Loading...
HomeMy WebLinkAboutSTITCH-TECH WAREHOUSE - EXPANSION OF A NON-CONFORMING USE - 16-88B - REPORTS - RECOMMENDATION/REPORT W/ATTACHMENTSITEM NO. 17 • • • PLANNING AND ZONING BOARD MEETING OF May 23, 1988 STAFF REPORT PROJECT: Stitch-Tec, Inc. Expansion of a Non -Conforming Use, #16-88B APPLICANT: Stitch-Tec, Inc. 1800 E. Harmony Road Fort Collins, CO 80525 Charles Lockman, Arlo Deines 1409 Longs Peak Drive Fort Collins, CO 80524 OWNER: Union Pacific Railroad (propertyowner) 1416 Dodge St. Omaha, NE 68179 Charles Lockman, Arlo Deines (building owner) 1409 Longs Peak Drive Fort Collins, CO 80524 PROJECT PLANNER: Sherry Albertson -Clark PROJECT DESCRIPTION: A request to add 57,200 square feet to an existing 60,000 square foot warehouse, located at 1800 E. Harmony Road, zoned condi- tional I-L, Limited Industrial. RECOMMENDATION: Approval. EXECUTIVE SUMMARY: Stitch Tec, Inc. is presently operating an existing warehouse. The site was annexed to the City of Fort Collins, effective April, 1988 and was zoned I-L, Limited Industrial with a PUD condition. The existing warehouse is a non -conforming use, since it was built in Larimer County and was in existence at the time of annexation. Since the proposed expansion is to an existing non -conforming use, the PUD condition on the site would apply only for any future development of the site. Issues identified at the neighborhood meeting on this project relate to buffering noise and visual impacts, operational aspects of the use and storm drainage. All issues have been addressed. The proposal is consistent with the review criteria for non -conforming use expansions and therefore, staff recommends approval. OFFICE OF DEVELOPMENT SERVICES, PLANNING DEPARTMENT 300 LaPorte Ave. • P.O. Box 580 • Fort Collins, Colorado 80522 • (303) 221-6750 Stitch Tee Inc., Lgansion of Non Conforming Use A 8B P & Z Meeting - May 23, 1988 Page 2 COMMENTS: • 1. Background: The surrounding zoning and land uses are as follows: N: FA-1, IP; existing single family S: I, FA-1; existing warehouse E: FA-1; existing single family W: IP; Golden Meadows Industrial Park The site, which is 8.6 acres, was originally developed in Larimer County and was zoned C-Commercial. The site was annexed as Union Pacific South Third No. 2 Annexation and was zoned I-L, Limited Industrial with a PUD condition and is in the city limits as of April 29, 1988. The Planning and Zoning Board also recommended at the March 28 Board review of the annexation and zoning request that a neighborhood meeting be held prior to any further consideration of expansion plans by the Board. 2. Neighborhood Meeting: A neighborhood meeting was held on Thursday, May 5, 1988. A summary of this meeting is attached. Neighborhood concerns generally related to the hours of operation and resulting noise from the operation, buffering the noise and views of the site from the adjacent residences and storm drainage. 3. Non -Conforming Use Expansion Review: In evaluating a proposed non -conforming use expansion, the Board shall determine whether or not the expansion will adversely affect the surrounding properties. For the purpose of review, the Board shall consider the following criteria: (1) The nature of the proposed expansion; (2) The size of the proposed expansion; (3) The difference in the degree of use of the non -conforming use as a result of the proposed expansion; (4) The reasons for the proposed expansion; (5) The overall impact of the proposed expansion on the surrounding property. Nature of the proposed expansion: Stitch Tee., Inc. operates the existing warehouse (as a sub -contractor) to receive rail and truck shipments of cardboard cases of bottles to be used at the Anheuser-Busch Brewery. The cases are unloaded at the warehouse, checked for damage and repaired or replaced and then delivered by truck to the brewery. The rail car deliveries occur on an average of 4-6 cars daily, with an expected high of 8 cars per day. The rail cars are left on a siding, until space is available in the Stitch Tec Inc., Exosion of Non Conforming Use #16* P & Z