTOR.
ALL REPAIRS TO
BE IN ACCORDANCE
WITH FORT COLLINS
STREET REPAIR STANDARDS.
10.ALL MANHOLE
RIM ELEVATIONS (
EXISTING & PROPOSED)
ARE TO BE
ADJUSTED
TO
14"BELOW FINISHED
GRADE. IF
NECESSARY, CONE
SECTIONS SHALL BE
ROTATED
TO
PREVENTLIDS
BEING LOCATED
WITHIN VEHICLE
OR BICYCLE
WHEEL PATHS.