Meeting - May 23, 1988 Page 3 IDwarehouse for unloading. The cars are shifted to the siding adjacent to the warehouse and unloaded. Once the inspection and repair/replacement is finished, the cases are loaded into trucks that use the existing bays along the south side of the building. The size of the proposed expansion: The size of the proposed expansion would nearly double the existing building size. The existing 60,000 square foot building is 20' high, while the proposed addition is planned at 22' high. The difference in the degree of use of the non -conforming use as a result of the proposed expansion: The use of the site as a warehouse facility would remain. The additional warehouse space would allow unloading of rail cars, as well as loading trucks, at a faster pace. At the present time, trucks are often parked along Harmony Road to wait for space on the site. The addition would incorporate a paved driveway along the west side of the site and a paved truck and employee parking area along the rear of the building. Trucks waiting to be loaded would be parked on the rear of the site. An additional four truck bays are planned. The applicant has stated that rail traffic would increase from an average of 4-6 cars per day to 8 cars per day and that truck traffic, which is presently at one truck leaving the site every 2 hours (24 hours per day), would remain the same. The reasons for the proposed expansion: Additional warehouse space for loading and storing and additional truck bays and parking area are needed. • The overall impact of the proposed expansion on the surrounding property: The proposed expansion would double the size of the existing building and provide additional parking areas and truck bays at the rear of the site. The building height for the addition is planned at 2' higher than the existing building. Residents expressed concern that noise from the shifting of rail cars and from truck traffic is a current problem, as is storm drainage. Storm drainage concerns are being addressed through a drainage report and plan and must meet city requirements for on -site$ detention. Noise and visual buffering are being addressed through the provision of berming and landscape plantings along the north and eastern propertyline. Residents have requested additional plantings along the eastern propertyline and have indicated willingness to allow plantings on or inside their pfopertylines, where space is inadequate for plantings. The proposed berming and plantings should help to buffer much of the noise from the rail line, as well as from truck traffic. Fencing the propertylines to the north and east was presented to the residents; however, their preference was for vegetational screening. Non -conforming use expansions must meet zoning code requirements or obtain variances from the ZBA. In this case, all code requirements, have been met, including the provision of interior parking lot landscaping. The code also requires a 30' setback from the propertyline, adjacent to a zoning district line. The proposed addition has been shifted back to meet this requirement and additional landscaping has been provided. 0Stitch Tec Inc., pansion of Non Conforming Use 88B P & Z Meeting - May 23, 1988 Page 4 RECOMNIENDATION: Overall, the staff believes that the proposed expansion will not adversely affcct the surrounding properties. While the size of the expansion is significant, it's overall impact, in terms of additional truck and rail traffic, is not. Storm drainage concerns have been resolved. In addition, noise and visual bufferings are being addressed through the building setback and buffering with berms and vegetation. The proposed expansion is justified in terms of improving the efficiency and output of the existing facility. Staff recommends approval. Q f_ • • 0 ITEM STITCH -TECH WAREHOUSE EXPANSION Non Conforming Use NUMBER 16-886 Hollontlls o, ew o3AOtlddO By.l ��dw� 3`Ia NtlId 91ri m S N 0 I S I n 3 tl iscc-zeslmn acw boa 'stlnwa so. 'aaans sa.o.x .a no�+++wae aa�oH�avr^ •aryl � H�1 •li?111ri sao�CananS puarsoan&r3&�rrtzo-, :+ ,n B9-L-IB HOiU♦S 4n 1avaH1^oa aNn Mills -- -s-1'N !.h'w40 1s1M db�� �N�W�bh N� .oL'4f M,�4.Yfo.kBv .a a VA Po.�� 6'fc •�aY as o� /• a,14.na oo.r �� .oroo9 aniwsoH—oZ i 9HCIaVd i Bnlad i'NNdhtl �4�X4-, m.ona ¢� S g �S O o 3 y .A p Y A Z s LL � r a' • ' mN too f � x oJ= � � o N Mpg �33E'E=:=g"sue"se�gR� � J � �3�6: ��;858y!•e �=yg� Xa P•$�S�n "Aa_�_ oniaava fr.b+e �roi �' o � .��$; .s$oFm48sE�:. av 4fN1401 �� of�aara .ai as ,a aol'm-� nn�aa+a aatroa: iuc4 z i 3 1 O o I I 1 YQ +; a� , % .o " _ �., _._~ r____« ....... . . . �_�& �+ S��� . ,G , 0 1p s 0 NEIGHBORHOOD MEETING Stitch Tech, Inc. Non -Conforming Use Expansion On Thursday, May 5, 1988 at 7:00 P.M. in the Media Center of Shepardson School, a neighborhood meeting was held to discuss the proposed expansion to an existing non -conforming use for Stitch Tech, Inc. Attending this meeting were Dick Rutherford (representing the building owners), Ken Waido (Chief Planner), Linda Hopkins (representing the City of Fort Collins) and Project Planner Sherry Albertson -Clark. Thirteen residents/propertyowners also attended this meeting. Introductions were given and an overview of the purpose of the meeting was provided by Sherry Albertson -Clark. Dick Rutherford then gave a brief pre- sentation on the proposed expansion to the Stitch Tech warehouse. A question and answer period followed, at which time the following comments/concerns were expressed by the residents: Operation/noise 1. What would the hours of operation be for the rail car delivery and shifting of rail cars? 2. Can the neighborhood have input on the hours of operation and can the Planning and Zoning Board regulate the hours of operation? 3. Residents expressed concern over the noise coming from trucks load- ing/unloading and the hours during which this occurs. 4. Where are new truck bays located? 5. At what point would a PUD be required for this site? 6. What is the ownership of the site/building? 7. Residents expressed concern that outside storage not be permitted. 8. Who has the responsibility to maintain the grounds? 9. Is there enforcement for weed control? Neighborhood Me* I — Stitch Tech Page 2 10. Residents prefer landscaping and berms for sound buffering over fencing. 11. Are there any plans for exhaust fans, heating or air conditioning (witli respect to noise)? Drainage I. How is the existing drainage situation going to be addressed (as well as the new situation)? 2. Will the drainage report take into consideration the existing problems? 3. Will this affect off -site drainage problems? 4. How would the detention area be graded? Building Height 1. Residents expressed concern that the new expansion is higher than the existing building. 2. Residents expressed concern that view of the mountains would be lost. 3. Residents asked that additional landscaping be provided along the cast propertyline of Stitch Tech and indicated a willingness to allow plantings on their own properties (due to lack of space between building and proper- tyline). General 1. Who is the applicant, whom do they work for? 2. Residents asked for a clarification of the zoning. 3. Residents expressed concern that if this tenant leaves, a number of smaller tenants could go into such a large building. 4. Residents asked for clarification of when the PUD will apply to this site. 5. Why isn't Timberline Lane shown on the maps? 6. Why is there so little landscaping shown along the east edge of the site? 7. Are there any future plans for the area on the northern end of the site? 8. Residents. expressed concern over the existing traffic/safety situation at Timberline and Harmony Road. 9. Is there a way to control the hours of construction? Neighborhood Mee* f — Stitch Tech Page 3 0 10. Can the Planning and Zoning Board limit the hours of construction? 11. Are there any chemicals, cleaners, toxic materials used in this warchouse? At the end of the question/answer period, Sherry gave a summary of the next steps that would occur prior to the Planning and Zoning Board review of this project on May 23, 1988. The meeting adjourned at 8:30 P.NI. In